Exit Meeting Summary The inspectors presented the inspection results to Mr. D. Bannister, Vice President and Chief Nuclear Officer and other members of the licensee staff at an debrief meeting on April 13, 2012. The licensee acknowledged the findings presented. Following additional in-office review, an exit meeting was conducted on May 17, 2012, with Mr. J. Herman, Division Manager, Nuclear Engineering, and other members of your staff.
 
=====Exit Meeting Summary=====
The inspectors presented the inspection results to Mr. D. Bannister, Vice President and Chief Nuclear Officer and other members of the licensee staff at an debrief meeting on April 13, 2012. The licensee acknowledged the findings presented. Following additional in-office review, an exit meeting was conducted on May 17, 2012, with Mr. J. Herman, Division Manager, Nuclear Engineering, and other members of your staff.


The inspectors asked the licensee whether any of the material examined during the inspection should be considered proprietary. No proprietary information was identified.
The inspectors asked the licensee whether any of the material examined during the inspection should be considered proprietary. No proprietary information was identified.

Revision as of 23:15, 16 February 2018

IR 05000285-12-007, 3/26/12 - 5/17/12, Omaha Public Power District, Fort Calhoun Station: Triennial Fire Protection Inspection
ML12165A258
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/13/2012
From: Miller G B
NRC/RGN-IV/DRS/EB-2
To: Bannister D J
Omaha Public Power District
References
IR-12-007
Download: ML12165A258 (40)


Text

June 13, 2012

EA-12-121 David J. Bannister, Site Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550

SUBJECT: FORT CALHOUN STATION - NRC TRIENNIAL FIRE INSPECTION REPORT (05000285/2012007)

Dear Mr. Bannister:

On April 13, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Fort Calhoun Station. The enclosed inspection report documents the inspection results, which were discussed in a debrief meeting on April 13, 2012, with you and other members of your staff. Following additional in-office review, an exit meeting was conducted on May 17, 2012, with Mr. J. Herman, Division Manager, Nuclear Engineering, and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Three NRC identified findings of very low safety significance (Green) were identified during this inspection. All three of these findings were determined to involve violations of NRC requirements. The NRC is treating these violations as non-cited violations consistent with Section 2.3.2 of the Enforcement Policy. Additionally, two other violations of NRC requirements were identified (EA-12-121). These findings were determined to be violations related to a previously issued Red finding regarding a significant fire event in the 480 Vac safety-related switchgear (Inspection Reports 05000285/2011014 and 05000285/2012010; ADAMS ML12072A128 and ML12101A193, respectively). The significance of these findings was bounded by the Red finding and therefore they were not characterized by color significance. Both of these findings were determined to involve violations of NRC requirements. Separate citations will not be issued as these items associated with the switchgear fire event are being evaluated by the NRC under the Manual Chapter 0350, "Oversight of Reactor Facilities in a Shutdown Condition Due to Significant Performance and/or Operational Concerns," process. If you contest any non-cited violation in this report, you should provide a written response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, D.C. 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Senior Resident Inspector at the Fort Calhoun Station. In addition, if you disagree with the characterization of any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV, and the NRC Resident Inspector at Fort Calhoun Station. The information you provide will be considered in accordance with Inspection Manual Chapter 0305. If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspector at Fort Calhoun Station.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Geoffrey B. Miller, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-285 License No. DPR-40

Enclosure:

Inspection Report No. 05000285/2012007

w/Attachment:

1 - Supplemental Information Electronic Distribution for Fort Calhoun Station

SUMMARY OF FINDINGS

IR 05000285/2012007; 3/26/12 - 5/17/12; Omaha Public Power District; Fort Calhoun Station: Triennial Fire Protection Inspection

The report covered a two-week triennial fire protection inspection by specialist inspectors from Region IV. Five findings were identified. Three Green findings, which were non-cited violations (NCVs), were identified. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter 0609, "Significance Determination Process." Additionally, two findings were identified and were determined to be violations related to and bounded by a previously issued Red finding issued on April 10, 2012, that related to responding to a significant internal fire event in the 480 Vac safety-related switchgear (Inspection Report 05000285/2012010) and, therefore, were not characterized by color. Findings for which the significance determination process (SDP) does not apply may be Green or be assigned a severity level after NRC management review. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.

A. NRC-Identified and Self-Revealing Findings

Cornerstone: Mitigating Systems

  • N/A. The inspectors identified a violation of Technical Specification 5.8.1.c for an inadequate fire protection procedure. Specifically, the post-fire safe shutdown procedure had several deficiencies that would have prevented implementation for fires that occurred in the East and West Switchgear Rooms. This finding, and its corrective actions, will be managed by the Manual Chapter 0350 Oversight Panel. Enforcement Action 12-121 is associated with this finding.

The failure to ensure a post-fire safe shutdown procedure could be implemented as written for fires in the East and West Switchgear Rooms was a performance deficiency. The performance deficiency was more than minor because it was associated with the protection against external events (fire) attribute of the Mitigating Systems Cornerstone and it adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The significance of this finding is bounded by the significance of a related Red finding regarding a fire in the 480 Vac safety-related switchgear in June 2011 (Inspection Report 05000285/2012010). The performance deficiency had a cross-cutting aspect in the area of human performance associated with decision making because the licensee did not perform effective interdisciplinary reviews during development of the post-fire safe shutdown procedure H.1(a). (Section 1R05.01.b)

  • N/A. The inspectors identified a violation of Technical Specification 5.8.1.c regarding a failure to adequately implement the fire protection program. Specifically, the fire brigade failed to maintain command and control of the response to a fire event inside the protected area as required by fire protection program procedures. This finding, and its corrective actions, will be managed by the Manual Chapter 0350 Oversight Panel. Enforcement Action 12-121 is associated with this finding.

The failure by station fire brigade personnel to implement the requirements of Procedure SO-G-28, Revision 81, in response to a fire at Fort Calhoun Station inside the licensee's protected area which required fire brigade response was a performance deficiency. The finding was more than minor because it was associated with the Mitigating Systems cornerstone attribute of protection against external events (fire) and it affected the associated cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The significance of this finding is bounded by the significance of a related Red finding regarding a fire in the 480 Vac safety-related switchgear in June 2011 (Inspection Report 05000285/2012010). This finding has a cross-cutting aspect in the area of human performance associated with decision making because the licensee failed to implement the fire brigade roles and authorities as designed for risk-significant decisions H.1(a). (Section 1R05.03.b)

Green.

The inspectors identified a non-cited violation with two examples related to the failure to establish an alternate shutdown capability that met the requirements of License Condition 3.D and the performance criteria in 10 CFR Part 50, Appendix R, Section III.L. Specifically, the licensee failed to establish an alternate shutdown capability that accounted for the effects of an inadvertent safety injection actuation signal and failed to ensure the plant parameters remained similar to those experienced during a loss of normal a.c. power following single spurious component actuations. The failure to meet the performance goals prescribed by the alternate shutdown capability was a performance deficiency. The performance deficiency was more than minor because it was associated with the protection against external events (fire) attribute of the Mitigating Systems Cornerstone and it adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The inspectors evaluated this deficiency using Inspection Manual Chapter 0609, Appendix F, "Fire Protection Significance Determination Process." The performance deficiency affected the fire protection defense-in depth strategies involving post-fire safe shutdown systems. Because Appendix F does not address control room fire scenarios, a senior reactor analyst evaluated the significance of this performance deficiency. This finding was evaluated using the process in Inspection Manual Chapter 0609, Attachment 4, "Phase 1 - Initial Screening and Characterization of Findings," and was determined to be of very low safety significance because the finding was not a design deficiency, confirmed not to result in loss of functionality, did not result in loss of a system safety function, did not result in loss of the safety function for a single train, did not result in loss of safety function for maintenance rule equipment, and did not potentially affect risk significant external initiating events. Because the original failure to comply with the regulations had occurred longer than three years prior to this inspection, this finding did not reflect current licensee performance. (Section 1R05.05.b.1)

Green.

The inspectors identified a non-cited violation of Technical Specification 5.8.1.c for an inadequate fire protection procedure. Specifically, the post-fire safe shutdown procedure had several deficiencies that would have prevented implementation of the alternate shutdown capability for fires in the control/cable spreading rooms. The failure to establish a procedure that could be implemented as written for fires that require operators to abandon the control room was a performance deficiency. The performance deficiency was more than minor because it was associated with the protection against external events (fire) attribute of the Mitigating Systems Cornerstone and it adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The inspectors evaluated this deficiency using Inspection Manual Chapter 0609, Appendix F, "Fire Protection Significance Determination Process." The performance deficiency affected the fire protection defense-in depth strategies involving post-fire safe shutdown systems. Because Appendix F does not address control room fire scenarios, a senior reactor analyst evaluated the significance of this performance deficiency.

This finding was evaluated using the process in Inspection Manual Chapter 0609, Attachment 4, and was determined to be of very low safety significance because the finding was not a design deficiency, confirmed not to result in loss of functionality, did not result in loss of a system safety function, did not result in loss of the safety function for a single train, did not result in loss of safety function for maintenance rule equipment, and did not potentially affect risk significant external initiating events. This finding had a cross-cutting aspect in the area of human performance associated with decision making because the licensee did not perform effective interdisciplinary reviews during development of the post-fire safe shutdown procedures H.1(a). (Section 1R05.05.b.2)

Green.

The inspectors identified a non-cited violation of License Condition 3.D and the Quality Assurance Plan for failure to take timely corrective action. Specifically, the licensee revised procedure steps to open the breakers for the reactor coolant gas vent system valves in response to Non-cited Violation 05000285/2008009-02; however, the licensee did not revise the procedures until March 24, 2012, after the inspectors requested to review the corrective actions for the 2008 violation.

