{{#Wiki_filter:* A CMS Energy Company Palisades Nuclear Plant 27780 Blue.Star Memorial Highway Covert, Mt 49043 April 3, 1998 US Nuclear Regulatory Commission Document Control Desk Washington; DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DAT A DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of March 1998. If you have questions or concerns, please contact me at (616) 764-3179.
{{#Wiki_filter:*
Sincerely, R.S.Hawn Reactor Engineering Supervisor CC: RAVincent, Palisades GABaustian, Palisades ALWilliams, Palisades KAToner, Palisades Senior Resident Inspector, DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml RWhale, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950*22*35*10/L Cycle 1 3 Reports 9804130126 980331 PDR ADOCK 05000255
A CMS Energy Company                       Palisades Nuclear Plant 27780 Blue.Star Memorial Highway Covert, Mt 49043 April 3, 1998 US Nuclear Regulatory Commission Document Control Desk Washington; DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20~ DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of March 1998.
* f R PDR ..,;
If you have   ~ny    questions or concerns, please contact me at (616) 764-3179.
*
Sincerely, R.S.Hawn Reactor Engineering Supervisor CC: RAVincent, Palisades GABaustian, Palisades ALWilliams, Palisades KAToner, Palisades Senior Resident Inspector, Pal!$ade~
* AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT DATE 04[03[98 COMPLETED BY RFSchmid!
DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml RWhale, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950*22*35*10/L Cycle 1 3 Reports 9804130126 980331 PDR     ADOCK 05000255
MONTH March TELEPHONE 16161764-2185 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1 . 789 17. 742 2. 18. 662 3. 789 19. 693 4. 788 20. 694 5. 789 21. 694 6. 786 22. 295 7. 790 23. 695 8. 789 24. 694 9. 786 25. 691 10. 787 26. 11 . 789 27. 686 12. 788 28. 735 13. 789 29. 753 14. 788 30. 15. 790 31. 751 16. :Z9Q INSTRUCTIONS:
* f R                         PDR     ..,;
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.
 
* *
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO         50-255 UNIT   P~lisades DATE     04[03[98 COMPLETED BY RFSchmid!
MONTH             March                                               TELEPHONE 16161764-2185 DAY       AVERAGE DAILY POWER LEVEL                         DAY   AVERAGE DAILY POWER LEVEL (MWe Net)                                                 (MWe Net)
: 1.                 789                                     17.             742
: 2.                 76~                                      18.             662
: 3.                 789                                     19.             693
: 4.               788                                       20.             694
: 5.               789                                       21.             694
: 6.               786                                       22.             295
: 7.               790                                       23.             695
: 8.               789                                       24.             694
: 9.               786                                       25.             691
: 10.               787                                       26.             68~
11 .               789                                       27.             686
: 12.               788                                       28.             735
: 13.               789                                       29.             753
: 14.               788                                       30.             7~6
: 15.               790                                       31.             751
: 16.               :Z9Q INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR MARCH 1998 The Unit began the month operating at 100 percent power. On March 17, 1998 at0116 hours, Turbine stop valve #1 was identified to be at 80% open. As a result, power level was reduced to approximately 90% at 1500 on March 17. After evaluation of the system configuration, reactor power level was increased on March 27. At 2100 on March 28, reactor power level of approximately 98% was obtained; this power level was maintained for the remainder of the month.
OF OPERATING EXPERIENCE FOR MARCH 1998 The Unit began the month operating at 100 percent power. On March 17, 1998 at0116 hours, Turbine stop valve #1 was identified to be at 80% open. As a result, power level was reduced to approximately 90% at 1500 on March 17. After evaluation of the system configuration, reactor power level was increased on March 27. At 2100 on March 28, reactor power level of approximately 98% was obtained; this power level was maintained for the remainder of the month.
REPORT MONTH _ __,MA=->:R_,,,C  
 
