MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216E2051998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Prairie Island Nuclear Generating Plant ML20216E2121998-01-31031 January 1998 Revised MOR for Jan 1998 for Prairie Island Nuclear Generating Plant for Unit 2 & Narrative Summary of Operating Experience ML20202E7761998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Prairie Island Nuclear Generating Plant ML20198P1541997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Prairie Island Nuclear Generating Plant,Unit 1 & 2 ML20203H4341997-11-30030 November 1997 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant,Unit 1 ML20199D0701997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Prairie Island Nuclear Generating Plant ML20198J7281997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20210S5911997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20217J0681997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Prairie Island Nuclear Generating Plant ML20148K3871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20141A9581997-04-30030 April 1997 Monthly Operating Repts for April 1997 for Prairie Island Nuclear Plant ML20137T2891997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Prairie Island Nuclear Plant ML20135F6841997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Praire Island Nuclear Generating Plant ML20134L8831997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Praire Island Nuclear Generating Plant ML20133F8611996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Praire Island Nuclear Generating Plant ML20135E8811996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant ML20134L7091996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Prairie Island Nuclear Generating Plant ML20128G1741996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Prairie Island Nuclear Generating Plant ML20117N1521996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Prairie Island Nuclear Generating Plant ML20116J6451996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Prairie Island Nuclear Generating Plant ML20115A8321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20117K5811996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Prairie Island Nuclear Generating Plant ML20111B2801996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Prairie Island Nuclear Generating Plant ML20101N8931996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20101D0671996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Praire Island Nuclear Generating Plant Units 1 & 2 ML20097D5411996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Prairie Island Units 1 & 2 ML20096E9631995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Prairie Island Nuclear Generating Plant ML20095G4371995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Prairie Island Nuclear Generating Station ML20094L7491995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Prairie Island Nuclear Generating Plant ML20098D0101995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Prairie Island Nuclear Generating Plant ML20092D0091995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Prairie Island Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20211D3981999-08-24024 August 1999 Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectively ML20211C2531999-08-0404 August 1999 Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526 ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20211B5971999-07-31031 July 1999 Cycle 20 Voltage-Based Repair Criteria 90-Day Rept ML20209J1131999-07-15015 July 1999 Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing Actions ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196F4081999-06-23023 June 1999 Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20207B5931999-05-26026 May 1999 SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMs ML20196L2501999-05-13013 May 1999 Rev 0 to PINGP Unit 1 COLR Cycle 20 ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20205Q5101999-03-15015 March 1999 Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327-981229 ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20202J7711999-02-0404 February 1999 Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual Rept ML20202G3761999-01-31031 January 1999 Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI Units ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20202J1731999-01-22022 January 1999 Safety Evaluation Concluding That NSP Proposed Alternative to Surface Exam Requirements of ASME BPV Code for CRD Mechanism Canopy Seal Welds Will Provide Acceptable Level of Quality & Safety ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20198J6441998-12-17017 December 1998 Rev 0 to PINGP COLR Unit 2-Cycle 19 ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196D7341998-11-20020 November 1998 Third Quarter 1998 & Oct 1998 Data Rept for Prairie Island Isfsi ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20202J7991998-09-30030 September 1998 Non-proprietary Version of Rev 3 to CEN-629-NP, Repair of W Series 44 & 51 SG Tubes Using Leaktight Sleeves,Final Rept ML20198P0571998-09-0303 September 1998 Rev 1 to 95T047, Back-up Compressed Air Supply for Cooling Water Strainer Backwash Valve Actuator ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20237A3961998-08-11011 August 1998 Safety Evaluation on Westinghouse Owners Group Proposed Insp Program for part-length CRDM Housing Issue.Insp Program for Type 309 Welds Inadequate from Statistical Point of View ML20237A8171998-08-0505 August 1998 SER Related to USI A-46 Program GL 87-02 Implementation for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R6481998-07-15015 July 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2 - Preliminary Summary Rept ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G7011998-05-31031 May 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at Prairie Island Nuclear Generating Plant,Unit 2 ML20248M0561998-05-31031 May 1998 Rev 5 to CEN-620-NP, Series 44 & 51 Design SG Tube Repair Using Tube Rerolling Technique ML20247E2671998-05-0505 May 1998 Rev 0 to Pingp,Units 1 & 2,Pressure & Temp Limits Rept (Effective Until 35 Efpy) ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20217M6901998-04-29029 April 1998 Safety Evaluation Accepting Methodology for Relocation of Reactor Coolant Sys P/T Limit Curves & LTOP Sys Limits Proposed by NSP for Pingp,Units 1 & 2 ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216H0341998-03-31031 March 1998 Cycle-19 Voltage Based TSP Alternate Repair Criteria 90-Day Rept ML20217D2041998-03-13013 March 1998 Rev 1 to 28723-A, Intake Canal Liquefaction Analysis Rept for Pingp,Welch,Mn ML20236P9801998-03-12012 March 1998 Rev 0 to 97FP02-DOC-01, Compliance Review of 10CFR50,App R, Section Iii.O RCP Lube Oil Collection Sys ML20248L3931998-03-10010 March 1998 ISI Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 971018-971212 Cycle 18,960303-971212 ML20216D0911998-03-0606 March 1998 Rev 0 to Prairie Island Generating Plant,Units 1 & 2, Pressure & Temp Limits Rept 1999-09-30
[Table view] |
Text
-
4 e
t NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50- 282 UNIT Prairie Island No.1 y DATE glosna !
