| | title = 04/17/2007 & 05/01/2007 - Summary of Internal Meeting of the Browns Ferry Unit 1 Restart Panel to Provide Policies & Requirements for the Restart Inspection Program | | | title = & 05/01/2007 - Summary of Internal Meeting of the Browns Ferry Unit 1 Restart Panel to Provide Policies & Requirements for the Restart Inspection Program |
| | author name = Shea J | | | author name = Shea J |
| | author affiliation = NRC/RGN-II/DRS | | | author affiliation = NRC/RGN-II/DRS |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:May 10, 2007LICENSEE:Tennessee Valley AuthorityFACILITY:Browns Ferry Unit 1 | | {{#Wiki_filter:May 10, 2007 LICENSEE: Tennessee Valley Authority FACILITY: Browns Ferry Unit 1 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| MEETING SUMMARIES FOR APRIL 17, 2007 AND MAY 1, 2007 - INTERNALMEETING OF THE BROWNS FERRY UNIT 1 RESTART PANEL - DOCKET NO. 50-259On April 17, 2007, the Nuclear Regulatory Commission (NRC) held a meeting of the NRCBrowns Ferry 1 (BF1) Restart Oversight Panel at the NRC Region II Office in Atlanta, GA. The Panel was established in accordance with NRC Inspection Manual Chapter (IMC) 2509, "Browns Ferry Unit 1 Restart Project Inspection Program." The purpose of IMC 2509 is to provide the policies and requirements for the restart inspection program, the BF1 Restart Oversight Panel, and the documentation of the major regulatory and license actions associated with the restart. In addition, the IMC provides guidance for assessing the licensee's readiness for restart and the return of the unit to the Reactor Oversight Process (ROP). The Restart Panel was established via a charter issued on October 13, 2005. The purpose of the April 17 th panel meeting was to discuss the BF1 restart project status andreview key issues. Discussion topics during this internal NRC meeting included: TVA schedule status; status of licensing activities; review of authorization memos and letters, discussion of Reactor Oversight Process (ROP) transition plan; discussion of power ascension plan; reviewof Inspection Plan and Schedule (IP&S) reports; remaining System Preoperability Checklist (SPOC) schedule; Operational Readiness Assessment Team (ORAT) status; and planning forthe next Internal Panel and public meetings. The Panel also discussed Browns Ferry Unit 2 outage which ended April 18, 2007.On May 1, 2007, the NRC held another meeting of the NRC BF1 Restart Oversight Panel at theBrowns Ferry Training Center in Athens, AL. The purpose of the panel meeting was to discuss the BF1 restart project status and review key issues. Discussion topics during this internal NRC meeting included TVA Schedule Status; the Operational Readiness Assessment Team (ORAT) inspection; status of licensing activities; update on Reactor Oversight Process (ROP) transition plan; Power Ascension inspections; review of Inspection Plan and Schedule (IP&S) reports; discussion of communication documents to be issued; and planning for upcoming public meetings. Enclosure 1 contains a list of the restart oversight panel members participating in the April 17,2007, meeting and other NRC attendees. Enclosure 2 contains a list of the restart oversight panel members participating in the May 1, 2007, meeting and other NRC attendees. Enclosure 3 contains the Inspection Plan and Schedule Report. | | MEETING SUMMARIES FOR APRIL 17, 2007 AND MAY 1, 2007 - INTERNAL MEETING OF THE BROWNS FERRY UNIT 1 RESTART PANEL - DOCKET NO. 50-259 On April 17, 2007, the Nuclear Regulatory Commission (NRC) held a meeting of the NRC Browns Ferry 1 (BF1) Restart Oversight Panel at the NRC Region II Office in Atlanta, GA. The Panel was established in accordance with NRC Inspection Manual Chapter (IMC) 2509, Browns Ferry Unit 1 Restart Project Inspection Program. The purpose of IMC 2509 is to provide the policies and requirements for the restart inspection program, the BF1 Restart Oversight Panel, and the documentation of the major regulatory and license actions associated with the restart. In addition, the IMC provides guidance for assessing the licensees readiness for restart and the return of the unit to the Reactor Oversight Process (ROP). The Restart Panel was established via a charter issued on October 13, 2005. |
