Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205B8961999-03-25025 March 1999 Forwards Insp Rept 50-326/99-201 on 990223-25.No Violations Noted.Various Aspects of Reactor Operations,Maint, Engineering Programs & Security Were Inspected ML20202A6841999-01-22022 January 1999 Forwards Amend 4 to License R-116 & Safety Evaluation.Amend Provides Surveillance Requirement Applicable to Shutdown Conditions,Air Effluent Release Limits Consistent with Current 10CFR20 & Clarifying,Editorial Changes ML20197J7101998-12-0707 December 1998 Responds to Recent Telcon in Which NRC Requested Clarification of Few Items Re Request for Amend to TS for Univ of Ca,Irvine Triga Reactor ML20151Z2901998-09-17017 September 1998 Forwards RAI Re Changes to Univ of California,Irvine Triga Research Reactor TSs for Surveillances During Shutdown Conditions Submitted on 980824.Response Requested within 60 Days of Date of Ltr ML20217E9371998-03-26026 March 1998 Forwards Insp Rept 50-326/97-201 on 971208-11 of Triga Research Reactor.No Significant Safety Issues Were Identified ML20199L6461997-11-29029 November 1997 Forwards Licensee Rept of Items of TS non-compliance & Facility Annual Rept for 960701-970630 ML20199L6571997-11-29029 November 1997 Informs of Several Violations of TS at Facility.Corrective Actions:Full Insps & Recalibrations Have Been Carried Out & Specific Schedule Established & Posted in Facility Detailing Dates of Required Surveillance Activities Projected ML20100E5021996-02-12012 February 1996 Responds to Violations Noted in License R-116.Corrective Actions:New Channel Instruments Designed to Provide Normally Closed Set of Contacts Initiated by bi-stable,providing Same Scram & Interlock Functions as Equipment ML20094S3951995-11-29029 November 1995 Informs of Omissions Found During Review of Records in Conjunction w/on-site Insp by Region IV Re Implementation of Operator Requalification Plan ML20091L3721995-08-13013 August 1995 Forwards Univ of CA Irvine Nuclear Reactor Facility Annual Rept for Jul 1994 - June 1995. Error Identified in Distribution of Previous Annual Rept.Rept for Jul 1993 - June 1994 Encl.W/O Jul 1993 - June 1994 Rept ML20065L7601994-04-12012 April 1994 Informs That Reactor Operations Committee for Facility Failed to Meet in Period 930624-1217,in Violation of Requirements in TS Section 6.2f Due to Lack of Urgent Business,Heavy Staff Teaching Loads & Busy Schedules ML20058K0841990-11-26026 November 1990 Advises of Changes Re Identity of Individuals in Administration Chain ML20065N0701990-11-19019 November 1990 Forwards Final Orau 90/K-53, Confirmatory Radiological Survey of Berkeley Research Reactor Facility Univ of CA at Berkeley Berkeley,Ca ML20217A4391990-11-12012 November 1990 Informs of Contaminated Soil Found on Ivy Beds Outside of Licensed Boundary During NRC Survey During Wk of 900716. Contaminated Soil Removed ML20058J0111990-11-0909 November 1990 Ack Receipt of Transmitting Rev 2 to Physical Security Plan & Supplemental Info Re Performance Characteristics of Intrusion Alarm Sys.Changes Acceptable IR 05000326/19900021990-07-24024 July 1990 Forwards Safeguards Insp Rept 50-326/90-02 on 900709-10.No Violations or Deviations Identified.Rept Withheld Per 10CFR2.790 ML20055G9271990-07-19019 July 1990 Provides Decommissioning Statement for Facility.Revised Estimates Will Be Reported to Commission at Intervals Not to Exceed 5-yrs ML20043H2191990-06-0505 June 1990 Forwards Updated Version of Physical Security Plan.Alarm Reporting Sys Redescribed to Agree W/Changes in Instrumentation Made Over Last 2 Yr Period.W/O Encl ML20012D1401990-02-27027 February 1990 Informs That Annual Rept for Reactor Operation for 1989 Will Not Be Submitted.Decommissioning Final Rept & Termination Radiation Survey Results Will Be Submitted to NRR in Washington,Dc on Apr 1990 ML19354E6331990-01-18018 January 1990 Responds to NRC 891222 Ltr Re Violations Noted in Insp of License R-116.Corrective