COMPLETED BY Dale Duantad TELEPHONE 612-388- 1121 MONTH in ,.4 1 1ont 5 The unit was base loaded this month, no shutdowns.
a a -
A 8
5 a.
B305160076 830511 PDR ADOCK 05000282 R PDR
4 DAILY UNIT PONER OUTPUT DOCKET NO. 50-282 UNIT Prairie Island No.1 DATE 830504 COMPLETED BY Dale Dunstad TELEPHONE 612-388- 1121 MONTH April 1983 DAY AVERAGE LOAD MWe-Net DAY n AVERAGE LOAD MWe-Net
$ 1 528 17 497 8
- 2 530 18 522 2
{ 3 527 19 522 E
g 4 530 20 529 5 526 21 519 6 529 22 526 7 524 23 522 8 524 24 525 9 526 25 525 10 529 26 523 11 528 27 525 1; 526 28 524 13 527 29 525 14 526 30 524 l
1 528 31 ---
16 523 l .
l
! Average loads above 503 tMe-Net are due to cooler cond.:nser circulating water.
l t
l l
l L-
~
e OPERATING DATA REPORT DOCKET NO 50-282 DATE 830504 COMPLETED BY Dale Dugstad OPERATING STATUS TELEPHONE 612-388-1121
- 1. Unit Name: Prairie Island No. 1
- 2. Reporting Period: April 1983
- 3. Licensed Thermal Power (MWt): 1650
- 4. Nameplate Rating (Gross MWe): 593
- 5. Design Electrical Rating (Net MWe): 530
- 6. Maximum Dependable Capacity (Gross MWe): 534 g 7. Maximum Dependable Capacity (Net MWe): 503
+ 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report:
2 ,
C
, 9. Power Level To Which Restricted, If Any (Net MWe): N/A
- 10. Reasons for Restrictions, If Any: N/A This Month Yr-To-Date Cumulative
- 11. Hours In Reporting Period 719 2879 82151
- 12. Number Of Hours Reactor Was Critical 719 2518.0 66533.6
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 5571.1
- 14. Hours Generator On Line 719 2513.8 65270.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1180326 4104828 102047806
- 17. Gross Electrical Energy Generated (MWH) 400310 1392660 33144080
- 18. Net Electrical Energy Generated (MWH) 377186 1317974 31020550
- 19. Unit Service Factor 100.0 87.3 79.5
- 20. Unit Availability Factor 100.0 87.3 79.5
- 21. Unit Capacity Factor (Using MDC Net) 104.3 91.0 75.1
- 22. Unit Capacity Factor (Using DER Net) 99.0 86.4 71.2
- 23. Unit Forced Outage Rate 0.0 0.4 9.2
'4. Shutdowns Scheduled Over Next-12 Months (Type, Date and Duration of Each):
Refueling fall of 1983 5 Weeks
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
. . o e
UNIT SHUTDOWNS AND /ER REDUCTIONS DOCKET NO. 50- 282 -
REPORT MONTH Apri1'1983 UNIT NAME Prairie Island No.I DATE 830504 COMPLETED BY Dale Dugstad
, TELEPHONE 612-388 1121 s c n % [u Licensee e ,s u Cause & Corrective Date 8, 3Q @ d3 Event *
.$ Em Action to N N$ $ EUE Report # $0 8 .$ Prevent Recurrence YE AV N SEN WM
$0 o
o E g u
- S g -. '
4-17-83 S 0.0 B N/A N/A N/A N/A Turbine valves test 5
m F: Forced Reason Method: Exhibit G-In-S: Scheduled A-Equipment Failure (Explain) 1-Manual structions for B-Haintenance or Test 2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & License Examination Report (LER) File F-Administrative (NUREG-0161)
G-Operational Error (Explain)
II-Other (Explain 5 Exhibit 1 - Same Source
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50- 306 UNIT Prairie Island No. 2 DATE 830504 COMPLETED BY Dale Dunstad TELEPHONE 612-388- 1121 MONTH Anril 1983
- The unit was base loaded this month. On the lith, after the Unit 2 h turbine valves test, one stop valve did not reopen thus limiting the a:
., unit to approximately 73% power for five days. The unit was brought
$ to cold shutdown on the 15th for repairs to the valve and at 1018 of
@i the 16th was returned to service.
