ML18065B207: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:* A CMS Energy Company Palisades Nuclear Plant 27780 Blue.Star Memorial Highway Covert, Mt 49043 April 3, 1998 US Nuclear Regulatory Commission Document Control Desk Washington; DC 20555 LICENSEE REPORT OF MONTHLY OPERATING | {{#Wiki_filter:* | ||
Sincerely, R.S.Hawn Reactor Engineering Supervisor CC: RAVincent, Palisades GABaustian, Palisades ALWilliams, Palisades KAToner, Palisades Senior Resident Inspector, DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml RWhale, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950*22*35*10/L Cycle 1 3 Reports 9804130126 980331 PDR ADOCK 05000255 | A CMS Energy Company Palisades Nuclear Plant 27780 Blue.Star Memorial Highway Covert, Mt 49043 April 3, 1998 US Nuclear Regulatory Commission Document Control Desk Washington; DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20~ DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of March 1998. | ||
* f R PDR ..,; | If you have ~ny questions or concerns, please contact me at (616) 764-3179. | ||
Sincerely, R.S.Hawn Reactor Engineering Supervisor CC: RAVincent, Palisades GABaustian, Palisades ALWilliams, Palisades KAToner, Palisades Senior Resident Inspector, Pal!$ade~ | |||
DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml RWhale, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950*22*35*10/L Cycle 1 3 Reports 9804130126 980331 PDR ADOCK 05000255 | |||
MONTH March TELEPHONE 16161764-2185 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1 . 789 17. 742 2. 18. 662 3. 789 19. 693 4. 788 20. 694 5. 789 21. 694 6. 786 22. 295 7. 790 23. 695 8. 789 24. 694 9. 786 25. 691 10. 787 26. 11 . 789 27. 686 12. 788 28. 735 13. 789 29. 753 14. 788 30. 15. 790 31. 751 16. :Z9Q INSTRUCTIONS: | * f R PDR ..,; | ||
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt. | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT P~lisades DATE 04[03[98 COMPLETED BY RFSchmid! | |||
MONTH March TELEPHONE 16161764-2185 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) | |||
: 1. 789 17. 742 | |||
: 2. 76~ 18. 662 | |||
: 3. 789 19. 693 | |||
: 4. 788 20. 694 | |||
: 5. 789 21. 694 | |||
: 6. 786 22. 295 | |||
: 7. 790 23. 695 | |||
: 8. 789 24. 694 | |||
: 9. 786 25. 691 | |||
: 10. 787 26. 68~ | |||
11 . 789 27. 686 | |||
: 12. 788 28. 735 | |||
: 13. 789 29. 753 | |||
: 14. 788 30. 7~6 | |||
: 15. 790 31. 751 | |||
: 16. :Z9Q INSTRUCTIONS: | |||
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt. | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE FOR MARCH 1998 The Unit began the month operating at 100 percent power. On March 17, 1998 at0116 hours, Turbine stop valve #1 was identified to be at 80% open. As a result, power level was reduced to approximately 90% at 1500 on March 17. After evaluation of the system configuration, reactor power level was increased on March 27. At 2100 on March 28, reactor power level of approximately 98% was obtained; this power level was maintained for the remainder of the month. | OF OPERATING EXPERIENCE FOR MARCH 1998 The Unit began the month operating at 100 percent power. On March 17, 1998 at0116 hours, Turbine stop valve #1 was identified to be at 80% open. As a result, power level was reduced to approximately 90% at 1500 on March 17. After evaluation of the system configuration, reactor power level was increased on March 27. At 2100 on March 28, reactor power level of approximately 98% was obtained; this power level was maintained for the remainder of the month. | ||
REPORT MONTH _ __,MA=->:R_,,,C | |||
..... H_,_1.:..:9'-"'9=- | REPORT MONTH _ __,MA=->:R_,,,C.....H_,_1.:..:9'-"'9=-8__ DOCKET NO 50-255 UNIT Palisades DATE 04/03/98 COMPLETED BY RFSchmidt TELEPHONE 616-764-2185 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type1 Duration (Hours) | ||
Reason2 Method of Shutting Down Reactor Licensee Event Report# | |||
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) | System Code 4 Component Code 5 Cause & Corrective Action to Prevent Recurrence | ||
: 7. 03/17/98 F 345 A 4 Mispositioned Turbine Stop Power Reduction Valve, EHC fluid inspection | |||
: 1. 2. 3. 4. 5. | |||
F: Forced Reason: Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-other (Explain) (NUREG-0161) | |||
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) | |||
H-Other (Explain) | H-Other (Explain) | ||
* OPERATING DATA REPORT | |||
* DOCKET NO DATE 50-255 4-1-98 COMPLETED BY RFSchmidt TELEPHONE (616)764-2185 OPERATING STATUS: | |||
NOTES: | |||
: 1. UNIT NAME Palisades | |||
: 2. REPORTING PERIOD: 980301-980331 | |||
: 3. LICENSED THERMAL POWER (MWt) 2530 | |||
: 4. NAMEPLATE RATING (GROSS MWe) 811. 7 | |||
SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF. EACH): Refueling Outage, Start 4/24/98, 39 days long 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | : 5. DESIGN ELECTRICAL RATING (NET MWe) 805 | ||
IN.ITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure | : 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) | ||
* Weighted Average (635 MWe used as MDC Net prior to October 1985) | : 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730 | ||
: 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET* MWe): | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | |||
This Month Yr-to-Date Cumulative | |||