..... H_,_1.:..:9'-"'9=-8
REPORT MONTH _ __,MA=->:R_,,,C.....H_,_1.:..:9'-"'9=-8__                                                                                                      DOCKET NO    50-255 UNIT    Palisades DATE  04/03/98 COMPLETED BY  RFSchmidt TELEPHONE 616-764-2185 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date     Type1                    Duration (Hours)
__ No. Date 7. 03/17/98 1. F: Forced S: Scheduled Type 1 Duration Reason 2 (Hours) F 345 A 2. Reason: A-Equipment Failure (Explain)
Reason2  Method of Shutting Down Reactor Licensee Event Report#
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
System Code  4 Component Code 5 Cause & Corrective Action to Prevent Recurrence
: 7.     03/17/98 F                          345        A        4                                                          Mispositioned Turbine Stop Power Reduction                                            Valve, EHC fluid inspection
: 1.               2.                                            3.                        4.                            5.
F: Forced     Reason:                                        Method:                    Exhibit G - Instructions      Exhibit I - Same Source S: Scheduled   A-Equipment Failure (Explain)                 1-Manual                  for Preparation of Data B-Maintenance or Test                         2-Manual Scram            Entry Sheets for Licensee C-Refueling                                   3-Automatic Scram          Event Report (LER) File D-Regulatory Restriction                       4-other (Explain)          (NUREG-0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
H-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Shutting Down Reactor 4 Power Reduction
* OPERATING DATA REPORT
: 3. Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-other (Explain)
* DOCKET NO DATE 50-255 4-1-98 COMPLETED BY RFSchmidt TELEPHONE (616)764-2185 OPERATING STATUS:
Licensee Event Report# 4. System Code 4 Component Code 5 Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
NOTES:
: 5. Cause & Corrective Action to Prevent Recurrence Mispositioned Turbine Stop Valve, EHC fluid inspection Exhibit I -Same Source DOCKET NO 50-255 UNIT Palisades DA TE 04/03/98 COMPLETED BY RFSchmidt TELEPHONE 616-764-2185  
: 1. UNIT NAME                                                         Palisades
* *
: 2. REPORTING PERIOD:                                              980301-980331
* OPERATING STATUS: 1. UNIT NAME 2. REPORTING PERIOD: 3. LICENSED THERMAL POWER (MWt) 4. NAMEPLATE RATING (GROSS MWe) 5. DESIGN ELECTRICAL RATING (NET MWe) 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) OPERATING DATA REPORT Palisades 980301-980331 2530 811. 7 805 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
: 3. LICENSED THERMAL POWER (MWt)                                             2530
* 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET* MWe): 10. REASONS FOR RESTRICTIONS, IF ANY: 11. HOURS IN REPORTING PERIOD 12. NUMBER OF HOURS REACTOR WAS CRITICAL 13. REACTOR RESERVE SHUTDOWN HOURS 14. HOURS GENERATOR ON-LINE 15. UNIT RESERVE SHUTDOWN HOURS 16. GROSS THERMAL ENERGY GENERATED (MWH) .17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 18. NET ELECTRICAL ENERGY GENERATED (MWH) 19. UNIT SERVICE FACTOR 20. UNIT AVAILABILITY FACTOR 21. UNIT CAPACITY FACTOR (USING MDC NET) 22. UNIT CAPACITY FACTOR (USING DER NET) 23. UNIT FORCED OUTAGE RATE This Month 744. 0 744. 0 744.0 1806566.4 587090 558075 100.0% 100.0% 102.8% 93.2% 0.0% 24.
: 4. NAMEPLATE RATING (GROSS MWe)                                           811. 7
SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF. EACH): Refueling Outage, Start 4/24/98, 39 days long 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
: 5. DESIGN ELECTRICAL RATING (NET MWe)                                         805
IN.ITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
* Weighted Average (635 MWe used as MDC Net prior to October 1985) Yr-to-Date 2160.0 2114. 5 2090.8 5114 651. 0 1666924 1585414 96.8% 96.8% 100.5% 91.2% 1. 6% Forecast DOCKET NO 50-255 DATE 4-1-98 COMPLETED BY RFSchmidt TELEPHONE (616)764-2185 NOTES: Cumulative 230391.0 138084.1 133032.1 295795455.3 93838058 88656630 57. 7% .57. 7% 56.2%* 47.8% 26.6% Achieved}}
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe)                                   **730
: 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET* MWe):
: 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month        Yr-to-Date                  Cumulative
: 11. HOURS IN REPORTING PERIOD                                               744. 0            2160.0                  230391.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                     744. 0            2114. 5                  138084.1
: 13. REACTOR RESERVE SHUTDOWN HOURS
: 14. HOURS GENERATOR ON-LINE                                                 744.0              2090.8                  133032.1
: 15. UNIT RESERVE SHUTDOWN HOURS
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                                 1806566.4          5114 651. 0              295795455.3
.17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                 587090            1666924                  93838058
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                                   558075            1585414                  88656630
: 19. UNIT SERVICE FACTOR                                                     100.0%                96.8%                      57. 7%
: 20. UNIT AVAILABILITY FACTOR                                                 100.0%                96.8%                    .57. 7%
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                                     102.8%              100.5%                      56.2%*
: 22. UNIT CAPACITY FACTOR (USING DER NET)                                       93.2%              91.2%                    47.8%
: 23. UNIT FORCED OUTAGE RATE                                                     0.0%               1. 6%                   26.6%
: 24. SH~TDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF. EACH):
Refueling Outage, Start 4/24/98, 39 days long
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast                      Achieved IN.ITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure
* Weighted Average (635 MWe used as MDC Net prior to October 1985)}}

