Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M2101999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML18107A5601999-10-18018 October 1999 Submits 30-day Fuel Clad Temp Rept,Iaw 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Salem Generating Station Large & Small Break LOCA Analyses ML20217N8371999-10-13013 October 1999 Forwards Summary of Changes Made to Maine Yankee Defueled Security Plan,Iaw 10CFR50.54(p)(2).Without Encl ML20217J0241999-10-13013 October 1999 Documents 991005 Telcon Between NRC & Util to Address All of Areas Identified in Reg Guide 1.179 & NUREG-1700 Re Final Survey Plan Except for One Area ML18107A5531999-10-0808 October 1999 Forwards Summary Rept of Plant Startup & Power Ascension Testing for Sgs,Unit 2 Cycle 11,per Requirements of TS 6.9.1.1 ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5591999-10-0505 October 1999 Informs That Nj Dept of Environ Protection Has No Comments on License Change Request S99-07 for Sgs,Units 1 & 2 IR 05000272/19990071999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-306/99-07 on 990721- 0831.One Potentially Safety Significant Issue Identified Dealing with Control Room Special Ventilation System.Four Addl Issues of Low Safety Significance Identified ML20212F4321999-09-24024 September 1999 Responds to 990921 e-mail to E Poteat,Requesting Waiver of Late Charges of Listed Amount for Annual Fee Invoice AR0431-99.Request Denied Because 10CFR15.37 Does Not Provide for Waiver Based on Info Provided in e-mail ML20212M2431999-09-22022 September 1999 Expresses Concern Re NRC Consideration of Adoption of Policy Based on Requests from Licensees,To Allow as Part of Decommissioning of Nuclear Power Plants & Demolition of Onsite Structures at Reactor Plant Sites ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) ML18107A5421999-09-22022 September 1999 Forwards Discharge Monitoring Rept for Salem Generating Station for Aug 1999.Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212F1361999-09-20020 September 1999 Confirms That NMSS Has Received 990916 Submittal & Will Be Included as Attachment to Commission Paper Along with State of Maine Submittal ML20212F2521999-09-20020 September 1999 Confirms That NMSS Has Received 990916 Submittal & Will Be Included as Attachment to Commission Paper Along with State of Maine Submittal ML20212E4611999-09-20020 September 1999 Responds to Concerning Possible Involvement in Weekly Telephone Calls NRC Staff Has with Maine Yankee Staff ML20212B7011999-09-14014 September 1999 Submits Comments & Raises Questions Re Generation of White Paper for Commission to Decide Merits of Rubberization ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML18107A5321999-09-13013 September 1999 Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources. ML18107A5331999-09-13013 September 1999 Provides Notification That PSEG Intends to Utilize ASME Code Case N-481 During Second ISI Interval at Sgs Units 1 & 2 ML18107A5351999-09-13013 September 1999 Informs That NRC Has Reviewed Pse&G Request Proposing to Modify TS Which Allow EDG to Be Operated for 24 Surveillance Test During Any Mode,Iaw 10CFR50.91(b) & Has No Comments ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML18107A5231999-09-0808 September 1999 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1999. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Salem Generating Station for Period of Jan-June 1999 ML20212A5911999-09-0808 September 1999 Responds to 990816 e-mail & 990901 Telcon with Respect to Comments Re Decommissioning of Maine Yankee Site.Concerns Raised with Respect to Status of Fuel at Maine Yankee Have Been Raised in Previous Ltrs to Us NRC ML20212B2181999-08-30030 August 1999 Responds to Re 990707 Message from N Allen Re Transportation Incident Involving Shipment from Maine Yankee Nuclear Power Plant ML20211M9371999-08-30030 August 1999 Addresses Two Issues Raised