| TVA2Documents associated with the NRC oversight of the BF1 Recovery can be found on the NRC'swebsite at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/bf1-recovery.html .Sincerely,/RA/Joseph W. Shea, DirectorDivision of Reactor SafetyDocket No.:50-259License No.:DPR-33
| | The purpose of the April 17th panel meeting was to discuss the BF1 restart project status and review key issues. Discussion topics during this internal NRC meeting included: TVA schedule status; status of licensing activities; review of authorization memos and letters, discussion of Reactor Oversight Process (ROP) transition plan; discussion of power ascension plan; review of Inspection Plan and Schedule (IP&S) reports; remaining System Preoperability Checklist (SPOC) schedule; Operational Readiness Assessment Team (ORAT) status; and planning for the next Internal Panel and public meetings. The Panel also discussed Browns Ferry Unit 2 outage which ended April 18, 2007. |
| | On May 1, 2007, the NRC held another meeting of the NRC BF1 Restart Oversight Panel at the Browns Ferry Training Center in Athens, AL. The purpose of the panel meeting was to discuss the BF1 restart project status and review key issues. Discussion topics during this internal NRC meeting included TVA Schedule Status; the Operational Readiness Assessment Team (ORAT) inspection; status of licensing activities; update on Reactor Oversight Process (ROP) transition plan; Power Ascension inspections; review of Inspection Plan and Schedule (IP&S) reports; discussion of communication documents to be issued; and planning for upcoming public meetings. contains a list of the restart oversight panel members participating in the April 17, 2007, meeting and other NRC attendees. Enclosure 2 contains a list of the restart oversight panel members participating in the May 1, 2007, meeting and other NRC attendees. Enclosure 3 contains the Inspection Plan and Schedule Report. |
| | |
| | TVA 2 Documents associated with the NRC oversight of the BF1 Recovery can be found on the NRCs website at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/bf1-recovery.html . |
| | Sincerely, |
| | /RA/ |
| | Joseph W. Shea, Director Division of Reactor Safety Docket No.: 50-259 License No.: DPR-33 |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| : 1. List of Attendees for the April 17, 2007 meeting 2. List of Attendees for the May 1, 2007 meeting 3. Inspection Plan and Schedule ReportDistribution w/encls: (See page 3) | | : 1. List of Attendees for the April 17, 2007 meeting |
| | : 2. List of Attendees for the May 1, 2007 meeting |
| | : 3. Inspection Plan and Schedule Report Distribution w/encls: (See page 3) |
|
| |
|
| _________________________OFFICERII:DRPRII:DRPRII:DRSSIGNATURETXN /RA/WTM /RA/JWS /RA/NAMETNazarioMWidmannJSheaDATE05/09/200705/10/200705/ /2007 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO YESNO TVA3Memo to Browns Ferry Unit 1 Restart Oversight Panel Members from Joseph W. Shea datedMay 10, 2007
| | OFFICE RII:DRP RII:DRP RII:DRS SIGNATURE TXN /RA/ WTM /RA/ JWS /RA/ |