Actions:All 13 Required Aspects for Each Licensed Individual Will Be Examined on Single Day & Retraining Performed Until Deficient Item Correct ML20005G1241989-12-18018 December 1989 Responds to Violations Noted in Exam Rept 50-326/OL-89-01. Corrective Action:Use of Lower Ranges of Linear Channel Will Be Fully Investigated & Mode Switch Electrical Transients Will Be Cleaned & Examined ML19324B4361989-10-25025 October 1989 Responds to NRC 890927 Ltr Re Violations Noted in Insp of License R-116.Corrective Actions:Reactor Daily Startup Checklist Modified to Require Reactor Operators to Verify Completion & Signoff of Appropriate Checklists ML19332D2091989-10-12012 October 1989 Discusses QA for Berkeley Research Reactor Decommissioning. Reg Guide 2.5 Provides Adequate and Relevant Regulatory Basis for Research Reactor Removal Project QA Program ML20248F3081989-09-29029 September 1989 Advises NRC of Proposed Changes in Decommissioning Organization Personnel,Functions & Responsibilities.Bj Mann & Rs Patenaude Resumes Encl ML20248D7371989-09-27027 September 1989 Forwards Insp Rept 50-326/89-01 on 890828-31 & Notice of Violation.Util Requested to re-evaluate Level of Mgt Attention Necessary to Assure Continued Safe Operations ML20247F9561989-09-12012 September 1989 Forwards Order Authorizing Dismantling of Facility & Disposition of Component Parts for License R-101,per 880108 Application & 890131 & 0414 Ltrs.Environ Assessment & Finding of No Impact & Safety Evaluation Also Encl ML20246P4751989-09-0505 September 1989 Forwards Notice of Environ Assessment & Finding of No Significant Impact Re 880108 Request for Authorization to Dismantle & Dispose of Component Parts ML20245H3081989-08-0101 August 1989 Advises That Return & Transfer of Triga III Fuel to DOE or DOE Designated Facilities Completed ML20247H8781989-07-24024 July 1989 Advises That Senior Operator Licensing Written Exams & Operating Exams Scheduled for 891025 & 26-27,respectively. W/O Stated Encls,Including List of Ref Matl Requirements to Be Submitted to NRC by 890911 IR 05000224/19890011989-07-13013 July 1989 Forwards Safeguards & Radiological Protection Insp Rept 50-224/89-01 on 890701 & 06.No Violations Noted.Rept Withheld (Ref 10CFR2.790(d)) ML19324B4391989-05-0505 May 1989 Informs That Reactor Operations Committee for Univ of California,Irvine Nuclear Reactor Facility Failed to Meet During 880818-890131,in Violation of Tech Specs,Due to Routine Operations Discontinued,Including Staff Reduction ML20245D1321989-04-14014 April 1989 Responds to 890406 Request for Addl Info Re Facility Decommissioning Plan.Exposure Rate Measurements Will Be Made W/Gamma Scintillation Detector & Pressurized Ionization Chamber ML20248J9951989-04-0606 April 1989 Forwards Request for Addl Info Re Decommissioning Plan, Including Number of Survey Measurements to Be Taken & Plans for Monitoring Airborne Radioactivity ML20247N5291989-03-14014 March 1989 Forwards 1988 Annual Rept.W/O Encl ML20195J9821988-11-30030 November 1988 Forwards Request for Addl Info Re 881010 Application for Amend to License R-101.Response Requested within 30 Days ML20206G2871988-11-10010 November 1988 Informs of Change in Arrangements for Emergency Care Re Emergency Response Plan for Facility.Alta Bates Hosp in Berkeley Will Provide Emergency Svcs for Contaminated Patients.Revised Pages to Plan Encl ML20205T3061988-11-0303 November 1988 Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region V ML20205T3411988-11-0303 November 1988 Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region V ML20205L0571988-10-18018 October 1988 Approves 880609 Request for Approval of Transportation Route for Spent Reactor Fuel from Berkeley,Ca to Idaho Falls,Id.Route Encl ML20154N8791988-09-23023 September 1988 Advises That Rev 3 to Operator Requalification Program Submitted on 880721 Meets Requirements of Regulations & Acceptable ML20151U7881988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status