| issue date = 06/21/1989
| issue date = 06/21/1989
| title = Further Response to Violations Noted in Insp Repts 50-250/89-02 & 50-251/89-02,per 890418 Request.Corrective Actions:Emergency Action Level Guidance Contained in Procedure EPIP-20101 Upgraded to Be Clearer
| title = Further Response to Violations Noted in Insp Repts 50-250/89-02 & 50-251/89-02,per 890418 Request.Corrective Actions:Emergency Action Level Guidance Contained in Procedure EPIP-20101 Upgraded to Be Clearer
| author name = WODDY C O
| author name = Woddy C
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000250/1989002]]


=Text=
=Text=
{{#Wiki_filter:ZCCEKZRATEO
{{#Wiki_filter:ZCCEKZRATEO -.D1STKBUTION "DZ3805.)TENTION"=-.SYrrxg SSION NBR-'8907260207       "DOC-DATE: '"89/06/21'OTARIZED: NO              DOCKET g
-.D1STKBUTION"DZ3805.)TENTION"=-.SYrrxg
.-,,~.. FACIL:50-250.Turkey>oint .Plant, Unit,.3,..Florida Power and Light           C 05000250 50-251   Turkey'oint Plant, Unit   4,. Florida   Power and Light C 05000251 AUTH.NAME           AUTHOR AFFILIATION WODDY,C.O.           Florida Power 6 Light; Co.
SSION NBR-'8907260207"DOC-DATE:
        'RECIP NAME     ,   RECIPIENT AFFILIATION Document Control,. Branch (Document Control Desk)
'"89/06/21'OTARIZED:
 
NO.-,,~..FACIL:50-250.Turkey>oint.Plant, Unit,.3,..Florida
==SUBJECT:==
Power and Light C 50-251 Turkey'oint
Forwards response to NRC 890418 request for addi info re util   response to Insp Repts 50-250,251/89-02.
Plant, Unit 4,.Florida Power and Light C AUTH.NAME" AUTHOR AFFILIATION
DISTRIBUTION CODE: IE01D       COPIES RECEIVED:LTR         ENCL     SIZE:
WODDY,C.O.
      'TITLE: General (50 .Dkt)-Insp Rept/Notice of Vio ation Response NOTES RECIPIENT           COPIES            RECIPIENT            COPIES ID CODE/NAME       LTTR ENCL        ID CODE/NAME        LTTR ENCL PD2-2 PD                 1      1    EDISON,G                1    1 INTERNAL: AEOD                     1      1    AEOD/DEIIB              1    1 AEOD/TPAD               1      1    DEDRO                    1    1 NRR SHANKMAN,S           1      1    NRR/DEST DIR            1    1 NRR/DLPQ/PEB             1      1    NRR/DOEA DIR 11          1    1 NRR/DREP/EPB 10         1      1    NRR/DREP/RPB 10          2    2 NRR/PMAS/I LRB1 2 OE LIEBE1gP~NJ 1
Florida Power 6 Light;Co.'RECIP NAME , RECIPIENT AFFILIATION
1 l.
Document Control,.Branch (Document Control Desk)SUBJECT: Forwards response to NRC 890418 request for addi info re util response to Insp Repts 50-250,251/89-02.
1 NUDOCS-ABSTRACT OGC/HDS2 1
DISTRIBUTION
1 1
CODE: IE01D COPIES RECEIVED:LTR
1 K!~XI            Of    1     1     RES MORISSEAU I D        1   1 RGN2      FILE  01    1 . 1 EXTERNAL: LPDR                      1     1     NRC PDR                  1   1 NSIC                    1     1 h
ENCL SIZE: 'TITLE: General (50.Dkt)-Insp
D D
Rept/Notice
NOIR 'IO ALL "RIES" RECIPIENIS:
of Vio ation Response NOTES DOCKET g 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD AEOD/TPAD NRR SHANKMAN, S NRR/DLPQ/PEB
S PIZASE HELP US 'IO REDUCE HASTE! CONI'ACT 'IHE DOCXMERI'XKIBOLDESK RXN Pl-37 (EXT. 20079) Io EIZMQQZS KN3R NAME FKH DIPHGHPXXCII LISTS FOR DOCUKWXS VXJ DON'T NEED)
NRR/DREP/EPB
TOTAL NUMBER OF COPIES REQUIRED: LTTR           23 ENCL       23
10 NRR/PMAS/I
 
