ML17055A970: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/27/1985
| issue date = 12/27/1985
| title = Forwards Rev 1 to NMPC-QATR-1, Niagara Mohawk Power Corp QA Program Topical Rept,Nine Mile Point Nuclear Station Units 1 & 2:Operations Phase.
| title = Forwards Rev 1 to NMPC-QATR-1, Niagara Mohawk Power Corp QA Program Topical Rept,Nine Mile Point Nuclear Station Units 1 & 2:Operations Phase.
| author name = PERRY J A
| author name = Perry J
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
| addressee name = GRIMES B K
| addressee name = Grimes B
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
| docket = 05000220, 05000410
| docket = 05000220, 05000410
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ACR;-EBBION NBR:FACIL:50-22050-410AUTH.NANEPERRY'.A.RECIP.NANEQRINEB,H.K.REGULAYINFORMATION DIBTRIBUTI SYSTEN(AIDS>8512310215 DOC.DATE:85/12/27NOTARIZED:
{{#Wiki_filter:REGULA      Y INFORMATION  DIBTRIBUTI    SYSTEN (AIDS>
NODOCKET0NineNilePointNuclearStation>Unitii.Niagara'Poue05000220NineNilePointNuclearBtationiUnit.2iNiagaraNoha05000410AUTHORAFFILIATION NiagaraNohawkPowerCorp.RECIPIENT AFFILIATION QualityAssurance Branch
ACR;-EBBION NBR: 8512310215         DOC. DATE: 85/12/27  NOTARIZED: NO          DOCKET 0 FAC IL: 50-220  Nine Nile    Point Nuclear Station> Unit      ii  .Niagara 'Poue 05000220 50-410 Nine Nile Point Nuclear Btationi Unit          .2i Niagara Noha    05000410 AUTH. NANE          AUTHOR    AFFILIATION PERRY'. A.        Niagara Nohawk Power Corp.
REC IP. NANE        RECIPIENT AFFILIATION QRINEB, H. K.          Quality Assurance Branch


==SUBJECT:==
==SUBJECT:==
ForwardsRev1toNNPC-GATR-ii "NiagaraMohawkPowerCorpGAProgramTopicalRept'ineNilePointNuclearStationUnits152:Operation Phase."llDISTRIBUTION CODE:6002PIRCEIVED:LTRENCLSIZE:TITLE:QualityAssuraneDist.ForAmdttoReportNOTES:OL:08/22/S9 05000220RECIPIENT IDCODE/NAME HERMANNRINTERNAL:
Forwards Rev 1 to NNPC-GATR-ii "Niagara Mohawk Power Corp GA Program Topical Rept'ine Nile Point Nuclear Station Units 1  5 2: Operation     Phase. "
ACRBIEFILERQNiRQN3RQN5COPIEBLTTRENCL101001110100RECIPIENT IDCODE/MANE HAUGHEY>NADN/LFNBIE/DGAVT/GAB 01RQN2QN03COPIESLTTRENCL10102210022EXTERNAL:
ll DISTRIBUTION CODE: 6002            PI    R CEIVED: LTR    ENCL        SIZE:
24XNRCPDR021111LPDRTOTALNUMBEROFCOPIESREQUIRED:
TITLE: Quality Assuran        e  Dist. For  Amdt to Report NOTES:                                                                           05000220 OL:08/22/S9 RECIPIENT            COPIEB            RECIPIENT          COPIES ID CODE/NAME         LTTR ENCL        ID CODE/MANE       LTTR ENCL HERMANN R                1      0    HAUGHEY> N              1    0 INTERNAL: ACRB                      10      0    ADN/LFNB                1    0 IE FILE                  1      1    IE/DGAVT/GAB 01        2    2 RQNi                      1      0    RQN2                    1    0 RQN3                      1      0      QN                          0 RQN5                            0                    03      2    2 EXTERNAL: 24X                        1      1    LPDR NRC PDR        02        1      1 TOTAL NUMBER OF COPIES REQUIRED: LTTR            26  ENCL    8
LTTR26ENCL8
 