ML20151U7581988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status.If Operator Goes from Licensed to Nonlicensed Position W/Possibility of Reassignment to Licensed position,50.74 Does Not Apply ML20207E6771988-08-0808 August 1988 Forwards Rev 3 to Facility Requalification Program,Per 880101 Termination of Operation of Reactor ML20153A8931988-07-0505 July 1988 Forwards Amend 5 to License R-101 & Safety Evaluation.Amend Allows Surveillance Requirements That Involves Raising Control Rods to Be Postponed If Reactor Not in Operation for Period of Time That Causes Surveillance to Be Missed ML20150B2101988-06-24024 June 1988 Ack Receipt of Advising NRC of Univ Intent to Prepare Environ Impact Rept Re Decommissioning & Removal of Reactor ML20150A7871988-06-22022 June 1988 Informs of Change in Arrangement Re Emergency Response Plan for Univ of California Triga Mark II Berkeley Research Reactor.Plan Now Calls Upon Herrick Hosp to Provide Emergency Svcs for Contaminated Patients ML20151D7941988-06-22022 June 1988 Informs of Change in Arrangements for Emergency Care Re Emergency Response Plan for Univ of California Triga Mark III Berkeley Research Reactor. Alta Bates Hosp Will Honor Existing Agreement W/Herrick Hosp ML20151A8161988-06-0909 June 1988 Requests Advance Route Approval as Required,Per 10CFR73.37(b)(7) ML20155H4331988-06-0303 June 1988 Partial Response to FOIA Request for Documents.Forwards App E Documents.App D & E Documents Available in PDR ML20155C4641988-05-31031 May 1988 Forwards Svc List Utilized by NRC in Proceeding,Per Wolfe Request.Svc List Should Be Modified to Reflect Subj Matter of Pleading & Person Serving Pleading.W/Certificate of Svc 1999-03-25
[Table view] Category:EDUCATIONAL INSTITUTION TO NRC
MONTHYEARML20055G9271990-07-19019 July 1990 Provides Decommissioning Statement for Facility.Revised Estimates Will Be Reported to Commission at Intervals Not to Exceed 5-yrs ML20043H2191990-06-0505 June 1990 Forwards Updated Version of Physical Security Plan.Alarm Reporting Sys Redescribed to Agree W/Changes in Instrumentation Made Over Last 2 Yr Period.W/O Encl ML20012D1401990-02-27027 February 1990 Informs That Annual Rept for Reactor Operation for 1989 Will Not Be Submitted.Decommissioning Final Rept & Termination Radiation Survey Results Will Be Submitted to NRR in Washington,Dc on Apr 1990 ML19354E6331990-01-18018 January 1990 Responds to NRC 891222 Ltr Re Violations Noted in Insp of License R-116.Corrective Actions:All 13 Required Aspects for Each Licensed Individual Will Be Examined on Single Day & Retraining Performed Until Deficient Item Correct ML20005G1241989-12-18018 December 1989 Responds to Violations Noted in Exam Rept 50-326/OL-89-01. Corrective Action:Use of Lower Ranges of Linear Channel Will Be Fully Investigated & Mode Switch Electrical Transients Will Be Cleaned & Examined ML19324B4361989-10-25025 October 1989 Responds to NRC 890927 Ltr Re Violations Noted in Insp of License R-116.Corrective Actions:Reactor Daily Startup Checklist Modified to Require Reactor Operators to Verify Completion & Signoff of Appropriate Checklists ML19332D2091989-10-12012 October 1989 Discusses QA for Berkeley Research Reactor Decommissioning. Reg Guide 2.5 Provides Adequate and Relevant Regulatory Basis for Research Reactor Removal Project QA Program ML20248F3081989-09-29029 September 1989 Advises NRC of Proposed Changes in Decommissioning Organization Personnel,Functions & Responsibilities.Bj Mann & Rs Patenaude Resumes Encl ML20245H3081989-08-0101 August 1989 Advises That Return & Transfer of Triga III Fuel to DOE or DOE Designated Facilities Completed ML19324B4391989-05-0505 May 1989 Informs That Reactor Operations Committee for Univ of California,Irvine Nuclear Reactor Facility Failed to Meet During 880818-890131,in Violation of Tech Specs,Due to Routine Operations Discontinued,Including Staff Reduction ML20245D1321989-04-14014 April 1989 Responds