The failure to take timely corrective action to address inadequate procedure guidance to safely shutdown the plant following a fire was a performance deficiency. The finding was more than minor because it was associated with the protection against external events (fire) attribute of the Mitigating Systems Cornerstone and it adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. This finding was evaluated using the Fire Protection Significance Determination Process and was determined to be of very low safety significance because of the design of the vent system valves (i.e., three spurious actuations needed to exceed charging pump capability), availability of reliable reactor coolant system pressure and pressurizer level indications in the control room, and the ability of the operator to compensate for the deficiency because of their experience and familiarity. This finding had a cross-cutting aspect in the area of human performance associated with decision making because the licensee did not use a systematic process to correct fire protection procedure deficiencies in response to a violation in 2008 H.1(a). (Section 4OA2)

B. Licensee-Identified Violations

None

REPORT DETAILS

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity

1R05 Fire Protection

This report presents the results of a triennial fire protection inspection conducted in accordance with NRC Inspection Procedure 71111.05T, "Fire Protection (Triennial)," at the Fort Calhoun Station. The licensee committed to adopt a risk informed fire protection program in accordance with National Fire Protection Association 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," 2001 Edition (NFPA-805), but have not yet completed the program transition. The inspectors evaluated the implementation of the approved fire protection program in selected risk-significant areas, with an emphasis on the procedures, equipment, fire barriers, and systems that ensure the post-fire capability to safely shutdown the plant. Inspection Procedure 71111.05T requires the selection of three to five fire areas for review. The inspectors used the fire hazards analysis section of the Fort Calhoun Station Individual Plant Examination of External Events and the Fire Probabilistic Risk Assessment to select the following four risk-significant fire areas (inspection samples) for review:

  • Fire Area 30, Containment
  • Fire Area 35A, Diesel Generator Room 1, Room 63
  • Fire Area 36A, East Switchgear Area, Room 56E
  • Fire Area 36B, West Switchgear Area, Room 56W The inspectors evaluated the licensee's fire protection program using the applicable requirements, which included plant Technical Specifications, Operating License Condition 2.C.(5), NRC safety evaluations, 10 CFR 50.48 and Branch Technical Position 9.5-1. The inspectors also reviewed related documents that included the Final Safety Analysis Report, Section 9.5; the fire hazards analysis; and the post-fire safe shutdown analysis. Specific documents reviewed by the inspectors are listed in the attachment. Four inspection samples were completed.

.1 Protection of Safe Shutdown Capabilities

a. Inspection Scope

The inspectors reviewed the piping and instrumentation diagrams, safe shutdown equipment list, safe shutdown design basis documents, and the post-fire safe shutdown analysis to verify that the licensee properly identified the components and systems necessary to achieve and maintain safe shutdown conditions for fires in the selected fire areas. The inspectors observed walk downs of the procedures used for achieving and maintaining safe shutdown in the event of a fire for fires outside of the control room to verify that the procedures properly implemented the safe shutdown analysis provisions. For each of the selected fire areas, the inspectors reviewed the separation of redundant safe shutdown cables, equipment, and components located within the same fire area.

The inspectors also reviewed the licensee's method for meeting the requirements of 10 CFR 50.48; Branch Technical Position 9.5-1, Appendix A; and 10 CFR Part 50, Appendix R, Section III.G. Specifically, the inspectors evaluated whether at least one post-fire safe shutdown success path remained free of fire damage in the event of a fire. In addition, the inspectors evaluated whether the licensee met applicable license commitments.

b. Findings

Introduction.

The inspectors identified a violation of Technical Specification 5.8.1.c for an inadequate fire protection procedure. Specifically, the post-fire safe shutdown procedure had several deficiencies that would have prevented implementation for fires that occurred in the East and West Switchgear Rooms. The licensee documented these deficiencies in their corrective action program.

Discussion. The inspectors walked down three fire areas inside the auxiliary building to verify that manual actions could be accomplished as described in Procedure AOP-06-01, "Auxiliary Building Radiation Controlled Areas and Containment," Revision 2 and Procedure AOP-06-02, "Uncontrolled Areas of Auxiliary Building," Revision 3. The licensee had implemented these manual actions in lieu of providing the separation required by 10 CFR Part 50, Appendix R, Section III.G.2. Because the licensee continued the process of transitioning to NFPA 805, the inspectors evaluated the manual actions to determine whether they provided appropriate compensatory measures.

The inspectors identified the following deficiencies related to implementing the manual actions for fire areas outside of the control room:

  • For a fire in either the East Switchgear Room or the West Switchgear Room, the equipment operator implementing Procedure AOP-06-02,Section V, Step 4.7 (East Switchgear Room), or Section VI, Step 4.6 (West Switchgear Room), could not complete the step as written. The equipment operator did not know where to obtain the key for the breaker locking device located on the battery disconnect molded case breaker. The inspectors noted that the procedure did not caution that a key would be necessary nor had the licensee made the key readily available to operators.

Opening the battery disconnect de-energized electrical equipment to protect post-fire safe shutdown equipment and fire fighting personnel. The licensee documented this deficiency in Condition Report 2012-02390.

  • For a fire in either the East Switchgear Room or the West Switchgear Room, the equipment operator implementing Procedure AOP-06-02,Section V, Contingency Steps 3.c and 6.1 (East Switchgear Room), or Section VI, Contingency Step 3.c and Step 6 (West Switchgear Room) would require entry into the affected fire area. Regulatory requirements do not allow entry into the affected fire area to perform operator actions. The licensee documented this deficiency in Condition Report 2012-02842.
  • For a fire in the East Switchgear Room, Procedure AOP-06-02,Section V, Step 4.3c, did not require that operators place offsite power feeds in "pull-to-lock" for Bus Tie Breakers BT-1B4A and BT-1B4C. Placing the bus tie breakers in this condition ensures that an offsite power source could not inadvertently reenergize a de-energized bus. The inspectors verified that Procedure AOP-06-02,Section VI, Step 4.3c correctly required that operators place Bus Tie Breaker BT-1B4B in "pull-to-lock" for a fire in the West Switchgear room. The licensee documented this deficiency in Condition Report 2012-02640.
  • For a fire in the West Switchgear Room, Procedure AOP-06-02,Section VI, Step 4.7 directed operators to verify power available to at least one of two fuel oil transfer pumps. The operator implementing the step could not locate appropriate instrumentation to verify that power was available to the fuel oil transfer pumps. The inspectors determined that the procedure did not discuss the method to accomplish the task. The licensee documented this deficiency in Condition Report 2012-02583.
Analysis.

The failure to ensure a post-fire safe shutdown procedure could be implemented as written for fires in the East and West Switchgear Rooms was a performance deficiency. The performance deficiency was more than minor because it was associated with the protection against external events (fire) attribute of the Mitigating Systems Cornerstone and it adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The significance of this finding is bounded by the significance of a related Red finding regarding a fire in the 480 Vac safety-related switchgear in June 2011 (Inspection Report 05000285/2012010). The performance deficiency had a cross-cutting aspect in the area of human performance associated with decision making because the licensee did not perform effective interdisciplinary reviews during development of the post-fire safe shutdown procedure H.1(a).

Enforcement.

Technical Specification 5.8.1.c specified that written procedures shall be established, implemented, and maintained covering the implementation of the Fire Protection Program. Procedure AOP-06-02, "Uncontrolled Areas of Auxiliary Building," Revision 3, Sections V and VI, provided instructions to operations personnel for fires outside the control room in the East and West Switchgear Rooms, respectively. Contrary to the above, from November 1997 to April 13, 2012, the licensee failed to establish written procedures covering the implementation of the Fire Protection Program. Specifically, the licensee failed to establish procedures for fires in the East and West Switchgear Rooms that could be implemented as written. Procedure AOP-06-02 required operators to enter hazardous areas without appropriate protective equipment, specified performing steps that could not be accomplished as written or failed to have all support equipment available, and failed to identify appropriate actions to prevent inadvertently reenergizing a faulted bus. These examples have been entered into the corrective action program (Condition Reports 2012-02390, 2012-02583, 2012 02640, and 2012-02842). This violation and its examples are considered as a related violation to the Red finding issued on April 10, 2012, that related to responding to a significant internal fire event in the 480 Vac safety-related switchgear(Enforcement Action 12-121). A separate citation will not be issued as this finding and its corrective actions will be managed by the Manual Chapter 0350 Oversight Panel: VIO 05000285/2012007-01, Failure to Provide Adequate Post-Fire Safe Shutdown Actions in the Switchgear Rooms.

.2 Passive Fire Protection

a. Inspection Scope

The inspectors walked down accessible portions of the selected fire areas to observe the material condition and configuration of the installed fire area boundaries (including walls, fire doors, and fire dampers) and verify that the electrical raceway fire barriers were appropriate for the fire hazards in the area. The inspectors compared the installed configurations to the approved construction details, supporting fire tests, and applicable license commitments. The inspectors reviewed installation, repair, and qualification records for a sample of penetration seals to ensure the fill material possessed an appropriate fire rating and that the installation met the engineering design. The inspectors also reviewed similar records for the rated fire wraps and radiant energy heat shields to ensure the material possessed an appropriate fire rating and that the installation met the engineering design.

b. Findings

No findings were identified.

.3 Active Fire Protection

a. Inspection Scope

The inspectors reviewed the design, maintenance, testing, and operation of the fire detection and suppression systems in the selected fire areas. The inspectors verified the automatic detection systems and the manual and automatic suppression systems were installed, tested, and maintained in accordance with the National Fire Protection Association code of record or approved deviations, and that each suppression system was appropriate for the hazards in the selected fire areas.

The inspectors walked down accessible portions of the detection and suppression systems in the selected fire areas. The inspectors also performed a walkdown of major system support equipment in other areas (e.g., fire pumps and Halon supply systems) to assess the material condition of these systems and components. The inspectors reviewed the electric and diesel fire pump flow and pressure tests to verify that the pumps met their design requirements. The inspectors also reviewed the halon suppression functional tests to verify that the system capability met the design requirements. The inspectors assessed the fire brigade capabilities by reviewing training, qualification, and drill critique records. The inspectors also reviewed pre-fire plans and smoke removal plans for the selected fire areas to determine if appropriate information was provided to fire brigade members and plant operators to identify safe shutdown equipment and instrumentation, and to facilitate suppression of a fire that could impact post-fire safe shutdown capability. In addition, the inspectors inspected fire brigade equipment to determine operational readiness for fire fighting.

