==SUMMARY== | |||
OF OPERATING EXPERIENCE DOCKET NO. 50- 282 UNIT Prairie Island No.1 y DATE glosna ! | |||
COMPLETED BY Dale Duantad TELEPHONE 612-388- 1121 MONTH in ,.4 1 1ont 5 The unit was base loaded this month, no shutdowns. | |||
a a - | |||
A 8 | |||
5 a. | |||
B305160076 830511 PDR ADOCK 05000282 R PDR | |||
4 DAILY UNIT PONER OUTPUT DOCKET NO. 50-282 UNIT Prairie Island No.1 DATE 830504 COMPLETED BY Dale Dunstad TELEPHONE 612-388- 1121 MONTH April 1983 DAY AVERAGE LOAD MWe-Net DAY n AVERAGE LOAD MWe-Net | |||
$ 1 528 17 497 8 | |||
- 2 530 18 522 2 | |||
{ 3 527 19 522 E | |||
g 4 530 20 529 5 526 21 519 6 529 22 526 7 524 23 522 8 524 24 525 9 526 25 525 10 529 26 523 11 528 27 525 1; 526 28 524 13 527 29 525 14 526 30 524 l | |||
1 528 31 --- | |||
16 523 l . | |||
l | |||
! Average loads above 503 tMe-Net are due to cooler cond.:nser circulating water. | |||
l t | |||
l l | |||
l L- | |||
~ | |||
e OPERATING DATA REPORT DOCKET NO 50-282 DATE 830504 COMPLETED BY Dale Dugstad OPERATING STATUS TELEPHONE 612-388-1121 | |||
: 1. Unit Name: Prairie Island No. 1 | |||
: 2. Reporting Period: April 1983 | |||
: 3. Licensed Thermal Power (MWt): 1650 | |||
: 4. Nameplate Rating (Gross MWe): 593 | |||
: 5. Design Electrical Rating (Net MWe): 530 | |||
: 6. Maximum Dependable Capacity (Gross MWe): 534 g 7. Maximum Dependable Capacity (Net MWe): 503 | |||
+ 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report: | |||
2 , | |||
* Give Reason: N/A o? | |||
C | |||
, 9. Power Level To Which Restricted, If Any (Net MWe): N/A | |||
: 10. Reasons for Restrictions, If Any: N/A This Month Yr-To-Date Cumulative | |||
: 11. Hours In Reporting Period 719 2879 82151 | |||
: 12. Number Of Hours Reactor Was Critical 719 2518.0 66533.6 | |||
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 5571.1 | |||
: 14. Hours Generator On Line 719 2513.8 65270.6 | |||
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | |||
: 16. Gross Thermal Energy Generated (MWH) 1180326 4104828 102047806 | |||
: 17. Gross Electrical Energy Generated (MWH) 400310 1392660 33144080 | |||
: 18. Net Electrical Energy Generated (MWH) 377186 1317974 31020550 | |||
: 19. Unit Service Factor 100.0 87.3 79.5 | |||
: 20. Unit Availability Factor 100.0 87.3 79.5 | |||
: 21. Unit Capacity Factor (Using MDC Net) 104.3 91.0 75.1 | |||
: 22. Unit Capacity Factor (Using DER Net) 99.0 86.4 71.2 | |||
: 23. Unit Forced Outage Rate 0.0 0.4 9.2 | |||
'4. Shutdowns Scheduled Over Next-12 Months (Type, Date and Duration of Each): | |||
Refueling fall of 1983 5 Weeks | |||
: 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A | |||
. . o e | |||
UNIT SHUTDOWNS AND /ER REDUCTIONS DOCKET NO. 50- 282 - | |||
REPORT MONTH Apri1'1983 UNIT NAME Prairie Island No.I DATE 830504 COMPLETED BY Dale Dugstad | |||
, TELEPHONE 612-388 1121 s c n % [u Licensee e ,s u Cause & Corrective Date 8, 3Q @ d3 Event * | |||
.$ Em Action to N N$ $ EUE Report # $0 8 .$ Prevent Recurrence YE AV N SEN WM | |||
$0 o | |||
o E g u | |||
; S g -. ' | |||
4-17-83 S 0.0 B N/A N/A N/A N/A Turbine valves test 5 | |||
m F: Forced Reason Method: Exhibit G-In-S: Scheduled A-Equipment Failure (Explain) 1-Manual structions for B-Haintenance or Test 2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & License Examination Report (LER) File F-Administrative (NUREG-0161) | |||
G-Operational Error (Explain) | |||
II-Other (Explain 5 Exhibit 1 - Same Source | |||
NARRATIVE | |||
==SUMMARY== | |||
OF OPERATING EXPERIENCE DOCKET NO. 50- 306 UNIT Prairie Island No. 2 DATE 830504 COMPLETED BY Dale Dunstad TELEPHONE 612-388- 1121 MONTH Anril 1983 | |||
- The unit was base loaded this month. On the lith, after the Unit 2 h turbine valves test, one stop valve did not reopen thus limiting the a: | |||
