ML18065A758: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:consumers . Power | {{#Wiki_filter:consumers | ||
. Power POWERiNii MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 June 4, 1996 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-259 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of May 1996. | |||
* If you have any questions or concerns, please feel free to contact me at (616) 764-2013. | * If you have any questions or concerns, please feel free to contact me at (616) 764-2013. | ||
Sincerely, AL Williams Reactor Engineering Supervisor CC: | Sincerely, AL Williams Reactor Engineering Supervisor CC: RAVincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansin*g, Ml JPadgett, Michigan Public Service Commission Records Center, iNPO, Atlanta, GA CWMain, Palisades SMMclntyre, P13-121 Region Ill Administrator, USNRC Document Control, 950*22*35*1 OIL Cycle 12 Reports | ||
~606070198:960531 PDR R_ | |||
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | ADOCK 0500025 PDR 5 | ||
** Based on condenser backpressure | I ) | ||
*Weighted Average (635 MWe used as MDC Net* prior to October 1985) | A CMS' ENERGY COMPANY | ||
*MONTH May TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1. 777 17. 761 2. 777 18. 755 3. 776 19. 756 4. 776 20. 766 5. 776 21. 772 6. 776 22. 770 7. 775 23. 769 8. 771 24. 772 9. 770 25. 777 10. 772 26. 775 11. 776 27. 776 12. 779 28. 773 13. 778 29. 776 14. 777 30. 778 15. 774 31. 775 16. 770 INSTRUCTIONS: | ~,\ | ||
On this format, list the average daily unit power. level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt. | OPERATING DATA REPORT | ||
* DOCKET NO 50-255 DATE 06-04-96 COMPLETED BY KAKobiata TELEPHONE (616)764-8913 OPERATING STATUS: | |||
NOTES: | |||
: 1. UNIT NAME Palisades | |||
: 2. REPORTING PERIOD: 960501-960531 | |||
: 3. LICENSED THERMAL POWER (MWt) 2530 | |||
: 4. NAMEPLATE RATING (GROSS MWe) 811. 7 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWe) 805 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730 | |||
: 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | |||
This Month Yr-to-Date cumulative 11 .. HOURS IN REPORTING PERIOD 744.0 3647.0 214334.0 | |||
: 12. NuMeER OF HOURS REACTOR WAS CRITICAL 744.0 3326.3 124277.6 | |||
: 13. REACTOR RESERVE. SHUTDOWN HOURS | |||
: 14. HOURS GENERATOR ON-LINE 744 .o 3317.6 119472. 3 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1874810.9 8254802.7 262373493.2 17.' GROSS ELECTRICAL ENERGY GENERATED (MWH) 603891 2670965 8314 7219 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 574846 2542130 78495549 19.*UNIT SERVICE FACTOR 100.0t 91. Ot 55.7\ | |||
: 20. UNIT AVAILABILITY FACTOR 100.0t 91.0t 55.7\ | |||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 105.8\ *95.5\ 53.9\* | |||
: 22. UNIT CAPACITY FACTOR (USING DER NET) 96.0t 86.6\ 45.5\ | |||
23". UNIT. FORCED OUTAGE RATE o:ot 9.0\ 28.3\ | |||
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE,. DATE AND DURATION OF Rll.CH): | |||
A 51 day refueling outage is scheduled to beg.in on November 2, 1996. | |||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | |||
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | |||
** Based on condenser backpressure | |||
*Weighted Average (635 MWe used as MDC Net* prior to October 1985) | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 06/04/96 COMPLETED BY KAKobiata | |||
*MONTH May TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) | |||
: 1. 777 17. 761 | |||
: 2. 777 18. 755 | |||
: 3. 776 19. 756 | |||
: 4. 776 20. 766 | |||
: 5. 776 21. 772 | |||
: 6. 776 22. 770 | |||
: 7. 775 23. 769 | |||
: 8. 771 24. 772 | |||
: 9. 770 25. 777 | |||
: 10. 772 26. 775 | |||
: 11. 776 27. 776 | |||
: 12. 779 28. 773 | |||
: 13. 778 29. 776 | |||
: 14. 777 30. 778 | |||
: 15. 774 31. 775 | |||
: 16. 770 INSTRUCTIONS: | |||
On this format, list the average daily unit power. level in MWe-NET for each day in the reporting month. | |||
Compute to the nearest whole megawatt. | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE FOR MAY 1996 The Unit operated at 100 percent power for the entire .month. | OF OPERATING EXPERIENCE FOR MAY 1996 The Unit operated at 100 percent power for the entire .month. | ||
REPORT MONTH MAY 1996 | |||
REPORT MONTH MAY 1996 DOCKET NO 50-255 UNIT Palisades DATE 06/04/96 COMPLETED BY iKAKobiata TELEPHONE 616-764-2572 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type 1 Duration Reason 2 Method of Licensee System Component Cause & Corrective 5 | |||
(Hours) Shutting Event Code' Code Action to Down Reactor Report# Prevent Recurrence NONE | |||
UNIT SHUTDOWNS AND POWER REDUCTIONS Reason 2 Method of Licensee Shutting Event Down Reactor Report# 3. 4. Method: Exhibit G -Instructions 1-Manual for Preparation of Data 2-Manual Scram Entry Sheets for Licensee 3-Automatic Scram Event Report (LER) File 4-0ther (Explain) (NUREG-0161) | : 1. 2. 3. 4. 5. | ||
F: Forced Reason Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-0ther (Explain) (NUREG-0161) | |||
E-Operator Training & Lie;anse Examination F-Administrative G-Operational Error (Explain) | |||
H-Other (Explain)}} |
Latest revision as of 10:27, 3 February 2020
ML18065A758 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 05/31/1996 |
From: | Kobiata K, Anthony Williams CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
NUDOCS 9606070198 | |
Download: ML18065A758 (5) | |
Text
consumers
. Power POWERiNii MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 June 4, 1996 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-259 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of May 1996.