The inspectors observed an unannounced fire drill, conducted on April 11, 2012, in the Turbine Building and the subsequent drill critique using the guidance contained in Inspection Procedure 71111.05AQ, "Fire Protection Annual/Quarterly." The inspectors observed fire brigade members fight a simulated fire in the Auxiliary Building, located in the radiological controlled area. The inspectors verified that the licensee identified problems; openly discussed them in a self-critical manner at the drill debrief, and identified appropriate corrective actions. Specific attributes evaluated were: (1) proper wearing of turnout gear and self-contained breathing apparatus; (2) proper use and layout of fire hoses; (3) employment of appropriate fire fighting techniques; (4) sufficient fire fighting equipment was brought to the scene; (5) effectiveness of fire brigade leader communications, command, and control; (6) search for victims and propagation of the fire into other areas; (7) smoke removal operations; (8) utilization of pre-planned strategies; (9) adherence to the pre-planned drill scenario; and (10) drill objectives. The inspectors also reviewed the licensee's evaluation of fire brigade performance during the fire event that occurred on June 7, 2011, and subsequent corrective actions.

This review was credited as the revised oversight process baseline inspection sample required by Inspection Procedure 71111.05AQ.

b. Findings

Introduction.

The inspectors identified a violation of Technical Specification 5.8.1.c regarding a failure to adequately implement the fire protection program. Specifically, the fire brigade failed to maintain command and control of the response to a fire event inside the protected area as required by fire protection program procedures.

Description.

On June 7, 2011, a fire occurred in a 480 Vac motor-control center in the West Switchgear Room at Fort Calhoun Station. The fire resulted in a loss of power to six of nine safety-related 480 Vac electrical distribution buses, and an Alert emergency action level declaration. The Halon system in the switchgear room automatically actuated and aided in extinguishing the fire. The station fire brigade responded, as did off-site fire assistance.

Plant fire brigade performance was governed, in part, by Procedure SO-G-28, "Station Fire Plan," Revision 81, which defined fire brigade responsibilities including the command and control functions. Procedure SO-G-28, Section 4.8.4, required, in part, that inside the protected area the fire brigade leader shall maintain the command role, and, when off-site support arrives, they will maintain a mutual aid assignment and direct their own personnel in support of the Fire Brigade Leader.

The fire brigade leader intended for both the attack and backup team to stage at the north end of the switchgear rooms. The fire brigade backup team went to the south mezzanine level instead of the north mezzanine level as expected by the fire brigade leader. The fire brigade leader formed a second backup team using available fire brigade qualified personnel. This adversely impacted the fire brigade initial response capability. The response was further delayed because the site fire brigade did not enter the switchgear room.

The City of Blair volunteer fire department went to the staging area at the north mezzanine level where the station fire brigade leader was located; however, the City of Fort Calhoun volunteer fire department went to the south mezzanine access without being directed to do so by the station fire brigade. Command and control of the response to the fire was transferred to the off-site fire department when they arrived on site. Offsite responders subsequently entered the fire area and declared the fire extinguished.

Analysis.

The failure by station fire brigade personnel to implement the requirements of Procedure SO-G-28, Revision 81, in response to a fire at Fort Calhoun Station inside the licensee's protected area which required fire brigade response was a performance deficiency. The finding was more than minor because it was associated with the Mitigating Systems cornerstone attribute of protection against external events (fire) and it affected the associated cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The significance of this finding is bounded by the significance of a related Red finding regarding the fire in the 480 Vac safety-related switchgear in June 2011 (Inspection Report 05000285/2012010).

This finding has a cross-cutting aspect in the area of human performance associated with decision making because the failed to implement the fire brigade roles and authorities as designed for risk-significant decisions H.1(a).

Enforcement.

Technical Specification 5.8.1.c requires that written procedures and administrative policies be established, implemented, and maintained covering the implementation of the fire protection program. Procedure SO-G-28, "Station Fire Plan,"

Revision 81, defined the composition and responsibilities of the plant fire brigade when responding to an emergency incident at Fort Calhoun Station, and required that inside the station's protected area the fire brigade leader maintain the command role in response to emergency incidents.

Contrary to the above, on June 7, 2011, the licensee failed to implement written procedures covering the implementation of the fire protection program. Specifically, the licensee failed to implement the requirements of Procedure SO-G-28 that required the fire brigade leader to maintain the command role in the station response to a fire in the West Switchgear Room requiring off-site fire fighting assistance. The fire brigade leader relinquished the command function to off-site fire responders during the event. This violation and its examples are considered as a related violation to the Red finding issued on April 10, 2012, that related to responding to a significant internal fire event in the 480 Vac safety-related switchgear (Enforcement Action 12-121). A separate citation will not be issued as this finding and its corrective actions will be managed by the Manual Chapter 0350 Oversight Panel: VIO 05000285/2012007-02, Failure to Maintain Command and Control Function during Fire Fighting Activities in the Protected Area.

.4 Protection from Damage from Fire Suppression Activities

a. Inspection Scope

The inspectors performed plant walkdowns and document reviews to verify that redundant trains of systems required for hot shutdown, which are located in the same fire area, would not be subject to damage from fire suppression activities or from the rupture or inadvertent operation of fire suppression systems. Specifically, the inspectors verified that:

  • A fire in one of the selected fire areas would not directly, through production of smoke, heat, or hot gases, cause activation of suppression systems that could potentially damage all redundant safe shutdown trains
  • A fire in one of the selected fire areas or the inadvertent actuation or rupture of a fire suppression system would not directly cause damage to all redundant trains (e.g., sprinkler-caused flooding of other than the locally affected train)
  • Adequate drainage is provided in areas protected by water suppression systems

b. Findings

No findings were identified.

.5 Alternative Shutdown Capability

a. Inspection Scope

Review of Methodology The inspectors reviewed the safe shutdown analysis, operating procedures, piping and instrumentation drawings, electrical drawings, the Final Safety Analysis Report, the supporting thermal-hydraulic analysis and other supporting documents to verify that hot and cold shutdown could be achieved and maintained from outside the control room for fires that require evacuation of the control room, with or without offsite power available. The inspectors conducted plant walk downs to verify that the plant configuration was consistent with the description contained in the safe shutdown and fire hazards analyses. The inspectors focused on ensuring the adequacy of systems selected for reactivity control, reactor coolant makeup, reactor decay heat removal, process monitoring instrumentation, and support systems functions.

The inspectors also verified that the systems and components credited for shutdown would remain free from fire damage. Finally, the inspectors verified that the transfer of control from the control room to the alternative shutdown location would not be affected by fire-induced circuit faults (e.g., by the provision of separate fuses and power supplies for alternative shutdown control circuits).

Review of Operational Implementation The inspectors verified that licensed and non-licensed operators received training on alternative shutdown procedures. The inspectors also verified that sufficient personnel to perform a safe shutdown were trained and available onsite at all times, exclusive of those assigned as fire brigade members. A walkthrough of the post-fire safe shutdown procedure with licensed and non-licensed operators was performed to determine the adequacy of the procedure. The inspectors verified that the operators could be reasonably expected to perform specific actions within the time required to maintain plant parameters within specified limits. Time critical actions that were verified included restoring electrical power, establishing control at the remote shutdown and local shutdown panels, establishing reactor coolant makeup, and establishing decay heat removal. The inspectors reviewed manual actions to ensure that they had been properly reviewed and approved and that the actions could be implemented in accordance with plant procedures in the time necessary to support the safe shutdown method for each fire area.

b. Findings

.1 Alternate Shutdown Procedure Does Not Account for Single Worst Case Spurious Actuations

Introduction.

The inspectors identified a Green non-cited violation with two examples related to the failure to establish an alternate shutdown capability that met the requirements of License Condition 3.D and the performance criteria in 10 CFR Part 50, Appendix R, Section III.L. Specifically, the licensee failed to establish an alternate shutdown capability that accounted for the effects of an inadvertent safety injection actuation signal and failed to ensure the plant parameters remained similar to those experienced during a loss of normal a.c. power following single spurious component actuations.

Description.

The inspectors reviewed the alternate shutdown capability implemented by Procedure AOP-06, "Fire Emergency," Revision 25, and existing permanent plant equipment. From review of Procedure AOP-06 and calculations to support alternate shutdown capability, the inspectors determined that the licensee identified transients that could result from spurious actuation of plant equipment during a control room fire. The approach assumed that operators would take actions within the first 10 minutes to terminate the transients by removing power from the control systems. The inspectors verified that the approach prevented the plant from experiencing an unrecoverable event. The inspectors identified that this approach established by the licensee for a control room evacuation failed to meet the requirements of 10 CFR Part 50, Appendix R, Section III.L, which specified that alternative or dedicated shutdown capability provided for a specific fire area shall be able to maintain reactor coolant inventory variables within those predicted for a loss of normal a.c. power. The first example related to an inadvertent safety injection actuation signal. The licensee had determined that a control room fire could result in an inadvertent safety injection actuation signal; however, the transient analysis had not evaluated the amount of water that would be injected by the positive displacement charging pumps and the corresponding pressurizer level increase caused by an inadvertent safety injection actuation signal.

The second example related to the approach taken by the licensee for implementing the alternate shutdown capability. Both Procedure AOP-06 and supporting calculations relied upon the plant response not creating an unrecoverable event. This approach did not meet the requirements of 10 CFR Part 50, Appendix R, Section III.L nor the approved fire protection licensing basis. Also, Letter 82-0060, "Fire Protection Rule - I0 CFR 50.48(C)(5) Alternative Safe Shutdown-Section III.G.3 of Appendix R to 10 CFR 50, Fort Calhoun Nuclear Power Station," dated April 8, 1982, specified, "The performance goals for post fire safe shutdown will be met using existing mechanical systems and equipment." Section III.L.2.b specified the performance goals for the shutdown functions for the reactor coolant makeup function shall be capable of maintaining the reactor coolant level within the level indicating range in the pressurizer for PWRs (pressurized water reactors). The licensee documented both of these deficiencies in Condition Report 2012-02338.

