September 12, 2016
SUBJECT:
ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR FORT CALHOUN STATION (REPORT 05000285/2016005)
Dear Mr. Marik:
August 31, 2016
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR FORT CALHOUN STATION (REPORT 05000285/2016005)
Dear Mr. Marik:
On August 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of the Fort Calhoun Station. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Fort Calhoun Station operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Fort Calhoun Station during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
By letter dated June 24, 2016, Omaha Public Power District (OPPD) certified their intention to permanently cease power operations at Fort Calhoun Station by December 31, 2016 (ADAMS Accession No. ML16176A213). Following certification from OPPD that permanent shutdown and permanent fuel removal from the reactor vessel has occurred, the Fort Calhoun Station 10 CFR Part 50 license will no longer authorize plant operation, and the station will transition to NRC decommissioning oversight in accordance with Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program.
The enclosed inspection plan lists the operating reactor ROP inspections scheduled through June 30, 2018. In consideration of your June 24, 2016, letter, the inspection plan has been adjusted to ensure inspections needed to verify safe operation during the transition to a defueled plant condition are performed. Routine inspections performed by resident inspectors are not included in the inspection plan. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances Enclosure 2 warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts towards compliance with these Orders, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 817-200-1173 with any questions you have regarding this letter.
Sincerely,
/RA/
Geoffrey B. Miller, Branch Chief Projects Branch D Division of Reactor Projects Docket No. 50-285 License No. DPR-40 Enclosure:
Fort Calhoun Inspection/Activity Plan
Page 1 of 2 08/30/2016 09:34:47 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Fort Calhoun Inspection / Activity Plan 07/01/2016 - 06/30/2018 RS1568PI
- RADIATION SAFETY - TEAM
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 07/18/2016 07/22/2016
IP Radiation Monitoring Instrumentation 71124.05 07/18/2016 07/22/2016
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 07/18/2016 07/22/2016
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 07/18/2016 07/22/2016
IP Occupational Exposure Control Effectiveness 71151-OR01 07/18/2016 07/22/2016
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 07/18/2016 07/22/2016 EB1-17T
- FCS PERM PLANT MODS & 50.59 INSPECTION
1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 07/25/2016 08/12/2016 INSP
- BIENNIAL REQUAL INSPECTION
1 IP Licensed Operator Requalification Program 7111111B 08/29/2016 09/02/2016 RS 234
- RADIATION SAFETY
1 IP Occupational ALARA Planning and Controls 71124.02 10/31/2016 11/10/2016 EP-1
- EP PERFORMANCE INDICATORS
1 IP Drill/Exercise Performance 71151-EP01 11/28/2016 12/02/2016
IP ERO Readiness 71151-EP02 11/28/2016 12/02/2016
IP Alert & Notification System Reliability 71151-EP03 11/28/2016 12/02/2016 EP-2
- BIENNIAL EP PROGRAM INSPECTION
1 IP Alert and Notification System Testing 7111402 11/28/2016 12/02/2016
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 11/28/2016 12/02/2016
IP Emergency Action Level and Emergency Plan Changes 7111404 11/28/2016 12/02/2016
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 11/28/2016 12/02/2016 RS 13 PI
- RADIATION SAFETY
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/27/2017 03/31/2017
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/27/2017 03/31/2017
IP Occupational Exposure Control Effectiveness 71151-OR01 03/27/2017 03/31/2017
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 03/27/2017 03/31/2017 ISFSI