to 890406 Request for Addl Info Re Facility Decommissioning Plan.Exposure Rate Measurements Will Be Made W/Gamma Scintillation Detector & Pressurized Ionization Chamber ML20247N5291989-03-14014 March 1989 Forwards 1988 Annual Rept.W/O Encl ML20206G2871988-11-10010 November 1988 Informs of Change in Arrangements for Emergency Care Re Emergency Response Plan for Facility.Alta Bates Hosp in Berkeley Will Provide Emergency Svcs for Contaminated Patients.Revised Pages to Plan Encl ML20207E6771988-08-0808 August 1988 Forwards Rev 3 to Facility Requalification Program,Per 880101 Termination of Operation of Reactor ML20151D7941988-06-22022 June 1988 Informs of Change in Arrangements for Emergency Care Re Emergency Response Plan for Univ of California Triga Mark III Berkeley Research Reactor. Alta Bates Hosp Will Honor Existing Agreement W/Herrick Hosp ML20150A7871988-06-22022 June 1988 Informs of Change in Arrangement Re Emergency Response Plan for Univ of California Triga Mark II Berkeley Research Reactor.Plan Now Calls Upon Herrick Hosp to Provide Emergency Svcs for Contaminated Patients ML20151A8161988-06-0909 June 1988 Requests Advance Route Approval as Required,Per 10CFR73.37(b)(7) ML20154H9311988-05-13013 May 1988 Informs That Univ of California Has Decided Not to Enter Opposition to City of Berkeley,Ca Petition to Intervene & Request for Hearing in Proceeding.Declaration of Svc Encl ML20151G4091988-04-0404 April 1988 Responds to NRC Re Violations Noted in Insp Rept 50-326/88-01.Corrective Actions:Review Sheet Being Created to Assure Review of All Checklists During Insps & Reactor Supervisor & Radiation Safety Officer Reviewed Issues ML20151D4311988-01-12012 January 1988 Discusses Changes in Reactor Surveillance,Per Termination of Operation on 880101 ML20147D7441988-01-0808 January 1988 Forwards Environ Rept for Triga Mark III & Decommissioning Plan for Triga Mark III ML20238B1941987-08-20020 August 1987 Forwards Mn Christensen to Author Informing of Steps Taken to Correct Violations Noted in NRC . Corrective Actions:Frequency of Reactor Operations Audits Corrected & Personnel Advised of Reporting Requirements ML20154S1501986-03-24024 March 1986 Forwards Revised Pages 8 & 10 to 1985 Annual Rept Reflecting Revised Max Concentration at Stack Discharge ML20137B7751985-10-28028 October 1985 Responds to NRC Re Violations Noted in Insp Rept. Corrective Actions:Reactor Operations Committee Established Firm Schedule for Holding Meetings & Senior Reactor Operator Exams Will Be Conducted ML20099B9231984-11-0909 November 1984 Advises That 840813 Revised Upgraded Emergency Plan Implemented on 841109 ML20096C6041984-08-24024 August 1984 Authorizes Th Lim to Sign Notarized Ltr Transmitting Amended Emergency Plan ML20096C5921984-08-24024 August 1984 Forwards Revised Emergency Response Plan for Univ of California Triga Mark II Berkeley Research Reactor. Plan Will Be Fully Implemented 120 Days from Approval Date ML20095E9131984-08-20020 August 1984 Ack Receipt of Re Proposed Research Reactor Emergency plan.Sixty-day Extension of Deadline for Response to Questions Raised by NRC Requested ML20081J1571983-10-31031 October 1983 Requests All Interested NRC Branches Be Made Aware of Changes in Mailing Address for Univ.Mail Continues to Be Sent to Old Mailing Address Which Delays Internal Distribution ML20024D1081983-07-25025 July 1983 Notifies That Th Pigford Will Replace Sn Kaplan as Administrator,Effective 830801 ML20085E2601983-06-21021 June 1983 Forwards Public Version of Revised Pages & New Attachment to Emergency Plan,In Response to ML20071E8351983-03-0808 March 1983 Forwards Berkeley Research Reactor Annual Rept of Operations ML20065B4901983-02-0202 February 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-326/82-04.Corrective Actions:Reactor Operations Committee Met on 821202 & 830107.Future Meetings Will Be Held on Schedule ML20066G4131982-11-0202 November 1982 Forwards Public Version