in s to Senator Collins & Governor a King That Relate to Construction of ISFSI at Maine Yankee ML20212E4841999-08-27027 August 1999 Informs That at 990429 Meeting of Myap Community Advisory Panel,R Shadis,Asked If Given Lack of Resident Inspectors & Limited NRC-license Review Correspondence,If Shadis Could Take Part in Weekly NRC Conference Calls with Licensee ML20216F1891999-08-26026 August 1999 Forwards Copies of Maine Yankee & Yankee Rowe Refs Listed, Supporting Industry Position That Branch Technical Position Asb 9-2 Methodology over-estimates Spent Fuel Decay Heat ML18107A4981999-08-26026 August 1999 Forwards Response to NOV That Resulted from Predecisional Enforcement Conference Conducted on 990624.Corrective Actions:Communications to Supervisors Reinforced Employee Right & Duty to Raise Nuclear Safety Issues ML18107A5061999-08-26026 August 1999 Provides First Feedback from Observation of NRC Insp Under Pilot Nuclear Power Plant Insp Program.Attached Are Completed Insp Feedback Forms for Procedure 71111, Attachment 21 & Procedure 71151 ML18107A5181999-08-26026 August 1999 Forwards Ninety Day Rept for ISI Activities Conducted at Sgs,Unit 2 During Ninth Extended Outage & Tenth Refueling Outage.List of Encl,Provided ML18107A5051999-08-24024 August 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Request IAW Requirements of 10CFR50.91(b) & Has No Comments Re Amend to FOL Change Request S99-02 to Modify TS Re Penetration Valves ML18107A4921999-08-23023 August 1999 Provides Suppl Info Re 971024 Amend Request to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Util Withdraws from Request All Proposed Changes Associated with Filter Testing,Per Issuance of GL 99-02 ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4861999-08-19019 August 1999 Forwards NPDES Discharge Monitoring Rept, for Salem Generating Station for Month of Jul 1999.Rept Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML20211C0591999-08-19019 August 1999 Forwards Addl Justification for Proprietary Request Re 990809 Submittal Info on Maine Yankee License Termination Plan ML18107A4831999-08-18018 August 1999 Submits Licensee Comments on NRC 990730 Ltr Which Provided Notification of Close Out of TAC Numbers MA0567 & MA0568 Re GL 92-01,Rev 1,Suppl 1 ML20212A5981999-08-16016 August 1999 Expresses Appreciation for with Respect to e-mail Message Re Site Release Criteria Standards Can Never Be Verified Using Existing Database ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML20210Q7201999-08-0909 August 1999 Forwards non-proprietary & Proprietary Draft Documents Re Info on Myap License Termination Plan & Diskette.Proprietary Info & Diskette Withheld ML20217M6501999-08-0909 August 1999 Responds to 990719 E-mail Re Cleanup Stds at MYAPC Station & Verification of Meeting Cleanup Stds.Informs That NRC Criteria for Licensing NPPs Contained in 10CFR50 & That 10CFR50.82 Addresses Requirements for License Termination ML20211D7041999-08-0909 August 1999 Forwards Rev 17 of Maine Yankee Defueled Safety Analysis Rept (Dsar), Per 10CFR50.71 & 10CFR50.4 ML20212B2271999-08-0606 August 1999 Discusses Concerns Re Recent Incindent Involving Transport of Nuclear Matl from Maine Yankee ML20210M8171999-08-0505 August 1999 Forwards Draft License Termination Plan/Amend Plan for Maine Yankee Atomic Power Co, to Enhance Dialogue Between Various Stakeholders & Provide Springboard for Clarifying Mutual Expectations.With Three Oversize Drawings ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210L2211999-08-0202 August 1999 Forwards Two Copies of Objectives & Sequence of Events for Maine Yankee Emergency Preparedness Exercise for 990922. Without Encl ML20210G3751999-07-28028 July 1999 Ack Receipt of June 30th Ltr That Responded to EDO Backfit Appeal Determination Re Bdba in Sfps.Staff Completed All Actions Associated with Backfit Appeal & Awaiting for New Info for Consideration Prior to Taking Addl Action ML18107A4531999-07-20020 July 1999 Forwards Discharge Monitoring Rept for Salem Generating Station, for June 1999.Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18107A5601999-10-18018 October 1999 Submits 30-day Fuel Clad Temp Rept,Iaw 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Salem Generating Station Large & Small Break LOCA Analyses ML20217N8371999-10-13013 October 1999 Forwards Summary of Changes Made to Maine Yankee Defueled Security Plan,Iaw 10CFR50.54(p)(2).Without Encl ML20217J0241999-10-13013 October 1999 Documents 991005 Telcon Between NRC & Util to Address All of Areas Identified in Reg Guide 1.179 & NUREG-1700 Re Final Survey Plan Except for One Area ML18107A5531999-10-0808 October 1999 Forwards Summary Rept of Plant Startup & Power Ascension Testing for Sgs,Unit 2 Cycle 11,per Requirements of TS 6.9.1.1 ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5591999-10-0505 October 1999 Informs That Nj Dept of Environ Protection Has No Comments on License Change Request S99-07 for Sgs,Units 1 & 2 ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) ML20212M2431999-09-22022 September 1999 Expresses Concern Re NRC Consideration of Adoption of Policy Based on Requests from Licensees,To Allow as Part of Decommissioning of Nuclear Power Plants & Demolition of Onsite Structures at Reactor Plant Sites ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML20212B7011999-09-14014 September 1999 Submits Comments & Raises Questions Re Generation of White Paper for Commission to Decide Merits of Rubberization ML18107A5321999-09-13013 September 1999 Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources. ML18107A5351999-09-13013 September 1999 Informs That NRC Has Reviewed Pse&G Request Proposing to Modify TS Which Allow EDG to Be Operated for 24 Surveillance Test During Any Mode,Iaw 10CFR50.91(b) & Has No Comments ML18107A5331999-09-13013 September 1999 Provides Notification That PSEG Intends to Utilize ASME Code Case N-481 During Second ISI Interval at Sgs Units 1 & 2 ML18107A5231999-09-0808 September 1999 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1999. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Salem Generating Station for Period of Jan-June 1999 ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML20212E4841999-08-27027 August 1999 Informs That at 990429 Meeting of Myap Community Advisory Panel,R Shadis,Asked If Given Lack of Resident Inspectors & Limited NRC-license Review Correspondence,If Shadis Could Take Part in Weekly NRC Conference Calls with Licensee ML20216F1891999-08-26026 August 1999 Forwards Copies of Maine Yankee & Yankee Rowe Refs Listed, Supporting Industry Position That Branch Technical Position Asb 9-2 Methodology over-estimates Spent Fuel Decay Heat ML18107A4981999-08-26026 August 1999 Forwards Response to NOV That Resulted from Predecisional Enforcement Conference Conducted on 990624.Corrective Actions:Communications to Supervisors Reinforced Employee Right & Duty to Raise Nuclear Safety Issues ML18107A5181999-08-26026 August 1999 Forwards Ninety Day Rept for ISI Activities Conducted at Sgs,Unit 2 During Ninth Extended Outage & Tenth Refueling Outage.List of Encl,Provided ML18107A5061999-08-26026 August 1999 Provides First Feedback from Observation of NRC Insp Under Pilot Nuclear Power Plant Insp Program.Attached Are Completed Insp Feedback Forms for Procedure 71111, Attachment 21 & Procedure 71151 ML18107A5051999-08-24024 August 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Request IAW Requirements of 10CFR50.91(b) & Has No Comments Re Amend to FOL Change Request S99-02 to Modify TS Re Penetration Valves ML18107A4921999-08-23023 August 1999 Provides Suppl Info Re 971024 Amend Request to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Util Withdraws from Request All Proposed Changes Associated with Filter Testing,Per Issuance of