- If you have any questions or concerns, please feel free to contact me at (616) 764-2013.
Sincerely, AL Williams Reactor Engineering Supervisor CC: RAVincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansin*g, Ml JPadgett, Michigan Public Service Commission Records Center, iNPO, Atlanta, GA CWMain, Palisades SMMclntyre, P13-121 Region Ill Administrator, USNRC Document Control, 950*22*35*1 OIL Cycle 12 Reports
~606070198:960531 PDR R_
ADOCK 0500025 PDR 5
I )
A CMS' ENERGY COMPANY
~,\
OPERATING DATA REPORT
- DOCKET NO 50-255 DATE 06-04-96 COMPLETED BY KAKobiata TELEPHONE (616)764-8913 OPERATING STATUS:
NOTES:
- 1. UNIT NAME Palisades
- 2. REPORTING PERIOD: 960501-960531
- 3. LICENSED THERMAL POWER (MWt) 2530
- 4. NAMEPLATE RATING (GROSS MWe) 811. 7
- 5. DESIGN ELECTRICAL RATING (NET MWe) 805
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
- 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month Yr-to-Date cumulative 11 .. HOURS IN REPORTING PERIOD 744.0 3647.0 214334.0
- 12. NuMeER OF HOURS REACTOR WAS CRITICAL 744.0 3326.3 124277.6
- 13. REACTOR RESERVE. SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE 744 .o 3317.6 119472. 3
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1874810.9 8254802.7 262373493.2 17.' GROSS ELECTRICAL ENERGY GENERATED (MWH) 603891 2670965 8314 7219
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 574846 2542130 78495549 19.*UNIT SERVICE FACTOR 100.0t 91. Ot 55.7\
- 20. UNIT AVAILABILITY FACTOR 100.0t 91.0t 55.7\
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 105.8\ *95.5\ 53.9\*
- 22. UNIT CAPACITY FACTOR (USING DER NET) 96.0t 86.6\ 45.5\
23". UNIT. FORCED OUTAGE RATE o:ot 9.0\ 28.3\
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE,. DATE AND DURATION OF Rll.CH):
A 51 day refueling outage is scheduled to beg.in on November 2, 1996.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net* prior to October 1985)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 06/04/96 COMPLETED BY KAKobiata
- MONTH May TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)
- 1. 777 17. 761
- 2. 777 18. 755
- 3. 776 19. 756
- 4. 776 20. 766
- 5. 776 21. 772
- 6. 776 22. 770
- 7. 775 23. 769
- 8. 771 24. 772
- 9. 770 25. 777
- 10. 772 26. 775
- 11. 776 27. 776
- 12. 779 28. 773
- 13. 778 29. 776
- 14. 777 30. 778
- 15. 774 31. 775
- 16. 770 INSTRUCTIONS:
On this format, list the average daily unit power. level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.
SUMMARY
OF OPERATING EXPERIENCE FOR MAY 1996 The Unit operated at 100 percent power for the entire .month.
REPORT MONTH MAY 1996 DOCKET NO 50-255 UNIT Palisades DATE 06/04/96 COMPLETED BY iKAKobiata TELEPHONE 616-764-2572 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type 1 Duration Reason 2 Method of Licensee System Component Cause & Corrective 5
(Hours) Shutting Event Code' Code Action to Down Reactor Report# Prevent Recurrence NONE
- 1. 2. 3. 4. 5.
F: Forced Reason Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-0ther (Explain) (NUREG-0161)
E-Operator Training & Lie;anse Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)