of Revision 0 to Emergency Plan ML20028A2021982-10-25025 October 1982 Forwards Public Version of Emergency Response Plan ML20055C1551982-08-0606 August 1982 Notifies of Change in Administrative Personnel.Future Official Communications Re Licensing Matters Should Be Addressed to Wj Lillyman,Vice Chancellor ML20062D7871982-07-30030 July 1982 Forwards Annual Rept for Jul 1981-June 1982,License:R-116 ML20105B3561982-06-0101 June 1982 Submits Rept Re Security Incident in Response to 10CFR73.71(c) Detailing Loss of Security Effectiveness, Responses Made & Efforts to Revise Sys & Procedures to Reduce Chance of Recurrence.Portions Deleted ML20054L8021982-05-0707 May 1982 Responds to NRC Re Violations Noted in IE Insp Rept.Corrective Actions:Std Operating Procedures Revised & Fuel Element Handling Tool Will Be Padlocked & Key Retained by Reactor Supervisor ML20042B7911982-03-18018 March 1982 Forwards Berkeley Research Reactor Annual Rept of Operations,Jan-Dec 1981. ML20009B0461981-07-0707 July 1981 Amends 810611 Request for Change in Feb 1964 SAR Pages 6-8, Lines 21,22, & 23 & Pages 6-9,Line 1.Clarifies Types of Personnel Working Around Reactor Who Must Have Physical Exams Every 24 Months ML20005B6011981-06-30030 June 1981 Forwards Response to 810619 Request for Addl Info Re Revision 1 to Physical Security Plan.Info Withheld (Ref 10CFR2.790) ML20004F1291981-06-11011 June 1981 Requests Changes to Feb 1964 Sar,Mandating Physical Exam for Operators & Supervisors Every 24 Months,But at Intervals Not to Exceed 28 Months.Change Does Not Constitute Unreviewed Safety Question ML19343D3371981-04-27027 April 1981 Forwards Revised Physical Security Plan for License R-116. Plan Withheld (Ref 10CFR2.790) ML19341C4401980-12-24024 December 1980 Responds to NRC 801208 Ltr Re Violations Noted in IE Insp Rept 50-326/80-02.Corrective Actions:Escort Provided to Any Person Required to Perform Work in Facility Which Is Not Directly Associated with Radiation Producing Device ML20148K0891980-11-24024 November 1980 Forwards Executed Amends 8 to Indemnity Agreements E-16 & E-53.Amend 8 Supersedes Amend 7,therefore Execution of Superseded Amends Not Necessary ML19340C1721980-11-0505 November 1980 Repts Two Changes in Administrative Personnel & Const & Occupation of Addl Living Spaces on Campus.Forwards Map Showing Current Status of Residential Occupancy.Const Is in Accordance W/Mar 1968 SAR ML19340C1091980-10-31031 October 1980 Informs That Endorsements,Indemnity Agreements or Most Current Amends Have Not Been Received & Requests Provision of All Referenced Agreements ML19344E4581980-08-25025 August 1980 Forwards Revised Page 15 of Proposed Security Plan.Plan Withheld (Ref 10CFR2.790) ML19344F1411980-08-21021 August 1980 Responds to NRC 800812 Ltr Re Violations Noted in IE Insp Rept 50-326/80-01.Corrective Actions:Operating Procedure Revised to Include Annual Review of Reactor Operational Records 1990-07-19
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20197J7101998-12-0707 December 1998 Responds to Recent Telcon in Which NRC Requested Clarification of Few Items Re Request for Amend to TS for Univ of Ca,Irvine Triga Reactor ML20199L6461997-11-29029 November 1997 Forwards Licensee Rept of Items of TS non-compliance & Facility Annual Rept for 960701-970630 ML20199L6571997-11-29029 November 1997 Informs of Several Violations of TS at Facility.Corrective Actions:Full Insps & Recalibrations Have Been Carried Out & Specific Schedule Established & Posted in Facility Detailing Dates of Required Surveillance Activities Projected ML20100E5021996-02-12012 February 1996 Responds to Violations Noted in License R-116.Corrective Actions:New Channel Instruments Designed to Provide Normally Closed Set of Contacts Initiated by bi-stable,providing Same Scram & Interlock Functions as Equipment ML20094S3951995-11-29029 November 1995 Informs of Omissions Found During Review of Records in Conjunction w/on-site Insp by Region IV