Analysis.

The failure to meet the performance goals prescribed by the alternate shutdown capability was a performance deficiency. The performance deficiency was more than minor because it was associated with the protection against external events (fire) attribute of the Mitigating Systems Cornerstone and it adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The inspectors evaluated this deficiency using Inspection Manual Chapter 0609, Appendix F, "Fire Protection Significance Determination Process." The performance deficiency affected the fire protection defense-in depth strategies involving post-fire safe shutdown systems. Because Appendix F does not address control room fire scenarios, a senior reactor analyst evaluated the significance of this performance deficiency.

Because these deficiencies involved front line mitigating system performance, the senior reactor analyst used Inspection Manual Chapter 0609, Attachment 4, "Phase 1 - Initial Screening and Characterization of Findings," to determine the risk significance of this finding. The thermal-hydraulic calculation demonstrated that no core damage resulted from the spurious actuations. Using Attachment 4, the senior reactor analyst determined finding was not a design deficiency, confirmed not to result in loss of functionality, did not result in loss of a system safety function, did not result loss of the safety function for a single train, did not result in loss of safety function for maintenance rule equipment, and did not potentially affect risk significant external initiating events. Consequently, the senior reactor analyst concluded this finding had very low safety significance (Green). Because the original failure to comply with the regulations had occurred longer than three years prior to this inspection, this finding did not reflect current licensee performance.

Enforcement.

License Condition 3.D specifies that the licensee shall implement and maintain in effect all provisions of the approved Fire Protection Program as described in the Updated Safety Analysis Report for the facility and as approved in the SERs dated February 14, and August 23, 1978, November 17, 1980, April 8, and August 12, 1982, July 3, and November 5, 1985, July 1, 1986, December 20, 1988, November 14, 1990, March 17, 1993 and January 14, 1994.

Letter 82-0060, "Fire Protection Rule - 10 CFR 50.48(C)(5) Alternative Safe Shutdown-Section III.G.3 of Appendix R to 10 CFR 50, Fort Calhoun Nuclear Power Station," dated April 8, 1982, specified, "The performance goals for post fire safe shutdown will be met using existing mechanical systems and equipment." Appendix R,Section III.L.1.(b) specified that alternative or dedicated shutdown capability provided for a specific fire area shall be able to maintain reactor coolant inventory.Section III.L.2.b specified the performance goals for the shutdown functions for the reactor coolant makeup function shall be capable of maintaining the reactor coolant level within the level indication in the pressurizer for PWRs (pressurized water reactors). Procedure AOP-06, "Fire Emergency," Revision 25, provides instructions for implementing the alternate shutdown capability.

Contrary to the above, from April 1982 through April 2012, the licensee failed to establish alternative shutdown capability that met their license condition and the requirements of 10 CFR 50, Appendix R, Section III.L. Specifically, Procedure AOP-06 did not have actions to mitigate an inadvertent safety injection actuation and was not designed to ensure that pressurizer level remained within the parameters for a loss of normal a.c. power or remained within the indicating range. Because this finding is of very low safety significance and has been entered into the corrective action program (Condition Report 2012-02338), this violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the NRC Enforcement Policy:

NCV 05000285/2012007-03, Alternate Shutdown Procedure Does Not Account for Single Worst Case Spurious Actuations.

.2 Failure to Provide Adequate Alternate Shutdown Capability

Introduction.

The inspectors identified a Green non-cited violation of Technical Specification 5.8.1.c for an inadequate fire protection procedure. Specifically, the post-fire safe shutdown procedure had several deficiencies that would have prevented implementation of the alternate shutdown capability for fires in the control room or cable spreading room.

Discussion. The inspectors walked down the alternate shutdown capability for a control room/cable spreading room fire to verify that the operators could perform the actions required by the post-fire safe shutdown procedure. The licensee utilized Procedure AOP-06, "Fire Emergency," Revision 25,Section II to implement their alternate shutdown capability for hot shutdown.

From the walk downs, the inspectors identified the following deficiencies related to implementing the alternate shutdown capability for a control room/cable spreading room fire:

  • In Attachment C, Step 18 contingency actions, a licensed operator was directed to use a "ratchet" to charge a 4160 Vac breaker. The breaker did not require a ratchet but operated via a charging spring handle. The operator was directed to obtain a ratchet instead of a charging spring handle in Step 16. In addition, the inspectors determined that the ratchet selected was a tool no longer required. The licensee documented this deficiency in Condition Report 2012-02407.
  • In Attachment D, Step 5, the control room communicator places the 125 Vdc breakers to off for DC-PNL-1-15, "ELP-5 Emergency Lighting Panel." This removes the power to emergency lights within the first 15 minutes for lights required to be illuminated for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The licensee documented this deficiency in Condition Report 2012-02680.
  • In Attachment C, Step 5, the licensee had insufficient emergency lighting to allow an individual to manipulate Swing Inverter EE-8T as specified in the procedure. The inspectors determined that the licensee had failed to account for the need for emergency lighting when installing the swing battery charger. The licensee documented this deficiency in Condition Report 2012-02692.
Analysis.

The failure to establish a procedure that could be implemented as written for fires that require operators abandon the control room was a performance deficiency. The performance deficiency was more than minor because it was associated with the protection against external events (fire) attribute of the Mitigating Systems Cornerstone and it adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The inspectors evaluated this deficiency using Inspection Manual Chapter 0609, Appendix F, "Fire Protection Significance Determination Process." The performance deficiency affected the fire protection defense-in depth strategies involving post-fire safe shutdown systems. Because Appendix F does not address control room fire scenarios, a senior reactor analyst evaluated the significance of this performance deficiency.

  • The senior reactor analyst evaluated the first example and determined the likelihood of core damage by multiplying the frequency of fire that requires control room abandonment by the likelihood of a 4.16 kV breaker failure to close.

Previously, the senior reactor analyst calculated and documented that the Fort Calhoun Station control room abandonment frequency resulting from a fire equaled 1E-05/yr. From NUREG/CR-6978, "Industry Average Performance for Components and Initiating Events at US Commercial Nuclear Power Plants," Revision 0, Appendix A, Section A.2.10, the senior reactor analyst determined the probability for a 4.16 kV breaker failure to close was 2.05E-03. The resulting value equaled 2.05E-08/yr; therefore, this performance deficiency example has very low safety significance (Green).

  • Because the second and third examples involved front line mitigating system support performance, the senior reactor analyst used Inspection Manual Chapter 0609, Attachment 4, "Phase 1 - Initial Screening and Characterization of Findings," to determine the risk significance of this finding. The senior reactor analyst determined that operators were required by procedures to carry flashlights, and the team determined that they do have flashlights on their persons when standing watch. Using Attachment 4 the senior reactor analyst determined finding was not a design deficiency, confirmed not to result in loss of functionality, did not result in loss of a system safety function, did not result loss of the safety function for a single train, did not result in loss of safety function for maintenance rule equipment, and did not potentially affect risk significant external initiating events. Consequently, the senior reactor analyst concluded this finding had very low safety significance (Green).

These examples of the performance deficiency had a cross-cutting aspect in the area of human performance associated with decision making because the licensee did not perform effective interdisciplinary reviews during development of the post-fire safe shutdown procedures H.1(a).

Enforcement.

Technical Specification 5.8.1.c specified that written procedures shall be established, implemented, and maintained covering the implementation of the Fire Protection Program. Procedure AOP-06, "Fire Emergency," Revision 25, implemented the alternate shutdown capability and provided directions to operations personnel for fires in the control room and cable spreading room.

Contrary to the above, from November 1997 to April 13, 2012, the licensee failed to implement written procedures covering the implementation of the Fire Protection Program. Specifically, for the alternate shutdown capability Procedure AOP-06 provided inadequate direction on tools required by the operators, directed operators to turn off required emergency lighting, and directed operators to take actions in areas without adequate emergency lighting. Because this finding is of very low safety significance and has been entered into the corrective action program (Condition Reports 2012-02407, 2012-02680, and 2012-02692), this violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the NRC Enforcement Policy: NCV 05000285/2012007-04, Failure to Provide Adequate Alternate Shutdown Capability.

.6 Circuit Analysis

a. Inspection Scope

The inspectors reviewed the post-fire safe shutdown analysis to verify that the licensee identified the circuits that may impact the ability to achieve and maintain safe shutdown. The inspectors verified, on a sample basis, that the licensee properly identified the cables for equipment required to achieve and maintain hot shutdown conditions in the event of a fire in the selected fire areas. The inspectors verified that these cables were either adequately protected from the potentially adverse effects of fire damage or were analyzed to show that fire-induced faults (e.g., hot shorts, open circuits, and shorts to ground) would not prevent safe shutdown.

The inspectors focused on the cables of selected components from the reactor coolant system, specifically the pressurizer power-operated relief valves (PCV-102-1, PCV-102-2), the pressurizer block valves (HCV-150, HCV-151), and the safety injection and refueling water tank (SIRWT) outlet valves (LCV-383-1, LCV-383-2). For the sample of components selected, the inspectors reviewed process and instrumentation drawings, electrical elementary and block diagrams and identified power, control, and instrument cables necessary to support their operation. In addition, the inspectors reviewed cable routing information to verify that fire protection features were in place as needed to satisfy the separation requirements specified in the fire protection license basis.

b. Findings

No findings were identified.

.7 Communications

a. Inspection Scope

The inspectors reviewed the adequacy of the communication system to support plant personnel in the performance of alternative post-fire safe shutdown functions and fire brigade duties. The review verified that the licensee established and maintained in working order primary and backup communications. Further, the inspectors evaluated the environmental impacts such as ambient noise levels, coverage patterns, and clarity of reception. The inspectors reviewed that the electrical power supplies and cable routing for the phone system would allow them to remain functional following a fire in the control room and other fire areas.

b. Findings

No findings were identified.