GL 99-02 ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML20211C0591999-08-19019 August 1999 Forwards Addl Justification for Proprietary Request Re 990809 Submittal Info on Maine Yankee License Termination Plan ML18107A4831999-08-18018 August 1999 Submits Licensee Comments on NRC 990730 Ltr Which Provided Notification of Close Out of TAC Numbers MA0567 & MA0568 Re GL 92-01,Rev 1,Suppl 1 ML20212A5981999-08-16016 August 1999 Expresses Appreciation for with Respect to e-mail Message Re Site Release Criteria Standards Can Never Be Verified Using Existing Database ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML20211D7041999-08-0909 August 1999 Forwards Rev 17 of Maine Yankee Defueled Safety Analysis Rept (Dsar), Per 10CFR50.71 & 10CFR50.4 ML20210Q7201999-08-0909 August 1999 Forwards non-proprietary & Proprietary Draft Documents Re Info on Myap License Termination Plan & Diskette.Proprietary Info & Diskette Withheld ML20212B2271999-08-0606 August 1999 Discusses Concerns Re Recent Incindent Involving Transport of Nuclear Matl from Maine Yankee ML20210M8171999-08-0505 August 1999 Forwards Draft License Termination Plan/Amend Plan for Maine Yankee Atomic Power Co, to Enhance Dialogue Between Various Stakeholders & Provide Springboard for Clarifying Mutual Expectations.With Three Oversize Drawings ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210L2211999-08-0202 August 1999 Forwards Two Copies of Objectives & Sequence of Events for Maine Yankee Emergency Preparedness Exercise for 990922. Without Encl ML20216D4311999-07-19019 July 1999 Informs That Util Intends to Construct ISFSI Located on Owner Controlled Property Currently Part of Maine Yankee Reactor Site ML20217M6571999-07-19019 July 1999 Expresses Concern Re Verification of Cleanup Stds at Maine Yankee Atomic Power Co Power Station ML20210C6271999-07-15015 July 1999 Forwards Draft Site Characterization Summary in Support of 10CFR50 License Termination & Copy of Latest Decommissioning Schedule with Milestones Identified.Info Submitted Per License Termination Plan ML18107A4431999-07-0606 July 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S98-17 Re Permissible Enrichment Values for New Fuel Storage & Has No Comments ML18107A4181999-06-30030 June 1999 Submits Response to NRC Request for Info Re Y2K Readiness at Npps,Per GL 98-01,suppl 1.Disclosure Encl ML20210G3981999-06-30030 June 1999 Discusses Review of Ltr Re Maine Yankee Backfit Appeal with Respect to Emergency Plan Exemptions for Decommissioning Plants ML20209C7731999-06-30030 June 1999 Responds to EDO Backfit Appeal Determination Re Emergency Plan Exemptions for Decommissioning Plants ML20209B4611999-06-29029 June 1999 Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Plant Is Y2K Ready.Contingency Plans Developed to Mitigate Potential Impact of non-plant Y2K-induced Events ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML18107A4061999-06-21021 June 1999 Provides Supplemental Info to Proposed License Amend, Modifying TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Info Re Acceptance Criterion Discussed ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML18107A3691999-06-11011 June 1999 Forwards Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1.Original Submittal Contained Typo for year-to-date Value for Numbers of Hours Generator Was on Line (Service Hours) ML20195G9411999-06-10010 June 1999 Informs That Maine Yankee Considers Backfit Claim & Appeal Request of 980716 & 990316,to Be Acceptably Resolved Based on Staff 990518 Response ML20195F7531999-06-0707 June 1999 Forwards Copy of Insurance Endorsement Dtd 990429,reflecting Change in Nuclear Energy Liability Insurance,Iaw Requirements of 10CFR140.15(e) 1999-09-08
[Table view] Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