Re Implementation of Operator Requalification Plan ML20091L3721995-08-13013 August 1995 Forwards Univ of CA Irvine Nuclear Reactor Facility Annual Rept for Jul 1994 - June 1995. Error Identified in Distribution of Previous Annual Rept.Rept for Jul 1993 - June 1994 Encl.W/O Jul 1993 - June 1994 Rept ML20065L7601994-04-12012 April 1994 Informs That Reactor Operations Committee for Facility Failed to Meet in Period 930624-1217,in Violation of Requirements in TS Section 6.2f Due to Lack of Urgent Business,Heavy Staff Teaching Loads & Busy Schedules ML20058K0841990-11-26026 November 1990 Advises of Changes Re Identity of Individuals in Administration Chain ML20065N0701990-11-19019 November 1990 Forwards Final Orau 90/K-53, Confirmatory Radiological Survey of Berkeley Research Reactor Facility Univ of CA at Berkeley Berkeley,Ca ML20217A4391990-11-12012 November 1990 Informs of Contaminated Soil Found on Ivy Beds Outside of Licensed Boundary During NRC Survey During Wk of 900716. Contaminated Soil Removed ML20055G9271990-07-19019 July 1990 Provides Decommissioning Statement for Facility.Revised Estimates Will Be Reported to Commission at Intervals Not to Exceed 5-yrs ML20043H2191990-06-0505 June 1990 Forwards Updated Version of Physical Security Plan.Alarm Reporting Sys Redescribed to Agree W/Changes in Instrumentation Made Over Last 2 Yr Period.W/O Encl ML20012D1401990-02-27027 February 1990 Informs That Annual Rept for Reactor Operation for 1989 Will Not Be Submitted.Decommissioning Final Rept & Termination Radiation Survey Results Will Be Submitted to NRR in Washington,Dc on Apr 1990 ML19354E6331990-01-18018 January 1990 Responds to NRC 891222 Ltr Re Violations Noted in Insp of License R-116.Corrective Actions:All 13 Required Aspects for Each Licensed Individual Will Be Examined on Single Day & Retraining Performed Until Deficient Item Correct ML20005G1241989-12-18018 December 1989 Responds to Violations Noted in Exam Rept 50-326/OL-89-01. Corrective Action:Use of Lower Ranges of Linear Channel Will Be Fully Investigated & Mode Switch Electrical Transients Will Be Cleaned & Examined ML19324B4361989-10-25025 October 1989 Responds to NRC 890927 Ltr Re Violations Noted in Insp of License R-116.Corrective Actions:Reactor Daily Startup Checklist Modified to Require Reactor Operators to Verify Completion & Signoff of Appropriate Checklists ML19332D2091989-10-12012 October 1989 Discusses QA for Berkeley Research Reactor Decommissioning. Reg Guide 2.5 Provides Adequate and Relevant Regulatory Basis for Research Reactor Removal Project QA Program ML20248F3081989-09-29029 September 1989 Advises NRC of Proposed Changes in Decommissioning Organization Personnel,Functions & Responsibilities.Bj Mann & Rs Patenaude Resumes Encl ML20245H3081989-08-0101 August 1989 Advises That Return & Transfer of Triga III Fuel to DOE or DOE Designated Facilities Completed ML19324B4391989-05-0505 May 1989 Informs That Reactor Operations Committee for Univ of California,Irvine Nuclear Reactor Facility Failed to Meet During 880818-890131,in Violation of Tech Specs,Due to Routine Operations Discontinued,Including Staff Reduction ML20245D1321989-04-14014 April 1989 Responds to 890406 Request for Addl Info Re Facility Decommissioning Plan.Exposure Rate Measurements Will Be Made W/Gamma Scintillation Detector & Pressurized Ionization Chamber ML20247N5291989-03-14014 March 1989 Forwards 1988 Annual Rept.W/O Encl ML20206G2871988-11-10010 November 1988 Informs of Change in Arrangements for Emergency Care Re Emergency Response Plan for Facility.Alta Bates Hosp in Berkeley Will Provide Emergency Svcs for Contaminated Patients.Revised Pages to Plan Encl ML20207E6771988-08-0808 August 1988 Forwards Rev 3 to Facility Requalification Program,Per 880101 Termination of Operation of Reactor ML20151D7941988-06-22022 June 1988 Informs of Change in Arrangements for Emergency Care Re Emergency Response Plan for Univ of California Triga