.8 Emergency Lighting

a. Inspection Scope

The inspectors reviewed the emergency lighting system required to support plant personnel in the performance of alternative post-fire safe shutdown functions to verify it was adequate to support the performance of manual actions required to achieve and maintain hot shutdown conditions, and for illuminating access and egress routes to the areas where manual actions are required. The review verified that the licensee:

(1) installed emergency lights with an 8-hour battery capacity or utilized incandescent lighting powered from the station 125 VDC batteries, (2) maintained the emergency light batteries in accordance with manufacturer recommendations, and (3) tested and performed maintenance in accordance with plant procedures and industry practices. The inspectors evaluated the locations and positioning of emergency lights during a walkthrough of the control room evacuation procedure and during review of manual actions performed for fires in areas outside of the control room. The inspectors witnessed an emergency lighting test in the electrical switchgear room and alternative shutdown equipment room.

b. Findings

No findings were identified.

.9 Cold Shutdown Repairs

a. Inspection Scope

The inspectors verified that the licensee identified repairs needed to reach and maintain cold shutdown and had dedicated repair procedures, equipment, and materials to accomplish these repairs. Using these procedures, the inspectors evaluated whether these components could be repaired in time to bring the plant to cold shutdown within the time frames specified in their design and licensing bases. The inspectors verified that the repair equipment, components, tools, and materials needed for the repairs were available and accessible on site.

b. Findings

No findings were identified.

.10 Compensatory Measures

a. Inspection Scope

The inspectors verified that compensatory measures were implemented for out-of-service, degraded, or inoperable fire protection and post-fire safe shutdown equipment, systems, or features (e.g., detection and suppression systems and equipment; passive fire barriers; or pumps, valves, or electrical devices providing safe shutdown functions). The inspectors also verified that the short-term compensatory measures compensated for the degraded function or feature until appropriate corrective action could be taken and that the licensee was effective in returning the equipment to service in a reasonable period of time.

b. Findings

No findings were identified.

.11 B.5.b Inspection Activities

a. Inspection Scope

The inspectors reviewed the licensee's implementation of guidance and strategies intended to maintain or restore core, containment, and spent fuel pool cooling capabilities under the circumstances associated with loss of large areas of the plant due to explosions or fire as required by Section B.5.b of the Interim Compensatory Measures Order, EA-02-026, dated February 25, 2002, and 10 CFR 50.54(hh)(2). The inspectors reviewed the strategies to verify that they continued to maintain and implement procedures, maintain and test equipment necessary to properly implement the strategies, and ensure station personnel are knowledgeable and capable of implementing the procedures. The inspectors visually inspected the fire truck, portable river pump, and other equipment used to implement the strategies to ensure the availability and material readiness of the equipment. The inspectors evaluated the adequacy of the trailer hitch attachments and verified the availability of on-site vehicles capable of towing the portable pump. The licensee implemented their strategies in accordance with Procedure OCAG-1, "Operational Contingency Action Guideline," Revision 20. The inspectors selected the following four specific strategies this inspection sample:

  • Spent Fuel Pool - Condition 1 The inspectors completed four samples.

b. Findings

No findings were identified.

OTHER ACTIVITIES

[OA]

4OA2 Identification and Resolution of Problems

Corrective Actions for Fire Protection Deficiencies

a. Inspection Scope

The inspectors selected a sample of condition reports associated with the licensee's fire protection program to verify that the licensee had an appropriate threshold for identifying deficiencies. In addition the inspectors reviewed the corrective actions proposed and implemented to verify that they were effective in correcting identified deficiencies. The inspectors also evaluated the corrective actions implemented for violations identified during the 2008 fire protection triennial inspection.

b. Findings

Introduction.

The inspectors identified a Green non-cited violation of License Condition 3.D and the Quality Assurance Plan for failure to take timely corrective action.

Specifically, the licensee revised procedure steps to open the breakers for the reactor coolant gas vent system valves in response to Non-cited Violation 05000285/2008009-02; however, the licensee did not revise the procedures until March 24, 2012, after the inspectors requested to review the corrective actions for the 2008 violation.

Description.

Inspection Report 05000285/2005008 documented Green Non-cited Violation 05000285/2005008-07 for the failure to ensure that, if reactor coolant gas vent system valves spuriously actuate because of fire damage, they will not cause an uncontrolled loss of reactor coolant inventory. All of the reactor coolant gas vent system valves are normally closed, air operated valves that can spuriously open because of a hot short on the unprotected power cable to the valves.

The licensee addressed this issue in Condition Report 200504013. For the four fire areas affected, the licensee revised Procedures AOP-06-01 and AOP-06-02 to incorporate actions to remove power in the event one of the reactor coolant gas vent system valves opens because of fire damage. Inspection Report 05000285/2008009 documented Green Non-cited Violation 05000285/2008009-02 for inadequate corrective actions related to revising a post-fire safe shutdown procedure. The 2008 inspectors determined that the procedures did not identify any specific diagnostic instrumentation operators could use to determine if any of the reactor coolant gas vent system valves spuriously operated. The inspectors concluded that operators could not be expected to reliably perform the procedure steps as written and, therefore, the licensee had implemented inadequate corrective actions. The licensee documented this deficiency in Condition Report 2008-05325. The inspectors requested to review the corrective actions for the 2008 violation in a letter dated January 12, 2012 (Fort Calhoun Station - Notification of NRC Triennial Fire Protection Baseline Inspection (05000285/2012007) and Request for Information, (ML120130238). The licensee subsequently implemented revisions to Procedures AOP-06-01 and AOP-06-02 to direct operators to remove power to these valves if a fire occurred in an area of concern without relying on operators having to diagnose if a valve had spuriously opened. Because the licensee revised the procedures just prior to the inspection on March 24, 2012, the inspectors considered the corrective actions untimely.

Analysis.

The failure to take timely corrective action to address inadequate procedure guidance to safely shutdown the plant following a fire was a performance deficiency.

The performance deficiency was more than minor because it was associated with the reactor safety mitigating systems cornerstone attribute for protection against external events (fire), and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences.

The inspectors evaluated this deficiency using Manual Chapter 0609, Appendix F, "Fire Protection Significance Determination Process." During the Phase 1 evaluation, the inspectors determined that this deficiency affected the ability to implement the post-fire safe shutdown response. Because of the design of the vent system valves (i.e., three spurious actuations needed to exceed charging pump capability), availability of reliable reactor coolant system pressure and pressurizer level indications in the control room, and the ability of operator to compensate for the deficiency because of their experience and familiarity, the inspectors assigned this finding a low degradation rating. As specified in Appendix F, Step 1.3, this finding had very low safety significance (Green). This finding had a cross-cutting aspect in the area of human performance associated with decision making because the licensee failed to use a systematic process to correct fire protection procedure deficiencies in response to a violation in 2008 H.1(a).

Enforcement.

License Condition 3.D specifies that the licensee shall implement and maintain in effect all provisions of the approved Fire Protection Program as described in the Updated Safety Analysis Report for the facility and as approved in the SERs dated February 14, and August 23, 1978, November 17, 1980, April 8, and August 12, 1982, July 3, and November 5, 1985, July 1, 1986, December 20, 1988, November 14, 1990, March 17, 1993 and January 14, 1994.

The Updated Safety Analysis Report, Section 9.11.1, specifies that the design basis of the fire protection systems includes commitment to APCSB 9.5 1, Appendix A, "Guidelines for Fire Protection for Nuclear Power Plants Docketed Prior to July 1, 1976." Fire Hazards Analysis Manual, Appendix A, "Comparison Matrix Guidelines of Appendix A to APCSB 9.5-1, 'Overall Requirements of Nuclear Plant Fire Protection Program,'" Section C.8 specifies that the licensee will use, in part, Quality Assurance Plan, Section 10.4. Quality Assurance Plan, Section 10.4, Step 4.1.1, requires that the licensee correct conditions adverse to quality as soon as practicable based upon their safety significance.

Contrary to the above, from September 24, 2008 until March 24, 2012, the licensee failed to correct conditions adverse to quality as soon as practicable based upon their safety significance. Specifically, the licensee failed to implement corrective actions to address Non-cited Violation 05000285/2008009-02 by failing to revise procedures to assure the required actions could be reliably performed.

The licensee documented this deficiency in Condition Report 2012-01703. Because this finding is of very low safety significance and has been entered into the corrective action program, this violation is being treated as a non-cited violation, consistent with Section 2.3.2 of the NRC Enforcement Policy: NCV 05000285/2012007-05, Untimely corrective actions related to revising a post-fire safe shutdown procedure.

4OA6 Meetings, Including Exit

Exit Meeting Summary

The inspectors presented the inspection results to Mr. D. Bannister, Vice President and Chief Nuclear Officer and other members of the licensee staff at an debrief meeting on April 13, 2012. The licensee acknowledged the findings presented. Following additional in-office review, an exit meeting was conducted on May 17, 2012, with Mr. J. Herman, Division Manager, Nuclear Engineering, and other members of your staff.

The inspectors asked the licensee whether any of the material examined during the inspection should be considered proprietary. No proprietary information was identified.