| | NAME TNazario MWidmann JShea DATE 05/09/2007 05/10/2007 05/ /2007 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO TVA 3 Memo to Browns Ferry Unit 1 Restart Oversight Panel Members from Joseph W. Shea dated May 10, 2007 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| MEETING SUMMARIES FOR APRIL 17, 2007 AND MAY 1, 2007 - INTERNALMEETING OF THE BROWNS FERRY UNIT 1 RESTART PANEL - DOCKET NO. 50-259Distribution w/encls:W. Bearden, DRPE. Brown, NRR C. Haney, NRR M. Lesser, DCI T. McGinty, NRR L. Mellen, DRP T. Nazario, DRP L. Raghavan, NRR T. Boyce, NRR T. Ross, DRP J. Shea, DRS C. Stancil, DRP M. Widmann, DRP List of AttendeesNRC Browns Ferry Unit 1 Restart Oversight Panel Meeting (April 17, 2007)Nuclear Regulatory Commission Panel Members Region IIJ. Shea, Director, Division of Reactor Safety (DRS) - ChairmanM. Widmann, Chief, Branch 6, Division of Reactor Projects (DRP) - MemberW. Bearden, Senior Resident Inspector Unit 1, Branch 6, DRP - MemberL. Mellen, Senior Project Engineer, Branch 6, DRP - MemberHeadquartersC. Haney, Director, Division of Operating Reactor Licensing (DORL), NRR - Vice- Chairman (participated via teleconference)L. Raghavan, Chief, Plant Licensing Branch III-1, DORL, NRR - Member (participated via teleconference) | | MEETING SUMMARIES FOR APRIL 17, 2007 AND MAY 1, 2007 - INTERNAL MEETING OF THE BROWNS FERRY UNIT 1 RESTART PANEL - DOCKET NO. 50-259 Distribution w/encls: |
| T. McGinty, Deputy Director, DORL, NRR (participated via teleconference)T. Boyce, Chief, DORL, NRR (participated via teleconference)E. Brown, Project Manager, DORL, NRR (participated via teleconference)Other ParticipantsT. Ross, Senior Resident Inspector Units 2 and 3, Branch 6, DRP, Region II T. Nazario, Project Engineer, Branch 6, DRP, Region II List of AttendeesNRC Browns Ferry Unit 1 Restart Oversight Panel Meeting (May 1, 2007)Nuclear Regulatory Commission Panel Members Region IIJ. Shea, Director, Division of Reactor Safety (DRS) - ChairmanM. Widmann, Chief, Branch 6, Division of Reactor Projects (DRP) - MemberW. Bearden, Senior Resident Inspector Unit 1, Branch 6, DRP - MemberM. Lesser, Chief, Division of Construction Inspection (DCI) - Member L. Mellen, Senior Project Engineer, Branch 6, DRP - MemberHeadquartersT. McGinty, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR | | W. Bearden, DRP E. Brown, NRR C. Haney, NRR M. Lesser, DCI T. McGinty, NRR L. Mellen, DRP T. Nazario, DRP L. Raghavan, NRR T. Boyce, NRR T. Ross, DRP J. Shea, DRS C. Stancil, DRP M. Widmann, DRP |
| -Acting Vice-Chairman L. Raghavan, Chief, Plant Licensing Branch III-1, DORL, NRR - MemberE. Brown, Project Manager, DORL, NRR (participated via teleconference)Other ParticipantsT. Ross, Senior Resident Inspector Units 2 and 3, Branch 6, DRP, Region II T. Nazario, Project Engineer, Branch 6, DRP, Region II R. Lantz, Senior Emergency Preparedness Inspector, DRS, Region IV}}
| | |
| | List of Attendees NRC Browns Ferry Unit 1 Restart Oversight Panel Meeting (April 17, 2007) |
| | Nuclear Regulatory Commission Panel Members Region II J. Shea, Director, Division of Reactor Safety (DRS) - Chairman M. Widmann, Chief, Branch 6, Division of Reactor Projects (DRP) - Member W. Bearden, Senior Resident Inspector Unit 1, Branch 6, DRP - Member L. Mellen, Senior Project Engineer, Branch 6, DRP - Member Headquarters C. Haney, Director, Division of Operating Reactor Licensing (DORL), NRR - Vice-Chairman (participated via teleconference) |
| | L. Raghavan, Chief, Plant Licensing Branch III-1, DORL, NRR - Member (participated via teleconference) |
| | T. McGinty, Deputy Director, DORL, NRR (participated via teleconference) |
| | T. Boyce, Chief, DORL, NRR (participated via teleconference) |
| | E. Brown, Project Manager, DORL, NRR (participated via teleconference) |
| | Other Participants T. Ross, Senior Resident Inspector Units 2 and 3, Branch 6, DRP, Region II T. Nazario, Project Engineer, Branch 6, DRP, Region II Enclosure 1 |
| | |
| | List of Attendees NRC Browns Ferry Unit 1 Restart Oversight Panel Meeting (May 1, 2007) |
