ML18065A812: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 06/30/1996
| issue date = 06/30/1996
| title = Monthly Operating Rept for June 1996 for Palisades Nuclear Plant.W/960702 Ltr
| title = Monthly Operating Rept for June 1996 for Palisades Nuclear Plant.W/960702 Ltr
| author name = KOBIATA K A, WILLIAMS A L
| author name = Kobiata K, Williams A
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name =  
| addressee name =  
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:consumers Power POWERINli MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 July 2, 1996 US Nuclear Regulatory Commission Docum:mt Control Dask
{{#Wiki_filter:consumers Power POWERINli MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 July 2, 1996 US Nuclear Regulatory Commission Docum:mt Control Dask
* Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 ' Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of June 1996. If you have any questions or concerns, please to contact me at (616) 764-2013.
* Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 '
Sincerely, AL Williams Reactor Engineering Supervisor CC: RA Vincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, M! JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P13-121 Region Ill Administrator, USNRC Document Control, 950*22*35*1 O/L Cycle 12 Reports __ . 9607090232 960630 PDR * *ADOCK 05000255 ', R *.* .. PDR ' A CMS' ENERGY COMPANY OPERATING STATUS: l. UNIT NAME 2. REPORTING PERIOD: 3. LICENSED THERMAL POWER (MWt) 4. NAMEPLATE RATING (GROSS MWe) 5. DESIGN ELECTRICAL RATING (NET MWe) 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) MAXIMUM DEPENDABLE CAPACITY (NET MWe) OPERATING DATA REPORT Palisades 960601-960630 2530 811. 7 805 **770 **730
Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of June 1996.
* DOCKET NO 255 DATE 07-02-96 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 NOTES: 7. 8. IF cHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE 1<&#xa3;ASONS:  
If you have any questions or concerns, please to contact me at (616) 764-2013.
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe) : 10. REASONS FOR RESTRICTIONS, IF ANY: This Month ll. HOURS IN REPORTING PERIOD 12. NUMBER OF HOURS REACTOR WAS CRITICAL 13. REACTOR RESERVE SHUTDOWN HOURS 14. HOURS GENERATOR ON-LINE 15. UNIT RESERVE SHUTDOWN HOURS 16. GROSS THERMAL ENERGY GENERATED (MWH) 17. GROSS ELECTRICAL ,ENERGY GENERATED (MWH) 18. NET ELECTRICAL ENERGY GENERATED (MWH) 19. UNIT SERVICE FACTOR 20. UNIT AVAILABILITY FACTOR 21. UNIT CAPACITY FACTOR (USING MDC NET) 22. UNIT CJl.PAC!TY FACTOR (USING DE."!. NET) 720.0 720.0 720.0 1750199.5 555739 527628 100.0l 100.0l 100.4' 91.0t -23'. UNIT FORCED OUTAGE RATE 0. Ol 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): A 51 day refueling outage is scheduled to begin on November 2, 1996. 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: . 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Sincerely, AL Williams Reactor Engineering Supervisor CC: RAVincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, t;~,,sing, M!
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure
JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P13-121 Region Ill Administrator, USNRC Document Control, 950*22*35*1 O/L Cycle 12 Reports __ .
* Weighted Average (635 MWe used as MDC Net prior to October 1985) Yr-to-Date 4367.0 4046.3 4037.6 10005002.2 3226704 3069758 92.5\ 92.5\ 96.3\ 97 .3\ .. 7.5\ Forecast . CUmulative 215054.0 124997.6 120192.3 264123692.7 83702958 79023177 55.9\ 55.9\ 54.0l* 45.6\ 28 .1' Achieved
9607090232 960630 PDR * *ADOCK 05000255 ',
* AVERAGE DAILY-UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 07102196 COMPLETED BY KAKobiata MONTH June TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1. 770 17. 758 2. 770 18. 757 3. 773 19. 760 4. 774 20. 760 5. 771 21. 711 6. 765 22. 296 / 7. 767 23. 362 8. 770 24. 730 9. 765 25. 772 10. 764 26. 770 11. 765 27. 765 12. 768 28. 761 13. 760 29. 753 14. 762 30. 755 15. 764 31. 16. 766 ., ) -INSTRUCTIONS:
R *.*     .                   PDR '
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt
A CMS' ENERGY COMPANY
,, * ..  
 