Mark III Berkeley Research Reactor. Alta Bates Hosp Will Honor Existing Agreement W/Herrick Hosp ML20150A7871988-06-22022 June 1988 Informs of Change in Arrangement Re Emergency Response Plan for Univ of California Triga Mark II Berkeley Research Reactor.Plan Now Calls Upon Herrick Hosp to Provide Emergency Svcs for Contaminated Patients ML20151A8161988-06-0909 June 1988 Requests Advance Route Approval as Required,Per 10CFR73.37(b)(7) ML20154H9311988-05-13013 May 1988 Informs That Univ of California Has Decided Not to Enter Opposition to City of Berkeley,Ca Petition to Intervene & Request for Hearing in Proceeding.Declaration of Svc Encl ML20154H9211988-05-10010 May 1988 Forwards Author for Substitution of 880425 Draft Ltr Supporting City of Berkeley Petition to Intervene in License Amend Proceedings & Request for Hearings & Further Relief.Served on 880523 ML20154J2301988-05-10010 May 1988 Supports City of Berkeley Petition for Intervention in License Amend Proceeding & Request for Hearings & Further Relief ML20154H6211988-04-25025 April 1988 Supports City of Berkely Petition to Intervene in License Amend Proceedings & Request for Hearings & Further Relief. Served on 880523 ML20151G4091988-04-0404 April 1988 Responds to NRC Re Violations Noted in Insp Rept 50-326/88-01.Corrective Actions:Review Sheet Being Created to Assure Review of All Checklists During Insps & Reactor Supervisor & Radiation Safety Officer Reviewed Issues ML20151D4311988-01-12012 January 1988 Discusses Changes in Reactor Surveillance,Per Termination of Operation on 880101 ML20149F4161988-01-12012 January 1988 Forwards Partial Response to NRC Compliance Bulletin 87-002, Fastener Testing to Determine Conformance W/Applicable Matl Specs, Including Procurement & Receipt Insp Program & Methods for Choosing Fasteners to Be Tested ML20147D7441988-01-0808 January 1988 Forwards Environ Rept for Triga Mark III & Decommissioning Plan for Triga Mark III ML20238B1941987-08-20020 August 1987 Forwards Mn Christensen to Author Informing of Steps Taken to Correct Violations Noted in NRC . Corrective Actions:Frequency of Reactor Operations Audits Corrected & Personnel Advised of Reporting Requirements ML20215E2141986-11-15015 November 1986 FOIA Request for Accident or Safety Repts Made to NRC by Univ of California Re Facility ML20154S1501986-03-24024 March 1986 Forwards Revised Pages 8 & 10 to 1985 Annual Rept Reflecting Revised Max Concentration at Stack Discharge ML20138M9201985-12-13013 December 1985 Forwards Addl Info Re 830623 Response to Generic Ltr 83-08, Mod of Vacuum Breakers on Mark I Containments, Per 851105 Request ML20137B7751985-10-28028 October 1985 Responds to NRC Re Violations Noted in Insp Rept. Corrective Actions:Reactor Operations Committee Established Firm Schedule for Holding Meetings & Senior Reactor Operator Exams Will Be Conducted ML20099B9231984-11-0909 November 1984 Advises That 840813 Revised Upgraded Emergency Plan Implemented on 841109 ML20096C5921984-08-24024 August 1984 Forwards Revised Emergency Response Plan for Univ of California Triga Mark II Berkeley Research Reactor. Plan Will Be Fully Implemented 120 Days from Approval Date ML20096C6041984-08-24024 August 1984 Authorizes Th Lim to Sign Notarized Ltr Transmitting Amended Emergency Plan ML20095E9131984-08-20020 August 1984 Ack Receipt of Re Proposed Research Reactor Emergency plan.Sixty-day Extension of Deadline for Response to Questions Raised by NRC Requested ML20081J1571983-10-31031 October 1983 Requests All Interested NRC Branches Be Made Aware of Changes in Mailing Address for Univ.Mail Continues to Be Sent to Old Mailing Address Which Delays Internal Distribution ML20024D1081983-07-25025 July 1983 Notifies That Th Pigford Will Replace Sn Kaplan as Administrator,Effective 830801 ML20085E2601983-06-21021 June 1983 Forwards Public Version of Revised Pages & New Attachment to Emergency Plan,In Response to ML20071E8351983-03-0808 March 1983 Forwards Berkeley Research Reactor Annual Rept of Operations ML20065B4901983-02-0202 February 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-326/82-04.Corrective Actions:Reactor Operations Committee Met on 821202 & 830107.Future Meetings Will Be Held on Schedule ML20066G4131982-11-0202 November 1982 Forwards Public Version of Revision 0 to Emergency Plan 1998-12-07
