ML12032A260: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Jan. 16, 2012 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2012-2351 USER INFORMATION: | |||
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION: | |||
TO: GERLACH*ROSE M 01/16/2012 LOCATION: NRC REGION 1 TECH SPECS FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2) | |||
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD6'E*°* UTILIZED TO ELIMINATE THE CHANCE OF ERRORS. | |||
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material. | |||
TSB2 - TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 11/30/2011 ADD MANUAL TABLE OF CONTENTS DATE: 01/13/2012 CATEGORY: DOCUMENTS TYPE: TSB2 bti | |||
Jan. 16, 2012 Page 2 of 2 ID: TEXT 3.4.3 REMOVE: REV:2 ADD: REV: 3 CATEGORY: DOCUMENTS TYPE: TSB2 ID: TEXT LOES REMOVE: REV:104 ADD: REV: 105 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX. | |||
SSES MANUAL Manual Name: TSB2 Manual | |||
==Title:== | |||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL Table Of Contents Issue Date: 01/13/2012 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 105 01/13/2012 | |||
==Title:== | |||
LIST OF EFFECTIVE SECTIONS TEXT TOC 18 09/01/2010 | |||
==Title:== | |||
TABLE OF CONTENTS K" | |||
TEXT 2.1.1 4 05/06/20109 | |||
==Title:== | |||
SAFETY LIMITS (SLS) REACTOR CORE SLS TEXT 2.1.2 1 10/04/20Q | |||
==Title:== | |||
SAFETY LIMITS (SLS) REACTOR YSýTEMy (RCS) PRESSURE SL TEXT 3.0 3 | |||
==Title:== | |||
LIMITING CONDITION FOR C TEXT 3.1.1 1 | |||
==Title:== | |||
REACTIVITY CONTROL,,SYSTI MARGIN (SDM) | |||
TEXT 3.1.2 \> 0 11/18/2002 | |||
==Title:== | |||
REACTIVITY SYSTEMS REACTIVITY ANOMALIES TEXT 3.1.3 2 01/19/2009 | |||
==Title:== | |||
REACTIV'ITY, SYSTEMS CONTROL ROD OPERABILITY TEXT 3.1.4 4 01/30/2009 | |||
==Title:== | |||
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES TEXT 3.1.5 1 07/06/2005 | |||
==Title:== | |||
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT, 3.1.6 2 03/24/2005 | |||
==Title:== | |||
REACTIVITY CONTROL SYSTEMS ROD,.TTERN CONTROL Report Date: 01/16/1 Pagel Page J, of of 88 Report Date: 01/16/1 | |||
SSES MANUAL Manual Name: TSB2 Manual | |||
==Title:== | |||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.1.7 3 10/04/2007 | |||
==Title:== | |||
REACTIVITY CONTROL SYSTEMS STANDBY LIQUIDCONTROL (SLC) SYSTEM TEXT 3.1.8 3 05/06/2009 | |||
==Title:== | |||
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 4 05/06/2009 | |||
==Title:== | |||
POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) | |||
TEXT 3.2.2 3 05/06/2009 | |||
==Title:== | |||
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR) | |||
TEXT 3.2.3 2 05/06/2009 | |||
==Title:== | |||
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE LHGR TEXT 3.3.1.1 4 05/06/2009 | |||
==Title:== | |||
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 2 01/19/2009 | |||
==Title:== | |||
INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.2.1 2 04/09/2007 | |||
==Title:== | |||
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 1 05/06/2009 | |||
==Title:== | |||
INSTRUMENTATION FEEDWATER - MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION TEXT 3.3.3.1 7 10/27/2008 | |||
==Title:== | |||
INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 1 04/18/2005 | |||
==Title:== | |||
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 1 05/06/2009 | |||
==Title:== | |||
INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION Page 2 of 8 Report Date: 01/16/12 | |||
SSES MANUAL Manual Name: TSB2 Manual | |||
==Title:== | |||
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.3.4.2 0 11/18/2002 | |||
==Title:== | |||
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.'1 4 08/20/2009 | |||
==Title:== | |||
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 0 11/18/2002 | |||
==Title:== | |||
INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION TEXT 3.3.6.1 4 05/06/2009 | |||
==Title:== | |||
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 4 09/01/2010 | |||
==Title:== | |||
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 2 10/27/2008 | |||
==Title:== | |||
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 3 12/17/2007 | |||
==Title:== | |||
INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 0 11/18/2002 | |||
==Title:== | |||
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 4 07/20/2010 | |||
==Title:== | |||
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3.4.2 2 07/20/2010 | |||
==Title:== | |||
REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 3 01/13/2012 | |||
==Title:== | |||
REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS) | |||
TEXT 3.4.4 0 1.1/18 |
Latest revision as of 18:32, 6 February 2020
ML12032A260 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 01/16/2012 |
From: | Susquehanna |
To: | Gerlach R Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
2012-2351 | |
Download: ML12032A260 (84) | |
Text
Jan. 16, 2012 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2012-2351 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSE M 01/16/2012 LOCATION: NRC REGION 1 TECH SPECS FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD6'E*°* UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TSB2 - TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 11/30/2011 ADD MANUAL TABLE OF CONTENTS DATE: 01/13/2012 CATEGORY: DOCUMENTS TYPE: TSB2 bti
Jan. 16, 2012 Page 2 of 2 ID: TEXT 3.4.3 REMOVE: REV:2 ADD: REV: 3 CATEGORY: DOCUMENTS TYPE: TSB2 ID: TEXT LOES REMOVE: REV:104 ADD: REV: 105 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name: TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL Table Of Contents Issue Date: 01/13/2012 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 105 01/13/2012
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 18 09/01/2010
Title:
TABLE OF CONTENTS K"
TEXT 2.1.1 4 05/06/20109
Title:
SAFETY LIMITS (SLS) REACTOR CORE SLS TEXT 2.1.2 1 10/04/20Q
Title:
SAFETY LIMITS (SLS) REACTOR YSýTEMy (RCS) PRESSURE SL TEXT 3.0 3
Title:
LIMITING CONDITION FOR C TEXT 3.1.1 1
Title:
REACTIVITY CONTROL,,SYSTI MARGIN (SDM)
TEXT 3.1.2 \> 0 11/18/2002
Title:
REACTIVITY SYSTEMS REACTIVITY ANOMALIES TEXT 3.1.3 2 01/19/2009
Title:
REACTIV'ITY, SYSTEMS CONTROL ROD OPERABILITY TEXT 3.1.4 4 01/30/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES TEXT 3.1.5 1 07/06/2005
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT, 3.1.6 2 03/24/2005
Title:
REACTIVITY CONTROL SYSTEMS ROD,.TTERN CONTROL Report Date: 01/16/1 Pagel Page J, of of 88 Report Date: 01/16/1
SSES MANUAL Manual Name: TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.1.7 3 10/04/2007
Title:
REACTIVITY CONTROL SYSTEMS STANDBY LIQUIDCONTROL (SLC) SYSTEM TEXT 3.1.8 3 05/06/2009
Title:
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 4 05/06/2009
Title:
POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)
TEXT 3.2.2 3 05/06/2009
Title:
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)
TEXT 3.2.3 2 05/06/2009
Title:
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE LHGR TEXT 3.3.1.1 4 05/06/2009
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 2 01/19/2009
Title:
INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.2.1 2 04/09/2007
Title:
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 1 05/06/2009
Title:
INSTRUMENTATION FEEDWATER - MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION TEXT 3.3.3.1 7 10/27/2008
Title:
INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 1 04/18/2005
Title:
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 1 05/06/2009
Title:
INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION Page 2 of 8 Report Date: 01/16/12
SSES MANUAL Manual Name: TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.3.4.2 0 11/18/2002
Title:
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.'1 4 08/20/2009
Title:
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 0 11/18/2002
Title:
INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION TEXT 3.3.6.1 4 05/06/2009
Title:
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 4 09/01/2010
Title:
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 2 10/27/2008
Title:
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 3 12/17/2007
Title:
INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 0 11/18/2002
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 4 07/20/2010
Title:
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3.4.2 2 07/20/2010
Title:
REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 3 01/13/2012
Title:
REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)
TEXT 3.4.4 0 1.1/18/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE Report Date: 01/16/12 Page~
Page 3 of of ~8 Report Date: 01/16/12
SSES MANUTAL Manual Name: TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.4.5 3 03/10/2010
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 3 01/25/2011
Title:
REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 2 10/04/2007
Title:
REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8 1 04/18/2005
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM
- HOT SHUTDOWN TEXT 3.4.9 0 11/18/2002
Title:
REACTOR COOLANT SYSTEM TEXT 3.4.10
- COLD SHUTDOWN 3
(RCS) RESIDUAL HEAT REMOVAL 05/06/2 009 (RHR) 0 SHUTDOWN COOLING SYSTEM
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 0 11/18/2002
Title:
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 3 01/16/2006
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM ECCS - OPERATING TEXT 3.5.2 0 11/18/2002
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM ECCS - SHUTDOWN TEXT 3.5.3 2 07/09/2010
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM RCIC SYSTEM TEXT 3.6.1.1 4 11/09/2011
Title:
PRIMARY CONTAINMENT TEXT 3.6.1.2 1 05/06/2009
Title:
CONTAINMENT SYSTEMS PRIMARY CONtAINMENT AIR LOCK Report Date: 01/16/12 PageA Page I of of 88 Report Date: 01/16/12
SSES MANUALI Manual Name: TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.1.3 11 04/14/2010
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)
TEXT 3.6.1.4 1 05/06/2009
Title:
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5 1 10/05/2005
Title:
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3.6.1.6 0 11/18/2002
Title:
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 2 12/17/2007
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 0 11/18/2002
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 1 01/16/2006
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 0 11/18/2002
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 2 06/13/20.06
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINERS TEXT 3.6.3.2 1 04/18/2005
Title:
CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM TEXT 3.6.3.3 0 11/18/2002
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 7 1.0,04/2007
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT Report Date: 01/16/12 Page~
Page a of of 8 8 Report Date: 01/16/12
SSES M~ANUJAL Manual Name: TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.4.2 3 03/10/2010
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)
TEXT 3.6.4.3 4 09/21/2006
Title:
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 4 04/05/2010
Title:
PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)
TEXT 3.7.2 2 05/02/2008
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 1 01/08/2010
Title:
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM TEXT 3.7.4 0 1'/18/2002
Title:
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 1 10/04/2007
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 3 01/25/2011
Title:
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 1 10/04/2007
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.8.1 8. 05/06/2009
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES - OPERATING TEXT 3.7.8 0 05/06/2009
Title:
MAINE TURBINE PRESSURE REGULATION SYSTEM TEXT 3.8.2 0 11/18/2002
Title:
ELECTRICAL POWER SYSTEMS-AC SOURCES - SHUTDOWN Report Date: 01/16/12 Page~6 Page of of 8
.8 Report Date: 01/16/12
SSES MANUAL Manual Name: TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3. 8.3 2 04/14/2010
Title:
ELECTRICAL POWER SYST'EMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR TEXT 3.8.4 3 01/19/2009
Title:
ELECTRICAL POWER SYST'EMS DC SOURCES - OPERATING TEXT 3.8.5 1 12/14/2006
Title:
ELECTRICAL POWER SYST'EMS DC SOURCES - SHUTDOWN TEXT 3.8.6 1 12/14/2006
Title:
ELECTRICAL POWER SYST'EMS BATTERY CELL PARAMETERS TEXT 3.8.7 3 03/31/2006
Title:
ELECTRICAL POWER SYST'EMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8 0 11/18/2002
Title:
ELECTRICAL POWER SYST 'EMS DISTRIBUTION SYSTEMS - SHUTDOWN TEXT 3.9.1 0 11/18/2002
Title:
REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 1 09/01/2010
Title:
REFUELING OPERATIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3 0 11/18/2002
Title:
REFUELING OPERATIONS CONTROL ROD POSITION TEXT 3.9.4 0 11/18/2002
Title:
REFUELING OPERATIONS CONTROL ROD POSITION INDICATION TEXT 3.9.5 0 11/18/2002
Title:
REFUELING OPERATIONS CONTROL ROD OPERABILITY - REFUELING TEXT 3.9.6 1 10/04/2007
Title:
REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL Report Date: 01/16/12 Page2 Page 7 at of 88 Report Date: 01/16/12
SSES MANUALs Manual Name: *TSB2 Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.9.7 0 11/18/2002
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL TEXT 3.9.8 0 11/18/2002
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - LOW WATER LEVEL TEXT 3.10.1 1 01/23/2008
Title:
SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 0 11/18/2002
Title:
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 0 11/18/2002
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN TEXT 3.10.4 0 1ii/18/2002
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - COLD SHUTDOWN TEXT 3.10.5 0 11/18/2002
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING TEXT 3.10.6 0 11/18/2002
Title:
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL REFUELING TEXT 3.10.7 1 03/24/2005
Title:
SPECIAL OPERATIONS CONTROL ROD TESTING- OPERATING TEXT 3.10.8 2 04/09/2007
Title:
SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING Report Date: 01/16/12 Page~
Page a of of 8 8 Report Date: 01/16/12
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision TOC Table of Contents 18 B 2.0 SAFETY LIMITS BASES Page TS / B 2.0-1 1 Pages TS / B 2.0-2 and TS / B 2.0-3 4 Page TS / B 2.0-4 6 Pages TS / B 2.0-5 through TS / B 2.0-8 1 B 3.0 LCO AND SR APPLICABILITY BASES Page TS / B 3.0-1 1 Pages TS / B 3.0-2 through TS / B 3.0-4 0 Pages TS / B 3.0-5 through TS / B 3.0-7 1 Page TS / B 3.0-8 3 Pages TS / B 3.0-9 through Page TS / B 3.0-11 2 Page TS / B 3.0-11a 0 Page TS / B 3.0-12 1 Pages TS / B 3.0-13 through TS / B 3.0-15 2 Pages TS / B 3.0-16 and TS / B 3.0-17 0 B 3.1 REACTIVITY CONTROL BASES Pages B 3.1-1 through B 3.1-4 0 Page TS / B 3.1-5 1 Pages TS / B 3.1-6 and TS / B 3.1-7 2 Pages B 3.1-8 through B 3.1-13 0 Page TS / B 3.1-14 1 Page TS / B 3.1-15 0 Page TS / B 3.1-16 1 Pages TS / B 3.1-17 through TS / B 3.1-19 0 Pages TS / B 3.1-20 and TS / B 3.1-21 1 Page TS / B 3.1-22 0 Page TS / B 3.1-23 1 Page TS / B3.1-24 0 Pages TS / B 3.1-25 through TS / B 3.1-27 1 Page TS / B 3.1-28 2 Page TS / 3.1-29 1 Pages B 3.1-30 through B 3.1-33 0 Pages TS / B 3.1.34 through TS / B 3.1-36 1 Pages TS / B 3.1-37 and TS / B 3.1-38 2 Pages TS / B 3.1-39 and TS / B 3.1-40 2 Page TS / B 3.1-40a 0 Page TS / B 3.1-41 1 Page TS / B 3.1-42 2 Revision 105 TS/BLOES-1 .
SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 2 2 TS / B LOES-1 Revision 105
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages TS / B 3.1-43 1 Page TS / B 3.1-44 0 Page TS / B 3.1-45 3 Page TS / B 3.1-46 0 Page TS / B 3.1-47 1 Pages TS / B 3.1-48 and TS / B 3.1-49 1 Page B 3.1-50 0 Page TS / B 3.1-51 3 B 3.2 POWER DISTRIBUTION LIMITS BASES Pages TS / B 3.2-1 and TS / B 3.2-2 2 Page TS / B 3.2-3 4 Page TS / B 3.2-4 1 Page TS / B 3.2-5 3 Page TS / B 3.2-6 4 Page TS / B 3.2-7 3 Pages TS / B 3.2-8 and TS / B 3.2-9 4 Pages TS / B 3.2-10 through TS / B 3.2-12 2 Page TS / B 3.2-13 1 B 3.3 INSTRUMENTATION Pages TS / B 3.3-1 through TS / B 3.3-4 1 Page TS / B 3.3-5 2 Page TS / B 3.3-6 1 Page TS / B 3.3-7 3 Page TS / B 3.3-8 4 Pages TS / B 3.3-9 through TS / B 3.3-13 3 Page TS / B 3.3-14 4 Pages TS / B 3.3-15 and TS / B 3.3-16 2 Pages TS / B 3.3-17 through TS / B 3.3-21 3 Pages TS / B 3.3-22 through TS / B 3.3-27 2 Page TS / B 3.3-28 3 Page TS / B 3.3-29 4 Pages TS / B 3.3-30 and TS / B 3.3-31 3 Pages TS / B 3.3-32 and TS / B 3.3-33 4 Page TS / B 3.3-34 2 Page TS / B 3.3-34a 1 Pages TS / B 3.3-34b through TS / B 3.3-34d 0 Page TS / B 3.3-34e 1 Pages TS / B 3.3-34f through TS / B 3.3-34i 0 Pages TS / B 3,3-35 and TS / B 3.3-36 2 Pages TS / B 3.3-37 and TS / B 3.3-38 1 SUSQUEHANNA - UNIT 2 TS / B] LOES-2 Revision 105
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Page TS / B 3.3-39 2 Pages TS / B 3.3-40 through TS / B 3.3-43 2 Pages TS / B 3.3-44 through TS / B 3.3-54 3 Pages TS / B 3.3-54a through TS / B 3.3-54e 0 Page TS / B 3.3-55 1 Page B 3.3-56 0 Page TS / B 3.3-57 1 Page B 3.3-58 0 Page TS / B 3.3-59 1 Pages B 3.3-60 through B 3.3-63 0 Pages TS / B 3.3-64 and TS / B 3.3-65 2 Page TS / B 3.3-66 4 Page TS / B 3.3-67 3 Page TS / B 3.3-68 4 Page TS / B 3.3.69 5 Page TS / B 3.3-70 4 Page TS / B 3.3-71 3 Pages TS / B 3.3-72 and TS / B 3.3-73 2 Page TS / B 3.3-74 3 Page TS / B 3.3-75 2 Pages TS / B 3.3-75a and TS / B 3.3-75 b 6 Page TS / B 3.3-75c 5 Pages B 3.3-76 and TS / B 3.3-77 0 Page TS / B 3.3-78 1 Pages B 3.3-79 through B 3.3-81 0 Page TS / B 3.3-82 1 Page B 3.3-83 0 Pages TS / B 3.3-84 and TS / B 3.3-85 1 Page 3.3-86 0 Page TS / B 3.3-87 1 Page B 3.3-88 0 Page TS / B 3.3-89 1 Pages B 3.3-90 and B 3.3-91 0 Pages TS / B 3.3-92 through TS / B 3.3-103 1 Page TS / B 3.3-104 3 Pages TS / B 3.3-105 and TS/ B 3.3-106 1 Page TS / B 3.3-107 2 Page TS/ B 3.3-108 1 Page TS / B 3.3-109 2 Pages TS / B 3.3-110 through TS/B 3.3-112 1 Page TS / B 3.3-113 2 Page TS / B 3.3-114 1 Page TS / B 3.3-115 2 Page TS / B 3.3-116 3 Pages TS / B 3.3-117 and TS / B 3.3-118 2 Revision 105 TS/BLOES-3 SUSQUEHANNA - UNIT UNIT 2 2 TS / B LOES-3 Revision 105
SUSQUEHANNA STEAM ELECTRIC STATION LIST OFEFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages TS / B 3.3-119 through TS / B 3.3-120 1 Pages TS / B 3.3-121 and TS / B 3.3-122 2 Page TS / B 3.3-123 1 Page TS / B 3.3-124 2 Page TS / B 3.3-124a 0 Page TS / B 3.3-125 1 Page TS / B 3.3-126 2 Page TS / B 3.3-127 3 Page TS / B 3.3-128 2 Pages TS / B 3.3-129 through TS / B 3.3-131 1 Page TS / B 3.3-132 2 Pages TS / B 3.3-133 and TS / B 3.3-134 1 Pages B 3.3-135 through B 3.3-137 0 Page TS / B 3.3-138 1 Pages B 3.3-139 through B 3.3-149 0 Pages TS/ B 3.3-150 and TS / B 3.3-151 1 Pages TS / B 3.3-152 through TS / B 3.3-154 2 Page TS / B 3.3-155 1 Pages TS / B 3.3-156 through TS / B 3.3-158 2 Pages TS / B 3.3-159 through TS / B 3.3-161 1 Page TS / B 3.3-162 1 Page TS / B 3.3-163 2 Page TS / B 3.3-164 1 Pages TS / B 3.3-165 and TS / B 3.3-166 2 Pages TS / B 3.3-167 and TS I B 3.3-168 1 Pages TS / B 3.3-169 and TS / B 3.3-170 2 Pages TS / B 3.3-171 through TS / B 3.3-177 1 Page TS / B 3.3-178 2 Page TS / B 3.3-179 3 Page TS / B 3.3-179a 2 Page TS / B 3.3-180 1 Page TS / B 3.3-181 3 Page TS / B 3.3-182 1 Page TS / B 3.3-183 2 Page TS / B 3.3-184 1 Page TS / B 3.3-185 4 Page TS / B 3.3-186 1 Pages TS / B 3.3-187 and TS /B 3.3-188 2 Pages TS / B 3.3-189 through TS / B 3.3-191 1 Page TS / B 3.3-192 0 Page TS / B 3.3-193 1 Pages TS / B 3.3-194 and TS / B 3.3-195 0 Page TS / B 3.3-196 2 Revision 105 TS/BLOES-4 UNIT 2 SUSQUEHANNA - UNIT SUSQUEHANNA 2 TS / B LOES-4 Revision 105
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages TS / B 3.3-197 through TS / B 3.3-205 0 Page TS / B 3.3-206 1 Pages B 3.3-207 through B 3.3-209 0 Page TS / B 3.3-210 1 Page TS / B 3.3-211 2 Pages TS / B 3.3-212 and TS / B 3.3-213 1 Pages B 3.3-214 through B 3.3-220 0 B 3.4 REACTOR COOLANT SYSTEM BASES Pages TS / B 3.4-1 and TS / B 3.4-2 2 Pages TS / B 3.4-3 through TS / B 3.4-5 4 Pages TS / B 3.4-6 through TS / B 3.4-9 3 Page TS / B 3.4-10 1 Pages TS / B 3.4-11 and TS / B 3.4-12 0 Page TS / B 3.4-13 1 Page TS / B 3.4-14 0 Page TS / B 3.4-15 2 Pages TS / B 3.4-16 and TS / B 3.4-17 4 Page TS / B 3.4-18 2 Pages B 3.4-19 through B 3.4-23 0 Pages TS / B 3.4-24 through TS / B 3.4-27 0 Page TS / B 3.4-28 1 Page TS / B 3.4-29 3 Page TS / B 3.4-30 1 Page TS / B 3.4-31 0 Pages TS / B 3.4-32 and TS / B 3.4-33 1 Page TS / B 3.4-34 0 Pages TS / B 3.4-35 and TS / B 3.4-36 1 Page TS / B 3.4-37 2 Page B 3.4-38 1 Pages B 3.4-39 and B 3.4-40 0 Page TS / B 3.4-41 1 Pages B 3.4-42 through B 3.4-48 0 Page TS / B 3.4-49 3 Pages TS / B 3.4-50 through TS / B 3.4-52 2 Page TS / B 3.4-53 1 Pages TS / B 3.4-54 through TS / B 3.4-57 2 Pages TS / B 3.4-58 through TS / B 3.4-60 1 B 3.5 ECCS AND RCIC BASES Pages TS / B 3.5-1 and TS / B 3.5-2 1 Pages TS / B 3.5-3 through TS / B 3.5-6 2 Pages TS / B 3.5-7 through TS / B 3.5-10 1 Pages TS / B 3.5-11 and TS / B 3.5-12 2 Pages TS / B 3.6-13 and TS / B 3.5-14 1 SUSQUEHANNA - UNIT 2 TS / B LOES-5 Revision 105
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages TS / B 3.5-15 and TS / B.3.5-16 2 Page TS / B 3.5-17 3 Page TS / B 3.5-18 1 Pages B 3.5-19 through B 3.5-24 0 Pages TS / B 3.5-25 through TS / B 3.5-27 1 Page TS / B 3.5-28 0 Page TS / B 3.5-29 1 Pages TS / B 3.5-30 and TS / B 3.5-31 0 B 3.6 CONTAINMENT SYSTEMS BASES Page TS / B 3.6-1 2 Page TS / B 3.6-1a 3 Page TS / B 3.6-2 4 Page TS / B 3.6-3 3 Page TS / B 3.6-4 4 Page TS / B 3.6-5 3 Page TS / B 3.6-6 4 Pages TS / B 3.6-6a and TS / B 3.6-6b 3 Page TS / B 3.6-6c 0 Page B 3.6-:7 0 Page TS /3.6-8 1 Pages B 3.6-9 through B 3.6-14 0 Page TS / B 3.6-15 3 Page TS / B 3.6-15a 0 Page TS / B 3.6-15b 3 Pages TS / B 3.6-16 and TS / B 3.6-17 2 Page TS / B 3.6-17a 0 Pages TS / B 3.6-18 and TS / B 3.6-19 1 Page TS / B 3.6-20 2 Page TS / B 3.6-21 3 Pages TS / B 3.6-21a and TS / B 3.6-21b 0 Pages TS / B 3.6-22 and TS / B 3.6-23 2 Pages TS / B 3.6-24 and TS / B 3.6-25 1 Pages TS / B 3.6-26 and TS / B 3.6-27 3 Page TS / B 3.6-28 7 Page TS / B 3.6-29 5 Page TS / B 3.6-29a 0 Page TS / B 3.6-30 2 Page TS / B 3.6-31 3 Pages TS / B 3.6-32 and TS / B 3.6-33 2 Revision 105 TS/BLOES-6 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 2 2 TS / B LOES-6 Revision 105
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Page TS / B 3.6-34 1 Page TS / B 3.6-35 3 Pages TS / B 3.6-36 and TS / B 3.6-37 2 Page TS / B 3.6-38 3 Page TS / B 3.6-39 7 Page TS / B 3.6-40 1 Pages B 3.6-41 and B 3.6-42 0 Pages TS / B 3.6-43 and TS / B 3.6-44 1 Page TS / B 3.6-45 2 Pages TS / B 3.6-46 through TS / B 3.6-50 1 Page TS / B 3.6-51 2 Pages B 3.6-52 through B 3.6-55 0 Pages TS / B 3.6-56 and TS / B 3.6-57 2 Pages B 3.6-58 through B 3.6-62 0 Pages TS / B 3.6-63 and TS / B 3.6-64 1 Pages B 3.6-65 through B 3.6-68 0 Pages B 3.6-69 through B 3.6-71 1 Page TS / B 3.6-72 2 Pages TS / B 3.6-73 and TS / B 3.6-74 1 Pages B 3.6-75 and B 3.6-76 0 Page TS / B 3.6-77 1 Pages B 3.6-78 through B 3.6-82 0 Page TS / B 3.6-83 3 Page TS / B 3.6-84 2 Page TS / B 3.6-85 4 Page TS / B 3.6-86 through TS / B 3.6-87a 2 Page TS / B 3.6-88 4 Page TS / B 3.6-89 2 Page TS / B 3.6-90 3 Pages TS / B 3.6-91 through TS / B 3.6-95 1 Page TS / B 3.6-96 2 Pages TS / B 3.6-97 and TS / B 3.6-98 1 Page TS / B 3.6-99 3 Page TS / B 3.6-99a 0 Pages TS / B 3.6-100 and TS / B 3.6-101 1 Pages TS / B 3.6-102 and TS / B 3.6-103 2 Page TS / B 3.6-104 3 Page TS / B 3.6-105 2 Page TS / B3.6-106 3 SUSQUEHANNA-UNIT2 TS / B] LOES-7 Revision 105
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision B 3.7 PLANT SYSTEMS BASES Page TS / B 3.7-1 3 Page TS / B 3.7-2 4 Pages TS / B 3.7-3 through TS / B 3.7-5 3 Page TS / B 3.7-5a 1 Page TS / B 3.7-6 3 Page TS / B 3.7-6a 2 Page TS / B 3.7-6b 1 Page TS / B 3.7-6c 2 Page TS / B 3.7-7 3 Page TS / B 3.7-8 2 Pages B 3.7-9 through B 3.7-11 0 Pages TS / B 3.7-12 and TS / B 3.7-13 2 Pages TS / B 3.7-14 through TS / B 3.7-18 3 Page TS / B 3.7-18a 1 Pages TS / B 3.7-18b through TS / B 3.7-18e 0 Pages TS / B 3.7-19 through TS / B 3.7-24 1 Pages TS / B 3.7-25 and TS / B 3.7-26 0 Page TS / B 3.7-27 4 Pages TS / B 3.7-28 and TS / B 3.7-29 3 Pages TS / B 3.7-30 and TS / B 3.7-31 1 Page TS / B 3.7-32 0 Page TS / B 3.7-33 1 Pages TS / B 3.7-34 through TS / B 3.7-37 0 B 3.8 ELECTRICAL POWER SYSTEMS BASES Page TS / B 3.8-1 1 Pages B 3.8-2 and B 3.8-3 0 Page TS / B 3.8-4 1 Pages TS / B 3.8-4a and TS / B 3.8-4b 0 Pages TS / B 3.8-5 and TS / B 3.8-6 3 Page TS / B 3.8-6a 1 Pages B 3.8-7 and B 3.8-8 0 Page TS / B 3.8-9 2 Pages TS / B 3.8-10 and TS / B 3.8-11 1 Pages B 3.8-12 through B 3.8-18 0 Page TS / B 3.8-19 1 Pages B 3.8-20 through B 3.8-22 0 Page TS / B 3.8-23 1 Page B 3.8-24 0 Pages TS / B 3.8-25 and TS / B 3.8-26 1 Revision 105 TS/B LOES-8 SUSQUEHANNA-UNIT2 SUSQUEHANNA - UNIT 2 TS / B LOES-8 Revision 105
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages B 3.8-27 through B 3.8-35 0 Page TS / B 3.8-36 1 Page TS / B 3.8-37 0 Page TS / B 3.8-38 1 Pages TS / B 3.8-39 through TS / B 3.8-46 0 Page TS / B 3.8-47 1 Pages TS / B 3.8-48 through TS / B 3.8-50 0 Pages TS / B 3.8-51 through TS / B 3.8-53 1 Page TS / B 3.8-54 0 Page TS / B 3.8-55 1 Pages TS / B 3.8-56 through TS / B 3.8-59 2 Pages TS / B 3.8-60 through TS / B 3.8-64 3 Page TS / B 3.8-65 4 Page TS / B 3.8-66 5 Pages TS / B 3.8-67 and TS / B 3.8-68 4 Page TS / B 3.8-69 5 Pages TS / B 3.8-70 through TS / B 3.8-83 1 Pages TS / B 3.8-83A through TS / B 3.8-83D 0 Pages B 3.8-84 through B 3.8-85 0 Page TS / B 3.8-86 1 Page TS / B 3.8-87 2 Pages TS / B 3.8-88 through TS / B 3.8-93 1 Pages B 3.8-94 through B 3.8-99 0 B 3.9 REFUELING OPERATIONS BASES Pages TS / B 3.9-1 and TS / B 3.9-2 1 Pages TS / B 3.9-2a through TS / B 3.9-5 1 Pages TS / B 3.9-6 through TS / B 3.9-8 0 Pages B 3.9-9 through B 3.9-18 0 Pages TS / B 3.9-19 through TS / B 3.9-21 1 Pages B 3.9-22 through B 3.9-30 0 B 3.10 SPECIAL OPERATIONS BASES Page TS / B 3.10-1 2 Pages TS / B 3.10-2 through TS / B 3.10-5 1 Pages B 3.10-6 through B 3.10-32 0 Page TS / B 3.10-33 2 Page B 3.10-34 0 Page B 3.10-35 1 Pages B 3.10-36 and B 3.10-37 0 Page B 3.10-38 1 Page TS / B 3.10-39 2 TSB2 Text LOES.doc 1/10/20 12 SUSQUEHANNA - UNIT 2 TS / B LOES-9 Revision 105
PPL Rev. 3 S/RVs B 3.4.3 B 3.4 REACTOR COOLANT SYSTEM (RCS)
B 3.4.3 Safety/Relief Valves (S/RVs)
BASES BACKGROUND The ASME Boiler and Pressure Vessel Code requires the reactor pressure vessel be protected from overpressure during upset conditions by self-actuated safety valves. As part of the nuclear pressure relief system, the size and number of S/RVs are selected such that peak pressure in the nuclear system will not exceed the ASME Code limits for the reactor coolant pressure boundary (RCPB).
