ML18306A488

From kanterella
Jump to navigation Jump to search
Revised Technical Specifications Manual
ML18306A488
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 10/25/2018
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18306A488 (14)


Text

MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2018-18612 USER INFORMATION:

GERLACH*ROSEY M Address: NUCSA2 Phone#:

542-3194 EMPL#: 028401 CA#:

0363 TRANSMITTAL INFORMATION:

TO:

GERLACH*ROSEY M 10/25/2018 LOCATION:

NRC REGION 1 TECH SPECS FROM:

NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

Page 1

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.

HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.

WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.

TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF RRORS.

TENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no C will be issued with the updated material.

TSl -

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 10/15/2018 ADD MANUAL TABLE OF CONTENTS DATE: 10/24/2018 CATEGORY: DOCUMENTS TYPE: TSl ID:

TEXT 3.6.4.1 REMOVE:

ADD:

.REV:6 REV: 7 of 2

Page 2

ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3107 OR X3171 FOR ASSISTANCE.

UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.

PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.

FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

of 2

SSES MANUAL Manual Name:

TSl Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL Table Of Contents Issue Date:

10/24/2018 Procedure Name TEXT LOES Rev 46

Title:

LIST OF EFFECTIVE SECTIONS TEXT TOC 9

Title:

TABLE OF CONTENTS TEXT 1.1 2

Issue Date 07/05/2018 07/05/2018 05/02/2008

Title:

USE AND APPLICATION DEFINITIONS TEXT 1.2 0

TEXT 1.3 TEXT 1.4 TEXT 2.0 TEXT 3.0 0

11/06/2002 Change ID

Title:

REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN (SDM)

TEXT 3.1.2 0

11/06/2002

Title:

REACTIVITY CONTROL SYSTEMS REACTIVITY ANOMALIES TEXT 3.1.3 2

11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD OPERABILITY Page 1.

of 9

Change Number REQUIREMENT Report Date: 10/25/18

SSES MANUAL Manual Name:

TSl Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANDA.

TEXT 3.1.4 3

11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS TEXT 3.1.5 1

11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3.1. 6 1

11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL TEXT 3.1.7 4

11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEXT 3.1.8 2

11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 2

11/16/2016

Title:

POWER DISTRIBUTION LIMITS AVERAGE PLANAR *LINEAR HEAT GENERATION RATE (APLHGR)

TEXT 3.2.2 2

11/16/2016

Title:

POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)

TEXT 3.2.3 2

11/16/2016

Title:

POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE (LHGR)

TEXT 3.3:1.1 4

11/16/2016

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 1

11/16/2016

Title:

INSTRUMENTATION SOURCE RANGE MONITOR (BRM) INSTRUMENTATION TEXT 3.3.2.1 3

11/16/2016

Title:

INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 2

11/16/2016

Title:

INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION

  • Page J of 9

Report Date: 10/25/18

.SSES MANUAL Manual Name:

TSl Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL TEXT 3.3.3.1 3

11/16/2016

Title:

INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 2

11/16/2016

Title:

INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 2

11/16/2016

Title:

INSTRUMENTATION.END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION TEXT 3.3.4.2 1

11/16/2016

Title:

INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT. SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 4

11/16/2016

Title:

INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 1

11/16/2016

Title:

INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION TEXT 3.3.6.l 6

11/16/2016

Title:

INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 1

11/16/2016

Title:

INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 1

11/16/2016

Title:

INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM.

INSTRUMENTATION TEXT 3.3.8.1 1

11/16/2016

Title:

IN~TRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION*

TEXT 3.3.8.2 1

11/16/2016

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 4

11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING Pagel of 9

Report Date: 10/25/18

SSES MANUAL Manual Name:

TSl

\\--

Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANU~

TEXT 3.4.2 2

Title:

REACTOR COOLANT SYSTEM (RCS)

TEXT 3.4.3 2

Title:

REACTOR COOLANT SYSTEM (RCS)

TEXT 3.4.4 1

Title:

REACTOR COOLANT SYSTEM (RCS)

TEXT 3.4.5 0

Title:

REACTOR COOLANT SYSTEM (RCS)

TEXT 3.4.6 3

Title:

REACTOR COOLANT SYSTEM (RCS)

TEXT 3.4.7 2

Title:

R~ACTOR COOLANT SYSTEM (RCS)

TEXT 3.4.8 2

Title:

REACTOR COOLANT SYSTEM (RCS)

HOT SHUTDOWN TEXT 3.4.9 1

Title:

