ML24183A268
ML24183A268 | |
Person / Time | |
---|---|
Site: | Susquehanna ![]() |
Issue date: | 06/19/2024 |
From: | Susquehanna |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML24183A268 (1) | |
Text
U U.L.L.
.l.:, 1 L:. U ~ ":I:
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2024-5488 USER INFORMATION:
GERLACH*ROSEY M Address: NUCSA2 Phone#:
542-3194 EMPL#:028401 CA#:
0363 TRANSMITTAL INFORMATION:
TO:
GERLACH*ROSEY M 06/19/2024 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
Page 1
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU.
HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL.
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL.
TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.
ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.
TSB2 - TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 04/04/2024 ADD MANUAL TABLE OF CONTENTS DATE: 06/18/2024 CATEGORY: DOCUMENTS TYPE: TSB2 of 2
U Ull.
.L:7 I L. UL.':!:
ID:
TEXT 3.6.3.3 REMOVE:
REV: 3 ADD:
REV: 4 Page 2
ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE.
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
of 2
SSES MANUAL Manual Name:
TSB2
'fanual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL Table Of Contents Issue Date :
06/18/ 2024 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 138 01/03/201 9 Title : LIST OF EFFECTIVE SECTI ONS TEXT TOC 25 03/05/2019
Title:
TABLE OF CONTENTS TEXT 2. 1.1 7
03/30/2023
Title:
SAFETY LIMITS (SLS) REACTOR CORE SLS TEXT 2. 1. 2 1
10/04/2007
Title:
SAFETY LIMITS (SLS) REACTOR COOLANT SYSTEM (RCS) PRESSURE SL TEXT 3. 0 5
03/18/2021 Title : LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY TEXT 3.1. 1 3
04 /04 /2024
Title:
REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN (SDM)
TEXT 3. 1. 2 0
11/18/2002
Title:
REACTIVITY CONTROL SYSTEMS REACTIVITY ANOMALIES TEXT 3.1.3 5
04/04/2024 Title : REACTIVITY CONTROL SYSTEMS CONTROL ROD OPERABILITY TEXT 3. 1. 4 5
11/16/2016 Title : REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM TIMES TEXT 3. 1.5 2
11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3. 1. 6 7
04/04/2024 Titl e: REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL Page 1 of 8
Report Date : 06/20/24
SSES MANUAL Manual Name:
TSB2
- l:-l:anual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.1. 7 5
01/05/2023
Title:
REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEXT 3.1. 8 4
11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 6
03/31/2021
Title:
POWER DISTRIBUTION LIMITS AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)
TEXT 3.2.2 6
03/30/2023
Title:
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)
TEXT 3.2.3 4
03/31/2021
Title:
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE LHGR
~EXT 3.3.1.1 7
01/05/2023
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 4
01/23/2018
Title:
INSTRUMENTATION SOURCE RANGE MONITOR (BRM) INSTRUMENTATION TEXT 3.3.2.1 7
04/04/2024
Title:
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 4
01/05/2023
Title:
INSTRUMENTATION FEEDWATER - MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION TEXT 3.3.3.1 9
11/16/2016
Title:
INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 2
11/16/2016
Title:
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 3
01/05/2023
Title:
INSTRUMENTATION END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION Page 2 of 8
Report Date: 06/20/24
SSES MANITAL Manual Name:
TSB2
~anual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.3.4.2 2
01/05/2023
Title:
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 8
01/05/2023
Title:
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 3
03/18/2021
Title:
REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL INSTRUMENTATION TEXT 3.3.5.3 1
01/05/2023
Title:
UNIT 1 REACTOR PRESSURE VESSEL WIC TS CHANGES TEXT 3.3.6.1 10 01/05/2023
Title:
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION
'1'EXT 3. 3. 6.'2 6
03/05/2019
Title:
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 4
03/05/2019
Title:
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM INSTRUMENTATION TEXT 3.3.8.1 7
01/05/2023
Title:
INSTRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION TEXT 3.3.8.2 1
11/16/2016 Title_: INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 6
03/31/2021
Title:
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING TEXT 3.4.2 4
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 3
01/13/2012
Title:
REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)
Page 3 of 8
Report Date: 06/20/24
SSES MANUAL Manual Name:
TSB2
- "M:anual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.4.4 1