The S/RVs are located on the main steam lines between the reactor vessel and the first isolation valve within the drywell. There are a total of 16 S/RVs of which any 14 are required to be OPERABLE. The S/RVs can actuate by either of two modes: the safety mode or the relief mode. In the safety mode (or spring mode of operation), the valve opens when .
steam pressure at the valve inlet overcomes the spring force holding the valve closed. This satisfies the Code requirement.
0 Each S/RV discharges steam through a discharge line to a point below the minimum water level in the suppression pool. Six S/RVs also serve as the Automatic Depressurization System (ADS) valves. The ADS requirements are specified in LCO 3.5.1, "ECCS-Operating."
APPLICABLE The overpressure protection system must accommodate the most severe SAFETY pressurization transient. Evaluations have determined that the most ANALYSES severe transient is the closure of all main steam isolation valves (MSIVs),
followed by reactor scram on high neutron flux (i.e., failure of the direct scram associated with MSIV position) (Ref. 1). For the purpose of the analyses, 14 of the 16 S/RVs are assumed to operate in the safety mode.
The analysis results demonstrate that the design S/R.V capacity is capable of maintaining reactor pressure below the ASME Code limit of 110% of vessel design pressure (110% x 1250 psig = 1375 psig). This LCO helps to ensure that the acceptance limit of 1375 psig is met during the Design Basis Event.
(continued)
SUSQUEHANNA - UNIT 2 TS /B 3.4-15 Revision 2
PPL Rev. 3 S/RVs B 3.4.3 BASES APPLICABLE From an overpressure standpoint, the design basis events are bounded SAFETY by the MSIV closure with flux scram event described above. Reference 2 ANALYSES discusses additional events that are expected to actuate the S/RVs.
(continued)
S/RVs satisfy Criterion 3 of the NRC Policy Statement (Ref. 4).
LCO The safety function of 14 of the 16 S/RVs are required to be OPERABLE to satisfy the assumptions of the safety analysis (Refs. 1 and 2). The requirements of this LCO are applicable only to the capability of the S/RVs to mechanically open to relieve excess pressure when the lift setpoint is exceeded (safety function).
The S/RV setpoints are established to ensure that the ASME Code limit on peak reactor pressure is satisfied. The ASME Code specifications require the lowest safety valve setpoint to be at or below vessel design pressure (1250 psig) and the highest safety valve to be set so that the total accumulated pressure does not exceed 110% of the design pressure for overpressurization conditions. The transient evaluations in the FSAR are based on these setpoints, but also include the additional uncertainty of + 3%, - 5 % of the nominal setpoint to provide an added degree of conservatism.
Operation with fewer valves OPERABLE than specified, or with setpoints outside the ASME limits, could result in a more severe reactor response to a transient than predicted, possibly resulting in the ASME Code limit on reactor pressure being exceeded.
APPLICABILITY In MODES 1, 2, and 3, all required S/RVs must be OPERABLE, since considerable energy may be in the reactor core and the limiting design basis transients are assumed to occur in these MODES. The S/RVs may be required to provide pressure relief to discharge energy from the core until such time that the Residual Heat Removal (RHR) System is capable of dissipating the core heat.
In MODE 4 reactor pressure is low enough that the overpressure limit is unlikely to be approached by assumed (continued)
SUSQUEHANNA - UNIT 2 TS / B 3.4-16 Revision 4
PPL Rev. 3 S/RVs B 3.4.3 BASES SURVEILLANCE SURVEQIR NENS SR 3.4.3.1 (continued)
REQUIREMENTS The Frequency of this Surveillance is established in accordance with the Inservice Testing Program.
REFERENCES 1. FSAR, Section 5.2.2.1.4.
- 2. FSAR, Section 15.
- 3. ASME Operation and Maintenance Code.
- 4. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).
SUSQUEHANNA - UNIT 2 TS / B 3.4-18 Revision 2
Jan. 16, 2012 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2012-2493 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSE M 01/16/2012 LOCATION: NRC REGION 1 TECH SPECS FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD *BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TSBI - TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 11/30/2011 ADD MANUAL TABLE OF CONTENTS DATE: 01/13/2012 CATEGORY: DOCUMENTS TYPE: TSBI Y
Jan. 16, 2012 Page 2 of 2 ID: TEXT 3.4.3 ADD: REV: 3 REMOVE: REV:2 CATEGORY: DOCUMENTS TYPE: TSB1 ID: TEXT LOES REMOVE: REV:102 ADD: REV: 103 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUJAL Manual Name: TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL Table Of Contents Issue Date: 01/13/2012 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 103 01/13/2012
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 20 09/01/2010
Title:
TABLE OF CONTENTS TEXT 2.1.1 5 05/06/2009
Title:
SAFETY LIMITS (SLS) REACTOR CORE' SLS TEXT 2.1.2 1 /'10/04/2007
Title:
SAFETY LIMITS (SLS) REACTOR COOLANT SYSTEM (RCS) PRESSURE S TEXT 3. 0 3 0'8.0//2009
Title:
LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY TEXT 3.1.1 1 04/18/2006
Title:
REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN (SDM)
TEXT 3.1.2 0 11/15/2002
Title:
REACTIVITY CONTROL SYSTEMS REACTIVITY ANOMALIES TEXT 3.1.3 2 01/19/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD OPERABILITY TEXT 3.1.4 4 01/30/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES TEXT 3.1.5 1 07/06/2005
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3.1.6 2 04/18/2006
Title:
REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL Report Date: 01/16/12 Pagel Page I of of 8 8 Report Date: 01/16/12
SSES MANUALJ Manual Name: TSBl Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.1.7 3 04/23/2008
Title:
REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEXT 3.1.8 3 05/06/2009
Title:
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 2 04/23/2008
Title:
POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)
TEXT 3.2.2 3 05/06/2009
Title:
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)
TEXT 3,2.3 2 04/23/2008
Title:
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE (LHGR)
TEXT 3.3.1.1 4 04/23/2008
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3,3.1.2 2 01/19/2009
Title:
INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.2.1 3 04/23/2008
Title:
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 2 04/05/2010
Title:
INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION TEXT 3.3.3.1 8 10/27/2008
Title:
INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 1 04/18/2005
Title:
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 1 04/23/2008
Title:
INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION*
Report Date: 01/16/12 PageZ Page 2 . of of 88 Report Date: 01/16/12
SSES MANUAL Manual Name: TSBI Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.3.4.2 0 11/15/2002
Title:
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 3 08/20/2009
Title:
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 0 11/15/2002
Title:
INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION TEXT 3.3.6.1 4 04/23/2008
Title:
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 4 09/01/2010
Title:
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 2 10/27/2008
Title:
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 2 12/17/2007
Title:
INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 0 11/15/2002
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 4 04/27/2010
Title:
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3.4.2 2 04/27/2010
Title:
REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 3 01/13/2012
Title:
REACTOR COOLANT SYSTEM RCS SAFETY RELIEF VALVES S/RVS TEXT 3.4.4 0 11/15/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE Report Date: 01/16/12 Page~
Page 3 of of *~
8 Report Date: 01/16/12
SSSMANU7AL Manual Name: TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1.MANUAL TEXT 3.4.5 1 01/16/2006
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 3 01/25/2011
Title:
REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 2 10/04/2007
Title:
REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4. 8 1 04/18/2005
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM
- HOT SHUTDOWN TEXT 3.4.9 0 11/15/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM
- COLD SHUTDOWN TEXT 3.4.10 3 04/23/2008
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 0 11/15/2002
Title:
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3. 5. 1 2 01/16/2006
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM ECCS - OPERATING TEXT 3.5.2 0 11/15/2002
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM ECCS - SHUTDOWN TEXT 3.5.3 2 07/09/2010
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM RCIC SYSTEM TEXT 3.6.1.1 4 11/09/2011
Title:
PRIMARY CONTAINMENT TEXT 3.6.1.2 1 04/23/2008
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK Report Date: 01/16/12 Page4 Page 4 of of 8
.8 Report Date: 01/16/12
SSES MANUAL Manual Name: TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.6.1.3 9 04/14/2010
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)
LDCN 3092 TEXT 3.6.1.4 1 04/23/2008
Title:
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5 1 10/05/2005
Title:
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3.6.1.6 0 11/15/2002
Title:
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 2 04/23/2008
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 0 11/15/2002
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 1 01/16/2006
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 0 11/15/2002
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 2 06/13/2006
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINERS TEXT 3.6.3.2 1 04/18/2005
Title:
CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM TEXT 3.6.3.3 0 11/15/2002
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 7 10'/04/2007
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT Page 5 of 8 Report Date: 01/16/12
SSES MANUAL Manual Name: TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.6.4.2 3 03/10/2010
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)
TEXT 3.6.4.3 4 09/21/2006
Title:
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 4 04/05/2010
Title:
PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)
TEXT 3.7.2 2 02/11/2009
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 1 01/08/2010
Title:
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM TEXT 3.7.4 0 11/15/2002
Title:
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 1 10/04/2007
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 2 04/23/2008
Title:
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 1 10/04/2007
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.7.8 0 04/23/2008
Title:
PLANT SYSTEMS TEXT 3.8.1 6 05/06/2009
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES - OPERATING TEXT 3.8.2 0 11/15/2002
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN.
