1 Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan P1aza Dr. , Suite 1000                                  Docket Nos. 50-445 Arlington, Texas 76012                                                      50-446 COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION PLASCITE 7122 C0ATING
1 Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan P1aza Dr. , Suite 1000                                  Docket Nos. 50-445 Arlington, Texas 76012                                                      50-446 COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION PLASCITE 7122 C0ATING
,                                                        FILE NO: 10110
,                                                        FILE NO: 10110
,                 


==Dear Mr. Seidle:==
==Dear Mr. Seidle:==


In accordance with the requirements of 10 CFR 50.55(e), this letter
In accordance with the requirements of 10 CFR 50.55(e), this letter provides the status of a potential deficiency with Plascite 7122 coating.
    '
provides the status of a potential deficiency with Plascite 7122 coating.
   "                The Engineering evaluation as to the reportability of the Plascite 7122 lining problem is still under investigation and we should be in a position to file a formal report by November 14, 1980.
   "                The Engineering evaluation as to the reportability of the Plascite 7122 lining problem is still under investigation and we should be in a position to file a formal report by November 14, 1980.
Il                                                                                  Very truly yours, R. '. Gary RJG:dk cc: NRC Region ~IV - (0 + 1 copy)                                                                l Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.
Il                                                                                  Very truly yours, R. '. Gary RJG:dk cc: NRC Region ~IV - (0 + 1 copy)                                                                l Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.
U. S. Nuclear Regulatory Commission Washington, D. C. 20555
U. S. Nuclear Regulatory Commission Washington, D. C. 20555
  ;
.t-il 8.0.101s o 4W.                        3
.t-il 8.0.101s o 4W.                        3
                               . - -                  . . . .        - - .. - - . . .                  . - . - . - .}}
                               . - -                  . . . .        - - .. - - . . .                  . - . - . - .}}

Latest revision as of 05:07, 18 February 2020

Deficiency Rept Re Plascite 7122 Coating.Ongoing Evaluation of Lining Problem Will Be Completed & Formal Rept Forwarded by 801114
ML19347C380
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/13/1980
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, TXX-3218, NUDOCS 8010170479
Download: ML19347C380 (1)


Text

_.

TENAS UTILITIES GENERATING CO.TIPANY

, 2001 IIIWAN 1Y)WER = !)ALIAN.TF*XAS 75201

. ..ifi^.".7, .,, October 13, 1980

-"'-- " ~ ~

TXX-3218 l

1 Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan P1aza Dr. , Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION PLASCITE 7122 C0ATING

, FILE NO: 10110

Dear Mr. Seidle:

In accordance with the requirements of 10 CFR 50.55(e), this letter provides the status of a potential deficiency with Plascite 7122 coating.

" The Engineering evaluation as to the reportability of the Plascite 7122 lining problem is still under investigation and we should be in a position to file a formal report by November 14, 1980.

Il Very truly yours, R. '. Gary RJG:dk cc: NRC Region ~IV - (0 + 1 copy) l Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.

U. S. Nuclear Regulatory Commission Washington, D. C. 20555