OPERATING DATA REPORT DOCKET NO -      50-255 DATE    07-02-96 COMPLETED BY    KAKobiata TELEPHONE  (616)764-2572 OPERATING STATUS:
NOTES:
: l. UNIT NAME                                                         Palisades
: 2. REPORTING PERIOD:                                              960601-960630
: 3. LICENSED THERMAL POWER (MWt)                                             2530
: 4. NAMEPLATE RATING (GROSS MWe)                                           811. 7
: 5. DESIGN ELECTRICAL RATING (NET MWe)                                       805
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)                                 **770
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe)                                   **730
: 8. IF cHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE 1<&#xa3;ASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe) :
: 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month         Yr-to-Date              . CUmulative ll. HOURS IN REPORTING PERIOD                                               720.0            4367.0                  215054.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                     720.0            4046.3                  124997.6
: 13. REACTOR RESERVE SHUTDOWN HOURS
: 14. HOURS GENERATOR ON-LINE                                                 720.0            4037.6                  120192.3
: 15. UNIT RESERVE SHUTDOWN HOURS
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                               1750199.5        10005002.2              264123692.7
: 17. GROSS ELECTRICAL ,ENERGY GENERATED (MWH)                               555739            3226704                  83702958
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                                 527628            3069758                  79023177
: 19. UNIT SERVICE FACTOR                                                     100.0l            92.5\                      55.9\
: 20. UNIT AVAILABILITY FACTOR                                                 100.0l            92.5\                      55.9\
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                                     100.4'            96.3\                      54.0l*
: 22. UNIT CJl.PAC!TY FACTOR (USING DE."!. NET)                                 91.0t -          97 .3\ ..                 45.6\
23'. UNIT FORCED OUTAGE RATE                                                   0. Ol             7.5\                    28 .1'
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
A 51 day refueling outage is scheduled to begin on November 2, 1996.
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
. 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast                    Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure
* Weighted Average (635 MWe used as MDC Net prior to October 1985)
 
AVERAGE DAILY-UNIT POWER LEVEL DOCKET NO           50-255 UNIT Palisades DATE     07102196 COMPLETED BY KAKobiata MONTH         June                                                         TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL                             DAY     AVERAGE DAILY POWER LEVEL (MWe Net)                                                     (MWe Net)
: 1.           770                                             17.           758
: 2.           770                                             18.           757
: 3.           773                                             19.           760
: 4.           774                                             20.           760
: 5.           771                                             21.           711
: 6.           765                                             22.           296
/ 7.             767                                             23.           362
: 8.           770                                             24.           730
: 9.           765                                             25.           772
: 10.           764                                             26.           770
: 11.           765                                             27.           765
: 12.           768                                             28.           761
: 13.           760                                             29.           753
: 14.           762                                             30.           755
: 15.           764                                             31.
: 16.           766                                                                                       .,
                                                                                                            )
- INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole megawatt.


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR JUNE 1996 The Unit decreased power to 40% at 0530 on June 22 to identify and plug condenser tube leaks. Full power was resumed at 2100 on June 24 ..
OF OPERATING EXPERIENCE FOR JUNE 1996 The Unit decreased power to 40% at 0530 on June 22 to identify and plug condenser tube leaks. Full power was resumed at 2100 on June 24 ..
REPORT MONTH JUNE 1996 No. Date 3 6121/96 1. F: Forced S: Scheduled UNIT SHUTDOWNS AND POWER REDUCTIONS Type, Duration Reason 2 {Hours) 81 B 2. 3. Method of* Licensee Shutting Event Down Reactor3 Report # 4 {Powr derate To40%) 4. 5. System Code' Component Code 5 Reason Method: Exhibit G -Instructions Exhibit I -Same Source A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-0ther {Explain)
 
                                                                                                                                                                .I i
REPORT MONTH       JUNE 1996                                                                                                                         DOCKET NO    50-255 UNIT    Palisades DATE    07/02196 COMPLETED BY KAKobiata TELEPHONE 616-764-2572 UNIT SHUTDOWNS AND POWER REDUCTIONS No.      Date        Type,     Duration     Reason2      Method of*          Licensee      System      Component Cause & Corrective 3      6121/96
{Hours) 81           B Shutting Down Reactor3 4 {Powr derate To40%)
Event Report #
Code'        Code 5 Action to Prevent Recurrence Derate due to condenser Tube leak identification and plugging.
: 1.            2.                            3.                4.                         5.
F: Forced      Reason                       Method:           Exhibit G - Instructions   Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual                 for Preparation of Data B-Maintenance or Test         2-Manual Scram Entry Sheets for Licensee C-Refueling                   3-Automatic Scram Event Report {LER) File D-Regulatory Restriction       4-0ther {Explain) {NURE~161)
E-Operator Training & License Examination F-Administrative G-Operational Error {Explain)
E-Operator Training & License Examination F-Administrative G-Operational Error {Explain)
H-Other (Explain) for Preparation of Data Entry Sheets for Licensee Event Report {LER) File Cause & Corrective Action to Prevent Recurrence Derate due to condenser Tube leak identification and plugging. . I i DOCKET NO 50-255 UNIT Palisades DATE 07/02196 COMPLETED BY KAKobiata TELEPHONE 616-764-2572
H-Other (Explain)}}
* *}}