Report Date: 01/16/12 Pages6 Page of of 88 Report Date: 01/16/12
SES MANUAL Manual Name: TSB1 Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.8.3 2 04/14/2010
Title:
ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL, LUBE OIL, AND STARTING AIR TEXT 3.8.4 3 01/19/2009
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING TEXT 3.8.5 1 12/14/2006
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES - SHUTDOWN TEXT 3.8.6 1 12/14/2006
Title:
ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS TEXT 3.8.7 1 10/05/2005
Title:
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8 0 1i/15/2002
Title:
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - SHUTDOWN TEXT 3. 9.1 0 11/15/2002
Title:
REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 1 09/01/2010
Title:
REFUELING OPERATIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3 0 11/15/2002
Title:
REFUELING OPERATIONS CONTROL ROD POSITION TEXT 3.9.4 0 11/15/2002
Title:
REFUELING OPERATIONS CONTROL ROD POSITION INDICATION TEXT 3.9.5 0 11/15/2002
Title:
REFUELING OPERATIONS CONTROL ROD OPERABILITY - REFUELING TEXT 3.9.6 1 10/04/2007
Title:
REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL Report Date: 01/16/12 Pagel7 Page of of 88 Report Date: 01/16/12
SSES MANUAL Manual Name: TSB1.
Manual
Title:
TECHNICAL SPECIFICATION BASES UNIT 1 MANUAL TEXT 3.9.7 0 11/15/2002
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL TEXT 3.9.8 0 11/15/2002
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) - LOW WATER LEVEL TEXT 3.10.1 1 01/23/2008
Title:
SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 0 11/15/2002
Title:
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING' TEXT 3.10.3 0 11/15/2002
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN TEXT 3.10.4 0 11/15/2002
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL - COLD SHUTDOWN TEXT 3.10.5 0 11/15/2002
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL REFUELING TEXT 3.10.6 0 11/15/2002
Title:
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL - REFUELING TEXT 3.10.7 1 04/18/2006
Title:
SPECIAL OPERATIONS CONTROL ROD TESTING - OPERATING TEXT 3.10.8 1 04/12/2006
Title:
SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST- REFUELING Pae f8RprtDt:0/61 Page 8 of 8 Report Date: 01/16/12
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision TOC Table of Contents 20 B 2.0 SAFETY LIMITS BASES Page B 2.0-1 0 Page TS / B 2.0-2 3 Page TS / B 2.0-3 5 Page TS / B 2.0-4 3 Page TS / B 2.0-5 5 Page TS / B 2.0-6 1 Pages TS / B 2.0-7 through TS / B 2.0-9 1 B 3.0 LCO AND SR APPLICABILITY BASES Page TS / B 3.0-1 1 Pages TS / B 3.0-2 through TS / B 3.0-4 0 Pages TS / B 3.0-5 through TS / B 3.0-7 1 Page TS / B 3.0-8 3 Pages TS / B 3.0-9 through TS / B 3.0-11 2 Page TS / B 3.0-11 a 0 Page TS / B 3.0-12 1 Pages TS / B 3.0-13 through TS / B 3.0-15 2 Pages TS / B 3.0-16 and TS / B 3.0-17 0 B 3.1 REACTIVITY CONTROL BASES Pages B 3.1-1 through B 3.1-4 0 Page TS / B 3.1-5 1 Pages TS / B 3.1-6 and TS / B 3.1-7 2 Pages B 3.1-8 through B 3.1-13 0 Page TS / B 3.1-14 1 Page B 3.1-15 0 Page TS / B 3.1-16 1 Pages B 3.1-17 through B 3.1-19 0 Pages TS / B 3.1-20 and TS / B 3.1-21 1 Page TS / B 3.1-22 0 Page TS / B 3.1-23 1 Page TS / B 3.1-24 0 Pages TS / B 3.1-25 through TS / B 3.1-27 1 Page TS / B 3.1-28 2 Page TS / B 3.1-29 1 Pages B 3.1-30 through B 3.1-33 0 Pages TS / B 3.3-34 through TS / B 3.3-36 1 Pages TS / B 3.1-37 and TS / B 3.1-38 2 Pages TS / B 3.1-39 and TS / B 3.1-40 2 Page TS / B 3.1-40a 0 Pages TS / B 3.1-41 and TS / B 3.1-42 2 UNIT 1I TSIBLOES-1 Revision 103 SUSQUEHANNA - UNIT SUSQUEHANNA -
TS / B LOES-1 Revision 103
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Page TS / B 3.1.43 1 Page TS / B 3.1-44 0 Page TS / B 3.1-45 3 Pages TS / B 3.1-46 through TS / B 3.1-49 1 Page TS / B 3.1-50 0 Page TS / B 3.1-51 3 B 3.2 POWER DISTRIBUTION LIMITS BASES Page TS / B 3.2-1 2 Pages TS / B 3.2-2 and TS / B 3.2-3 3 Pages TS / B 3.2-4 and TS / B 3.2-5 2 Page TS / B 3.2-6 3 Page B 3.2-7 1 Pages TS / B 3.2-8 and TS / B 3.2-9 3 Page TS / B 3.2.10 2 Page TS / B 3.2-11 3 Page TS / B 3.2-12 1 Page TS / B 3.2-13 2 B 3.3 INSTRUMENTATION Pages TS /.B 3.3-1 through TS / B 3.3-4 1 Page TS / B 3.3-5 2 Page TS / B 3.3-6 1 Page TS / B 3.3-7 3 Page TS / B 3.3-7a 1 Page TS / B 3.3-8 4 Pages TS / B 3.3-9 through TS / B 3.3-12 3 Pages TS / B 3.3-12a 1 Pages TS / B 3.3-12b and TS / B 3.3-12c 0 Page TS / B 3.3-13 1 Page TS / B 3.3-14 3 Pages TS / B 3.3-15 and TS / B 3.3-16 1 Pages TS / B 3.3-17 and TS / B 3.3-18 4 Page TS / B 3.3-19 1 Pages TS / B 3.3-20 through TS / B 3.3-22 2 Page TS / B 3.3-22a 0 Pages TS / B 3.3-23 and TS / B 3.3-24 2 Pages TS / B 3.3-24a and TS / B 3.3-24b 0 Page TS / B 3.3-25 3 Page TS / B 3.3-26 2 Page TS / B 3.3-27 1 Pages TS / B 3.3-28 through TS / B 3.3-30 3 Page TS / B 3.3-30a 0 UNIT 11 TS/BLOES-2 Revision 103 SUSQUEHANNA - UNIT SUSQUEHANNA -
TS / B LOES-2 Revision 103
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Page TS / B 3.3-31 4 Page TS / B 3.3-32 5 Pages TS / B 3.3-32a 0 Page TS / B 3.3-32b 1 Page TS I B 3.3-33 5 Page TS I B 3.3-33a 0 Page TS / B 3.3-34 1 Pages TS / B 3.3-35 and TS / B 3.3-36 2 Pages TS / B 3.3-37 and TS / B 3.3-38 1 Page TS / B 3.3-39 2 Pages TS / B 3.3-40 through TS / B 3.3-43 1 Page TS / B 3.3-44 4 Pages TS / B 3.3-44a and TS / B 3.3-44b 0 Page TS / B 3.3-45 3 Pages TS / B 3.3-45a and TS / B 3.3-45b 0 Page TS / B 3.3-46 3 Pages TS / B 3.3-47 2 Pages TS / B 3.3-48 through TS / B 3.3-51 3 Pages TS / B 3.3-52 and TS / B 3.3-53 2 Page TS / B 3-3-53a 0 Page TS / B 3.3-54 4 Page TS / B 3.3-55 2 Pages TS / B 3.3-56 and TS / B 3.3-57 1 Page TS / B 3.3-58 0 Page TS / B 3.3-59 1 Page TS / B 3.3-60 0 Page TS / B 3.3-61 1 Pages TS / B 3.3-62 and TS / B 3.3-63 0 Pages TS / B 3.3-64 and TS / B 3.3-65 2 Page TS / B 3.3-66 4 Page TS / B 3.3-67 3 Page TS / B 3.3-68 4 Page TS / B 3.3-69 5 Pages TS / B 3.3-70 4 Page TS / B 3.3-71 3 Pages TS / B 3.3-72 and TS / B 3.3-73 2 Page TS / B 3.3-74 3 Page TS / B 3.3-75 2 Page TS / B 3.3-75a 6 Page TS / B 3.3-75b 7 Page TS / B 3.3-75c 5 SUSQUEHANNA - UNIT 1 TS / B LOES-3 Revision 103
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages B 3.3-76 through 3.3-77 0 Page TS / B 3.3-78 1 Pages B 3.3-79 through B 3.3-81 0 Page B 3.3-82 1 Page B 3.3-83 0 Pages B 3.3-84 and B 3.3-85 1 Page B 3.3-86 0 Page B 3.3-87 1 Page B 3.3-88 0 Page B 3.3-89 1 Page TS / B 3.3-90 1 Page B 3.3-91 0 Pages TS / B 3.3-92 through TS / B3.3-100 1 Pages TS / B 3.3-101 through TS / B 3.3-103 0 Page TS / B 3.3-104 2 Pages TS / B 3.3-105 and TS / B 3.3-106 0 Page TS / B 3.3-107 1 Page TS / B 3.3-108 0 Page TS / B 3.3-109 1 Pages TS / B 3.3-110 and TS / B 3.3-111 .0 Pages TS / B 3.3-112 and TS I B 3.3-112a 1 Pages TS / B 3.3-113 through TS / B 3.3-115 1 Page TS / B 3.3-116 3 Page TS / B 3.3-117 1 Pages TS / B 3.3-118 through TS / B 3.3-122 0 Pages TS / B 3.3-123 and TS / B 3.3-124 1 Page TS / B 3.3-124a 0 Page TS / B 3.3-125 0 Pages TS / B 3.3-126 and TS / B 3.3-127 1 Pages TS / B 3.3-128 through TS/ B 3.3-130 0 Page TS / B 3.3-131 1 Pages TS / B 3.3-132 through TS/ B 3.3-134 0 Pages B 3.3-135 through B 3.3-137 0 Page TS / B 3.3-138 1 Pages B 3.3-139 through B 3.3-149 0 Pages TS / B 3.3-150 and TS / B 3.3-151 1 Pages TS / B 3.3-152 through TS/ B 3.3-154 2 Page TS / B 3.3-155 1 Pages TS / B 3.3-156 through TS / B 3.3-158 2 Pages TS / B 3.3-159 through TS I B 3.3-162 1 Page TS / B 3.3-163 2 Pages TS / B 3.3-164 and TS / B 3.3-165 1 Pages TS I B 3.3-166 and TS / B 3.3-167 2 UNIT 1I TS/BLOES-4 Revision 103 SUSQUEHANNA SUSQUEHANNA - UNIT TS / B LOES-4 Revision 103
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages TS / B 3.3-168 and TS / B 3.3-169 1 Page TS / B 3.3-170 2 Pages TS / B 3.3-171 through TS / B 3.3-177 1 Pages TS / B 3.3-178 through TS / B 3.3-179a 2 Pages TS / B 3.3-179b and TS / B 3.3-179c 0 Page TS / B 3.3-180 1 Page TS / B 3.3-181 3 Page TS / B 3.3-182 1 Page TS / B 3.3-183 2 Page TS / B 3.3-184 1 Page TS / B 3.3-185 4 Page TS / B 3.3-186 1 Pages TS / B 3.3-187 and TS / B 3.3-188 2 Pages TS / B 3.3-189 through TS / B 3.3-191 1 Page TS / B 3.3-192 0 Page TS / B 3.3-193 1 Pages TS / B 3.3-194 and TS / B 3.3-195 0 Page TS / B 3.3-196 2 Pages TS / B 3.3-197 through TS / B 3.3-204 0 Page TS / B 3.3-205 1 Pages B 3.3-206 through B 3.3-209 0 Page TS / B 3.3-210 1 Pages B 3.3-211 through B 3.3-219 0 B 3.4 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 and B 3.4-2 0 Pages TS / B 3.4-3 and Page TS / B 3.4-4 4 Page TS / B 3.4-5 3 Pages TS / B 3.4-6 through TS / B 3.4-9 2 Page TS / B 3.4-10 1 Pages TS / 3.4-11 and TS / B 3.4-12 0 Page TS / B 3.4-13 1 Page TS / B 3.4-14 0 Page TS / B 3.4-15 2 Pages TS / B 3.4-16 and TS / B 3.4-17 4 Page TS / B 3.4-18 2 Pages B 3.4-19 through B 3.4-27 0 Pages TS / B 3.4-28 through TS / B 3.4-30 1 Page TS / B 3.4-31 0 Pages TS / B 3.4-32 and TS / B 3.4-33 1 Page TS / B 3.4-34 0 Pages TS / B 3.4-35 and TS / B 3.4-36 1 Page TS / B 3.4-37 2 Page TS / B 3.4-38 1 SUSQUEHANNA - UNIT 1 TS / B LOES-5 Revision 103