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE TEXT 3.4.5 3
03/10/2010
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 5
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 3
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8 3
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM
- HOT SHUTDOWN 1'EXT 3.4.9 2
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM COLD SHUTDOWN TEXT 3.4.10 6
05/14/2019
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 1
11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 9
01/05/2023
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.2 7
06/09/2022
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING TEXT 3.5.3 7
01/05/2023 Page 4
Title:
EMERGENCY CORE COOLING SYSTEMS (ECCS) REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY CONTROL AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM ECCS OPERATING of 8
Report Date: 06/20/24
SSES MANUAL Manual Name:
TSB2
-Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.1.1 6
11/16/2016
Title:
PRIMARY CONTAINMENT TEXT 3.6.1.2 3
01/05/2023
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK TEXT 3.6.1.3 20 01/05/2023
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)
TEXT 3.6.1.4 3
11/27/2023
Title:
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE TEXT 3.6.1.5 2
11/16/2016
Title:
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3.6.1.6 2
01/05/2023
Title:
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 3
11/16/2016
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 2
03/05/2019
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 3
01/05/2023
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 2
01/05/2023
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1
Title:
CONTAINMENT SYSTEMS TEXT 3.6.3.2 2
4 06/13/2006 INTENTIONALLY LEFT BLANK 08/02/2021
Title:
CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM Page 5 of 8
Report Date: 06/20/24
SSES MANUAL Manual Name:
TSB2
-Manual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.6.3.3 4
06/18/2024
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 17 12/16/2020
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT TEXT 3.6.4.2 14 03/05/2019
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)
TEXT 3.6.4.3 7
03/05/2019
Title:
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 10 01/05/2023
Title:
PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE ULTIMATE HEAT SINK (UHS)
TEXT 3.7.2 6
01/05/2023 *
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 4
03/05/2019
Title:
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM TEXT 3.7.4 2
03/05/2019
Title:
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 2
11/16/2016
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 4
11/16/2016
Title:
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 2
11/16/2016
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL TEXT 3.7.8 1
11/16/2016
Title:
MAINE TURBINE PRESSURE REGULATION SYSTEM Page 6 of 8
Report Date: 06/20/24
SSES MANUAL Manual Name:
TSB2
-~anual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.8.1 17 01/05/2023
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES - OPERATING TEXT 3.8.2 2
03/18/2021
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES -
SHUTDOWN TEXT 3.8.3 7
08/07/2019
Title:
ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR TEXT 3.8.4 5
01/05/2023
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES - OPERATING TEXT 3.8.5 2
03/05/2019
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES -
SHUTDOWN TEXT 3.8.6 2
11/16/2016
Title:
ELECTRICAL POWER SYSTEMS BATTERY CELL PARAMETERS TEXT 3.8.7 9
01/05/2023
Title:
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS - OPERATING TEXT 3.8.8 2
03/05/2019
Title:
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS -
SHUTDOWN TEXT 3.9.1 1
11/16/2016
Title:
REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 2
11/16/2016
Title:
REFUELING OPERATIONS REFUEL POSITION ONE-ROD-OUT INTERLOCK TEXT 3.9.3 1
11/16/2016
Title:
REFUELING OPERATIONS CONTROL ROD POSITION TEXT 3.9.4 0
11/18/2002
Title:
REFUELING OPERATIONS CONTROL ROD POSITION INDICATION Page 7 of 8
Report Date: 06/20/24
SSES MANUAL Manual Name:
TSB2
- ~anual
Title:
TECHNICAL SPECIFICATIONS BASES UNIT 2 MANUAL TEXT 3.9.5 1
11/16/2016
Title:
REFUELING OPERATIONS CONTROL ROD OPERABILITY -
REFUELING TEXT 3.9.6 2
11/16/2016
Title:
REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL TEXT 3.9.7 1
11/16/2016
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR)
- HIGH WATER LEVEL TEXT 3.9.8 1
11/16/2016
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) -