- ROUTINE INSPECTION (ONE WEEK IN MONTH)
1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 04/01/2017 04/30/2017 EXAM
- INITIAL LICENSED OPERATOR EXAM
1 INITIAL EXAM FCS (09/2017)
X02594 08/21/2017 08/25/2017
INITIAL EXAM FCS (09/2017)
X02594 09/25/2017 09/29/2017 EB1-07T
- FCS HEAT SINK PERFORMANCE
1 IP Heat Sink Performance 7111107T 05/22/2017 05/26/2017 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information FC Official Use Only - Sensitive Internal Information/Security-Related Information Enclosure
Page 2 of 2 08/30/2016 09:34:47 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Fort Calhoun Inspection / Activity Plan 07/01/2016 - 06/30/2018 RS 24
- RADIATION SAFETY
1 IP Occupational ALARA Planning and Controls 71124.02 06/12/2017 06/16/2017
IP Occupational Dose Assessment 71124.04 06/12/2017 06/16/2017 TSB 52B
- BIENNIAL PI&R
1 IP Problem Identification and Resolution 71152B 09/11/2017 09/25/2017
IP Problem Identification and Resolution 71152B 09/25/2017 09/29/2017 EB2-05XT
- TRIENNIAL FIRE PROTECTION INSPECTION
1 IP Fire Protection - NFPA 805 (Triennial)
7111105X 10/23/2017 10/27/2017
IP Fire Protection - NFPA 805 (Triennial)
7111105X 11/13/2017 11/17/2017 EP-2
- BIENNIAL EP EXERCISE INSPECTION
1 IP Exercise Evaluation 7111401 10/16/2017 10/20/2017
IP Emergency Action Level and Emergency Plan Changes 7111404 10/16/2017 10/20/2017 EP-3
- EP PERFORMANCE INDICATOR VERIFICATION
1 IP Drill/Exercise Performance 71151-EP01 10/16/2017 10/20/2017
IP ERO Readiness 71151-EP02 10/16/2017 10/20/2017
IP Alert & Notification System Reliability 71151-EP03 10/16/2017 10/20/2017 EP-1
- EP PROGRAM INSPECTION
1 IP Alert and Notification System Testing 7111402 05/14/2018 05/18/2018
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/14/2018 05/18/2018
IP Emergency Action Level and Emergency Plan Changes 7111404 05/14/2018 05/18/2018
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/14/2018 05/18/2018
IP Drill/Exercise Performance 71151-EP01 05/14/2018 05/18/2018
IP ERO Readiness 71151-EP02 05/14/2018 05/18/2018
IP Alert & Notification System Reliability 71151-EP03 05/14/2018 05/18/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information FC Official Use Only - Sensitive Internal Information/Security-Related Information Enclosure
ML16237A038 SUNSI Review By: GBM ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:
NRC-002 OFFICE: RIV D: DRS D: DRP C: DRP/D NAME AVegel TWPruett GBMiller SIGNATURE
/JAC for/
/RA/
/RA/
DATE 8/19/16 8/22/16 8/22/16
Letter to Michael R. Chisum from Geoffrey Miller, dated August 31, 2016 SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR FORT CALHOUN STATION (REPORT 05000285/2016005)
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Max.Schneider@nrc.gov)
Resident Inspector (vacant)
Administrative Assistant (vacant)
Senior Project Engineer, DRP/D (vacant)
Project Engineer (Jan.Tice@nrc.gov)
Project Engineer (Brian.Parks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov
ML16256A220 /PACKAGE: ML16256A205 SUNSI Review By: EDU ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:
NRC-002 OFFICE TL: IPAT
NAME THipschman
SIGNATURE
/RA/
DATE 9/12/16
Letter to Shane from Thomas R. Hipschman dated September 12, 2016 SUBJECT:
ERRATA FOR MID-CYCLE ASSESSMENT LETTER FOR FORT CALHOUN STATION (REPORT 05000285/2016005)
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Max.Schneider@nrc.gov)
Acting Resident Inspector (Thomas.Sullivan@nrc.gov)
Site Administrative Assistant (Yvonne.Dubay@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP (Vacant)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
RIV Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
RIV RITS Coordinator (Marisa.Herrera@nrc.gov)
RIV Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (G-R4-DRP-BC@nrc.gov)
DRS Branch Chiefs (R4DRS-BC1@nrc.gov)
ROPreports.Resource@nrc.gov ROPassessment.Resource@nrc.gov