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages B 3.4-39 and B 3.4-40 0 Page TS / B 3.4-41 1 Pages B 3.4-42 through B 3.4-48 0 Page TS / B 3.4-49 3 Page TS / B 3.4-50 1 Page TS / B 3.4-51 3 Page TS / B 3.4-52 2 Page TS / B 3.4-53 1 Pages TS / B 3.4-54 through TS / B 3.4-56 2 Page TS / B 3.4-57 3 Pages TS / B 3.4-58 through TS / B 3.4-60 1 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 0 Page TS / B 3.5-3 2 Page TS / B 3.5-4 1 Page TS / B 3.5-5 2 Page TS / B 3.5-6 1 Pages B 3.5-7 through B 3.5-10 0 Page TS / B 3.5-11 1 Page TS / B 3.5-12 0 Page TS / B 3.5-13 1 Pages TS / B 3.5-14 and TS / B 3.5-15 0 Pages TS / B 3.5-16 through TS / B 3.5-18 1 Pages B 3.5-19 through B 3.5-24 0 Page TS / B 3.5-25 through TS / B 3.5-27 1 Page TS / B 3.5-28 0 Page TS / B 3.5-29 1 Pages TS / B 3.5-30 and TS / B 3.5-31 0 B 3.6 CONTAINMENT SYSTEMS BASES Page TS/B 3.6-1 2 Page TS / B 3.6-1a 3 Page TS / B 3.6-2 4 Page TS / B 3.6-3 3 Page TS / B 3.6-4 4 Pages TS / B 3.6-5 and TS / B 3.6-6 3 Page TS / B 3.6-6a 2 Page TS / B 3.6-6b 3 Page TS / B 3.6-6c 0 Page B 3.6-7 0 Page B 3.6-8 1 Pages B 3.6-9 through B 3.6-14 0 Page TS / B 3.6-15 2 Page TS / B 3.6-15a 0 Page TS / B 3.6-15b 2 Revision 103 SUSQUEHANNA - UNIT
- UNIT 11 TS / B LOES-6 TSIB LOES-6 Revision 103
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages TS / B 3.6-16 and TS / B 3.6-17 1 Page TS / B 3.6-17a 0 Pages TS / B 3.6-18 and TS / B 3.6-19 0 Page TS / B 3.6-20 1 Page TS / B 3.6-21 2 Page TS / B 3.6-22 1 Page TS / B 3.6-22a 0 Page TS / B 3.6-23 1 Pages TS / B 3.6-24 and TS / B 3.6-25 0 Pages TS / B 3.6-26 and TS / B 3.6-27 2 Page TS / B 3.6-28 7 Page TS / B 3.6-29 2 Page TS / B 3.6-30 1 Page TS / B 3.6-31 3 Pages TS / B 3.6-32 and TS / B 3.6-33 1 Pages TS / B 3.6-34 and TS / B 3.6-35 0 Page TS / B 3.6-36 1 Page TS / B 3.6-37 0 Page TS / B 3.6-38 3 Page TS / B 3.6-39 2 Page TS / B 3.6-40 6 Page B 3.6-41 1 Pages B 3.6-42 and B 3.6-43 3 Pages TS / B 3.6-44 and TS / B 3.6-45 1 Page TS / B 3.6-46 2 Pages TS / B 3.6-47 through TS / B 3.6-51 1 Page TS / B 3.6-52 2 Pages TS I B 3.6-53 through TS / B 3.6-56 0 Page TS / B 3.6-57 1 Page TS / 3.6-58 2 Pages B 3.6-59 through B 3.6-63 0 Pages TS / B 3.6-64 and TS / B 3.6-65 1 Pages B 3.6-66 through B 3.6-69 0 Pages TS / B 3.6-70 through TS / B 3.6-72 1 Page TS / B 3.6-73 2 Pages TS / B 3.6-74 and TS / B 3.6-75 1 Pages B 3.6-76 and B 3.6-77 0 Page TS / B 3.6-78 1 Pages B 3.6-79 through B 3.3.6-83 0 Page TS / B 3.6-84 3 Page TS I B 3.6-85 2 Page TS / B 3.6-86 4 LOES-7 Revision 103 SUSQUEHANNA SUSQUEHANNA - UNIT
- UNIT 11 TS /I B TS B LOES-7 Revision 103
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision Pages TS / B 3.6-87 through TS / B 3.6-88a 2 Page TS / B 3.6-89 4 Page TS / B 3.6-90 2 Page TS / B 3.6-91 3 Pages TS / B 3.6-92 through TS / B 3.6-96 1 Page TS / B 3.6-97 2 Pages TS / B 3.6-98 and TS / B 3.6-99 1 Page TS / B 3.6-100 3 Page TS / B 3.6-100a 0 Pages TS / B 3.6-101 and TS / B 3.6-102 1 Pages TS I B 3.6-103 and TS / B 3.6-104 2 Page TS / B 3.6-105 3 Page TS / B 3.6-106 2 Page TS / B 3.6-107 3 B 3.7 PLANT SYSTEMS BASES Pages TS / B 3.7-1 3 Page TS / B 3.7-2 4 Pages TS / B 3.7-3 through TS / B 3.7-5 3 Page TS / B 3.7-5a 1 Page TS / B 3.7-6 3 Page TS / B 3.7-6a 2 Page TS / B 3.7-6b 1 Page TS / B 3.7-6c 2 Page TS / B 3.7-7 3 Page TS / B 3.7-8 2 Pages TS / B 3.7-9 through TS / B 3.7-11 1 Pages TS / B 3.7-12 and TS / B 3.7-13 2 Pages TS / B 3.7-14 through TS / B 3.7-18 3 Page TS / B 3.7-18a 1 Pages TS / B 3.7-18b through TS / B 3.7-18e 0 Pages TS / B 3.7-19 through TS / B 3.7-23 1 Page TS / B 3.7-24 1 Pages TS / B 3.7-25 and TS / B 3.7-26 0 Pages TS / B 3.7-27 through TS / B 3.7-29 5 Page TS / B 3.7-30 2 Page TS / B 3.7-31 1 Page TS / B 3.7-32 0 Page TS / B 3.7-33 1 Pages TS / B 3.7-34 through TS / B 3.7-37 0 Revision 103 SUSQUEHANNA - UNIT SUSQUEHANNA - UNIT 11 TS / B LOES-8 TS/B LOES-8 Revision 103
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision B 3.8 ELECTRICAL POWER SYSTEMS BASES Page TS / B 3.8-1 3 Pages TS / B 3.8-2 and TS / B 3.8-3 2 Page TS / B 3.8-4 3 Pages TS / B 3.8-4a and TS / B 3.8-4b 0 Page TS / B 3.8-5 5 Page TS / B 3.8-6 3 Pages TS / B 3.8-7 through TS/B 3.8-8 2 Page TS / B 3.8-9 4 Page TS / B 3.8-10 3 Pages TS / B 3.8-11 and TS / B 3.8-17 2 Page TS / B 3.8-18 3 Pages TS / B 3.8-19 through TS / B 3.8-21 2 Pages TS / B 3.8-22 and TS / B 3.8-23 3 Pages TS / B 3.8-24 through TS / B 3.8-37 2 Pages B 3.8-38 through B 3.8-44 0 Page TS / B 3.8-45 1 Pages TS / B 3.8-46 through TS / B 3.8-48 0 Pages TS / B 3.8-49 through TS / B 3.8-51 1 Page TS / B 3.8-52 0 Page TS / B 3.8-53 1 Pages TS / B 3.8-54 through TS / B 3.8-57 2 Pages TS / B 3.8-58 through TS / B 3.8-61 3 Pages TS / B 3.8-62 and TS / B 3.8-63 5 Page TS I B 3.8-64 4 Page TS / B 3.8-65 5 Pages TS / B 3.8-66 through TS / B 3.8-77 1 Pages TS / B 3.8-77A through TS / B 3.8-77C 0 Pages B 3.8-78 through B 3.8-80 0 Page TS / B 3.8-81 1 Pages B 3.8-82 through B 3.8-90 0 B 3.9 REFUELING OPERATIONS BASES Pages TS / B 3.9-1 and TS / B 3.9-1a 1 Pages TS / B 3.9-2 through TS / B 3.9-5 1 Pages TS / B 3.9-6 through TS / B 3.9-8 0 Pages B 3.9-9 through B 3.9-18 0 Pages TS / B 3.9-19 through TS / B 3.9-21 1 Pages B 3.9-22 through B 3.9-30 0 Revision 103 SUSQUEHANNA - UNIT I1 SUSQUEHANNA - TS / B LOES-9 TS/B LOES-9 Revision 103
SUSQUEHANNA STEAM ELECTRIC STATION LIST OFEFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS BASES)
Section Title Revision B 3.10 SPECIAL OPERATIONS BASES Page TS / B 3.10-1 2 Pages TS / B 3.10-2 through TS / B 3.10-5 1 Pages B 3.10-6 through B 3.10-31 0 Page TS / B 3.10-32 2 Page B 3.10-33 0 Page TS / B 3.10-34 1 Pages B 3.10-35 and B 3.10-36 0 Page TS / B 3.10-37 1 Page TS / B 3.10-38 2 TSB1 Text LOES.doc 1/10/2012 LOES-1 0 B1LOES-1 Revision 103 SUSQUEHANNA - UNIT 1SUSQUEHANNA TS, - // B TSUNIT 0 Revision 103
PPL Rev. 3 S/RVs B 3.4.3 B 3.4 REACTOR COOLANT SYSTEM (RCS)
B 3.4.3 Safety/Relief Valves (SIRVs)
BASES BACKGROUND The ASME Boiler and Pressure Vessel Code requires the reactor pressure vessel be protected from overpressure during upset conditi6ns by self-actuated safety valves. As part of the nuclear pressure relief system, the size and number of S/RVs are selected such that peak pressure in the nuclear system will not exceed the ASME Code limits for the reactor coolant pressure boundary (RCPB).
The S/RVs are located on the main steam lines between the reactor vessel and the first isolation valve within the drywell. There are a total of 16 S/RVs of which any 14 are required to be OPERABLE. The S/RVs can actuate by either of two modes: the safety mode or the relief mode. In the safety mode (or spring mode of operation), the valve opens when steam pressure at the valve inlet overcomes the spring force holding the valve closed. This satisfies the Code requirement.
Each S/RV discharges steam through a discharge line to a point below the minimum water level in the suppression pool. Six S/RVs also serve as the Automatic Depressurization System (ADS) valves. The ADS requirements are specified in LCO 3.5.1, "ECCS-Operating."
APPLICABLE The overpressure protection system must accommodate the most severe SAFETY pressurization transient. Evaluations have determined that the most ANALYSES severe transient is the closure of all main steam isolation valves (MSIVs),
followed by reactor scram on high neutron flux (i.e., failure of the direct scram associated with MSIV position) (Ref. 1). For the purpose of the analyses, 14 of the 16 S/RVs are assumed to operate in the safety mode.
The analysis results demonstrate that the design S/RV capacity is capable of maintaining reactor pressure below the ASME Code limit of 110% of vessel design pressure (110% x 1250 psig = 1375 psig). This LCO helps to ensure that the acceptance limit of 1375 psig is met during the Design Basis Event.
(continued)
SUSQUEHANNA - UNIT 1 TS I B 3.4-15 Revision 2
PPL Rev. 3 S/RVs B 3.4.3 BASES APPLICABLE From an overpressure standpoint, the design basis events are bounded SAFETY by the MSIV closure with flux scram event described above. Reference 2 ANALYSES discusses additional events that are expected to actuate the S/RVs.
(continued)
S/RVs satisfy Criterion 3 of the NRC Policy Statement (Ref. 4).
LCO The safety function of 14 of the 16 S/RVs are required to be OPERABLE to satisfy the assumptions of the safety analysis (Refs. 1 and 2). The requirements of this LCO are applicable only to the capability of the S/RVs to mechanically open to relieve excess pressure when the lift setpoint is exceeded (safety function).
The S/RV setpoints are established to ensure that the ASME Code limit on peak reactor pressure is satisfied. The ASME Code specifications require the lowest safety valve setpoint to be at or below vessel design pressure (1250 psig) and the highest safety valve to be set so that the total accumulated pressure does not exceed 110% of the design pressure for overpressurization conditions. The transient evaluations in the FSAR are based on these setpoints, but also include the additional uncertainty of + 3%, - 5% of the nominal setpoint to provide an added degree of conservatism.
Operation with fewer valves OPERABLE than specified, or with setpoints outside the ASME limits, could result in a more severe reactor response to a transient than predicted, possibly resulting in the ASME Code limit on reactor pressure being exceeded.
APPLICABILITY In MODES 1, 2, and 3, all required SIRVs must be OPERABLE, since considerable energy may be in the reactor core and the limiting design basis transients are assumed to occur in these MODES. The S/RVs may be required to provide pressure relief to discharge energy from the core until such time that the Residual Heat Removal (RHR) System is capable of dissipating the core heat.
In MODE 4 reactor pressure is low enough that the overpressure limit is unlikely to be approached by assumed (continued)
SUSQUEHANNA - UNIT 1 TS / B 3.4-16 Revision 4
PPL Rev. 3 S/RVs B 3.4.3 BASES APPLICABILITY operational transients or accidents. In MODE 5, the reactor vessel head is (continued) unbolted or removed and the reactor is at atmospheric pressure. The S/RV function is not needed during these conditions.