LOW WATER LEVEL TEXT 3.10.1 2
03/05/2019
Title:
SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION 1'EXT 3.10.2 1
11/16/2016
Title:
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 11/16/2016
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL -
HOT SHUTDOWN TEXT 3.10.4 1
11/16/2016
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL -
COLD SHUTDOWN TEXT 3.10.5 1
11/16/2016
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL -
REFUELING TEXT 3.10.6 1
11/16/2016
Title:
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL - REFUELING TEXT 3.10.7 2
03/31/2021
Title:
SPECIAL OPERATIONS CONTROL ROD TESTING - OPERATING TEXT 3.10.8 5
04/04/2024
Title:
SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST - REFUELING Page 8 of 8
Report Date: 06/20/24
Rev.4 Primary Containment Oxygen Concentration B 3.6.3.3 B 3.6 CONTAINMENT SYSTEMS B 3.6.3.3 Primary Containment Oxygen Concentration BASES BACKGROUND APPLICABLE SAFETY ANALYSES LCO APPLICABILITY All nuclear reactors must be designed to withstand events that generate hydrogen either due to the zirconium metal water reaction in the core or due to radiolysis. The primary method to control hydrogen is to inert the primary containment. With the primary containment inert, that is, oxygen concentration< 4.0 volume percent (v/o), a combustible mixture cannot be present in the primary containment for any hydrogen concentration. An event that rapidly generates hydrogen from zirconium metal water reaction will result in excessive hydrogen in primary containment, but oxygen concentration will remain < 4.0 v/o and no combustion can occur. This LCO ensures that oxygen concentration does not exceed 4.0 v/o during operation in the applicable conditions.
The Reference 1 calculations assume that the primary containment is inerted when a Design Basis Accident loss of coolant accident occurs.
Thus, the hydrogen assumed to be released to the primary containment as a result of metal water reaction in the reactor core will not produce combustible gas mixtures in the primary containment.
Primary containment oxygen concentration satisfies Criterion 2 of the NRC Policy Statement. (Ref. 2)
The primary containment oxygen concentration is maintained < 4.0 v/o to ensure that an event that produces any amount of hydrogen does not result in a combustible mixture inside primary containment.
The primary containment oxygen concentration must be within the specified limit when primary containment is inerted. The primary containment must be inert in MODE 1 and 2, since this is the condition with the highest probability of an event that could produce hydrogen.
SUSQUEHANNA - UNIT 2 3.6-80
BASES ACTIONS SURVEILLANCE REQUIREMENTS REFERENCES A.1 Rev.4 Primary Containment Oxygen Concentration B 3.6.3.3 If oxygen concentration is :2: 4.0 v/o while operating in MODE 1 or 2, oxygen concentration must be restored to < 4.0 v/o within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is allowed when oxygen concentration is :2: 4.0 v/o because of the low probability and long duration of an event that would generate significant amounts of hydrogen occurring during this period.
A Note permits the use of the provisions of LCO 3.0.4.c. This allowance permits entry into the applicable MODE(S) while relying on the ACTIONS.
This allowance is acceptable because inerting the primary containment prevents containment access without an appropriate breathing apparatus.
Therefore, the primary containment is inerted as late as possible in the plant startup, after entering Modes 1 and 2, and de-inerted as soon as possible in the plant shutdown. It is acceptable to intentionally enter Required Action A.1 prior to a shutdown in order to begin de-inerting the primary containment prior to exiting the Applicability.
B.1 If oxygen concentration cannot be restored to within limits within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, power must be reduced to MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Completion Time is reasonable, based on operating experience, to reduce reactor power from full power conditions in an orderly manner and without challenging plant systems.
SR 3.6.3.3.1 The primary containment must be determined to be inert by verifying that oxygen concentration is < 4.0 v/o. The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.
- 1.
FSAR, Section 6.2.5.
- 2.
Final Policy Statement on Technical Specifications Improvements July 22, 1993 (58 FR 39132).
SUSQUEHANNA - UNIT 2 3.6-81
BASES Rev.4 Primary Containment Oxygen Concentration 8 3.6.3.3 THIS PAGE INTENTIONALLY LEFT BLANK SUSQUEHANNA - UNIT 2 3.6-82