| | Nuclear Regulatory Commission Panel Members Region II J. Shea, Director, Division of Reactor Safety (DRS) - Chairman M. Widmann, Chief, Branch 6, Division of Reactor Projects (DRP) - Member W. Bearden, Senior Resident Inspector Unit 1, Branch 6, DRP - Member M. Lesser, Chief, Division of Construction Inspection (DCI) - Member L. Mellen, Senior Project Engineer, Branch 6, DRP - Member Headquarters T. McGinty, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR - |
| | Acting Vice-Chairman L. Raghavan, Chief, Plant Licensing Branch III-1, DORL, NRR - Member E. Brown, Project Manager, DORL, NRR (participated via teleconference) |
| | Other Participants T. Ross, Senior Resident Inspector Units 2 and 3, Branch 6, DRP, Region II T. Nazario, Project Engineer, Branch 6, DRP, Region II R. Lantz, Senior Emergency Preparedness Inspector, DRS, Region IV Enclosure 2}} |
|
---|
Category:Meeting Summary
MONTHYEARML24269A0062024-10-0303 October 2024 Correction to Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the TVA Nuclear Quality Assurance Plan ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24221A0132024-08-19019 August 2024 July 10, 2024, Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24176A1252024-06-28028 June 2024 Summary of Partially Closed Meeting with Tennessee Valley Authority to Discuss a Proposed License Amendment Request Regarding the Hydrologic Analysis Updates ML24155A0422024-06-13013 June 2024 Meeting Summary: Public Scoping Webinars for the Environmental Review of the Subsequent License Renewal Application for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML24142A5152024-05-28028 May 2024 April 22, 2024, Summary of Public Mtg with Tennessee Valley Authority to Discuss Use of Risk-Informed Process Evaluation for a Proposed License Amendment Request Elimination of Limiting Condition for Operation Actions for the Rod Worth Mini ML24155A0432024-04-18018 April 2024 Meeting Summary ML24089A0712024-04-0101 April 2024 3/20/24 & 3/27/24 2023 TVA Public Annual Assessment Meeting Summary ML24057A0402024-02-27027 February 2024 Summary of February 7, 2024, Public Meeting with Tennessee Valley Authority to Preliminarily Discuss the Planned Approach for the Browns Ferry Nuclear Plant Hydrologic Analysis ML24043A0462024-02-16016 February 2024 Summary of Meeting with TVA to Discuss Use of Risk-Informed Process Evaluation (RIPE) for a Proposed LAR Regarding Elimination of Limiting Condition for Operation Actions for Rod Worth Minimizers ML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23157A1272023-06-13013 June 2023 Meeting Summary for Environmental Pre-Submittal Meeting for Subsequent License Renewal Application on May 11, 2023 ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML22319A1952022-12-0202 December 2022 Summary of October 13, 2022, Meeting with Tennessee Valley Authority to Discuss Planned Alternative Requests for the Fifth 10-Year Inservice Testing Program Interval for Brown'S Ferry Nuclear Plant, Units 1, 2, and 3 ML22298A1612022-11-17017 November 2022 Summary of Public Meeting on SAMA with TVA ML22266A2742022-09-28028 September 2022 Summary of September 22, 2022, Public Meeting with Tennessee Valley Authority to Discuss a Request to Use a Later Edition of the ASME OM Code ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22103A2472022-04-14014 April 2022 Summary of April 12, 2022, Closed Meeting with Tennessee Valley Authority to Discuss Recently Identified Errors Potentially Affecting the Browns Ferry Revised Criticality Analysis License Amendment Request ML22094A1112022-04-0404 April 2022 Public Meeting Summary 2021 Annual Assessment Meeting Catawba Dockets Nos. 50-413 and 50-414; McGuire No. 50-369 and 50-370; Oconee. 