NRC Security Baseline Inspection Report 05000285/2017406
ML17177A700
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 06/26/2017
From: Jeremy Groom
Plant Support Branch-1
To: Fisher M
Omaha Public Power District
References
IR 2017406
Download: ML17177A700 (3)


Text

une 26, 2017

SUBJECT:

FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2017406

Dear Ms. Fisher:

On May 31, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Fort Calhoun Station. The NRC inspectors discussed the results of this inspection with Mr. C. Heimes, Security Director, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.

The NRC inspectors did not identify any findings or violations of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA James R. Larsen Acting for/

Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-285 License No. DPR-40 Nonpublic Enclosure:

Inspection Report 05000285/2017406 w/Attachment: Supplemental Information cc w/enclosure:

Mr. Herb Childs Manager, Site Security Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-1 9610 Power Lane Blair, NE 68008 cc w/o encl:

Electronic Distribution for Fort Calhoun Station ML17177A694 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review By: Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML17177A700 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review By: Yes No Publicly Available Sensitive NRC-002 OFFICE PSI:PSB1 PSI:PSB1 C:PSB1 DNMS C:PSB1 NAME MChambers RLanfear JGroom RKellar JGroom SIGNATURE /RA/ /RA/ /RA/ JRL for /RA/ /RA/ JRL for DATE 6/26/17 6/26/17 6/26/17 6/26/17 6/26/17