ACTIONS A.1 and A.2 With less than the minimum number of required S/RVs OPERABLE, a transient may result in the violation of the ASME Code limit on reactor pressure. If the safety function of one or more required S/RVs is inoperable, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.4.3.1 REQUIREMENT The Surveillance requires that the required S/RVs will open at the pressures assumed in the safety analysis of Reference 1. The demonstration of the S/RV safe lift settings must be performed during shutdown, since this is a bench test, to be done in accordance with the Inservice Testing Program. The lift setting pressure shall correspond to ambient conditions of the valves at nominal operating temperatures and pressures. The S/RV setpoint is + 3%, - 5% of the nominal setpoint for OPERABILITY. Requirements for accelerated testing are established in accordance with the Inservice Test Program. Any of the 16 S/RVs, identified in this Surveillance Requirement, with their associated setpoints, can be designated as the 14 required S/RVs. This maintains the assumptions in the overpressure analysis.
A Note is provided to allow up to two of the required 14 S/RVs to be physically replaced with S/RVs with lower setpoints until the next refueling outage. This provides operational flexibility which maintains the assumptions in the over-pressure analysis.
(continued)
SUSQUEHANNA - UNIT 1 TS / B 3.4-17 Revision 4
PPL Rev. 3 S/RVs B 3.4.3 BASES SURVEILLANCE SR 3.4.3.1 (continued)
REQUIREMENTS The Frequency of this Surveillance is established in accordance with the Inservice Testing Program.
REFERENCES 1. FSAR, Section 5.2.2.1.4.
- 2. FSAR, Section 15.
- 3. ASME Operation and Maintenance Code.
- 4. Final Policy Statement on Technical Specifications Improvements, July 22, 1993 (58 FR 39132).
SUSQUEHANNA - UNIT 1 TS / B 3.4-18 Revision 2
Jan. 16, 2012 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2012-2515 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSE M 01/16/2012 LOCATION: NRC REGION 1 TECH SPECS FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID .OU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD:*BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TS2 - PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 2 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 04/20/2011 ADD MANUAL TABLE OF CONTENTS DATE: 01/13/2012
Jan. 16, 2012 Page 2 of 2 CATEGORY: DOCUMENTS TYPE: TS2 ID: TEXT 3.4.3 ADD: REV: 2 REMOVE: REV:1 CATEGORY: DOCUMENTS TYPE: TS2 ID: TEXT LOES REMOVE: REV:39 ADD: REV: 40 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUAL Manual Name: TS2 Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 2 MANUK Table Of Contents Issue Date: 0)1/13/2012 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 40 01/13/2012
Title:
LIST OF EF FECTIVE SECTIONS TEXT TOC 9 01/23/2008
Title:
TABLE OF CONTENTS TEXT 1.1 3 05/06/2009
Title:
USE AND APPLICATION DEFINITIONS TEXT 1.2 0 11/14/2002
Title:
USE AND APPLICATION LOGICAL CONNECTORS TEXT 1.3 0 11i4./2002
Title:
USE AND APPLICATION COMPLETION TIMES TEXT 1.4 1 01/19/2009
Title:
USE AND APPLICATION FREQUENCY TEXT 2.0 4 05/06/2009
Title:
SAFETY LIMITS SLS TEXT 3.0 2 10/12/2006
Title:
LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY/SURVEILLANCE REQUIREMENT (SR) APPLICABILITY TEXT 3.1.1 0 11/14/2002
Title:
REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN SDM TEXT 3.1.2 0 11/14/2002
Title:
REACTIVITY CONTROL SYSTEMS REACTIVITY ANOMALIES TEXT 3.1.3 1 01/19/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD OPERABILITY Report Date: 01/16/12 Pagel Page I of of 99 Report Date: 01/16/12
SSES MANUAL Manual Name: TS2 Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 2 MA1 TEXT 3. 1.4 2 01/30/2009
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES TEXT 3.1.5 0 11/14/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3.1.6 0 11/14/2002
Title:
REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL TEXT 3.1.7 3 10/04/2007
Title:
REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEXT 3.1.8 1 10/19/2005
Title:
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 1 05/06/2009
Title:
POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)
TEXT 3.2.2 1 05/06/2009
Title:
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)
TEXT 3.2.3 1 05/06/2009
Title:
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE (LHGR)
TEXT 3.3.1.1 3 05/06/2009
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM RPS INSTRUMENTATION TEXT 3.3.1.2 0 11/14/2002
Title:
INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.2.1 1 04/09/2007
Title:
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 1 05/06/2009
Title:
INSTRUMENTATION FEEDWATER - MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATIO W Page 2 of .9 Report Date: 01 .
/16/12
SSES MANUAL Manual Name: TS2 Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 2 MANUA TEXT 3.3.3.1 2 06/13/2006
Title:
INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 1 04/18/2005
Title:
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 1 05/06/2009
Title:
INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION TEXT 3.3.4.2 0 11/14/2002
Title:
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 4 12/15/2009
Title:
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 0 11/14/2002
Title:
INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION TEXT 3.3.6.1 3 05/06/2009
Title:
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 0 11/14/2002
Title:
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 0 11/14/2002
Title:
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 1 03/31/2006
Title:
INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 0 11/14/2002
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 3 04Q/b9/2007
Title:
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING Page3 of -a Report Date: 01/16/12
SSES MANUAL Manual Name: TS2 Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 2 MA*
TEXT 3.4.2 1 05/06/2009
Title:
REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 2 01/13/2012
Title:
REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)
TEXT 3.4.4 0 11/14/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE TEXT 3.4.5 0 11/14/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 1 04/18/2005
Title:
REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 1 04/18/2005
Title:
REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8 1 04/18/2005
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM
- HOT SHUTDOWN TEXT 3.4.9 0 11/14/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM
- COLD SHUTDOWN TEXT 3.4.10 3 05/06/2009
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 0 11/14/2002
Title:
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 1 04/18/2005
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM ECCS - OPERATING TEXT 3.5.2 0 11/14/2002
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCICW SYSTEM ECCS - SHUTDOWN Rpr ae:0/61
- Pae4o, Page 4 .of 9 Report Date: 01/16/12
SSES MANUAL Manual Name: TS2 Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 2 MANUK TEXT 3.5.3 1 04/18/2005
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM RCIC SYSTEM TEXT 3.6.1.1 0 11/14/2002
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT TEXT 3.6.1.2 0 11/14/2002
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK TEXT 3.6.1.3 2 05/06/2009
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)
TEXT 3.6.1.4 0 11/14/2002
Title:
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5 0 11/14/2002
Title:
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3.6.1.6 0 11/14/2002
Title:
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 0 11/14/2002
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 0 11/14/2002
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 0 11/14/2002
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 0 11/14/2002
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 2 06/13/2006
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINERS Report Date: 01/16/12 Page 5.
Page5 of 99 Report Date: 01/16/12
SSES MANUTAL Manual Name: TS2 Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 2 TEXT 3.6.3.2 1 04/18/2005
Title:
CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM TEXT 3.6.3.3 0 11/14/2002
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 3 03/16/2006
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT TEXT 3.6.4.2 0 11/14/2002
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)
TEXT 3.6.4.3 1 10/24/2005
Title:
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 1 05/02/2008
Title:
PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)
TEXT 3.7.2 0 11/14/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 1 01/08/2010
Title:
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM TEXT 3.7.4 0 11/14/2002
Title:
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 0 11/14/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 2 05/06/2009
Title:
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 0 11/./4/2002
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL Report Date: 01/16/12 Page~6 Page of of 99 Report.Date: 01/16/12
SSES MANUA-L Manual Name: TS2 Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 2 MANUA TEXT 3.7.8 0 05/06/2009
Title:
MAIN TURBINE PRESSURE REGULATION SYSTEM TEXT 3.8.1 4 02/28/2008
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES - OPERATING TEXT 3.8.2 1 10/05/2005
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES - SHUTDOWN TEXT 3.8.3 0 11/14/2002
Title:
ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL, LUBE OIL, AND STARTING AIR TEXT 3.8.4 3 01/19/2009
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING TEXT 3.8.5 1 12/14/2006
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES - SHUTDOWN TEXT 3.8.6 1 12/14/2006
Title:
ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS TEXT 3.8.7 2 03/31/2006
Title:
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8 0 11/14/2002
Title:
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - SHUTDOWN TEXT 3.9.1 0 11/14/2002
Title:
REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 0 11/14/2002
Title:
REFUELING OPERATIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3 0 11/14/2002
Title:
REFUELING OPERATIONS CONTROL ROD POSITION Pae f9RprtDt:0/61 Page 7 of 9 Report Date: 01/16/12
SSES MANUJAL Manual Name: TS2 Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 2 TEXT 3.9.4 0 11/14/2002
Title:
REFUELING OPERATIONIS CONTROL ROD POSITION INDICATION TEXT 3.9.5 0 11/14/2002
Title:
REFUELING OPERATIONIS CONTROL ROD OPERABILITY - REFUELING TEXT 3.9.6 0 11/14/2002
Title:
REFUELING OPERATIONIS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL TEXT 3.9.7 0 11/14/2002
Title:
REFUELING OPERATIONIS RESIDUAL HEAT REMOVAL (RHR) - HIGH WATER LEVEL TEXT 3.9.8 0 11/14/2002
Title:
REFUELING OPERATIOINIS RESIDUAL HEAT REMOVAL (RHR) - LOW WATER LEVEL TEXT 3.10.1 1 01/23/2008
Title:
SPECIAL 0O?ERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 0 11/14/2002
Title:
SPECIAL 01?ERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 0 11/14/2002
Title:
SPECIAL 01PERATIONS SINGLE CONTROL ROD WITHDRAWAL - HOT SHUTDOWN TEXT 3.10.4 0 11/14/2002
Title:
SPECIAL 0O?ERATIONS SINGLE CONTROL ROD WITHDRAWAL - COLD SHUTDOWN TEXT 3.10.5 0 11/14/2002
Title:
SPECIAL 0O?ERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL - REFUELING TEXT 3.10.6 0 11/14/2002
Title:
SPECIAL 01PERATIONS MULTIPLE CONTROL ROD WITHDRAWAL - REFUELING TEXT 3.10.7 0 114.4/2002
Title:
SPECIAL 01PERATIONS CONTROL ROD TESTING - OPERATING Pae f9RprtDt:0/61 Page 8 of .9 Report Date: 01/16/12
SSES MANUAL Manual Name: TS2 Manual
Title:
PP&L SUSQUEHANNA STEAM ELEC6ýTRIC STATION TECHNICAL SPECIFICATIONS UNIT 2 MANUK TEXT 3.10.8 2 12/15/2009
Title:
SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING TEXT 4.0 1 05/24/2007
Title:
DESIGN FEATURES TEXT 5.1 11/14/2002
Title:
ADMINISTRATIVE CONTROLS RESPONSIBILITY TEXT 5.2 1 10/09/2009
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 5.3 0 11/14/2002
Title:
ADMINISTRATIVE CONTROLS UNIT STAFF QUALIFICATIONS TEXT 5.4 0 11/14/2002
Title:
ADMINISTRATIVE CONTROLS PROCEDURES TEXT 5.5 5 01/08/2010
Title:
ADMINISTRATIVE CONTROLS PROGRAMS AND MANUALS TEXT 5.6 05/06/2009
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 5.7 0 11/14/2002
Title:
ADMINISTRATIVE CONTROLS HIGH RADIATION AREA TEXT APPENDIX B 0 11/14/2002
Title:
ENVIRONMENTAL PROTECTION PLAN NON-RADIOLOGICAL Report Date: 01/16/12 Pages Page 9 of of 9 9 Report Date: 01/16/12
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 40 LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS)
Section Title Amendment TOC Table of Contents TS/TOC-1 223 TS/TOC-2 211 TS/TOC-3 223 TS/TOC-4 210 1.0 USE AND APPLICATION 1.1 Definitions Page 1.1-1 151 Pages 1.1-2 and 1.1-3 216 Page 1.1-4 151 Page 1.1-5 220 Page 1.1-6 224 Pages 1.1-7 and 1.1-8 151 1.2 Logical Connectors Pages 1.2-1 through 1.2-3 151 1.3 Completion Times Pages 1.3-1 through 1.3-13 151 1.4 Frequency Pages 1.4-1 through 1.4-3 151 Pages TS / 1.4-4 and TS / 1.4-5 229 2.0 SAFETY LIMITS (SLs)