50-269, 50-270, and 50-287 ML22083A0762022-03-24024 March 2022 Summary of March 17, 2022, Closed Meeting with Tennessee Valley Authority to Discuss Recently Identified Errors Potentially Affecting the Browns Ferry Atrium 11 License Amendment Request (EPID L-2021-LLA-0132 ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21266A0532021-10-20020 October 2021 Summary of September 22, 2021, Meeting with Tennessee Valley Authority Regarding Planned License Amendment Request to Adopt Technical Specifications Task Force (TSTF)-205 and TSTF-563 ML21273A1922021-10-12012 October 2021 September 27, 2021, Summary of Meeting with Browns Ferry Nuclear Plant, Units 1 & 2 Related to a Planned Alternative Request Per American Society of Mechanical Engineers (Asmee) Code Case N-526, Alternative Requirements for Successive Sect ML21251A1122021-09-14014 September 2021 Summary of September 7, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21155A0212021-06-0808 June 2021 Summary of Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML20357A0092021-01-19019 January 2021 Summary of December 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to Use of Alternate Probability of Detection at Watts Bar Nuclear Plant, Unit 2 ML20175A8012020-08-11011 August 2020 Summary of June 23, 2020, Public Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20162A1532020-06-25025 June 2020 Summary of June 8, 2020, Partially Closed Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML20094M9012020-04-13013 April 2020 Summary of April 2, 2020 Public Meeting with Tennessee Valley Authority Regarding the Future Submittal of a License Amendment Request Adoption of 10 CFR 50.69 ML19120A2882019-06-0606 June 2019 Summary of March 19, 2019, Closed Meeting with Tennessee Valley Authority a License Amendment Request to Implement Maximum Extended Line Limit Analysis Plus ML19120A3692019-04-30030 April 2019 Public Meeting Summary - Browns Nuclear Plant, Docket No. 50-259, 50-260, and 50-296 ML18242A4882018-09-24024 September 2018 Summary of Pre-Application Conference Call with Tennessee Valley Authority to Discuss Proposed Changes to Modifications Associated with Approved NFPA 805 for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML18101A1012018-04-13013 April 2018 Summary of March 16, 2018, Meeting with Tennessee Valley Authority Regarding a License Amendment Request to Implement Maximum Extended Load Line Limit Analysis Plus for Browns Ferry Nuclear Plant ML18068A0792018-03-15015 March 2018 Summary of Pre-Application Meeting with Tennessee Valley Authority Regarding a Planned License Amendment Request Associated with Modifications to the Control Bay Chillersystems at Browns Ferry Units 1, 2 and 3 ML18053A5362018-03-0101 March 2018 Summary of February 7, 2018, Pre-Application Conference Call with TVA a Planned License Amendment Request to Change the Emergency Response Organization Staffing ML17278A8972017-10-17017 October 2017 Summary of Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry, Units 1, 2, and 3, Sequoyah Nuclear, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2(EPID L2016-TOP-0011; CAC Nos. MF8391-MF8397 ML17227A5142017-09-0101 September 2017 Summary of August 1, 2017, Pre-Submittal Public Meeting with TVA Regarding a Class 1E Unbalanced Voltage Relay Licensing Amendment Request for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant ML17131A2512017-05-11011 May 2017 Summary of Public Meeting Concerning Annual Assessment of Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML17061A6722017-04-0606 April 2017 Summary of February 15, 2017, Meeting with Tennessee Valley Authority on Updates to the Transmission System Regarding Extended Power Uprate for Browns Ferry Nuclear Plant, Units 1, 2, and 3 ML17017A4552017-02-0303 February 2017 Summary of Meeting with Tennessee Valley Authority