REACTOR COOLANT SYSTEM (RCS)

COLD SHUTDOWN TEXT 3.4.10 4

Title:

REACTOR COOLANT SYSTEM (RCS)

TEXT 3.4.11 1

Title:

REACTOR COOLANT SYSTEM (RCS)

TEXT 3.5.1 3

11/16/2016 JET PUMPS 01/13/~012 SAFETY/RELIEF VALVES (S/RVS) 11/16/2016 RCS OPERATIONAL LEAKAGE 11/14/2002 RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE 11/16/2016 RCS LEAKAGE DETECTION INSTRUMENTATION 11/16/20i6 RCS SPECIFIC ACTIVITY 11/16/2016 RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM 11/16/2016 RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM I

11/16/2016 RCS PRESSURE AND TEMPERATURE (P/T) LIMITS 11/16/2016 REACTOR STEAM DOME PRESSURE 11/16/2016

Title:

EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM ECCS OPERATING TEXT 3.5.2 1

11/16/2016

Title:

EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM ECCS SHUTDOWN Page!

of

~

Report Date: 10/25/18

SSES MANUAL Manual Name:

TSl Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL TEXT 3.5.3 2

11/16/2016

Title:

EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM RCIC SYSTEM TEXT 3.6.1.1 1

11/16/2016

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT TEXT 3. 6. 1. 2 1

11/16/2016

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK TEXT 3. 6. 1. 3 4

11/16/2016 Titl~: CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)

TEXT 3. 6. 1. 4 1

11/16/2016

Title:

CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3. 6. 1. 5 1

11/16/2016

Title:

CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3. 6. 1. 6 1

11/16/2016

Title:

CONTAINMENT SYSTEMS SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 1

11/16/2016

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 1

11/16/2016

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 1

11/16/2016 Titl~: CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 1

11/16/2016

Title:

CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 2

06/13/2006

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINE~S Page~

of 9

Report Date: 10/25/18

SSES MANUAL Manual Name:

TSl Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANDA~

TEXT 3.6.3.2 2

11/16/2016

Title:

CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM TEXT 3.6.3.3 1

11/16/2016

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 7

10/24/2018

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT TEXT 3.6.4.2 1

11/16/2016

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)

TEXT 3.6.4.3 3

09/15/2017

Title:

CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 2

11/16/2016

Title:

PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)

TEXT 3.7.2 1

11/16/2016

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 3

09/15/2017

Title:

PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM TEXT 3.7.4 1

11/16/2016

Title:

PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 1

11/16/2016

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 3

11/16/2016

Title:

PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 1

11/16/2016

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL Page.§.

of i Report Date: 10/25/18

SSES MANUAL Manual Name:

TSl Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL TEXT 3.7.8 1

11/16/2016

Title:

MAIN TURBINE PRESSURE REGULATION SYSTEM PLANT SYSTEMS TEXT 3.8.1 6

02/27/2018

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES OPERATING TEXT 3.8.2 1

10/05/2005

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES SHUTDOWN TEXT 3.8.3 1

11/16/2016

Title:

ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR TEXT 3.8.4 4

11/16/2016

Title:

ELECTRICAL POWER SYSTEMS DC SOURCES OPERATING TEXT 3.8.5 1

12/14/2006

Title:

ELECTRICAL POWER SYSTEMS DC SOURCES SHUTDOWN TEXT 3.8.6 2

11/16/2016

Title:

ELECTRICAL POWER SYSTEMS BATTERY CELL. PARAMETERS TEXT 3.8.7 2

11/16/2016

Title:

ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS OPERATING TEXT 3.8.8 2

11/16/2016

Title:

ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS SHUTDOWN TEXT 3.9.1 1

11/16/2016

Title:

REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 1

11/16/2016

Title:

REFUELING OPERATIONS REFUEL POSITION ONE ROD OUT INTERLOCK TEXT 3.9.3 1

11/16/2016

Title:

REFUELING OPERATIONS CONTROL ROD POSITION Page 1 of 9

Report Date: 10/25/18

SSES MANUAL Manual Name:

TSl

,~ Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUA~

TEXT 3.9.4 0

11/14/2002

Title:

REFUELING OPERATIONS CONTROL ROD POSITION INDICATION TEXT 3.9.5 1

, 11/16/2016

Title:

REFUELING OPERATIONS CONTROL ROD OPERABILITY REFUELING TEXT 3.9.6 1

11/16/2016

Title:

REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL TEXT 3.9.7 1

11/16/2016

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) HIGH WATER LEVEL TEXT 3.9.8 1