5 a.
i
DAILY UNIT POWER OUTPUT DOCKET NO. 50- 306 UNIT Prairie Island No. 2 DATE 830504 COMPLETED BY Dale Dugstad .
TELEPHONE 612-388- 1121 MONTH Anril 1983 DAY AVERACE LOAD MWe-Net DAY AVERAGE LOAD MWe-Net m
f 1 522 17 -11
,. 2 524 18 -13 3 523 19 68
[
a g 4 522 20 419 5 520 21 516 6 520 22 523 7 519 23 520 8 521 24 524 9 507 25 520 10 339 26 519 11 344 27 521 12 358 28 523 13 353 29 517 l' 357 30 517 15 272 31 ---
16 -11 Average loads above 500 !!We-Net are due to cooler condcaser circulating water.
OPERATING DATA REPORT DOCKET NO 50- 306 DATE 830504 COMPLETED BY na1, nuoarmd OPERATING STATUS TELEPHONE 612-38'B-1121
- 1. Unit Name: Prairie Island No. 2
- 2. tes Reporting Period: April 1983
- 3. Licensed Thermal Power (MWt): 1650
- 4. Nameplate Rating (Gross MWe): 593
- 5. Design Electrical Rating (Net MWe): 530
- 6. Maximum Dependable Capacity (Gross MWe): 531 g 7. Maximum Dependable Capacity (Net MWe): 500
,- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report:
O Give Reason: N/A o?
d
, 9. Power Level To Which Restricted, If Any (Net MWe): N/A e
f '.0. Reasons for Restrictions, If Any: N/A 6
This Month Yr-To-Date Cumulative
- 11. Hours In Reporting Pericd 719 2879 73269
- 12. Number Of Hours Reactor Was Critical 641.4 2596.3 63203.4
! ^13. Reactor Reserve Shutdown Hours 0.0 0.0 IS16.1
- 14. Hours Generator On Line 632.0 2582.9 62298.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 953086 4132573 97950361
- 17. Gross Electrical Energy Generated (MWH) 316080 1051870 31218960
- 18. Net Electrical Energy Generated (MWH) 295692 1310536 29569199
- 19. Unit Service Factor 87.9 89.7 85.0
- 20. Unit Availability Factor 87.9 89.7 85.0
- 21. Unit Capacity Factor (Using MDC Net) 82.3 91.0 80.7 l 22. Unit Capacity Factor (Using DER Net) 77.6 85.9 76.1
- 23. Unit Forced Outage Rate 0.0 0.0 4.9
- 4. Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Each):
Refueling, July 1983 5 Weeks
( 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A 1
UNIT SHUTDOWNS AND .ER REDUCTIONS
REPORT MONTil April 1983 UNIT NAME Prairie Island No. 2 DATE 830504 COMPLETED BY Dale Dus;stad
. r TELEPHONE 612-388 1121 a e m u [u Licensee g4 u Cause & Corrective Date $. O9 8 dO Event u 8 8m Action to N N$ $ 3 I$ $ Report i EO $ .$ Prevent Recurrence
$0
.n Av gm 3 9
i
4-10-83 S 0.0 B N/A N/A N/A N/A Turbine Valves Test .
@ 4-10-83 F 0.0 A N/A RO 83-8 IIA Valvex Power Limited Due to Failed n.
Valve 4-16-83 S 87.0 A 1 RO 83-8 IIA Valvex Repaired Failed Valve 1
1 F: Forced Reason Method: Exhibit G-In-S: Scheduled A-Equipment Failure (Explain) 1-Manual structions for B-Maintenance or Test 2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Operator Training & License Examination Report (LER) File F-Administrative (NUREG-0161)
C-Operational Error (Explain) 5 it-Other (Explain Exhibit 1 - Same Source