MONTHYEARML20148G9001988-02-0101 February 1988 FOIA Request for Documents Re 10CFR50,App R Insps & Enforcements ML20238B7731987-08-0707 August 1987 FOIA Request for Records Explaining Status of Listed LERs Omitted from List,Previously Received from Nrc,Of LERs Filed by Commercial Nuclear Power Plant Licensees for Operating Year 1986 ML20238E0261987-07-15015 July 1987 Responds to Recipient 870528 Response to Bg Strout Re Maine Yankee & Pilgrim.Author Distressed by NRC Answers & Requests Addl Response to Listed Questions ML20235F7451987-06-30030 June 1987 FOIA Request for Documents Re Safeteam Programs Being Used at Listed Facilities ML20133B5441985-04-23023 April 1985 FOIA Request for Daily Emission Repts for Dec 1979 & Jan 1980 ML18089A1811983-06-0808 June 1983 Comments on Recent Near melt-down at Facility.Nrc Should Begin to Enforce Regulations as Required by Law & Shut Down Obviously accident-prone Plants ML20077H5591983-05-13013 May 1983 FOIA Request for Documents Re SALP Review of Facilities Since 1980,siting &/Or Seismic Issues & Info Sent to or Routed Through RM Fleugge ML20054L9251982-07-0707 July 1982 Requests Me Times Newspaper Be Added to Svc List ML18086A6391981-05-18018 May 1981 Expresses Concern Re Emergency Preparedness Plans ML18086A6381981-05-18018 May 1981 Expresses Concern Re Emergency Preparedness Plans ML18086A4641981-05-0404 May 1981 Requests Info Re Util Requests to Perform Pin Consolidation at Facilities ML18086A4631981-05-0404 May 1981 Requests Info Re Reracking of Spent Fuel & Proposed Pin Consolidation at Facility ML18086A4611981-05-0404 May 1981 Requests Injunction to Preserve Status Quo of Reracking at Facility ML20003H7701981-04-11011 April 1981 Opposes Full Power License for Util ML18086A2271981-03-27027 March 1981 Advises That AC Coleman &/Or Eg Coleman Will Present Oral Argument & Rebuttal at Aslab 810430 Hearing Re Increase of Storage Capacity for Spent Fuel.W/Svc List ML19347D6041981-03-21021 March 1981 Urges NRC to Expedite Full Power Licensing of Facilities & Restart of TMI-1.Concern for Safety & Careful Review of Licensing Process Has Gone Beyond Reasonable Caution ML19339A8561980-09-0303 September 1980 Objects to Issuance of full-term OL & Expresses Concerns Re Emergency Plans ML19321B1851980-05-16016 May 1980 Requests Placement on Svc List as Friend of Court in Order to Receive Copy of All Papers Served ML18082A8031980-05-16016 May 1980 Requests Inclusion in Salem Svc List to Receive All post- 800222 Documents & Presenting Testimony Responding to NRC Witnesses' Claim Against Re Webb Testimony ML18082A5221980-05-0505 May 1980 Comments on R Webb Hearing Testimony Re Roof of Bldg Housing Spent Fuel Pool.Webb Relied in Part,On Erroneous Info from W Russ,Project Engineer for Facility.Transcript Does Not Include This Info.Intervenor 800505 Ltr to Util Encl ML19344D2841980-03-0505 March 1980 Discusses Experience in Facility Proceeding & 791029 Meeting in Bethesda,Md Re Shortnose Sturgeon.Nrc Should Improve Intervenor Treatment.Expresses Opposition to Facilities ML18081B1631980-03-0303 March 1980 Comments on NRC Actions Re Facility Licensing.Extended Delay in OL Issuance Provided Adequate Time to Grant Hearing Requested in 790831 Petition.Commission Should Review Cost/ Benefit Analysis.Svc List & 800303 Press Release Encl ML20126B7051980-01-19019 January 1980 Forwards Two Newpapers Articles Re NRC Mistake in Interpretation of Application for License Amend.Opposes Addition of Waste Storage Facility.Workable Evacuation Plan for Plant Vicinity Is Impossible ML19260E1291979-12-14014 December 1979 FOIA Request for Documents Re Salem Nuclear Generating Station,Unit 1 ML19257C3291979-12-0909 December 1979 Requests Copy of NUREG-0553, Beyond Defense-In-Depth. Suggests Emergency Planning Be Paid for by Stockholders of Public Utils.More Realistic Parameters Needed for Emergency Action ML19210D9331979-11-0909 November 1979 Requests No New Licenses Be Issued Until TMI Investigation Complete ML19276H5151979-11-0909 