Regarding Maximum Extended Load Line Limit Plus Pre-Application Meeting for Browns Ferry Nuclear Plant ML16350A2962016-12-14014 December 2016 Enclosure 3- Reactor Oversight Process Task Force FAQ Log- November 16, 2016 ML16280A2912016-10-31031 October 2016 September 23, 2016, Summary of Public Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Nuclear Plant, Units 1 & 2 (CAC Nos. MF83 ML16279A2332016-10-0505 October 2016 Summary of Closed Pre-Decisional Enforcement Conference with Tennessee Valley Authority Regarding Browns Ferry Nuclear Plant ML16210A4532016-08-16016 August 2016 07/19/2016 Summary of Meeting with Tennessee Valley Authority Regarding Extended Power Uprate License Amendment Request for Browns Ferry Nuclear Plant (CAC Nos. MF6741, MF6742, and MF6743) ML16193A4602016-07-21021 July 2016 June 23, 2016, Summary of Closed Meeting with Tennessee Valley Authority Regarding the Structural Adequacy of Steam Dryers for Extended Power Uprate License Amendment Request for Browns Ferry Nuclear Plant, Units 1, 2, and 3 (MF6741, MF6742 ML16153A1982016-06-0101 June 2016 2015 EOC Meeting Summary 2024-09-23
[Table view] |
Text
May 10, 2007 LICENSEE: Tennessee Valley Authority FACILITY: Browns Ferry Unit 1
SUBJECT:
MEETING SUMMARIES FOR APRIL 17, 2007 AND MAY 1, 2007 - INTERNAL MEETING OF THE BROWNS FERRY UNIT 1 RESTART PANEL - DOCKET NO. 50-259 On April 17, 2007, the Nuclear Regulatory Commission (NRC) held a meeting of the NRC Browns Ferry 1 (BF1) Restart Oversight Panel at the NRC Region II Office in Atlanta, GA. The Panel was established in accordance with NRC Inspection Manual Chapter (IMC) 2509, Browns Ferry Unit 1 Restart Project Inspection Program. The purpose of IMC 2509 is to provide the policies and requirements for the restart inspection program, the BF1 Restart Oversight Panel, and the documentation of the major regulatory and license actions associated with the restart. In addition, the IMC provides guidance for assessing the licensees readiness for restart and the return of the unit to the Reactor Oversight Process (ROP). The Restart Panel was established via a charter issued on October 13, 2005.
The purpose of the April 17th panel meeting was to discuss the BF1 restart project status and review key issues. Discussion topics during this internal NRC meeting included: TVA schedule status; status of licensing activities; review of authorization memos and letters, discussion of Reactor Oversight Process (ROP) transition plan; discussion of power ascension plan; review of Inspection Plan and Schedule (IP&S) reports; remaining System Preoperability Checklist (SPOC) schedule; Operational Readiness Assessment Team (ORAT) status; and planning for the next Internal Panel and public meetings. The Panel also discussed Browns Ferry Unit 2 outage which ended April 18, 2007.
On May 1, 2007, the NRC held another meeting of the NRC BF1 Restart Oversight Panel at the Browns Ferry Training Center in Athens, AL. The purpose of the panel meeting was to discuss the BF1 restart project status and review key issues. Discussion topics during this internal NRC meeting included TVA Schedule Status; the Operational Readiness Assessment Team (ORAT) inspection; status of licensing activities; update on Reactor Oversight Process (ROP) transition plan; Power Ascension inspections; review of Inspection Plan and Schedule (IP&S) reports; discussion of communication documents to be issued; and planning for upcoming public meetings. contains a list of the restart oversight panel members participating in the April 17, 2007, meeting and other NRC attendees. Enclosure 2 contains a list of the restart oversight panel members participating in the May 1, 2007, meeting and other NRC attendees. Enclosure 3 contains the Inspection Plan and Schedule Report.
