ML19305E868: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 24: Line 24:
                                                                       ~
                                                                       ~
f ja c[S m F. L. Clayton, Jr.
f ja c[S m F. L. Clayton, Jr.
FLCJr/TNE:aw cc:    Mr. R. A. Thomas                                                                      l Mr. G. F. Trowbridge s  I
FLCJr/TNE:aw cc:    Mr. R. A. Thomas                                                                      l Mr. G. F. Trowbridge s  I I
                                                                                              ;
A}}
I A}}

Latest revision as of 23:33, 21 February 2020

Responds to NRC 800410 Ltr Requesting That Proposed Tech Specs Be Submitted for Sections 3.0.3 & 3.0.5.Current Tech Specs Include Section 3.0.3.Proposed Tech Spec Change Re 3.0.5 to Be Submitted by 800530
ML19305E868
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/13/1980
From: Clayton F
ALABAMA POWER CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8005200548
Download: ML19305E868 (1)


Text

Alabama Power Company 600 North 18th S*reet Post Office Box 2641 Birmingham Alabama 35291 Telephone 205 323-5341 C

nk (boWei,hffin, Alabama Power May 13, 1980 the sournern eiectre system Docket No. 50-348 - Unit 1 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Mr. D. G. Eisenhut Gentlemen:

Your letter dated April 10, 1980, requested that proposed technical specifications be submitted for Sections 3.0.3 and 3.0.5 for the Joseph M.

Farley Nuclear Plant. Our current technical specifications include a Section 3.0.3, similar to the one in your letter, so this revision is not necessary. Alabama Power Company plans to submit a variation of the requested Technical Specification 3.0.5 in the near future, but due to a rework of the wording in this change, more time is required than allowed in your letter.

A proposed technical specification change on this subject will be submitted by May 30, 1980.

Very truly yours,

~

f ja c[S m F. L. Clayton, Jr.

FLCJr/TNE:aw cc: Mr. R. A. Thomas l Mr. G. F. Trowbridge s I I

A