Forwards Request for Addl Info Re Decommissioning Plan, Including Number of Survey Measurements to Be Taken & Plans for Monitoring Airborne Radioactivity
ML20248J995
Person / Time
Site: Berkeley Research Reactor
Issue date: 04/06/1989
From: Alexander Adams
Office of Nuclear Reactor Regulation
To: Fowler T
CALIFORNIA, UNIV. OF, BERKELEY, CA
References
NUDOCS 8904170177
Download: ML20248J995 (4)


Text

-

N ...

- cApril'6, 1989.

$4 . D:cket No. 50-224.

Dr. T. Kenneth Fowler, Reactor Administrator.

3 University of California at Berkeley Department of Nuclear Engineering -

' Berkeley,' California 94720

Dear Dr. Fowler:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ,

We are continuing our review of the Berkeley decommissioning plan tha't was- ,

' submitted on February 10,.1988, as supplemented on January 31, 1989. 'During.

~ our review of the-responses you submitted to our request for additional-information dated December.14,.1988 ~ questions have arisen for which we require-additional.information and; clarification.Please provide responses to the enclosed Request:for- Additionhl Information within' 30 days of the date of this letter. Following receipt:of the additional information we will continue our

evaluation of the plan. JIf you have 'any. questions regarding this review, please contact me at~(301) 492-1121.

The reporting and/or recordkeeping requirements contained in this letter

' affect fewer than ten respondents; therefore; OMB clearance.is not. required under P. L.95-511.

Sincerely,

/s/

Alexander. Adams, 'Jr. , Project Manager Standardization and Non-Power Reactor Prcject Directorate.

Division of Reactor Projects.- III, IV, LY and Special ProjectsL Office of Nuclear Reactor Regulation ,

Enclosure:

As stated cc:.:See'next page DISTRIBUTION: i DocRet Ulad .i

? NRC*&"L'Oca l"PDRs  !

PDSNP R/F i EHylton'  ;

AAdams >

EJordan Sf0/

BGrimes OGC /g ACRS.(10) f i

(LTR T0.DR. T. F0WLER) i a i StiP PM:PD D:PDSNP cp on AAda CMiller 03 /89; 03Ap 9 Qh/h/89 .

8904170177 890406 PDR ADOCK 05000224 q m- _1 PNU .j

f, $.a aiog ,

' Do . UNITED STATES -

'(

g.

g

.g- NUCLEAR REGULATORY COMMISSION -

~(> -g ;E. WASHINGTON, D. C. 20555 g: April 6, 1989-Docket No. 50-224 a1 i

Dr. T. Kenneth Fowler, P.eactor Administrator .,

' University;of California at Berkeley i Department of Nuclear Engineering Berkeley, California 94720

Dear Dr. Fowler:

SlJBJECT:. REQUEST FOR ADDITIONAL INFORMATION We are continuing our review of the Berkeley decommissioning plan that was 1 submitted on February 10, 1988, as supplemented on January 31, 1989. During 1 our review of the responses you submitted to our request for additional-

.information' dated December 14, 1988 questions have arisen for which we require l ,

H additional information and clarification. Please provide responses to the enclosed Request for Additional Information within 30 days of the date of this-letter. Following receipt of the additional information.we'will. continue our evaluation of the plan. If you have any questions regarding this review,.  !

.pleasecontactme'at'(301)492-1121.

The reporting and/or recordkeeping requirements-contained in this letter affect fewer than ten respondents; therefore; OMB clearance is not required under P. L.'95-511.

Sincerely, h& /-

/

l Alexander Adams, J ., oject Manager 1 Standardization a d n-Power . . .

Reactor Project rectorate ]

Division of Reactor Projects III, IV, ,

V and Special Projects  ?

Office of Nuclear Reactor Regulation .!

Enclosure:

i As stated ]

L' cc: Sec next page l

l f

1; 1

l

1 ...

4 o ,

ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION UNIVERSITY OF CALIFORNIA, BERKELEY DOCKET NO. 50-224

1. Your answer to our question 21 states the criteria under which equipment will be disposed of as radwaste. The use of the word "or"'between the-criteria could be misinterpreted to mean that you will pick one of the two criteria to test against. Please confirm that equipment will be.

tested.against both criteria and that if it meets either (or both), it will be disposed as radwaste.

2. Your answer to our question 25 describes periodic radiation measurements that will be taken during the decommissioning process. You state that you will monitor airborne radioactivity continuously with samples analyzed weekly. Please provide additional details about your' plans for monitoring airborne radioactivity.
3. Your. answer to our question 31 provides details on the survey instruments to'be used to make 5 uR/hr above background measurements needed to justify license termination by'the NRC. Please provide additional information on number of- survey measurements to be taken, the survey instruments to be used, and why the survey instrument is appropriate to show that the 5 uR/hr limit is not exceeded.-

1 i

i l=

(

)

i i

l' . ,

.s

~ University 'of. California Docket No. 50-224' ,

. . at' Berkeley, .;

c ,

t cc: : California. Department of Health ATTN: Chief, Environmental Radiation Control Unit Radiological Health Section 714 P. Street, Room 498 Sacramento, California' 95814 Mr. Tek' Lim Reactor Supervisor Department.of Nuclear Engineering University of California at Berkeley College ~of Engineering Berkeley; California ' 94720 Adjudicatory File (2)-

Atixnic Safety and Licensing Board Panel Docket

' U.S. - Nuclear Regulatory Commission LWashington, D.C. 20555 i