., unit to approximately 73% power for five days. The unit was brought | |||
$ to cold shutdown on the 15th for repairs to the valve and at 1018 of | |||
@i the 16th was returned to service. | |||
5 a. | |||
i | |||
DAILY UNIT POWER OUTPUT DOCKET NO. 50- 306 UNIT Prairie Island No. 2 DATE 830504 COMPLETED BY Dale Dugstad . | |||
TELEPHONE 612-388- 1121 MONTH Anril 1983 DAY AVERACE LOAD MWe-Net DAY AVERAGE LOAD MWe-Net m | |||
f 1 522 17 -11 | |||
,. 2 524 18 -13 3 523 19 68 | |||
[ | |||
a g 4 522 20 419 5 520 21 516 6 520 22 523 7 519 23 520 8 521 24 524 9 507 25 520 10 339 26 519 11 344 27 521 12 358 28 523 13 353 29 517 l' 357 30 517 15 272 31 --- | |||
16 -11 Average loads above 500 !!We-Net are due to cooler condcaser circulating water. | |||
OPERATING DATA REPORT DOCKET NO 50- 306 DATE 830504 COMPLETED BY na1, nuoarmd OPERATING STATUS TELEPHONE 612-38'B-1121 | |||
: 1. Unit Name: Prairie Island No. 2 | |||
: 2. tes Reporting Period: April 1983 | |||
: 3. Licensed Thermal Power (MWt): 1650 | |||
: 4. Nameplate Rating (Gross MWe): 593 | |||
: 5. Design Electrical Rating (Net MWe): 530 | |||
: 6. Maximum Dependable Capacity (Gross MWe): 531 g 7. Maximum Dependable Capacity (Net MWe): 500 | |||
,- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report: | |||
O Give Reason: N/A o? | |||
d | |||
, 9. Power Level To Which Restricted, If Any (Net MWe): N/A e | |||
f '.0. Reasons for Restrictions, If Any: N/A 6 | |||
This Month Yr-To-Date Cumulative | |||
: 11. Hours In Reporting Pericd 719 2879 73269 | |||
: 12. Number Of Hours Reactor Was Critical 641.4 2596.3 63203.4 | |||
! ^13. Reactor Reserve Shutdown Hours 0.0 0.0 IS16.1 | |||
: 14. Hours Generator On Line 632.0 2582.9 62298.0 | |||
: 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | |||
: 16. Gross Thermal Energy Generated (MWH) 953086 4132573 97950361 | |||
: 17. Gross Electrical Energy Generated (MWH) 316080 1051870 31218960 | |||
: 18. Net Electrical Energy Generated (MWH) 295692 1310536 29569199 | |||
: 19. Unit Service Factor 87.9 89.7 85.0 | |||
: 20. Unit Availability Factor 87.9 89.7 85.0 | |||
: 21. Unit Capacity Factor (Using MDC Net) 82.3 91.0 80.7 l 22. Unit Capacity Factor (Using DER Net) 77.6 85.9 76.1 | |||
: 23. Unit Forced Outage Rate 0.0 0.0 4.9 | |||
: 4. Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Each): | |||
Refueling, July 1983 5 Weeks | |||
( 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A 1 | |||
UNIT SHUTDOWNS AND .ER REDUCTIONS | |||
* DOCKET NO. 50-306 - | |||
REPORT MONTil April 1983 UNIT NAME Prairie Island No. 2 DATE 830504 COMPLETED BY Dale Dus;stad | |||
. r TELEPHONE 612-388 1121 a e m u [u Licensee g4 u Cause & Corrective Date $. O9 8 dO Event u 8 8m Action to N N$ $ 3 I$ $ Report i EO $ .$ Prevent Recurrence | |||
* $$ 5 '0E N * | |||
$0 | |||
.n Av gm 3 9 | |||
i | |||
* 5 kH . | |||
4-10-83 S 0.0 B N/A N/A N/A N/A Turbine Valves Test . | |||
@ 4-10-83 F 0.0 A N/A RO 83-8 IIA Valvex Power Limited Due to Failed n. | |||
Valve 4-16-83 S 87.0 A 1 RO 83-8 IIA Valvex Repaired Failed Valve 1 | |||
1 F: Forced Reason Method: Exhibit G-In-S: Scheduled A-Equipment Failure (Explain) 1-Manual structions for B-Maintenance or Test 2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & License Examination Report (LER) File F-Administrative (NUREG-0161) | |||
C-Operational Error (Explain) 5 it-Other (Explain Exhibit 1 - Same Source}} |
Latest revision as of 10:14, 20 May 2020
ML20074A786 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 05/04/1983 |
From: | Dugstad D NORTHERN STATES POWER CO. |
To: | |
Shared Package | |
ML20074A766 | List: |
References | |
NUDOCS 8305160076 | |
Download: ML20074A786 (8) | |
Text
-
4 e
t NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50- 282 UNIT Prairie Island No.1 y DATE glosna !