[Table view] |
Text
' -
~* VNIVERSITY OF CALIFORNIA, LOS ANCELES
/ ~,
%E k arnn.rY . DAVIS
- S' A FRMCDCO { 3 inn BAnaARA
_THE FACTS AND FIGURES IN THIS DOC MENT ARE NO LONGER TIMELY OR ACCURATE. THEY SHOULD BE CONSIDERED ONL 6 ,, m o m u m 3 % , ,
IN A HISTORICAL CONTEXP. nm crsrta roR um ur. uni sc2rsczs
, LoS ANCELES. CALIFORNIA 90024 August 15, 1979 EHS: C1251 James R. Miller So -u.+
Acting Assistant Director for 2
Site and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Miller:
Due to the sensitive nature of the contents of this letter, we request that this document be withheld from public disclosure pursuant to Section 2.790 of 10 CFR Part 2. This letter is our response to your letter dated July 30, 1979.
It is not our intention to possess greater than a formula quantity of non-exempt SSNM because greater amounts would entail financial costs, manpower requirements, and restrictions which could not be met at this facility. Our Argonaut Reactor contains approximately 3.6 Kgs of SSNM.
Wc also have 0.7 Kg of irradiated SSNM in the process of being shipped to the Idaho Chemical Reprocessing Plant and another 4.6 Kg of non-irradiated fuel in storage. We have three alternatives.
- a. Ask for a variance on the 3.6 Kgs of SSNM in the core of the reactor due to the difficulty in retrieving it from the reactor.
- b. Store the 4.6 Kgs of non-irradiated SSNM elsewhere off-site.
- c. Remove all the irradiated fue*1 fro'm the reactor and send it to ICRP for reprocessing and place the non-irradiated fuel in the reactor.
d' With the above comments in mind, the following are our responses
,i to your sixteen questions answered in the same order as submitted in your letter:
M 1. None planned.
\'
T
- 2. None except change of locks, keys, and combinations in the naar future.
Nt'edd!ulb iMUK"
- 3. Uncertain, depends upon alternatives. '""'
D g Jg g 4 Approximately S500,000 to S1,000,000. g,gg -
- 5. Approximately S25,000 to S35,000.
9' 0 e-n n nn 790130070x yh?U,, p p DF i A;U m nnu r. i. a 5W idUiUih sim a Q
c=
' ~ ' ~
S$G0ARDS FORMATJ
- 6. Uncertain, but would result in a reduction in the number of graduate nuclear engineers entering industry. Our reactor also supports uranium assay work related to the search for uranium resources. ,
- 7. None.
- 8. None planned.
- 9. Yes, conditionally.
- 10. The reactor serves as a major part of five laboratory courses -
offered by the School of Engineering and Applied Science. Closing the facility will cost UCLA at least three job openings, five classes, and several research programs here and at other Univer-sities. Closure would diminish not only our total educational program, but would diminish educational programs at other schools because our reactor is a part of the Reactor Sharing Program of DOE.
- 11. Seven. Yes. We will have to cut approximately three people.
- 12. Approximately 30 per quarter. Yes.
- 13. Approximately a dozen. Reactor shutdown would not directly affect them.
- 14. $120,000.
- 15. It does not seem possible to meet the 100 r/m at 3' at all times for the reactor fuel. The impact of the upgrade rule would result in p r o h ib it ive costs if unfavorably interprered in our case.
- 16. There are five courses which utilize the reactor, and two courses on reactor licensing (on a one-time-only basis) are beginning this fall.
We hope that the answers to these* questions meet with your approval.
Sincerely, narol [. V.lht&"
Brown, Dr. P.H.
Environmental Health and Safety Officer HVS/jao cc: Charles E. Ashbaugh Ivan Catton John Evraets WBilAUS DFORMATON
.-. - - . . - -