: 11. HOURS IN REPORTING PERIOD 744. 0 2160.0 230391.0 | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744. 0 2114. 5 138084.1 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS | |||
: 14. HOURS GENERATOR ON-LINE 744.0 2090.8 133032.1 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1806566.4 5114 651. 0 295795455.3 | |||
.17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 587090 1666924 93838058 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 558075 1585414 88656630 | |||
: 19. UNIT SERVICE FACTOR 100.0% 96.8% 57. 7% | |||
: 20. UNIT AVAILABILITY FACTOR 100.0% 96.8% .57. 7% | |||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.8% 100.5% 56.2%* | |||
: 22. UNIT CAPACITY FACTOR (USING DER NET) 93.2% 91.2% 47.8% | |||
: 23. UNIT FORCED OUTAGE RATE 0.0% 1. 6% 26.6% | |||
: 24. SH~TDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF. EACH): | |||
Refueling Outage, Start 4/24/98, 39 days long | |||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | |||
Forecast Achieved IN.ITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure | |||
* Weighted Average (635 MWe used as MDC Net prior to October 1985)}} |
Latest revision as of 10:21, 3 February 2020
ML18065B207 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 03/31/1998 |
From: | Hawn R, Schmidt R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
NUDOCS 9804130126 | |
Download: ML18065B207 (5) | |
Text
A CMS Energy Company Palisades Nuclear Plant 27780 Blue.Star Memorial Highway Covert, Mt 49043 April 3, 1998 US Nuclear Regulatory Commission Document Control Desk Washington; DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20~ DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of March 1998.
If you have ~ny questions or concerns, please contact me at (616) 764-3179.
Sincerely, R.S.Hawn Reactor Engineering Supervisor CC: RAVincent, Palisades GABaustian, Palisades ALWilliams, Palisades KAToner, Palisades Senior Resident Inspector, Pal!$ade~
DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml RWhale, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950*22*35*10/L Cycle 1 3 Reports 9804130126 980331 PDR ADOCK 05000255
- f R PDR ..,;
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT P~lisades DATE 04[03[98 COMPLETED BY RFSchmid!
MONTH March TELEPHONE 16161764-2185 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)
- 1. 789 17. 742
- 2. 76~ 18. 662
- 3. 789 19. 693
- 4. 788 20. 694
- 5. 789 21. 694
- 6. 786 22. 295
- 7. 790 23. 695
- 8. 789 24. 694
- 9. 786 25. 691
- 10. 787 26. 68~
11 . 789 27. 686
- 12. 788 28. 735
- 13. 789 29. 753
- 14. 788 30. 7~6
- 15. 790 31. 751
- 16. :Z9Q INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.
SUMMARY
OF OPERATING EXPERIENCE FOR MARCH 1998 The Unit began the month operating at 100 percent power. On March 17, 1998 at0116 hours, Turbine stop valve #1 was identified to be at 80% open. As a result, power level was reduced to approximately 90% at 1500 on March 17. After evaluation of the system configuration, reactor power level was increased on March 27. At 2100 on March 28, reactor power level of approximately 98% was obtained; this power level was maintained for the remainder of the month.
REPORT MONTH _ __,MA=->:R_,,,C.....H_,_1.:..:9'-"'9=-8__ DOCKET NO 50-255 UNIT Palisades DATE 04/03/98 COMPLETED BY RFSchmidt TELEPHONE 616-764-2185 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type1 Duration (Hours)
Reason2 Method of Shutting Down Reactor Licensee Event Report#
System Code 4 Component Code 5 Cause & Corrective Action to Prevent Recurrence
- 7. 03/17/98 F 345 A 4 Mispositioned Turbine Stop Power Reduction Valve, EHC fluid inspection
- 1. 2. 3. 4. 5.
F: Forced Reason: Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-other (Explain) (NUREG-0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
- OPERATING DATA REPORT
- DOCKET NO DATE 50-255 4-1-98 COMPLETED BY RFSchmidt TELEPHONE (616)764-2185 OPERATING STATUS:
NOTES:
- 1. UNIT NAME Palisades
- 2. REPORTING PERIOD: 980301-980331
- 3. LICENSED THERMAL POWER (MWt) 2530
- 4. NAMEPLATE RATING (GROSS MWe) 811. 7
- 5. DESIGN ELECTRICAL RATING (NET MWe) 805
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
- 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET* MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month Yr-to-Date Cumulative
- 11. HOURS IN REPORTING PERIOD 744. 0 2160.0 230391.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744. 0 2114. 5 138084.1
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE 744.0 2090.8 133032.1
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1806566.4 5114 651. 0 295795455.3
.17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 587090 1666924 93838058
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 558075 1585414 88656630
- 19. UNIT SERVICE FACTOR 100.0% 96.8% 57. 7%
- 20. UNIT AVAILABILITY FACTOR 100.0% 96.8% .57. 7%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.8% 100.5% 56.2%*
- 22. UNIT CAPACITY FACTOR (USING DER NET) 93.2% 91.2% 47.8%
- 23. UNIT FORCED OUTAGE RATE 0.0% 1. 6% 26.6%
- 24. SH~TDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF. EACH):
Refueling Outage, Start 4/24/98, 39 days long
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast Achieved IN.ITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)