'4,+irI4wMPttI.~lrtJ4HW,lIIW'4tt'IJHMI,'/WtfIDCW,IllitItH1MJMI44ItltI,I~IM",Q.'aMtL3.P3fritlJttHQttt4''I,tlIw14*flItt14"II~4H t'MIIAGAIRA
  '4                                                   Ptt I
~UlitRQHAMK 4QA852361,TOP-1NIAGARAMOHAWKPOWERCORPORATION/300 ERIEBOULEVARD WEST,SYRACUSE, N.Y.13202/TELEPHONE (315)474-1511December27,1985Mr.BrianK.Grimes,DirectorDivisionofQuality-Assurance VendorTechnical TrainingCenterProgramsOfficeofInspection andEnforcement U.S.NuclearRegulatory Commission Washington, DC20555Ref:LetterJ.A.PerrytoG.T.AnkrumdatedAugust16,1985
                                                                  ~                      l rt J      4  H    W,l
                          ,+ir            I                  II W 4 w M              '4                tt
                                                                                        'I J  H  M I,'/Wtf It                                              I, H
ID CW                        , Il                  1 lit                                                              I MJ    M I     4    4 Itlt
          ~
I M  ", Q.'a  Mt  L 3    . P3 fri tlJtt      H  Qttt    4''   I,tl  I                    w  1
* fl I tt  14 II   ~
4                                                    4 H
 
      ~
MIIAGAIRA U litRQHAMK t                                         4                    QA852361
                                                                                    ,TOP-1 NIAGARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 December 27, 1985 Mr. Brian K. Grimes,         Director Division of Quality -Assurance Vendor Technical Training Center Programs Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Ref:   Letter J.A. Perry to G.T.             Ankrum dated August 16, 1985


==Subject:==
==Subject:==
NineMilePointUnits1and2QualityAssurance ProgramTopicalReportNMPC-QATR-1 Rev.1
Nine Mile Point Units 1 and 2 Quality Assurance Program Topical Report NMPC-QATR-1 Rev. 1
 
==Dear Mr. Grimes:==
 
Attached    is  a copy    of the subject        document Rev. 1 for NRC final approval.      The  earlier version,        Rev. 0, was transmitted per the above reference.        The enclosed document reflects resolution of all of the NRC comments received on the subject document                                covering both proposed changes transmitted by letter as well as resolution of comments that were provided verbally. The changes from Rev. 0 to Rev. 1 are noted in the right-hand margin of each page with a vertical line.
Your prompt approval        of the subject Topical Report                  will be greatly appreciated.
Very    truly'yours,
                                                -c7.
                                                .A. Perr Director of Quality Assurance JAP/ams Attachments Distribution:      see attached i
851227 8>i2gi0215
      >DOCV 06000220 PDR~
P y5'I'I)


==DearMr.Grimes:==
B.K. Grimes               Attachment Distribution: G.T. Ankrum      U.S. NRC Dr. P.K. Eapen    U.S. NRC Region I R.A. Gramm        U.S. NRC Sr. Resident Inspector J.W. Gilray      U.S. NRC S. Hudson        U.S. NRC Sr. Resident Inspector T.E. Lempges      NMPC C.V. Mangan      NMPC R.J. Pasternak    NMPC T.J. Perkins      NMPC G.D. Wilson      NMPC A.F. Zallnick    NMPC W.M. Bryant      NMPC W.A. Hansen      NMPC C.E. Hjort        NMPC J. Kroehler      NMPC
AttachedisacopyofthesubjectdocumentRev.1forNRCfinalapproval.
Theearlierversion,Rev.0,wastransmitted pertheabovereference.
Theencloseddocumentreflectsresolution ofalloftheNRCcommentsreceivedonthesubjectdocumentcoveringbothproposedchangestransmitted byletteraswellasresolution ofcommentsthatwereprovidedverbally.
ThechangesfromRev.0toRev.1arenotedintheright-hand marginofeachpagewithaverticalline.YourpromptapprovalofthesubjectTopicalReportwillbegreatlyappreciated.
Verytruly'yours, JAP/amsAttachments Distribution:
seeattached-c7..A.PerrDirectorofQualityAssurance 8>i2gi0215 06000220851227i>DOCVPDR~Py5'I'I)


B.K.GrimesAttachment Distribution:
J}}
G.T.AnkrumDr.P.K.EapenR.A.GrammJ.W.GilrayS.HudsonT.E.LempgesC.V.ManganR.J.Pasternak T.J.PerkinsG.D.WilsonA.F.ZallnickW.M.BryantW.A.HansenC.E.HjortJ.KroehlerU.S.U.S.U.S.U.S.U.S.NMPCNMPCNMPCNMPCNMPCNMPCNMPCNMPCNMPCNMPCNRCNRCRegionINRCSr.ResidentInspector NRCNRCSr.ResidentInspector J}}