Latest revision as of 10:27, 3 February 2020

Monthly Operating Rept for June 1996 for Palisades Nuclear Plant.W/960702 Ltr
ML18065A812
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/30/1996
From: Kobiata K, Anthony Williams
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9607090232
Download: ML18065A812 (5)


Text

consumers Power POWERINli MICHlliAN"S PROliRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 July 2, 1996 US Nuclear Regulatory Commission Docum:mt Control Dask

Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of June 1996.

If you have any questions or concerns, please to contact me at (616) 764-2013.

Sincerely, AL Williams Reactor Engineering Supervisor CC: RAVincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, t;~,,sing, M!

JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P13-121 Region Ill Administrator, USNRC Document Control, 950*22*35*1 O/L Cycle 12 Reports __ .

9607090232 960630 PDR * *ADOCK 05000255 ',

R *.* . PDR '

A CMS' ENERGY COMPANY

OPERATING DATA REPORT DOCKET NO - 50-255 DATE 07-02-96 COMPLETED BY KAKobiata TELEPHONE (616)764-2572 OPERATING STATUS:

NOTES:

l. UNIT NAME Palisades
2. REPORTING PERIOD: 960601-960630
3. LICENSED THERMAL POWER (MWt) 2530
4. NAMEPLATE RATING (GROSS MWe) 811. 7
5. DESIGN ELECTRICAL RATING (NET MWe) 805
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
8. IF cHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE 1<£ASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe) :
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date . CUmulative ll. HOURS IN REPORTING PERIOD 720.0 4367.0 215054.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4046.3 124997.6
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE 720.0 4037.6 120192.3
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH) 1750199.5 10005002.2 264123692.7
17. GROSS ELECTRICAL ,ENERGY GENERATED (MWH) 555739 3226704 83702958
18. NET ELECTRICAL ENERGY GENERATED (MWH) 527628 3069758 79023177
19. UNIT SERVICE FACTOR 100.0l 92.5\ 55.9\
20. UNIT AVAILABILITY FACTOR 100.0l 92.5\ 55.9\
21. UNIT CAPACITY FACTOR (USING MDC NET) 100.4' 96.3\ 54.0l*
22. UNIT CJl.PAC!TY FACTOR (USING DE."!. NET) 91.0t - 97 .3\ .. 45.6\

23'. UNIT FORCED OUTAGE RATE 0. Ol 7.5\ 28 .1'

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

A 51 day refueling outage is scheduled to begin on November 2, 1996.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

. 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure

  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

AVERAGE DAILY-UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 07102196 COMPLETED BY KAKobiata MONTH June TELEPHONE (616)764-2572 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)

1. 770 17. 758
2. 770 18. 757
3. 773 19. 760
4. 774 20. 760
5. 771 21. 711
6. 765 22. 296

/ 7. 767 23. 362

8. 770 24. 730
9. 765 25. 772
10. 764 26. 770
11. 765 27. 765
12. 768 28. 761
13. 760 29. 753
14. 762 30. 755
15. 764 31.
16. 766 .,

)

- INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR JUNE 1996 The Unit decreased power to 40% at 0530 on June 22 to identify and plug condenser tube leaks. Full power was resumed at 2100 on June 24 ..

.I i

REPORT MONTH JUNE 1996 DOCKET NO 50-255 UNIT Palisades DATE 07/02196 COMPLETED BY KAKobiata TELEPHONE 616-764-2572 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type, Duration Reason2 Method of* Licensee System Component Cause & Corrective 3 6121/96

{Hours) 81 B Shutting Down Reactor3 4 {Powr derate To40%)

Event Report #

Code' Code 5 Action to Prevent Recurrence Derate due to condenser Tube leak identification and plugging.

1. 2. 3. 4. 5.

F: Forced Reason Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report {LER) File D-Regulatory Restriction 4-0ther {Explain) {NURE~161)

E-Operator Training & License Examination F-Administrative G-Operational Error {Explain)

H-Other (Explain)