TVA 2 Documents associated with the NRC oversight of the BF1 Recovery can be found on the NRCs website at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/bf1-recovery.html .
Sincerely,
/RA/
Joseph W. Shea, Director Division of Reactor Safety Docket No.: 50-259 License No.: DPR-33
Enclosures:
- 1. List of Attendees for the April 17, 2007 meeting
- 2. List of Attendees for the May 1, 2007 meeting
- 3. Inspection Plan and Schedule Report Distribution w/encls: (See page 3)
OFFICE RII:DRP RII:DRP RII:DRS SIGNATURE TXN /RA/ WTM /RA/ JWS /RA/
NAME TNazario MWidmann JShea DATE 05/09/2007 05/10/2007 05/ /2007 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO TVA 3 Memo to Browns Ferry Unit 1 Restart Oversight Panel Members from Joseph W. Shea dated May 10, 2007
SUBJECT:
MEETING SUMMARIES FOR APRIL 17, 2007 AND MAY 1, 2007 - INTERNAL MEETING OF THE BROWNS FERRY UNIT 1 RESTART PANEL - DOCKET NO. 50-259 Distribution w/encls:
W. Bearden, DRP E. Brown, NRR C. Haney, NRR M. Lesser, DCI T. McGinty, NRR L. Mellen, DRP T. Nazario, DRP L. Raghavan, NRR T. Boyce, NRR T. Ross, DRP J. Shea, DRS C. Stancil, DRP M. Widmann, DRP
List of Attendees NRC Browns Ferry Unit 1 Restart Oversight Panel Meeting (April 17, 2007)
Nuclear Regulatory Commission Panel Members Region II J. Shea, Director, Division of Reactor Safety (DRS) - Chairman M. Widmann, Chief, Branch 6, Division of Reactor Projects (DRP) - Member W. Bearden, Senior Resident Inspector Unit 1, Branch 6, DRP - Member L. Mellen, Senior Project Engineer, Branch 6, DRP - Member Headquarters C. Haney, Director, Division of Operating Reactor Licensing (DORL), NRR - Vice-Chairman (participated via teleconference)
L. Raghavan, Chief, Plant Licensing Branch III-1, DORL, NRR - Member (participated via teleconference)
T. McGinty, Deputy Director, DORL, NRR (participated via teleconference)
T. Boyce, Chief, DORL, NRR (participated via teleconference)
E. Brown, Project Manager, DORL, NRR (participated via teleconference)
Other Participants T. Ross, Senior Resident Inspector Units 2 and 3, Branch 6, DRP, Region II T. Nazario, Project Engineer, Branch 6, DRP, Region II Enclosure 1
List of Attendees NRC Browns Ferry Unit 1 Restart Oversight Panel Meeting (May 1, 2007)
Nuclear Regulatory Commission Panel Members Region II J. Shea, Director, Division of Reactor Safety (DRS) - Chairman M. Widmann, Chief, Branch 6, Division of Reactor Projects (DRP) - Member W. Bearden, Senior Resident Inspector Unit 1, Branch 6, DRP - Member M. Lesser, Chief, Division of Construction Inspection (DCI) - Member L. Mellen, Senior Project Engineer, Branch 6, DRP - Member Headquarters T. McGinty, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR -
Acting Vice-Chairman L. Raghavan, Chief, Plant Licensing Branch III-1, DORL, NRR - Member E. Brown, Project Manager, DORL, NRR (participated via teleconference)
Other Participants T. Ross, Senior Resident Inspector Units 2 and 3, Branch 6, DRP, Region II T. Nazario, Project Engineer, Branch 6, DRP, Region II R. Lantz, Senior Emergency Preparedness Inspector, DRS, Region IV Enclosure 2