LRB1 2 OE LIEBE1gP~NJ
P.O.Box14000,Juno Beach,R 33408-0420 FPL 9DI'r 2 i. 398Q L-B9-263.
K!~XI Of RGN2 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 l.1 1 1 1 1.1 1 1 1 1 RECIPIENT ID CODE/NAME EDISON,G AEOD/DEIIB
. U. S. Nuclear Regulatory Commission Attn:     Document Control Desk Washington, D. C.               20555 Gentlemen:
DEDRO NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB
Re:   Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Additional         Res onse   to Ins ection   Re ort   89-02 By   letter     dated       April 18,   1989, (Stewart D. Ebneter to W. F.
10 NUDOCS-ABSTRACT
Conway), you requested             an   additional response to Florida Power &
OGC/HDS2 RES MORI SSEAU I D NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 NOIR'IO ALL"RIES" RECIPIENIS:
Light Company (FPL) letter L-89-108 dated March 27, 1989, which provided a response to Inspection Report 89-02. FPL's additional response     is attached.
PIZASE HELP US'IO REDUCE HASTE!CONI'ACT'IHE DOCXMERI'XKIBOL
Very   truly     yours, C. O. oo-y Actin       enior Vice President             Nuclear COW/JRH/cm Attachment cc:   Stewart D. Ebneter, Regional Administrator, Region II.,                       USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 8907'I-C 07 890621 PDR    QDQCK t-)5000-'-'0@fan 0
DESK RXN Pl-37 (EXT.20079)Io EIZMQQZS KN3R NAME FKH DIPHGHPXXCII
an FPL Group company
LISTS FOR DOCUKWXS VXJ DON'T NEED)TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 23 h D D S
 
P.O.Box14000,Juno
                                      ~aCHMENT   1               7g
Beach,R 33408-0420
      'I m             REQUEST POR ~ITIOHAL.IHPOBMAZIOH
FPL 9DI'r 2 i.398Q L-B 9-263..U.S.Nuclear Regulatory
        .. HRC THSPECTIOH REPORT SOS   50-250/8~     AHD. 5G-,251/89-02 In an NRC-letter dated April;,18,,1989 to Mr -W. P. Conway the NRC requested additional information concerniag the corrective actions PPL had taken in response to violation 50-250/89-02-01.         Specffi'cally, the NRC stated "during the week of April 3, 1989, your staff s capabilities to .make prompt classifications were again evaluated by an NRC license examiner. The findings indicated that additional training in classifications was necessary.
Commission
  'We understand 'that, in response to these findings, you are revising the applicable procedure and you are providing additional training to your staff regarding emergency classification. In view of this, we request that you provide a supplemental response to the Notice of Violation outlining the
Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
  'additional corrective actions you have taken and plan to undertake."
Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Additional
The   following corrective actions have been taken, in addition to those outlined in the "Reply to Notice of Violation Inspection Report 89-02" dated March 27, 1989, to prevent the recurrence of this problem.
Res onse to Ins ection Re ort 89-02 By letter dated April 18, 1989, (Stewart D.Ebneter to W.F.Conway), you requested an additional
: 1)       The Emergency Action Level (EAL) guidance contained in procedure EPIP-20101, "Duties of Emergency Coordinator," has been upgraded to be clearer and more "user friendly." An "approved for training purposes only" version of this upgraded guidance was used during the retraining provided, between April 17 and May 5, 1989, to the potential Emergency Coordinators. This allowed the procedure to be thoroughly validated prior to its implementation on May 5, 1989.
response to Florida Power&Light Company (FPL)letter L-89-108 dated March 27, 1989, which provided a response to Inspection
: 2)       All personnel who are currently expected to act as the Emergency Coordinator have been retrained in the area of emergency classification. The retraining included both classroom and simulator training. A written examination was given to all personnel attending the training. Additionally, the Assistant Plant Supervisor-Nuclear (APSNs) and Plant Supervisor-Nuclear (PSNs) were given a simulator examination on this sub)ect.}}
Report 89-02.FPL's additional
response is attached.Very truly yours, C.O.oo-y Actin enior Vice President-Nuclear COW/JRH/cm
Attachment
cc: Stewart D.Ebneter, Regional Administrator, Region II., USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 8907'I-C 07)5000-'-'0
890621 PDR QDQCK t-@fan 0 an FPL Group company  
~aCHMENT 1 7g'I m REQUEST POR~ITIOHAL.IHPOBMAZIOH
..HRC THSPECTIOH
REPORT SOS 50-250/8~AHD.5G-,251/89-02
In an NRC-letter
dated April;,18,,1989
to Mr-W.P.Conway the NRC requested additional
information
concerniag
the corrective
actions PPL had taken in response to violation 50-250/89-02-01.
Specffi'cally, the NRC stated"during the week of April 3, 1989, your staff s capabilities
to.make prompt classifications
were again evaluated by an NRC license examiner.The findings indicated that additional
training in classifications
was necessary.
'We understand
'that, in response to these findings, you are revising the applicable
procedure and you are providing additional
training to your staff regarding emergency classification.
In view of this, we request that you provide a supplemental
response to the Notice of Violation outlining the'additional
corrective
actions you have taken and plan to undertake." The following corrective
actions have been taken, in addition to those outlined in the"Reply to Notice of Violation Inspection
Report 89-02" dated March 27, 1989, to prevent the recurrence
of this problem.1)The Emergency Action Level (EAL)guidance contained in procedure EPIP-20101,"Duties of Emergency Coordinator," has been upgraded to be clearer and more"user friendly." An"approved for training purposes only" version of this upgraded guidance was used during the retraining
provided, between April 17 and May 5, 1989, to the potential Emergency Coordinators.
This allowed the procedure to be thoroughly
validated prior to its implementation
on May 5, 1989.2)All personnel who are currently expected to act as the Emergency Coordinator
have been retrained in the area of emergency classification.
The retraining
included both classroom and simulator training.A written examination
was given to all personnel attending the training.Additionally, the Assistant Plant Supervisor-Nuclear (APSNs)and Plant Supervisor-Nuclear (PSNs)were given a simulator examination
on this sub)ect.
}}