COMPLETED BY Dale Duantad TELEPHONE 612-388- 1121 MONTH in ,.4 1 1ont 5 The unit was base loaded this month, no shutdowns.
a a -
A 8
5 a.
B305160076 830511 PDR ADOCK 05000282 R PDR
4 DAILY UNIT PONER OUTPUT DOCKET NO. 50-282 UNIT Prairie Island No.1 DATE 830504 COMPLETED BY Dale Dunstad TELEPHONE 612-388- 1121 MONTH April 1983 DAY AVERAGE LOAD MWe-Net DAY n AVERAGE LOAD MWe-Net
$ 1 528 17 497 8
- 2 530 18 522 2
{ 3 527 19 522 E
g 4 530 20 529 5 526 21 519 6 529 22 526 7 524 23 522 8 524 24 525 9 526 25 525 10 529 26 523 11 528 27 525 1; 526 28 524 13 527 29 525 14 526 30 524 l
1 528 31 ---
16 523 l .
l
! Average loads above 503 tMe-Net are due to cooler cond.:nser circulating water.
l t
l l
l L-
~
e OPERATING DATA REPORT DOCKET NO 50-282 DATE 830504 COMPLETED BY Dale Dugstad OPERATING STATUS TELEPHONE 612-388-1121
- 1. Unit Name: Prairie Island No. 1
- 2. Reporting Period: April 1983
- 3. Licensed Thermal Power (MWt): 1650
- 4. Nameplate Rating (Gross MWe): 593
- 5. Design Electrical Rating (Net MWe): 530
- 6. Maximum Dependable Capacity (Gross MWe): 534 g 7. Maximum Dependable Capacity (Net MWe): 503
+ 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report:
2 ,
- Give Reason: N/A o?
C
, 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons for Restrictions, If Any: N/A This Month Yr-To-Date Cumulative
- 11. Hours In Reporting Period 719 2879 82151
- 12. Number Of Hours Reactor Was Critical 719 2518.0 66533.6
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 5571.1
- 14. Hours Generator On Line 719 2513.8 65270.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1180326 4104828 102047806
- 17. Gross Electrical Energy Generated (MWH) 400310 1392660 33144080
- 18. Net Electrical Energy Generated (MWH) 377186 1317974 31020550
- 19. Unit Service Factor 100.0 87.3 79.5
- 20. Unit Availability Factor 100.0 87.3 79.5
- 21. Unit Capacity Factor (Using MDC Net) 104.3 91.0 75.1
- 22. Unit Capacity Factor (Using DER Net) 99.0 86.4 71.2
- 23. Unit Forced Outage Rate 0.0 0.4 9.2
'4. Shutdowns Scheduled Over Next-12 Months (Type, Date and Duration of Each):
Refueling fall of 1983 5 Weeks
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
. . o e
UNIT SHUTDOWNS AND /ER REDUCTIONS DOCKET NO. 50- 282 -
REPORT MONTH Apri1'1983 UNIT NAME Prairie Island No.I DATE 830504 COMPLETED BY Dale Dugstad
, TELEPHONE 612-388 1121 s c n % [u Licensee e ,s u Cause & Corrective Date 8, 3Q @ d3 Event *
.$ Em Action to N N$ $ EUE Report # $0 8 .$ Prevent Recurrence YE AV N SEN WM
$0 o
o E g u
- S g -. '
4-17-83 S 0.0 B N/A N/A N/A N/A Turbine valves test 5
m F: Forced Reason Method: Exhibit G-In-S: Scheduled A-Equipment Failure (Explain) 1-Manual structions for B-Haintenance or Test 2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & License Examination Report (LER) File F-Administrative (NUREG-0161)
G-Operational Error (Explain)
II-Other (Explain 5 Exhibit 1 - Same Source
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50- 306 UNIT Prairie Island No. 2 DATE 830504 COMPLETED BY Dale Dunstad TELEPHONE 612-388- 1121 MONTH Anril 1983
- The unit was base loaded this month. On the lith, after the Unit 2 h turbine valves test, one stop valve did not reopen thus limiting the a:
., unit to approximately 73% power for five days. The unit was brought
$ to cold shutdown on the 15th for repairs to the valve and at 1018 of
@i the 16th was returned to service.