November 1979 Requests Delay in Opening Facility Until All Facts Re TMI-2 Complete ML19257D7361979-10-11011 October 1979 Notifies That Cumberland Conservation League Supports Proposal That Util Develop Evacuation Procedures within 50-mile Radius.Existing 10-mile Radius Will Not Protect People in Cumberland County from Risks ML19290D6481979-10-11011 October 1979 Requests Info Re Emergency Planning.Util Is Responsible for Evacuation Plans for People within 10-mile Radius of Facility.Wind May Carry Radioactive Plume Many Miles Into Heavily Populated Areas ML19208B6761979-09-11011 September 1979 Expresses Concern Re NRC Delay in Issuing Plant Ol.Requests Full Explanation ML20126C5091979-08-16016 August 1979 Opposes Restart of TMI-1,const of Nuclear Plants in Nj & Nuclear Accidents Due to Health Hazards & Risks to Public Safety ML18079B0161979-08-14014 August 1979 Objects to Facility Standing Idle at $800,000/day Awaiting NRC Signature on License.Urges Immediate Issuance of License ML18079B0221979-07-30030 July 1979 Opposes Licensing of Facility Until Effects of Allowing 17-yr Storage in Spent Fuel Pool Can Be Explored & Evaluated ML19210E1631979-07-30030 July 1979 Requests That No OL Be Issued Until Studies of TMI Complete ML18079A9531979-07-30030 July 1979 Requests Answers to Questions Raised by M Lewis During Public Hearings on Reactor Site & Also Ltrs to NRC Re Possibility of Spent Fuel Pool Going Critical & Startup of Unit 2 ML19207A8321979-07-23023 July 1979 FOIA Request for Access to Public Svc Electric & Gas Documents Responding to NRC Questions Re Population Data & Spent Fuel Pool ML19207A8341979-07-23023 July 1979 FOIA Request for Access to Documents of Public Svc Electric & Gas Re Estimated Annual Cost for Operating Facility ML19225A8531979-07-16016 July 1979 Urges Moratorium on Licensing of Facility Pending Resolution of Questions Re Safety of Nuclear Plants & Disposal of Wastes,In Light of TMI-2 ML20136C4831979-06-26026 June 1979 Comments on Proximity of Facility to Robin Hood Geological Fault Running Through Montsweag Bay.Test Borings Should Be Taken.Requests Reply by NRC Re Actions That Will Be Taken ML18079A8741979-06-25025 June 1979 Opposes OL for Facility.Nuclear Power Is Not Safe.Region Will Not Suffer Power Shortage W/O Facility.Safety Should Be First Concern to Those Entrusted W/Health & Safety of Public ML19224D1321979-05-19019 May 1979 Requests Info Re follow-up Testimony Re Seismic Concerns ML19248C7951979-04-13013 April 1979 Submits Limited Appearance Written Testimony Opposing Approval of Amend for Increasing Storage of Spent Fuel Assemblies ML18079A5841979-03-22022 March 1979 Forwards Board Resolution 79-109, Resolution Opposing Storage of High Level Radioactive Wastes in Salem County, Adopted by Board of Chosen Freeholders of County of Salem at Regular Meeting on 790321 ML19281A8431979-03-19019 March 1979 FOIA Request for Lers,Nrc Insp Repts & Communications W/ Licensee Re Effect of Plant on Environ & Plant Disaster Evacuation Plan ML19263C6421979-02-0606 February 1979 Forwards 780721 Testimony of J Gofman as Limited Appearance Statement.Author Unable to Attend 790222 Hearing ML19282B1031979-01-30030 January 1979 Opposes Operating License on Two Grounds:No Solution to Waste Problem & No Need for Power Demonstrated.Mentions Various Factors to Be Considered Before Licensing Should Be Granted ML19259B3801979-01-18018 January 1979 Opposes Issuance of Operating License.Kepford 781204 Ltr, Addl Info, & News Article Encl ML19263B3921979-01-0202 January 1979 Requests Opportunity to Review Info from Asea Inc Re Encapsulation of Spent Fuel Rods in Container of Synthetic Corundum ML19274D8721978-11-24024 November 1978 Requests Shutdown of Plant Until Investigation of Safety Hazards Is Complete,Particularly Leak from Reactor Coolant Pump.W/Encl 781124 Ltrs to Governors of DE & Nj & Senator of DE 1988-02-01
[Table view] |