Page TS /2.0-1 230 Pages TS / 2.0-2 and 2.0-3 154 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY/
SURVEILLANCE REQUIREMENT (SR) APPLICABILITY Page TS /3.0-1 213 Page TS / 3.0-2 195 Page TS /3.0-3 213 Page TS /3.0-4 179 Page TS / 3.0-5 195 3.1 REACTIVITY CONTROL SYSTEMS Pages 3.1-1 through 3.1-7 151 Page TS 3.1-8 229 Page 3.1-9 151 Page TS 3.1-10 229 Page 3.1-11 151 SUSQUEHANNA - UNIT 2 TS / LOES-1 Effective Date 01 /10/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 40 LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS)
Section Title Amendment Page TS /3.1-12 214 Page TS / 3.1-13 228 Pages 3.1-14 through 3.1-19 151 Pages 3.1-20 and 3.1-21 217 Page TS /3.1-22 217 Page 3.1-23 217 Page 3.1-24 151 Page TS / 3.1-25 199 Page 3.1-26 151 3.2 POWER DISTRIBUTION LIMITS Pages 3.2-1 through 3.2-6 224 3.3 INSTRUMENTATION Page 3.3-1 207 Pages 3.3-2 through 3.3-6 224 Pages TS / 3.3-7 and TS / 3.3-8 224 Page 3.3-9 224 Pages 3.3-10 through 3.3-15 151 Page 3.3-16 220 Page 3.3-17 151 Page TS / 3.3-18 220 Page 3.3-19 151 Page TS / 3.3-20 220 Page 3.3-21 224 Page 3.3-22 151 Page TS / 3.3-23 195 Page 3.3-24 151 Pages TS / 3.3-25 and TS I 3.3-26 211 Page TS /3.3-27 195 Pages 3.3-28 and 3.3-29 151 Pages 3.3-30 through 3.3-32 224 Pages TS / 3.3-37 through TS / 3.3-41 155 Page TS / 3.3-42 202 Pages TS / 3.3-43 and TS / 3.3-44 155 Page TS / 3.3-45 234 Pages TS / 3.3-46 and TS / 3.3-47 196 SUSQUEHANNA-UNIT2 TS / LOES-2 Effective Date 01 /10/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 40 LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS)
Section Title Amendment Pages 3.3-48 through 3.3-51 151 Page TS /3.3-52 188 Pages 3.3-53 through 3.3-55 151 Page TS / 3.3-56 166 Page TS / 3.3-57 224 Pages 3.3-58 through 3.3-60 151 Page 3.3-61 216 Page TS /3.3-62 188 Pages 3.3-63 through 3.3-71 151 Pages TS / 3.3-72 through TS / 3.3-74 208 Pages 3.3-75 through 3.3-77 151 3.4 REACTOR COOLANT SYSTEM (RCS)
Page TS / 3.4-1 207 Pages TS / 3.4-2 through TS / 3.4-5 192 Page 3.4-6 151 Pages 3.4-7 and 3.4-8 224 Page TS / 3.4-9 237 Pages 3.4-10 through 3.4-13 151 Pages TS / 3.4-14 and TS / 3.4-15 195 Page 3.4-16 151 Page TS / 3.4-17 195 Page 3.4-18 151 Page TS / 3.4-19 195 Pages 3.4-20 through 3.4-25 151 Page TS /3.4-26 174 Pages 3.4-27 and 3.4-28 224 Page 3.4-29 151 Pages TS /3.4-30 through TS I 3.4-30b 209 Page 3.4-31 151 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM Page TS / 3.5-1 195 Pages 3.5-2 through 3.5-11 151 Page TS /3.5-12 195 Pages 3.5-13 and 3.5-14 151 TS / LOES-3 Effective Date 01/10/2012 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 2 2 TS / LOES-3 Effective Date 01/10/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 40 LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS)
Section Title Amendment 3.6 CONTAINMENT SYSTEMS Page 3.6-1 151 Page TS / 3.6-2 171 Pages 3.6-3 through 3.6-7 151 Page TS /3.6-8 170 Page 3.6-9 151 Pages TS / 3.6-10 and TS /3.6-11 170 Pages 3.6-12 and 3.6-13 151 Page TS / 3.6-14 200 Page TS / 3.6-15 231 Pages 3.6-16 through 3.6-20 151 Page TS /3.6-21 173 Pages 3.6-22 through 3.6-25 151 Page TS / 3.6-26 181 Pages 3.6-27 through 3.6.29 151 Pages TS / 3.6-30 and TS / 3.6-31 211 Page TS /3.6-32 195 Pages 3.6-33 and 3.6-34 151 Pages TS / 3.6-35 and TS / 3.6-36 203 Page TS / 3.6-37 205 Pages 3.6-38 through 3.6-42 151 Pages TS / 3.6-43 and TS / 3.6-44 203 3.7 PLANT SYSTEMS Page TS / 3.7-1 224 Page TS / 3.7-2 180 Page TS / 3.7-3 224 Pages TS / 3.7-3a through TS / 3.7-3d 224 Pages 3.7-4 and 3.7-5 151 Pages TS / 3.7-6 through TS / 3.7-9 232 Pages 3.7-10 through 3.7-14 151 Page TS / 3.7-15 224 Page TS /3.7-16 193 Page 3.7-17 151 Pages TS / 3.7-18 and TS / 3.7-19 224 3.8 ELECTRICAL POWER SYSTEMS Page TS / 3.8-1 225 Page TS /3.8-2 202 Pages 3.8-3 through 3.8-7 151 Page TS /3.8-8 159 TS I LOES-4 Effective Date 01/10/2012 SUSQUEHANNA - UNIT
- UNIT 22 TS, / LOES-4 Effective Date 01 /10/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 40 LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS)
Section Title Amendment Pages 3.8-9 through 3.8-18 151 Page TS / 3.8-19 202 Pages 3.8-20 through 3.8-22 151 Page TS / 3.8-23 157 Page TS / 3.8-24 151 Page TS /3.8-25 157 Pages TS / 3.8-26 and TS / 3.8-26a 227 Page TS / 3.8-27 227 Pages TS / 3.8-28 and TS / 3.8-29 215 Page TS / 3.8-30 227 Pages TS / 3.8-31 through TS / 3.8-33 215 Pages 3.8-34 through 3.8-37 151 Pages TS /3.8-38 through TS /3.8-43 215 Pages TS / 3.8-44 through TS / 3.8-46 208 Pages 3.8-47 through 3.8-53 151 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-15 151 3.10 SPECIAL OPERATIONS Page TS / 3.10-1 223 Pages 3.10-2 through 3.10-19 151 Page TS / 3.10-20 234 Page TS /3.10-21 207 Pages 3.10-22 and 3.10-23 151 4.0 DESIGN FEATURES Page TS / 4.0-1 184 Pages 4.0-2 and 4.0-3 151 Page TS / 4.0-4 221 5.0 ADMINISTRATIVE CONTROLS Pages 5.0-1 and 5.0-2 151 Pages TS / 5.0-3 and TS / 5.0-4 233 Pages 5.0-5 through 5.0-7 151 Page TS / 5.0-8 188 Page TS / 5.0-9 183 Page 5.0-10 151 Page TS / 5.0-11 219 Pages 5.0-12 and 5.0-13 151 TS / LOES-5 Effective Date 01/10/2012 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 22 TS, / LOES-5 Effective Date 01 /10/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 40 LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS)
Section Title Amendment Page TS / 5.0-14 186 Page 5.0-15 151 Pages TS / 5.0-16 and TS / 5.0-17 183 Page TS / 5.0-18 224 Page TS / 5.0-18a 219 Pages TS / 5.0-18b and TS / 5.0-18c 232 Page TS / 5.0-19 210 Page TS / 5.0-20 183 Pages TS / 5.0-21 through TS / 5.0-23 224 Page TS / 5.0-23a 194 Pages TS / 5.0-24 through TS / 5.0-27 184 Appendix B Environmental Protection Plan 162 TS2 Text LOES 01/10/2012 SUSQUEHANNA - UNIT 2 TS / LOES-6 Effective Date 01 /10/2012
PPL Rev. 2 S/RVs 3.4.3 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.3 Safety/Relief Valves (S/RVs)
LCO 3.4.3 The safety function of 14 S/RVs shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.1 One or more required A.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> S/RVs inoperable.
AND A.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SUSQUEHANNA - UNIT 2 3.4-8 Amendment M1, 224
PPL Rev. 2 S/RVs 3.4.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY i
SR 3.4.3.1 Verify the safety function lift setpoints of the In accordance with the required S/RVs are as follows: Inservice Testing Program
NOTE -------------------------
Up to two inoperable required S/RVs may be replaced with spare OPERABLE S/RVs having lower setpoints until the next refueling outage.
Number of Setpoint S/RVs (psig) 2 1175 (Ž1117 and
- 1210) 6 1195 (Ž1136 and *<1230) 8 1205 (Ž! 1145 and *<1241)
Following testing, lift settings shall be within
+/-1%.
SUSQUEHANNA - UNIT 2 TS / 3.4-9 Amendment 475, 237
Jan. 16, 2012 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2012-2337 USER INFORMATION:
GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSE M 01/16/2012 LOCATION: NRC REGION 1 TECH SPECS FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD,'.BAE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TSI - PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 04/20/2011 ADD MANUAL TABLE OF CONTENTS DATE: 01/13/2012
Jan. 16, 2012 Page 2 of 2 CATEGORY: DOCUMENTS TYPE: TSI ID: TEXT 3.4.3 REMOVE: REV:I ADD: REV: 2 CATEGORY: DOCUMENTS TYPE: TS1 ID: TEXT LOES REMOVE: REV:35 ADD: REV: 36 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
SSES MANUJAL Manual Name: TS1 Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUK Table Of Contents Issue Date: 0)1/13/2012 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 36 01/13/2012
Title:
LIST OF EF FECTIVE SECT IONS TEXT TOC 8 01/23/2008
Title:
TABLE OF CONTENTS TEXT 1.1 2 05/02/2008
Title:
USE AND APPLICATION DEFINITIONS TEXT 1.2 0 11/06/2002
Title:
USE AND APPLICATION LOGICAL CONNECTORS TEXT 1.3 0 11/06/2002
Title:
USE AND APPLICATION COMPLETION TIMES TEXT 1.4 1 01/19/2009
Title:
USE AND APPLICATION FREQUENCY TEXT 2.0 4 05/02/2008
Title:
SAFETY LIMITS SLS TEXT 3.0 2 10/12/2006
Title:
LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY/SURVEILLANCE REQUIREMENT (SR) APPLICABILITY TEXT 3.1.1 0 11/06/2002
Title:
REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN (SDM)
TEXT 3.1.2 0 1/i06/2002
Title:
REACTIVITY CONTROL SYSTEMS REACTIVITY ANOMALIES TEXT 3.1.3 1 01/19/2009
Title:
REACTIVITY CONTROL SYSTEMS-CONTROL ROD OPERABILITY Report Date: 01/16/12 Pagel Page 1 of of 99 Report Date: 01/16/12
SSES MANUJAL Manual Name: TS1 Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 TEXT 3.1.4 2 01/30/2009
Title:
REACTIVITY CONTROL SYSTEMS TEXT 3.1.5 0 11/06/2002
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3.1.6 0 11/06/2002
Title:
REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL TEXT 3.1.7 3 05/02/2008
Title:
REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEXT 3.1.8 1 10/19/2005
Title:
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2. 1 1 05/02/2008
Title:
POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)
TEXT 3.2.2 1 05/02/2008
Title:
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)
TEXT 3.2.3 1 05/02/2008
Title:
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE (LHGR)
TEXT 3.3.1.1 3 05/02/2008
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 0 11/06/2002
Title:
INSTRUMENTATION SOURCE RANGE MONITOR (SRM) INSTRUMENTATION TEXT 3.3.2.1 2 05/02/2008
Title:
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 1 05/0.2/2008
Title:
INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION Page 2 of 9 Report. Date: 01/16/12
SSES MANUAL Manual Name: TS1 Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUKJ TEXT 3.3.3.1 2 06/13/2006
Title:
INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION LDCN 2930 TEXT 3.3.3.2 1 04/18/2005
Title:
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 1 05/02/2008
Title:
INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION TEXT 3.3.4.2 0 11/14/2002
Title:
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 3 12/15/2009
Title:
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 0 11/14/2002
Title:
INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION TEXT 3.3.6.1 4 05/02/2008
Title:
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 0 11/14/2002
Title:
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 0 11/14/2002
Title:
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 0 11/14/2002
Title:
INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 0 11/14/2002
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 3 03/,.i/2006
Title:
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING Report Date: 01/16/12 Page~3 Page of of 9 9 Report Date: 01/16/12
SSES MANUAL Manual Name: TS1 Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 TEXT 3.4.2 1 05/02/2008
Title:
REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 2 01/13/2012
Title:
REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)
TEXT 3.4.4 0 11/14/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE TEXT 3.4.5 0 11/14/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 1 04/18/2005
Title:
REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 1 04/18/2005
Title:
REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4. 8 1 04/18/2005
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM HOT SHUTDOWN TEXT 3.4.9 0 11/14/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM COLD SHUTDOWN TEXT 3.4.10 2 05/02/2008
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 0 11/14/2002
Title:
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5. 1 1 04/18/2005
Title:
EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM ECCS OPERATING TEXT 3.5.2 0 1171,4/2002
Title:
EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)@*
SYSTEM ECCS SHUTDOWN Report Date: 01/16/12 Page4 Page 4 of 1 of 9 9 Report Date: 01/16/12
SSES MANUJAL Manual Name: TS1 Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUK TEXT 3.5.3 1 04/18/2005
Title:
EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM RCIC SYSTEM TEXT 3.6.1.1 0 11/14/2002
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT TEXT 3.6.1.2 0 11/14/2002
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK TEXT 3.6.1.3 3 05/06/2009
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)
TEXT 3.6.1.4 0 11/14/2002
Title:
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5 0 11/i4/2002
Title:
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3.6.1.6 0 11/14/2002
Title:
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 0 11/14/2002
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 0 11/14/2002
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 0 11/14/2002
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 0 11/14/2002
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 2 Q6/13/2006
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINERS Report Date: 01/16/12 Pages Page 5 of of .9.