5 a.
i
DAILY UNIT POWER OUTPUT DOCKET NO. 50- 306 UNIT Prairie Island No. 2 DATE 830504 COMPLETED BY Dale Dugstad .
TELEPHONE 612-388- 1121 MONTH Anril 1983 DAY AVERACE LOAD MWe-Net DAY AVERAGE LOAD MWe-Net m
f 1 522 17 -11
,. 2 524 18 -13 3 523 19 68
[
a g 4 522 20 419 5 520 21 516 6 520 22 523 7 519 23 520 8 521 24 524 9 507 25 520 10 339 26 519 11 344 27 521 12 358 28 523 13 353 29 517 l' 357 30 517 15 272 31 ---
16 -11 Average loads above 500 !!We-Net are due to cooler condcaser circulating water.
OPERATING DATA REPORT DOCKET NO 50- 306 DATE 830504 COMPLETED BY na1, nuoarmd OPERATING STATUS TELEPHONE 612-38'B-1121
- 1. Unit Name: Prairie Island No. 2
- 2. tes Reporting Period: April 1983
- 3. Licensed Thermal Power (MWt): 1650
- 4. Nameplate Rating (Gross MWe): 593
- 5. Design Electrical Rating (Net MWe): 530
- 6. Maximum Dependable Capacity (Gross MWe): 531 g 7. Maximum Dependable Capacity (Net MWe): 500
,- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report:
O Give Reason: N/A o?
d
, 9. Power Level To Which Restricted, If Any (Net MWe): N/A e
f '.0. Reasons for Restrictions, If Any: N/A 6
This Month Yr-To-Date Cumulative
- 11. Hours In Reporting Pericd 719 2879 73269
- 12. Number Of Hours Reactor Was Critical 641.4 2596.3 63203.4
! ^13. Reactor Reserve Shutdown Hours 0.0 0.0 IS16.1
- 14. Hours Generator On Line 632.0 2582.9 62298.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 953086 4132573 97950361
- 17. Gross Electrical Energy Generated (MWH) 316080 1051870 31218960
- 18. Net Electrical Energy Generated (MWH) 295692 1310536 29569199
- 19. Unit Service Factor 87.9 89.7 85.0
- 20. Unit Availability Factor 87.9 89.7 85.0
- 21. Unit Capacity Factor (Using MDC Net) 82.3 91.0 80.7 l 22. Unit Capacity Factor (Using DER Net) 77.6 85.9 76.1
- 23. Unit Forced Outage Rate 0.0 0.0 4.9
- 4. Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Each):
Refueling, July 1983 5 Weeks
( 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A 1
UNIT SHUTDOWNS AND .ER REDUCTIONS
- DOCKET NO. 50-306 -
REPORT MONTil April 1983 UNIT NAME Prairie Island No. 2 DATE 830504 COMPLETED BY Dale Dus;stad
. r TELEPHONE 612-388 1121 a e m u [u Licensee g4 u Cause & Corrective Date $. O9 8 dO Event u 8 8m Action to N N$ $ 3 I$ $ Report i EO $ .$ Prevent Recurrence
- $$ 5 '0E N *
$0
.n Av gm 3 9
i
- 5 kH .
4-10-83 S 0.0 B N/A N/A N/A N/A Turbine Valves Test .
@ 4-10-83 F 0.0 A N/A RO 83-8 IIA Valvex Power Limited Due to Failed n.
Valve 4-16-83 S 87.0 A 1 RO 83-8 IIA Valvex Repaired Failed Valve 1
1 F: Forced Reason Method: Exhibit G-In-S: Scheduled A-Equipment Failure (Explain) 1-Manual structions for B-Maintenance or Test 2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & License Examination Report (LER) File F-Administrative (NUREG-0161)