June 4, 2019
SUBJECT:
FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION
REPORT 05000285/2019403
Dear Ms. Fisher:
On May 9, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Fort Calhoun Station. The NRC inspectors discussed the results of this inspection with Mr. T. Uehling, Senior Director, Fort Calhoun Station Decommissioning, and other members of your staff. The results of this inspection are documented in the enclosed report.
No NRC-identified or self-revealing findings were identified during this inspection.
However, the inspectors documented a licensee-identified violation which was determined to be Severity Level IV in this report. The NRC is treating this violation as a non-cited violation (NCV)
consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; and the Director, Office of Enforcement.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
If Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety
Docket No. 50-285 License No. DPR-40
Enclosure:
Inspection Report 05000285/2019403
ML19156A011 Entire Report:
ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By: DAH Yes No Publicly Available Sensitive _______MD 3.4 A.3
ADAMS ACCESSION NUMBER: ML19156A012 Cover Letter Only:
ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By: DAH Yes No Publicly Available Sensitive NRC-002 OFFICE PSI:PSB1 SPSI:PSB1 C:PSB1 C:RIB
NAME MChambers DHolman JGroom GWarnick
SIGNATURE
/RA/
/RA/
/RA/
/RA/
DATE 5/29/2019 5/31/2019 6/4/2019 5/30/2019