Latest revision as of 23:00, 3 February 2020

Further Response to Violations Noted in Insp Repts 50-250/89-02 & 50-251/89-02,per 890418 Request.Corrective Actions:Emergency Action Level Guidance Contained in Procedure EPIP-20101 Upgraded to Be Clearer
ML17347B194
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/21/1989
From: Woddy C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-261, NUDOCS 8907260207
Download: ML17347B194 (4)


Text

ZCCEKZRATEO -.D1STKBUTION "DZ3805.)TENTION"=-.SYrrxg SSION NBR-'8907260207 "DOC-DATE: '"89/06/21'OTARIZED: NO DOCKET g

.-,,~.. FACIL:50-250.Turkey>oint .Plant, Unit,.3,..Florida Power and Light C 05000250 50-251 Turkey'oint Plant, Unit 4,. Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION WODDY,C.O. Florida Power 6 Light; Co.

'RECIP NAME , RECIPIENT AFFILIATION Document Control,. Branch (Document Control Desk)

SUBJECT:

Forwards response to NRC 890418 request for addi info re util response to Insp Repts 50-250,251/89-02.

DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL SIZE:

'TITLE: General (50 .Dkt)-Insp Rept/Notice of Vio ation Response NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 EDISON,G 1 1 INTERNAL: AEOD 1 1 AEOD/DEIIB 1 1 AEOD/TPAD 1 1 DEDRO 1 1 NRR SHANKMAN,S 1 1 NRR/DEST DIR 1 1 NRR/DLPQ/PEB 1 1 NRR/DOEA DIR 11 1 1 NRR/DREP/EPB 10 1 1 NRR/DREP/RPB 10 2 2 NRR/PMAS/I LRB1 2 OE LIEBE1gP~NJ 1

1 l.

1 NUDOCS-ABSTRACT OGC/HDS2 1

1 1

1 K!~XI Of 1 1 RES MORISSEAU I D 1 1 RGN2 FILE 01 1 . 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 h

D D

NOIR 'IO ALL "RIES" RECIPIENIS:

S PIZASE HELP US 'IO REDUCE HASTE! CONI'ACT 'IHE DOCXMERI'XKIBOLDESK RXN Pl-37 (EXT. 20079) Io EIZMQQZS KN3R NAME FKH DIPHGHPXXCII LISTS FOR DOCUKWXS VXJ DON'T NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 23

P.O.Box14000,Juno Beach,R 33408-0420 FPL 9DI'r 2 i. 398Q L-B9-263.

. U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Additional Res onse to Ins ection Re ort 89-02 By letter dated April 18, 1989, (Stewart D. Ebneter to W. F.

Conway), you requested an additional response to Florida Power &

Light Company (FPL) letter L-89-108 dated March 27, 1989, which provided a response to Inspection Report 89-02. FPL's additional response is attached.

Very truly yours, C. O. oo-y Actin enior Vice President Nuclear COW/JRH/cm Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II., USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 8907'I-C 07 890621 PDR QDQCK t-)5000-'-'0@fan 0

an FPL Group company

~aCHMENT 1 7g

'I m REQUEST POR ~ITIOHAL.IHPOBMAZIOH

.. HRC THSPECTIOH REPORT SOS 50-250/8~ AHD. 5G-,251/89-02 In an NRC-letter dated April;,18,,1989 to Mr -W. P. Conway the NRC requested additional information concerniag the corrective actions PPL had taken in response to violation 50-250/89-02-01. Specffi'cally, the NRC stated "during the week of April 3, 1989, your staff s capabilities to .make prompt classifications were again evaluated by an NRC license examiner. The findings indicated that additional training in classifications was necessary.

'We understand 'that, in response to these findings, you are revising the applicable procedure and you are providing additional training to your staff regarding emergency classification. In view of this, we request that you provide a supplemental response to the Notice of Violation outlining the

'additional corrective actions you have taken and plan to undertake."

The following corrective actions have been taken, in addition to those outlined in the "Reply to Notice of Violation Inspection Report 89-02" dated March 27, 1989, to prevent the recurrence of this problem.

1) The Emergency Action Level (EAL) guidance contained in procedure EPIP-20101, "Duties of Emergency Coordinator," has been upgraded to be clearer and more "user friendly." An "approved for training purposes only" version of this upgraded guidance was used during the retraining provided, between April 17 and May 5, 1989, to the potential Emergency Coordinators. This allowed the procedure to be thoroughly validated prior to its implementation on May 5, 1989.
2) All personnel who are currently expected to act as the Emergency Coordinator have been retrained in the area of emergency classification. The retraining included both classroom and simulator training. A written examination was given to all personnel attending the training. Additionally, the Assistant Plant Supervisor-Nuclear (APSNs) and Plant Supervisor-Nuclear (PSNs) were given a simulator examination on this sub)ect.