A-1 Attachment

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

R. Acker, Licensing Engineer
D. Bannister, Site Vice President and Chief Nuclear Officer
S. Baughn, Manager - Nuclear Licensing
S. Benham, Control Room Supervisor
B. Blome, Manager - Quality
C. Cameron, Supervisor - Regulatory Compliance
K. Daughenbaugh, Control Room Supervisor
K. Erdman, Supervisor - Engineering Programs
W. Goodell, Division Manager - Nuclear Performance Improvement and Support
A. Hedges, Equipment Operator
J. Herman, Division Manager- Engineering
R. Hugenroth, Nuclear Safety Review Group/Quality Assurance
W. Kropp, Recovery Inspectors Lead
C. Kuchta, Equipment Operator
B. Linden, Equipment Operator
J. McManis, Manager Projects - Recovery OPPD
A. Meusch, Engineering Programs - Co-op
D. Nemecek, Equipment Operator
F. De Peralta, TRI-EN Corporation, Fire Protection
M. Prospero, Plant Manager
R. Reno, Manager - Operations Support
R. Ricks, Control Room Supervisor
G. Riva, Fire Protection System Engineer
J. Roche, Equipment Operator
K. Root, ENP Recovery Inspectors
R. Rybak, ENP recovery Inspectors
R. Salazar, TRI-EN Corporation, Fire Protection
R. Short, Manager - Recovery OPPD
R. Swerczek, Fire Protection Program Engineer

NRC Personnel

John Kirkland, Senior Resident Inspector

Attachment

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened

05000285/2012007-01VIO Failure to Provide Adequate Post-Fire Safe Shutdown Actions in the Switchgear Rooms (Section 1R05.01.b)
05000285/2012007-02VIO Failure to Maintain Command and Control Function During Fire Fighting Activities in the Protected Area (Section 1R05.03.b)

Opened and Closed

05000285/2012007-03NCV Alternate Shutdown Procedure Does Not Account for Single Worst Case Spurious Actuations (Section 1R05.05.b.1)
05000285/2012007-04NCV Failure to Provide Adequate Alternate Shutdown Capability (Section 1R05.05.b.2)
05000285/2012007-05NCV Untimely Corrective Actions Related to Revising a Post-Fire Safe Shutdown Procedure (Section 4OA2.b)

LIST OF ACRONYMS ADAMS Agencywide Documents Access and Management System

CR Condition Report CFR Code of Federal Regulations DRS Division of Reactor Safety FPIP Fire Protection Impairment Permits NCV Non-cited Violation

NFPA National Fire Protection Association NRC Nuclear Regulatory Commission PAR Publicly Available Records SDP Significance Determination Process