Latest revision as of 10:21, 3 February 2020

Monthly Operating Rept for Mar 1998 for Palisades Nuclear Plant.W/980403 Ltr
ML18065B207
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/31/1998
From: Hawn R, Schmidt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9804130126
Download: ML18065B207 (5)


Text

A CMS Energy Company Palisades Nuclear Plant 27780 Blue.Star Memorial Highway Covert, Mt 49043 April 3, 1998 US Nuclear Regulatory Commission Document Control Desk Washington; DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20~ DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of March 1998.

If you have ~ny questions or concerns, please contact me at (616) 764-3179.

Sincerely, R.S.Hawn Reactor Engineering Supervisor CC: RAVincent, Palisades GABaustian, Palisades ALWilliams, Palisades KAToner, Palisades Senior Resident Inspector, Pal!$ade~

DRHahn, Div of Rad Health Services, Lansing, Ml BWJorgensen, Michigan Dept of Labor, Lansing, Ml RWhale, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, P26-204 Region Ill Administrator, USNRC Document Control, 950*22*35*10/L Cycle 1 3 Reports 9804130126 980331 PDR ADOCK 05000255

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT P~lisades DATE 04[03[98 COMPLETED BY RFSchmid!

MONTH March TELEPHONE 16161764-2185 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)

1. 789 17. 742
2. 76~ 18. 662
3. 789 19. 693
4. 788 20. 694
5. 789 21. 694
6. 786 22. 295
7. 790 23. 695
8. 789 24. 694
9. 786 25. 691
10. 787 26. 68~

11 . 789 27. 686

12. 788 28. 735
13. 789 29. 753
14. 788 30. 7~6
15. 790 31. 751
16. :Z9Q INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.

SUMMARY

OF OPERATING EXPERIENCE FOR MARCH 1998 The Unit began the month operating at 100 percent power. On March 17, 1998 at0116 hours, Turbine stop valve #1 was identified to be at 80% open. As a result, power level was reduced to approximately 90% at 1500 on March 17. After evaluation of the system configuration, reactor power level was increased on March 27. At 2100 on March 28, reactor power level of approximately 98% was obtained; this power level was maintained for the remainder of the month.

REPORT MONTH _ __,MA=->:R_,,,C.....H_,_1.:..:9'-"'9=-8__ DOCKET NO 50-255 UNIT Palisades DATE 04/03/98 COMPLETED BY RFSchmidt TELEPHONE 616-764-2185 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type1 Duration (Hours)

Reason2 Method of Shutting Down Reactor Licensee Event Report#

System Code 4 Component Code 5 Cause & Corrective Action to Prevent Recurrence

7. 03/17/98 F 345 A 4 Mispositioned Turbine Stop Power Reduction Valve, EHC fluid inspection
1. 2. 3. 4. 5.

F: Forced Reason: Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-other (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

  • OPERATING DATA REPORT
  • DOCKET NO DATE 50-255 4-1-98 COMPLETED BY RFSchmidt TELEPHONE (616)764-2185 OPERATING STATUS:

NOTES:

1. UNIT NAME Palisades
2. REPORTING PERIOD: 980301-980331
3. LICENSED THERMAL POWER (MWt) 2530
4. NAMEPLATE RATING (GROSS MWe) 811. 7
5. DESIGN ELECTRICAL RATING (NET MWe) 805
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH 7AND 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET* MWe):
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date Cumulative

11. HOURS IN REPORTING PERIOD 744. 0 2160.0 230391.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744. 0 2114. 5 138084.1
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS GENERATOR ON-LINE 744.0 2090.8 133032.1
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH) 1806566.4 5114 651. 0 295795455.3

.17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 587090 1666924 93838058

18. NET ELECTRICAL ENERGY GENERATED (MWH) 558075 1585414 88656630
19. UNIT SERVICE FACTOR 100.0% 96.8% 57. 7%
20. UNIT AVAILABILITY FACTOR 100.0% 96.8% .57. 7%
21. UNIT CAPACITY FACTOR (USING MDC NET) 102.8% 100.5% 56.2%*
22. UNIT CAPACITY FACTOR (USING DER NET) 93.2% 91.2% 47.8%
23. UNIT FORCED OUTAGE RATE 0.0% 1. 6% 26.6%
24. SH~TDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF. EACH):

Refueling Outage, Start 4/24/98, 39 days long

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast Achieved IN.ITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Based on condenser backpressure

  • Weighted Average (635 MWe used as MDC Net prior to October 1985)