11/16/2016

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) LOW WATER LEVEL TEXT 3.10.1 1

01/23/2008

Title:

SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 1

11/16/2016

Title:

SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 1

11/16/2016

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL HOT SHUTDOWN TEXT 3.10.4 1

11/16/2016

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL COLD SHUTDOWN TEXT 3.10.5 1

11/16/2016

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL REFUELING TEXT 3.10.6 1

11/16/2016

Title:

SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL REFUELING TEXT 3.10.7 0

11/14/2002

Title:

SPECIAL OPERATIONS CONTROL ROD TESTING OPERATING Page~

of 9

Report Date: 10/25/18

SSES MANUAL Manual Name:

TSl Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL TEXT 3.10.8 3

11/16/2016

Title:

SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST REFUELING TEXT 4.0 2

05/24/2007

Title:

DESIGN FEATURES TEXT 5.1 0

11/14/2002

Title:

ADMINISTRATIVE CONTROLS RESPONSIBILITY TEXT 5.2 1

10/09/2009

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 5.3 0

11/14/2002

Title:

ADMINISTRATIVE CONTROLS UNIT STAFF QUALIFICATIONS TEXT 5.4 0

11/14/2002

Title:

ADMINISTRATIVE CONTROLS PROCEDURES TEXT 5.5 6

11/16/2016

Title:

ADMINISTRATIVE CONTROLS PROGRAMS AND MANUALS TEXT 5.6 7

05/02/2008

Title:

ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 5.7 0

11/14/2002

Title:

ADMINISTRATIVE CONTROLS HIGH RADIATION AREA Page~

of 9

Report Date: 10/25/18

3.6 3.6.4.1 LCO 3.6.4.1 CONTAINMENT SYSTEMS Secondary Containment The secondary containment shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, and 3, Rev. 7 Secondary Containment 3.6.4.1 During movement of irradiated fuel assemblies in the secondary _

containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION A. Secondary containment inoperable in MODE 1, 2, or 3.

REQUIRED ACTION COMPLETION TIME A.1 Restore secondary containment 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to OPERABLE status.

48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> for a one-time outage for replacement of the Reactor Building Recirculating Fan Damper Motors, to be completed by December 31, 2005.

B. Required Action and B.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met.

B.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)

SUSQUEHANNA - UNIT 1 TS/ 3.6-35 Amendment~. 226

ACTIONS (continued)

Rev. 7 Secondary Containment 3.6.4.1 CONDITION REQUIRED ACTION COMPLETION TIME C. Secondary containment inoperable during movement of irradiated fuel assemblies in the secondary containment, during CORE ALTERATIONS, or during OPDRVs.

C.1


NOTE----------------

LCO 3.0.3 is not applicable.

Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.

C.2 Suspend CORE ALTERATIONS.

Immediately C.3 Initiate action to suspend OPDRVs.

Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE SR 3. 6.4. 1.1 ----------------------------NOTE----------------------------

N ot required to be met for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> if analysis demonstrates one standby gas treatment (SGT) subsystem is capable of establishing the required secondary containment vacuum.

Verify secondary containment vacuum is

~ 0.25 inch of vacuum water gauge.

SR 3.6.4.1.2 Verify all required secondary containment removable walls and equipment hatches required to be closed are closed and sealed.

FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program (continued)

SUSQUEHANNA - UNIT 1 TS I 3.6-36 Amendment..:J.+g, 2-24,-2-2@, 2W, 270

SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE SR 3.6.4.1.3 Verify one secondary containment access door in each access opening is closed, except when the access opening is being used for entry and exit.

SR 3.6.4.1.4 ---------------------------NOTE-------------------------

The maximum time allowed for secondary containment draw down is dependent on the secondary containment configuration.

Verify each SGT subsystem will draw down the secondary containment to ~ 0.25 inch of vacuum water gauge in less than or equal to the maximum time allowed for the secondary containment configuration that is OPERABLE.

SR 3.6.4.1.5 -------------------NOTE---------------------

The maximum flow allowed for maintaining secondary containment vacuum is dependent on the secondary containment configuration.

Verify each SGT subsystem can maintain

~ 0.25 inch of vacuum water gauge in the secondary containment for at least 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at a flow rate less than or equal to the maximum flow rate permitted for the secondary containment configuration that is OPERABLE.

Rev. 7 Secondary Containment 3.6.4.1 FREQUENCY In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program In accordance with the Surveillance Frequency Control Program SUSQUEHANNA - UNIT 1 TS/ 3.6-37 Amendment 4--78, ~. 2-29, 2W, 2-6-7, 270