LIST OF DOCUMENTS REVIEWED

B.5.b MITIGATION STRATEGIES

Number Title Revision
OCAG-1 Operational Contingency Action Guideline 17
OCAG-1 Operational Contingency Action Guideline 20
Attachment COMPONENT CABLE ROUTING DATA
HCV-150,
HCV-151 - PORV Block Valves
PCV-102-1,
PCV-102-2 - Power Operated Relief Valves
LCV-383-1,
LCV-383-2 - SIRWT Outlet Valves
CALCULATIONS
Number Title Revision
EA-91-084 Breaker/Fuse Coordination Study 11
EA-FC-89-055 Emergency Lighting Verification 17
EA-FC-89-055 Fort Calhoun Safe Shutdown Analysis 17
EA-FC-89-055 Attachment 7 Communications Systems Evaluation 17
EA-FC-97-043 Fire Safe Shutdown for Control Room Evacuation Design Basis Analysis 2
EA-FC-97-044 10
CFR 50 Appendix R Cable Identification 10
EA-FC-98-022 Plant Specific Analysis to Support 10CFR50 Appendix R Transient Analysis for Fort Calhoun Station 2
EA-FC-06-008 Engineered Safety Features Actuation System (ESFAS) Fire-Induced Failure Evaluation 0 FC05690 Loads Calculation (In Amps) For Dc Bus #1 (EE-8F) 8 FCO6355 10
CFR 50 Appendix R Functional Requirements and Component Selection 14 FC06766 B.5.b Phase 2 and 3 Mitigation Strategies - Water Flow and Hose Capacities 3
CONDITION REPORTS
2008-05319 2008-05325 2010-03383 2010-03418 2010-04677
2010-06891 2011-00759 2011-00964 2011-01007 2011-05992
2011-06266 2011-06418 2011-07356 2011-07621 2011-07624
2011-07951 2011-08213 2011-08274 2011-08275 2011-08528
2011-08600 2011-08672 2011-09009 2011-09219 2011-09531
2011-09798 2012-01421 2012-01459 2012-01506 2012-01507
2012-01511 2012-01549 2012-01603 2012-01613 2012-01630
2012-01649 2012-01656 2012-01667 2012-01680 2012-01684
2012-01691 2012-01692 2012-01703 2012-01794 2012-01795
2012-01854 2012-01869 2012-01883 2012-01887 2012-01889
2012-01893 2012-01949 2012-01954 2012-01955 2012-01962
2012-01963 2012-01976 2012-01982 2012-01983 2012-01984
2012-01985 2012-01986 2012-01987 2012-01989 2012-01990
Attachment CONDITION REPORTS
2012-01991 2012-02000 2012-02032 2012-02034 2012-02035
2012-02045 2012-02050 2012-02053 2012-02063 2012-02068
2012-02069 2012-02126 2012-02138 2012-02150 2012-02177
2012-02181 2012-02185 2012-02187 2012-02190 2012-02191
2012-02192 2012-02194 2012-02195 2012-02196 2012-02197
2012-02198 2012-02199 2012-02201 2012-02213 2012-02213
2012-02222 2012-02224 2012-02225 2012-02226 2012-02229
2012-02231 2012-02232 2012-02233 2012-02235 2012-02236
2012-02239 2012-02244 2012-02245 2012-02246 2012-02247
2012-02255 2012-02256 2012-02270 2012-02271 2012-02274
2012-02276 2012-02309* 2012-02338* 2012-02386* 2012-02390*
2012-02401* 2012-02404* 2012-02406* 2012-02407* 2012-02410*
2012-02417* 2012-02431* 2012-02436* 2012-02467* 2012-02573*
2012-02575* 2012-02576* 2012-02578* 2012-02579* 2012-02581*
2012-02583* 2012-02640* 2012-02680* 2012-02682* 2012-02692*
2012-02748* 2012-02750*
2012-02781* 2012-02793* 2012-02795*
2012-02798* 2012-02838* 2012-02839* 2012-02839* 2012-02842*
2012-03214* 2012-03238* 2012-03239*
  • CR initiated due to NRC inspection activities.
DESIGN BASIS DOCUMENTS (DBD)
Number Title Revision
SDBD-SI-LP-133 Low Pressure Safety Injection System 30
SDBD-RC-128 Reactor Coolant 34
TBD-OCAG-1 Technical Basis Document - Operational Contingency Action Guide 1 1
DRAWINGS
Number Title Revision/Date B-4063 Switchgear Room and Room 81 Halon/Smoke Damper Information 8 B-4250 Cable Block Diagram
PCV-102-2 1 B-4250, Sheet 31 Cable Block Diagram
HCV-151 2
B-4250, Sheet 149 Cable Block Diagram
LCV-383-1 3 B-4250, Sheet 151 Cable Block Diagram
LCV-383-2 3 B-4250, Sheet 190 Cable Block Diagram
PCV-102-1 1 B-4280, Sheet 1 Elementary Diagram Limit Switch & 43/SW. Contact Development 2
Attachment DRAWINGS
Number Title Revision/Date D-4094, Sheet 1 Fire Detection System Ground Floor Plan 8 D-4094, Sheet 2 Fire Detection System Basement Floor Plan Elevation 995'-6" 5 D-4094, Sheet 3 Fire Detection System Auxiliary Building and Containment Elevation 1025'-0" 6 D-4094, Sheet 4 Fire Detection System Operating Floor Plan Elevation 1036'-0" 13 D-4094, Sheet 5 Fire Detection System Turbine Building Elevation 990'-0" 4 D-4094, Sheet 6 Fire Detection System Turbine Building Elevation 1011'-0" 5 D-4094, Sheet 7 Fire Detection System Turbine Building Elevation 1036'-0" 3 D-4098, Sheet 1 Auxiliary Building Fire Areas Operating Level 2 D-4098, Sheet 2 Auxiliary Building Fire Areas Ground Level 6
D-4098, Sheet 3 Auxiliary Building Fire Areas Basement Level 1 D-4098, Sheet 4 Auxiliary Building Fire Areas Intermediate Level 3 D-4159 Schematic Diagram Solenoid Operated Valves 7 D-4324, Sheet 1 Wiring Diagram QSPDS Panel
AI-208A 5 D-4324, Sheet 3 of 4 Wiring Diagram QSPDS Panel
AI-208B 6
D-4364, Sheet 1 Radiant Energy Shields, Sheet 1 2 D-4364, Sheet 2 Radiant Energy Shields, Sheet 2 2 D-4409 13.8 KV One - Line Diagram P &
ID 26 D-4547 Radiant Energy Shields For
HCV-249 2 D-4575, Sheet 1 Supply Piping For Diesel Generator Room Dry-Pipe Sprinkler System Seismic Support Location Isometric Drawing 1 D-4575, Sheet 2 Supply Piping For Diesel Generator Room Dry-Pipe Sprinkler System Seismic Support Location Isometric Drawing 0 D-4575, Sheet 3 Supply Piping For Diesel Generator Room Dry-Pipe Sprinkler System Seismic Support Location Isometric Drawing 0 D-4575, Sheet 4 Supply Piping For Diesel Generator Room Dry-Pipe Sprinkler System Seismic Support Location Isometric Drawing 0 D-4575, Sheet 5 Supply Piping For Diesel Generator Room Dry-Pipe Sprinkler System Seismic Support Location Isometric Drawing 0 D-4575, Sheet 6 Supply Piping For Diesel Generator Room Dry-Pipe Sprinkler System Seismic Support Location Isometric 0
Attachment DRAWINGS
Number Title Revision/Date Drawing D-4575, Sheet 7 Supply Piping For Diesel Generator Room Dry-Pipe Sprinkler System Seismic Support Location Isometric Drawing 0 D-4575, Sheet 8 Supply Piping For Diesel Generator Room Dry-Pipe Sprinkler System Seismic Support Location Isometric Drawing 0 D-4575, Sheet 9 Supply Piping For Diesel Generator Room Dry-Pipe Sprinkler System Seismic Support Location Isometric Drawing 0 D-4575, Sheet 10 Supply Piping For Diesel Generator Room Dry-Pipe Sprinkler System Seismic Support Location Isometric Drawing 0 D-4575, Sheet 11 Supply Piping For Diesel Generator Room Dry-Pipe Sprinkler System Seismic Support Location Isometric Drawing 0 D-4575, Sheet 12 Supply Piping For Diesel Generator Room Dry-Pipe Sprinkler System Seismic Support Location Isometric Drawing 0 D-4666
DG-2 Diesel Generator One Line Diagram P & ID 6 D-4665 DG- Diesel Generator One Line Diagram P & ID 6 D-4769 Sheet 1 Emergency Lighting Ground Floor Plan For Fire Safe Shutdown 1 D-4769 Sheet 2 Emergency Lighting Ground Floor Plan For Fire Safe Shutdown 2 D-4769 Sheet 3 Emergency Lighting Ground Floor Plan For Fire Safe Shutdown 2 D-4769 Sheet 4 Emergency Lighting Ground Floor Plan For Fire Safe Shutdown 1 D-4769 Sheet 5 Emergency Lighting Ground Floor Plan For Fire Safe Shutdown 1 E-4228 Sheet 1 Communication Equipment Layout Elevations 989' and 990' 0 E-4228 Sheet 2 Communications Equipment Layout Elevation 1007', 1011', and 1019' 0 E-4228 Sheet 3 Communication Equipment Layout Elevation 1025', 1036', and 1045' 0 E-4228 Sheet 4 Communication Equipment Layout For Radwaste, CARP, TSC, and Maintenance Buildings 0 E-4228 Sheet 5 Communication Equipment Layout For Intake Structure, New Warehouse, Security Building and Training Center 2 E-4228 Sheet 6 Communication Equipment Layout For Administration 0
Attachment DRAWINGS
Number Title Revision/Date Building and Old Warehouse
E-4228 Sheet 7 Communication Equipment Layout For Outdoors
1
FS77-655 Sheet 2 Automatic Switch Company Buletin 905 - 908 Automatic Transfer Switch July 31, 1961
GE 177B2371, Sheet 441 Motor Control Center 4A1 Unit C05 1 GHDR 11405-E-73, Sheet 2 Switchgear Diesel Generator & Electrical Penetration Area Tray & Conduit Layout Plan Elevation 1011'-0" &
1013'-0" 28 GHDR 11405-E-73, Sheet 3 Switchgear Diesel Generator & Electrical Penetration Area Tray & Conduit Layout Plan Elevation 1011'-0" & 1013'-0" 20 GHDR 11405-E-30, Sheet 6 Stored Energy System & Miscellaneous Systems S.C. & I. 21 2C6288 Fort Calhoun Station D.C. Distribution Schematic
EE-8F (Cuttler-Hammer Drawing) November 29, 1994 2C6289 Fort Calhoun Station D.C. Distribution Schematic
EE-8G (Cuttler-Hammer Drawing) November 29, 1994 3-368, Sheet 1 Halon System For Switchgear Room 6 3-368, Sheet 2 Halon System For Switchgear Room 6
8-4250, Sheet 30 Cable Block Diagram
HCV-150 2 117C3250 Switches-AI-30A,
AI-30B 2 136B2431, Sheet 70 Elementary Diagram Electrical Control Valves & Pumps 20 136B2431, Sheet 80 Elementary Diagram Electrical Control Valves & Pumps 20 136B2431, Sheet 92 Elementary Diagram Electrical Control Valves & Pumps 21
136B2431, Sheet 93 Elementary Diagram Electrical Control Valves & Pumps 22 136B2432, Sheet 9 Elementary Diagram Switch Development 1 136B2432, Sheet 50 Elementary Diagram Switch Developments 18 136B2432, Sheet 51 Elementary Diagram Switch Developments 21 136B3219, Sheet 30 Elementary Diagram Electrical Control Valves & Pumps 10
136B3219, Sheet 31 Elementary Diagram Electrical Control Valves & Pumps 10 161F570 Connection Diagram, Panel
CB-1.2.3, SH
NO 15 65 161F570 Connection Diagram, Panel
CB-1.2.3, SH
NO 23 79 161F598, Sheet 6 Elementary Diagram
AI-30B 19 161F598, Sheet 7 Elementary Diagram
AI-30B 13
11405-A-6 Primary Plant Ground Floor Plan P &
ID 87 11405-E-1 Main Oneline Diagram P &
ID 49 11405-E-3 4.16 KV Auxiliary Power One Line Diagram P &
ID 23 11405-E-4, Sheet 1
480 Volt Auxiliary Power One Line Diagram P &
ID 31
Attachment DRAWINGS
Number Title Revision/Date 11405-E-5, Sheet 2 480 Volt Auxiliary Power One Line Diagram
P &
ID 66 11405-E-6, Sheet 1 480 Volt Primary Plant Motor Control Center One Line Diagram P &
ID 78 11405-E-7 Sheet 2B 480 Volt Primary Plant Motor Control Center One Line Diagram P &
ID 30 11405-E-8 Sheet 1 125 Volt DC Miscelaneous Power Distribution Diagram P &
ID 62 11405-E-9 Sheet 1 120 Volt AC Instrument Buses One Line Diagrams
P &
ID 47 11405-E-9 Sheet 2
120 Volt AC Instrument Buses One Line Diagrams
P &
ID 18 11405-E-9 Sheet 3 120 Volt AC Instrument Buses One Line Diagrams
P &
ID 35 11405-E-9 Sheet 4 120 volt instrument bus 3 one line diagram P & ID 7 11405-E-10 Sheet 1 480/120/208 Vac Miscellaneous Power Distribution Diagram (Primary Plant) P &
ID 45 11405-E-32, Sheet 2 Pressurizer & Reactor Coolant System, I&C MOV Elementary Terminal Block 25 11405-E-42, Sheet 9 Safety Injection and Chemical Volume Control Systems Schematic Control & Instrumentation 22 11405-E-51, Sheet 3 Pressurizer
RC-4, Relief Isolation Valves
HCV-150 &
HCV-151 Schematic Diagram 33 11405-E-67, Sheet 6 Cable Tray Sections 3 11405-E-72 Air Compressor Bay & Electrical Penetration Area Tray & Conduit Layout Plan Elevation 989'-0" 23 11405-E-76 Switchgear Diesel Generator Electrical Penetration Area & Containment Building Penetr. Outside - Section & Details SHEET*2 61 11405-E-78, Sheet 2 Cable Room Tray & Conduit Layout Plan Elevation 1025'-0" 33 11405-E-92, Sheet 2 Containment Building Tray & Conduit Layout Plan Elevation 994'-0" 4 11405-E-93, Sheet 2 Containment Building Tray & Conduit Layout Plan Elev. 1013'-0" 13 11405-E-98 Containment Building Penetrations Inside 26 11405-E-120 Sheet 6