9 Report Date: 01/16/12
SSES MANUJAL Manual Name: TS1 Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 TEXT 3.6.3.2 1 04/18/2005
Title:
CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM TEXT 3.6.3.3 0 11/14/2002
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 3 03/16/2006
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT TEXT 3.6.4.2 0 11/14/2002
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)
TEXT 3.6.4.3 1 10/24/2005
Title:
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 1 05/02/2008
.Title: PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)
TEXT 3.7.2 0 11/14/2002
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 1 01/08/2010
Title:
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM TEXT 3.7.4 0 11/14/2002
Title:
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 0 11/14/2002
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 2 05/02/2008
Title:
PLANT SYSTEMS MAIN.TURBINE BYPASS SYSTEM TEXT 3.7.7 0 11/14/2002
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL Report Date: 01/16/12 Page66 Page of of .99 Report Date: 01/16/12
SSES MANUAL Manual Name: TS1 Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUA:
TEXT 3.7.8 0 05/02/2008
Title:
EXTENDED POWER UPRATE TEXT 3. 8.1 4 05/24/2007
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES OPERATING LDCN 3586 TEXT 3.8.2 1 10/05/2005
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES SHUTDOWN TEXT 3.8.3 0 11/14/2002
Title:
ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR TEXT 3.8.4 3 01/19/2009
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES OPERATING TEXT 3.8.5 1 12/14/2006
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES SHUTDOWN TEXT 3.8.6 1 12/14/2006
Title:
ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS TEXT 3.8.7 1 10/05/2005
Title:
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS OPERATING TEXT 3.8.8 1 10/05/2005
Title:
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS SHUTDOWN TEXT 3.9.1 0 11/14/2002
Title:
REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 0 11/14/2002
Title:
REFUELING OPERATIONS REFUEL POSITION ONE ROD OUT INTERLOCK TEXT 3.9.3 0 11/1,4/2002
Title:
REFUELING OPERATIONS CONTROL ROD POSITION Report Date: 01/16/12 Page 7 Page 7 of of ~9 Report Date: 01/16/12
SSES MANUAL Manual Name: TS1 Manual
Title:
PP&LSUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 TEXT 3.9.4 0 11/14/2002
Title:
REFUELING OPERATIONS IS CONTROL ROD POSITION INDICATION TEXT 3,9.5 0 11/14/2002
Title:
REFUELING OPERATION,IS CONTROL ROD OPERABILITY REFUELING TEXT 3,9.6 0 11/14/2002
Title:
REFUELING OPERATIONIS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL TEXT 3.9.7 0 11/14/2002
Title:
REFUELING OPERATIONIS RESIDUAL HEAT REMOVAL (RHR) HIGH WATER LEVEL TEXT 3.9.8 0 11/14/2002
Title:
REFUELING OPERATION.S RESIDUAL HEAT REMOVAL (RHR) LOW WATER LEVEL TEXT 3.10.1 1 01/23/2008
Title:
SPECIAL 0O?ERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 0 11/14/2002
Title:
SPECIAL 01?ERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 0 11/14/2002
Title:
SPECIAL 0O?ERATIONS SINGLE CONTROL ROD WITHDRAWAL HOT SHUTDOWN TEXT 3.10.4 0 11/14/2002
Title:
SPECIAL 01PERATIONS SINGLE CONTROL ROD WITHDRAWAL COLD SHUTDOWN TEXT 3.10.5 0 11/14/2002
Title:
SPECIAL 01?ERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL REFUELING TEXT 3.10.6 0 11/14/2002
Title:
SPECIAL 01?ERATIONS MULTIPLE CONTROL ROD WITHDRAWAL REFUELING TEXT 3.10.7 0 1:1'./14/2002
Title:
SPECIAL 0O?ERATIONS CONTROL ROD TESTING OPERATING Report Date: 01/16/12 Page~
Page 8 of of 99 Report Date: 01/16/12
SSES MANUAL Manual Name: TS1 Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUA TEXT 3.10. .8 2 12/15/2009
Title:
SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST REFUELING TEXT 4.0 2 05/24/2007
Title:
DESIGN FEATURES TEXT 5.1 0 11/14/2002
Title:
ADMINISTRATIVE CONTROLS RESPONSIBILITY TEXT 5.2 1 10/09/2009
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 5.3 0 11/14/2002
Title:
ADMINISTRATIVE CONTROLS UNIT STAFF QUALIFICATIONS TEXT 5.4 0 11/14/2002
Title:
ADMINISTRATIVE CONTROLS PROCEDURES TEXT 5.5 5 01/08/2010
Title:
ADMINISTRATIVE CONTROLS PROGRAMS AND MANUALS TEXT 5.6 7 05/02/2008
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 5.7 0 11/14/2002
Title:
ADMINISTRATIVE CONTROLS HIGH RADIATION AREA TEXT APPENDIX B 0 11/14/2002
Title:
ENVIRONMENTAL PROTECTION PLAN NON RADIOLOGICAL Report Date: 01/16/12 Pages Page 9 of of 99 Report Date: 01/16/12
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 36 LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS)
Section Title Amendment TOC Table of Contents TS/TOC-1 242 TS/TOC-2 234 TS/TOC-3 245 TS/TOC-4 233 1.0 USE AND APPLICATION 1.1 Definitions Page 1.1-1 178 Pages 1.1-2 and 1.1-3 239 Page 1.1-4 178 Page 1.1-5 242 Page 1.1-6 246 Pages 1.1-7 and 1.1-8 178 1.2 Logical Connectors Pages 1.2-1 through 1.2-3 178 1.3 Completion Times Pages 1.3-1 through 1.3-13 178 1.4 Frequency Pages 1.4-1 through 1.4-3 178 Pages TS / 1.4-4 and TS / 1.4-5 250 2.0 SAFETY LIMITS (SLs)
Page TS / 2.0-1 246 Pages 2.0-2 and 2.0-3 186 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY/
SURVEILLANCE REQUIREMENT (SR) APPLICABILITY Page TS / 3.0-1 236 Page TS / 3.0-2 219 Page TS / 3.0-3 236 Page TS / 3.0-4 205 Page TS / 3.0-5 219 3.1 REACTIVITY CONTROL SYSTEMS Pages 3.1-1 through 3.1-7 178 Page TS / 3.1-8 250 Page 3.1-9 178 Page TS / 3.1-10 250 Page 3.1-11 178 SUSQUEHANNA - UNIT 1 TS / LOES-1 Effective Date 01 A 0/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 36 LIST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS)
Section Title Amendment Page TS /3.1-12 237 Page TS /3.1-13 249 Pages 3.1-14 through 3.1-19 178 Pages 3.1-20 and 3.1-21 240 Page TS / 3.1-22 240 Page 3.1-23 240 Page 3.1-24 178 Page TS / 3.1-25 222 Page 3.1-26 178 3.2 POWER DISTRIBUTION LIMITS Pages 3.2-1 through 3.2-6 246 3.3 INSTRUMENTATION Page TS / 3.3-1 230 Pages TS 13.3-2 and TS / 3.3-3 246 Page 3.3-4 178 Pages TS / 3.3-5 through TS /3.3-9 246 Pages 3.3-10 through 3.3-15 178 Page 3.3-16 242 Page 3.3-17 178 Page TS / 3.3-18 through TS / 3.3-20 242 Page 3.3-21 246 Page 3.3-22 178 Page TS /3.3-23 219 Pages TS / 3.3-24 and TS / 3.3-25 234 Page TS /3.3-26 219 Pages 3.3-27 and 3.3-28 178 Pages 3.3-29 through 3.3-31 246 Pages 3.3-32 through 3.3-40 178 Page TS / 3.3-41 225 Pages TS / 3.3-42 and TS / 3.3-43 181 Page TS / 3.3-44 254 Page TS 1 3.3-45 204 Pages TS / 3.3-46 and TS / 3.3-47 220 Pages 3.3-48 through 3.3-51 178 Page TS / 3.3-52 213 Pages 3.3-53 through 3.3-55 178 Page TS / 3.3-56 191 TS /LOES-2 Effective Date 01/10/2012 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT 11 TS / LOES-2 Effective Date 01 /10/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 36 LIST OF EFFECTIVESECTIONS (TECHNICAL SPECIFICATIONS)
Section Title Amendment Page TS / 3.3-57 246 Pages 3.3-58 through 3.3-60 178 Page 3.3-61 239 Page TS /3.3-62 213 Pages 3.3-63 through 3.3-77 178 3.4 REACTOR COOLANT SYSTEM (RCS)
Page TS 13.4-1 230 Pages TS / 3.4-2 through TS / 3.4-5 217 Page 3.4-6 178 Pages 3.4-7 and 3.4-8 246 Page TS / 3.4-9 257 Pages 3.4-10 through 3.4-13 178 Pages TS / 3.4-14 and TS / 3.4-15 219 Page 3-4-16 178 Page TS / 3.4-17 219 Page 3.4-18 178 Page TS /3.4-19 219 Pages 3.4-20 through 3.4-25 178 Page TS / 3.4-26 200 Pages 3.4-27 and 3.4-28 246-Page TS /3.4-29 178 Pages TS / 3.4-30 through TS / 3.4-30b 232 Page 3.4-31 178 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM Page TS / 3.5-1 219 Pages 3.5-2 through 3.5-11 178 Page TS / 3.5-12 219 Pages 3.5-13 and 3.5-14 178 3.6 CONTAINMENT SYSTEMS Pages 3.6-1 through 3.6-7 178 Page TS / 3.6-8 195 Page TS /3.6-9 178 Pages TS /3.6-10 and TS / 3.6-11 195 Pages TS /3.6-12 and TS / 3.6-13 178 Page TS / 3.6-14 223 Page TS / 3.6-15 251 Pages 3.6-16 through 3.6-20 178 TS/LOES-3 Effective Date 01/10/2012 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT I1 TS / LOES-3 Effective Date 01/10/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 36 LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS)
Section Title Amendment Page TS / 3.6-21 198 Pages 3.6-22 through 3.6-25 178 Page TS / 3.6-26 207 Pages 3.6-27 through 3.6-29 178 Pages TS / 3.6-30 and TS / 3.6-31 234 Page TS / 3.6-32 219 Pages 3.6-33 and 3.6-34 178 Pages TS / 3.6-35 and TS / 3.6-36 226 Page TS / 3.6-37 229 Pages 3.6-38 through 3.6-42 178 Pages TS / 3.6-43 and TS / 3.6-44 226 3.7 PLANT SYSTEMS Page TS /3.7-1 246 Page TS / 3.7-2 206 Page TS / 3.7-3 246 Pages TS / 3.7-3a through TS / 3.7-3d 246 Pages 3.7-4 and 3.7-5 178 Pages TS / 3.7-6 through TS /3.7-9 252 Pages 3.7-10 through 3.7-14 178 Page TS / 3.7-15 246 Page TS / 3.7-16 218 Page 3.7-17 178 Pages 3.7-18 and TS / 3.7-19 246 3.8 ELECTRICAL POWER SYSTEMS Page TS / 3.8-1 219 Page TS / 3.8-2 225 Page TS / 3.8-3 243 Page TS / 3.8-4 214 Page 3.8-5 178 Page TS /.3.8-6 185 Pages 3.8-7 through 3.8-16 178 Page TS / 3.8-17 225 Pages 3.8-18 and 3.8-19 178 Page TS / 3.8-20 183 Page TS / 3.8-21 178 Page TS / 3.8-22 183 Pages TS / 3.8-23 and TS / 3.8-23a 248 Page TS / 3.8-24 248 Page TS / 3.8-25 238 TS / LOES-4 Effective Date 01 /10/2012 SUSQUEHANNA SUSQUEHANNA - UNIT
- I UNIT 1. TS / LOES-4 Effective Date 01 /10/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 36 LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS)
Section Title Amendment Page TS / 3.8-26 248 Pages TS / 3.8-27 and TS / 3.8-28 238 Pages 3.8-29 and 3.8-30 178 Pages TS / 3.8-31 through TS / 3.8-36 238 Page TS / 3.8-37 225 Pages 3.8-38 through 3.8-40 178 Page TS / 3.8-41 225 Pages 3.8-42 and 3.8-43 178 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-15 178 3.10 SPECIAL OPERATIONS Page TS /3.10-1 245 Pages 3.10-2 through 3.10-19 178 Page TS / 3.10-20 254 Page TS / 3.10-21 230 Pages 3.10-22 and 3.10-23 178 4.0 DESIGN FEATURES Page TS / 4.0-1 216 Pages 4.0-2 and 4.0-3 178 Page TS / 4.0-4 243 5.0 ADMINISTRATIVE CONTROLS Pages 5.0-1 and 5.0-2 178 Pages TS / 5.0-3 and TS / 5.0-4 253 Pages 5.0-5 through 5.0-7 178 Page TS / 5.0-8 212 Page TS / 5.0-9 209 Page 5.0-10 178 Page TS / 5.0-11 241 Pages 5.0-12 and 5.0-13 178 Page TS / 5.0-14 211 Page 5.0-15 178 Pages TS /5.0-16 and TS / 5.0-17 209 Page TS / 5.0-18 246 Page TS / 5.0-18A 241 Pages TS / 5.0-18B and TS / 5.0-18C 252 Page TS / 5.0-19 233 TS / LOES-5 Effective Date 01/10/2012 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT I1 TS / LOES-5 Effective Date 01/10/2012
SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 36 LIST OF EFFECTIVE SECTIONS (TECHNICAL SPECIFICATIONS)
Section Title Amendment Page TS / 5.0-20 209 Page TS / 5.0-21 through TS / 5.0-23 246 Page TS / 5.0-24 209 Page TS / 5.0-25 186 Pages 5.0-26 through 5.0-30 178 Appendix B Environmental Protection Plan 188 TSlText LOES 1/10/2012 TSILOES-6 Effective Date 01/1 0/2012 SUSQUEHANNA - UNIT SUSQUEHANNA -
UNIT II TS / LOES-6 Effective Date 01 /10/2012
PPL Rev. 2 S/RVs 3.4.3 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.3 Safety/Relief Valves (S/RVs)
LCO 3 .4.3 The safety function of 14 S/RVs shall be OPERABLE.
APPLIC'ABILITY: MODES 1, 2, and 3.
ACTIOI CONDITION REQUIRED ACTION COMPLETION TIME A.1 One or more required A.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> S/RVs inoperable.
AND A.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> SUSQUEHANNA - UNIT 1 3.4-8 Amendment IX, 246
PPL Rev. 2 S/RVs 3.4.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.3.1 Verify the safety function lift setpoints of the In accordance with the required SIRVs are as follows: Inservice Testing Program
-- --------------NOTE ------------
Up to two inoperable required S/RVs may be replaced with spare OPERABLE S/RVs having lower setpoints until the next refueling outage.
Number of Setpoint S/RVs (Psiq) 2 1175 (Ž1117 and*_< 1210) 6 1195 (Ž1136 and
- 1230) 8 1205 (Ž1145 and < 1241)
Following testing, lift settings shall be within
+/-1%.
SUSQUEHANNA - UNIT 1 TS / 3.4-9 Amendment 294, 257