Latest revision as of 20:09, 4 February 2020

Forwards Rev 1 to NMPC-QATR-1, Niagara Mohawk Power Corp QA Program Topical Rept,Nine Mile Point Nuclear Station Units 1 & 2:Operations Phase.
ML17055A970
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 12/27/1985
From: Jamila Perry
NIAGARA MOHAWK POWER CORP.
To: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML17055A971 List:
References
IOP-1, QA852361, TOP-1, NUDOCS 8512310215
Download: ML17055A970 (6)


Text

REGULA Y INFORMATION DIBTRIBUTI SYSTEN (AIDS>

ACR;-EBBION NBR: 8512310215 DOC. DATE: 85/12/27 NOTARIZED: NO DOCKET 0 FAC IL: 50-220 Nine Nile Point Nuclear Station> Unit ii .Niagara 'Poue 05000220 50-410 Nine Nile Point Nuclear Btationi Unit .2i Niagara Noha 05000410 AUTH. NANE AUTHOR AFFILIATION PERRY'. A. Niagara Nohawk Power Corp.

REC IP. NANE RECIPIENT AFFILIATION QRINEB, H. K. Quality Assurance Branch

SUBJECT:

Forwards Rev 1 to NNPC-GATR-ii "Niagara Mohawk Power Corp GA Program Topical Rept'ine Nile Point Nuclear Station Units 1 5 2: Operation Phase. "

ll DISTRIBUTION CODE: 6002 PI R CEIVED: LTR ENCL SIZE:

TITLE: Quality Assuran e Dist. For Amdt to Report NOTES: 05000220 OL:08/22/S9 RECIPIENT COPIEB RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/MANE LTTR ENCL HERMANN R 1 0 HAUGHEY> N 1 0 INTERNAL: ACRB 10 0 ADN/LFNB 1 0 IE FILE 1 1 IE/DGAVT/GAB 01 2 2 RQNi 1 0 RQN2 1 0 RQN3 1 0 QN 0 RQN5 0 03 2 2 EXTERNAL: 24X 1 1 LPDR NRC PDR 02 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 8

'4 Ptt I

~ l rt J 4 H W,l

,+ir I II W 4 w M '4 tt

'I J H M I,'/Wtf It I, H

ID CW , Il 1 lit I MJ M I 4 4 Itlt

~

I M ", Q.'a Mt L 3 . P3 fri tlJtt H Qttt 4 I,tl I w 1

  • fl I tt 14 II ~

4 4 H

~

MIIAGAIRA U litRQHAMK t 4 QA852361

,TOP-1 NIAGARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 December 27, 1985 Mr. Brian K. Grimes, Director Division of Quality -Assurance Vendor Technical Training Center Programs Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Ref: Letter J.A. Perry to G.T. Ankrum dated August 16, 1985

Subject:

Nine Mile Point Units 1 and 2 Quality Assurance Program Topical Report NMPC-QATR-1 Rev. 1

Dear Mr. Grimes:

Attached is a copy of the subject document Rev. 1 for NRC final approval. The earlier version, Rev. 0, was transmitted per the above reference. The enclosed document reflects resolution of all of the NRC comments received on the subject document covering both proposed changes transmitted by letter as well as resolution of comments that were provided verbally. The changes from Rev. 0 to Rev. 1 are noted in the right-hand margin of each page with a vertical line.

Your prompt approval of the subject Topical Report will be greatly appreciated.

Very truly'yours,

-c7.

.A. Perr Director of Quality Assurance JAP/ams Attachments Distribution: see attached i

851227 8>i2gi0215

>DOCV 06000220 PDR~

P y5'I'I)

B.K. Grimes Attachment Distribution: G.T. Ankrum U.S. NRC Dr. P.K. Eapen U.S. NRC Region I R.A. Gramm U.S. NRC Sr. Resident Inspector J.W. Gilray U.S. NRC S. Hudson U.S. NRC Sr. Resident Inspector T.E. Lempges NMPC C.V. Mangan NMPC R.J. Pasternak NMPC T.J. Perkins NMPC G.D. Wilson NMPC A.F. Zallnick NMPC W.M. Bryant NMPC W.A. Hansen NMPC C.E. Hjort NMPC J. Kroehler NMPC

J