LP-5 Panel Schedule 11 11405-E-120 Sheet 61
ELP-1 Panel Schedule 3 11405-E-120 Sheet 62
ELP-2 Panel Schedule 5 11405-E-253, Sheet Secondary Plant 480 Volt Motor Control Center One 68
Attachment DRAWINGS
Number Title Revision/Date 1 Line Diagram P &
ID 11405-E-254 Secondary Plant 480 Volt Motor Control Center One Line Diagram P &
ID 84 11405-E-308 Turbine Room Lighting Plan Elevation 1011'-0"
AND 1023'-6" 33 11405-E-348 Sheet 1 345 And 161 KV Switchyard Junction Cabinet "1E" and Kirk Interlock Diagrams 13 11405-M-253, Sheet 1 Composite Flow Diagram Steam Generator Feedwater and Blowdown 48 11405-M-253, Sheet 3 Composite Flow Diagram Steam Generator Feedwater and Blowdown 48 11405-M-253, Sheet 4 Composite Flow Diagram Steam Generator Feedwater and Blowdown 39 11405-M-254, Sheet 4 Flow Diagram Condensate 30 11405-M-266, Sheet 1 Fire Protection Flow Diagram P&ID 90 11405-M-266, Sheet 1A Fire Protection Flow Diagram P&ID 28 11405-M-266, Sheet 1B Fire Protection Flow Diagram P&ID 29 11405-M-266, Sheet 10 Halon Piping System Switchgear Room, Cable Spread Room, Control Room & Q.A. Vault 2 FIG 8.1-1 Simplified One Line Diagram Plant Electrical System P &
ID 142
Drawing Markups to Show Post-Fire Safe Shutdown Equipment
Drawing Markups to Show Post-Fire Safe Shutdown Equipment Number Title 11405-E-8, Sheet 1 125 Vdc Miscellaneous Power Distribution Diagram
11405-E-9, Sheet 2 120 Vac Instrument Buses One Line Diagram
11405-M-10, Sheet 1 Flow Diagram Auxiliary Coolant Component Cooling System 11405-M-10, Sheet 3 Flow Diagram Auxiliary Coolant Component Cooling System 11405-M-10, Sheet 4 Flow Diagram Auxiliary Coolant Component Cooling System
11405-M-40, Sheet 1 Flow Diagram Auxiliary Coolant Component Cooling System 11405-M-100 Flow Diagram Raw Water 11405-M-252, Sheet 1 Flow Diagram Steam 11405-M-253, Sheet 1 Flow Diagram Steam Generator Feedwater and Blowdown 11405-M-253, Sheet 3 Flow Diagram Steam Generator Feedwater and Blowdown Attachment Drawing Markups to Show Post-Fire Safe Shutdown Equipment Number Title 11405-M-253, Sheet 4 Flow Diagram Steam Generator Feedwater and Blowdown
11405-M-254, Sheet 2 Flow Diagram Condensate 11405-M-254, Sheet 4 Flow Diagram Condensate
11405-M-262, Sheet 1 Flow Diagram Fuel Oil 11405-M-266, Sheet 1 Flow Diagram Fire Protection 11405-M-266, Sheet 1A Flow Diagram Fire Protection 11405-M-266, Sheet 1B Flow Diagram Fire Protection D-4078 Flow Diagram Reactor Coolant Gas Vent System
E-23866-210-110, Sheet 1 Flow Diagram Reactor Coolant System E-23866-210-110, Sheet 1A Flow Diagram Reactor Coolant System E-23866-210-120, Sheet 1 Flow Diagram Chemical and Volume Control System
E-23866-210-120, Sheet 1A Flow Diagram Chemical and Volume Control System
E-23866-210-121, Sheet 1 Flow Diagram Chemical and Volume Control System
E-23866-210-121, Sheet 2 Flow Diagram Chemical and Volume Control System
E-23866-210-130, Sheet 1 Flow Diagram Safety Injection and Containment Spray System
E-23866-210-130, Sheet 2 Flow Diagram Safety Injection and Containment Spray System
E-23866-210-130, Sheet 2A Flow Diagram Safety Injection and Containment Spray System
E-23866-210-130, Sheet 2B Flow Diagram Safety Injection and Containment Spray System
E-23866-210-130, Sheet 3 Flow Diagram Safety Injection and Containment Spray System
ENGINEERING ANALYSIS
Number Title Revision/Date
EA 93-033 Evaluation of Fire Barriers to
GL 92-08 and Evaluation of Miscellaneous Fire Barriers 4
EA 97-001 Fire Hazards Analysis (FHA) Manual 16
EA-FC-93-047 Halon System Operability Evaluation 4
EA-FC-95-022 NFPA Code Compliance 4
EA-FC-01-013 Effects of Secondary Environment Resulting From a Fire Event 0
EAR 94-132 Evaluate Halon Enclosure Test Results November 30, 1994
FIRE IMPAIRMENTS
2006016
2010226
2919236
Attachment
PROCEDURES
Number Title Revision/Date
AOP-06 Fire Emergency May 16, 2011
AOP-06-01 Fire Emergency Auxiliary Building Radiation Controlled Areas and Containment May 23, 2008
AOP-06-02 Fire Emergency Uncontrolled Areas of Auxiliary Building January 19, 2012
AOP-06-03 Fire Emergency Miscellaneous Areas 1 EOP/AOP Attachment 2 Reactor Coolant System Pressure - Temperature Limits for 40 Effective Full Power Years 32 EOP/AOP Attachment 6 Minimizing Direct Current Loads 32
EM-ST-EE-0011 Annual Testing Of Emergency Lighting Panels 9
EM-ST-EE-0014 Battery Powered Emergency Lighting Discahrge Performance Test (8-Hour) 5
EM-ST-FP-0011 Visual Inspection of Fire Detection Zone Eleven 13
EM-ST-FP-0012 Inspection and Functional Test Of Fire Detection Zone Twelve 12
EM-ST-FP-0013 Calibration and Functional Test Of Auxiliary Building, Elevation 1025' Fire Detection 11
EM-ST-FP-0017 Inspection of Fire Detection Zone Seventeen 13
EM-ST-FP-0018 Inspection of Fire Detection Zone Eighteen 13
EM-ST-FP-0021 Inspection of Fire Detection Zone Twenty-One 10
EM-ST-FP-0022 Calibration and Functional Test of Containment Purge Discharge Fans (VA-32A/VA-32B) and Supply Fans (VA-24A/VA-24B) Fire Detectors 14
EM-ST-FP-0035 Calibration and Functional Test of Auxiliary Building,
DG-2 (Room 64) Fire Detectors 11
EM-ST-FP-0036 Calibration and Functional Test of Auxiliary Building,
DG-1 (Room 63) Fire Detectors 13
EM-ST-FP-0043 Calibration and Functional Test of Switchgear Room Halon Fire Detection Zones Five and Six 12
EM-ST-FP-0044 Calibration and Functional Test of Switchgear Room Halon Fire Detection Zones Seven and Eight 11
GM-RR-FP-0502 Firedoor Replacement 8
GM-ST-FP-0005 Semi-Annual Switchgear Rooms Halon Cylinders Weight and Pressure Test 21
MM-RR-FP-1006A Application of Carboline Company "Pyrocrete 241" Fireproofing 0
OP-ST-FP-0003 Fire Protection System Diesel Generator Rooms Sprinkler Functional Test 15
PE-RR-FP-0400 Resetting of Dry Pipe Deluge Valve,
FP-513 9
Attachment PROCEDURES
Number Title Revision/Date
PE-ST-FP-0001 Fire Protection System Halon System Air Flow Test 11
SE-ST-FP-0002 Fire Protection System Motor Driven Fire Pump Full Flow Test 19, 20 & 21
SE-ST-FP-0003 Fire Protection System Diesel Driven Fire Pump Full Flow Test 22, 24 & 25
SE-ST-FP-0005 Fire Barrier and Penetration Seals Eighteen Month Inspection 15
SE-ST-FP-0011 Fire Barrier and Penetration Seals Outage Inspection 2
SO-G-28 Station Fire Plan 82
SO-O-41 Control of Operator Aids and Emergency Equipment 130
SO-G-58 Control of Fire Protection System Impairments 37
SO-G-91 Control and Transportation of Combustible Materials 27
SO-G-102 Fire Protection Program Plan 11
SO-G-103 Fire Protection Operability and Surveillance Requirements 25
MISCELLANEOUS DOCUMENTS
Number Title Revision/Date FBTPMP Fire Brigade Training Program Master Plan 18
FHA-EA97-001 Fire Hazards Analysis (FHA) Manual 16 Figure 8.1-1 Marked Up Simplified One Line Diagram That Demonstrates the Electrical Configuration After Implementing the Alternate Shutdown Procedure
Lesson Plan
AOP-06 Emergency Fire Procedure 19 Lesson Plan 1061-01 Incident Command
Lesson Plan 1064-11 Live Fire Practical
LIC-84-411 Letter from R. L. Andrews (OPPD) to J. R. Miller (NRC) December 3, 1984
LIC-85-037 Letter from R. L. Andrews (OPPD) to J. R. Miller (NRC) March 8, 1985
LIC-86-118 Letter from R. L. Andrews (OPPD) to A. C. Thadani (NRC) April 9, 1986
LIC-11-0099 License Amendment Request 10-07, Proposed Changes to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants (2001 Edition) at Fort Calhoun September 28, 2011 NFPA 600 Standard on Industrial Fire Brigades 1992
NOD-QP-34 Ongoing Commitment Program (Evaluation For Not Moving Spent Fuel Into The Preferred Pattern Within 60-Days) June 9, 2011
Attachment MISCELLANEOUS DOCUMENTS
Number Title Revision/Date
NOD-QP-34 Ongoing Commitment Program (Evaluation For Moving Fire Truck And Trailer Mounted Pump Inside Protected Area) June 9, 2011
NRC-85-0200 Letter from E. J. Butcher (NRC) to R. L. Andrews (OPPD) July 3, 1985
NRC-86-0211 Letter from D. E. Sells (NRC) to R. L. Andrews (OPPD) July 1, 1986
OE 2009-2418 IN09-29 Potential Failure of Fire Water Supply Pumps To Automatically Start Due To A Fire December 1, 2009
PED-ESS-15 Electrical Standard Specification Stores Switchboard Wire/Cable Specification 4 Procedure Change Request
EC 53257 For
AOP-06, Fire Emergency, Revision 25
QAP-10.4 Condition Reporting and Corrective Action 9
RA 2011-1290 Request For Training October 28, 2011
RA 2011-1398 Request For Training November 22, 2011
RA 2011-1419 Request For Training November 23, 2011
RA 2012-0147 Request For Training January 24, 2012 R11AD606 Fort Calhoun Systems Training Material,
AOP-06 Fire Emergency
System Training Manual Vol. 17 Emergency Lighting Systems 2 System Training Manual, Volume 21 Fire Protection System 29 TD G080.2400 Time-Current Curves For General Electric Molded Case Circuit Breaker E-100 Line Type TE,10-100 Amperes (GES-6107C) March 1, 1989 TD G080.2350 Renewal Parts For Panelboards Types NAB, NHB STYLE 3 (GEG-13611C) March 1, 1989 07-0038 Lessons Learned on Multiple Spurious Operations 3
Fire Protection Program Review Report 0
MODIFICATIONS
Number Title Revision EC41428 Replace Charger For Room 81 Appendix R Emergency Lights 0
Attachment System Training Manuals
Number Title Revision Volume 2 Alternate Shutdown System 21 Volume 4 Auxiliary Feedwater System 48
Volume 12 Chemical and Volume Control System 45 Volume 21 Fire Protection 21
TECHNICAL BASIS DOCUMENTS
Number
Title Revision
TBD-AOP-06 Fire Emergency 25
TBD-AOP-06-01 Fire Emergency Auxiliary Building Radiation Controlled Areas and Containment 2
TBD-AOP-06-02 Fire Emergency Uncontrolled Areas of Auxiliary Building 3
TBD-OCAG-1 Technical Basis Document - Operational Contingency Action Guide 1 1
VENDOR MANUALS
Number Title Revision/Date TD C84.0070 Engineering Data for Crane Valves 1
TD A180.0050 Operation & Maintenance Instructions & Parts List for Allis-Chalmers Streamseal Butterfly Valves 3 TD C684.0020 Crane Steel Valve Installation & Maintenance Manual 1 TD A391.0090 Operating and Maintenance Manual for Anchor/Darling 20" Butterfly Valves with
GH-Bettis T-316 SR Operator 0 TD A391.0310 Instruction Manual for Anchor Darling (Flowserve) Butterfly Valves 0 TD D243.0090 Instruction Manual for Installation and Maintenance of Consolidated Electromagnetic Relief Valve Type 31533VX-30

with Bellows 4 TD C684.0100 Condensed Valve Catalog for Older Model Crane Valves 0 TD T960.0020 Training Guide For Teledyne Big Beam S6 Series Seismic Rated Emergency Lights January 23, 1998 TD T960.0030 Instructions For Teledyne Big Beam High Temperature Slide Out Charger Assembly December 30, 2008

Attachment WORK ORDERS
00406926 01
00381962 01
00390794 01
00416235 01
00423873 01
00381066 01
00360701 01
00414364 01
00367228 01
00381961 01
00367230 01
00367231 01
00367233 01
00393485 01
00384431 01
00384432 01
00282634 01
00424910 01
00396921 01
00364699 01
00335617 01
00400199 01
00368409 01
00337901 01
00362753 01
00391282 01
00413473-01 00420801-01