ML19056A289: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML19056A289 | | number = ML19056A289 | ||
| issue date = 02/27/2019 | | issue date = 02/27/2019 | ||
| title = 2/19/2019 Summary of Public Meeting with | | title = 2/19/2019 Summary of Public Meeting with NuScale to Discuss Dhrs/Eccs Actuation Logic | ||
| author name = Tabatabai-Yazdi O | | author name = Tabatabai-Yazdi O | ||
| author affiliation = NRC/NRO/DLSE/LB1 | | author affiliation = NRC/NRO/DLSE/LB1 | ||
| addressee name = Lee | | addressee name = Lee S | ||
| addressee affiliation = NRC/NRO/DLSE/LB1 | | addressee affiliation = NRC/NRO/DLSE/LB1 | ||
| docket = 05200048 | | docket = 05200048 | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:/RA/}} | {{#Wiki_filter:February 27, 2019 MEMORANDUM TO: Samuel S. Lee, Chief Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM: Omid Tabatabai, Senior Project Manager /RA/ | ||
Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors | |||
==SUBJECT:== | |||
==SUMMARY== | |||
OF THE FEBRUARY 19, 2019, PUBLIC MEETING WITH NUSCALE POWER, LLC, TO DISCUSS NUSCALE POWER LLCS DESIGN CHANGES TO THE DECAY HEAT REMOVAL SYSTEM AND EMERGENCY CORE COOLING SYSTEM ACTUATION LOGICS On February 19, 2019, representatives of the U.S. Nuclear Regulatory Commission (NRC) and NuScale Power, LLC (NuScale) held a public meeting to discuss NuScales design changes to the decay heat removal system (DHRS) and the emergency core cooling system (ECCS) actuation logic. captures the summary of the topics discussed during the meeting. The Meeting Agenda and List of Attendees are included in Enclosures 2 and 3, respectively. The notice for this meeting is available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML19014A102. NuScales presentation slides are publicly available in ADAMS (ML19053A517). | |||
Docket No. 52-048 | |||
==Enclosures:== | |||
As stated CONTACT: Omid Tabatabai, NRO/DLSE 301-415-6616 | |||
ML19056A289 *via email NRC-002 OFFICE NRO/DLSE/LB1:PM NRO/DLSE/LB1:LA NRO/DLSE/LB1:PM NAME OTabatabai CSmith* OTabatabai DATE 02/25/2019 02/26/2019 02/27/2019 U.S. NUCLEAR REGULATORY COMMISSION | |||
==SUMMARY== | |||
OF THE FEBRUARY 19, 2019, PUBLIC MEETING WITH NUSCALE POWER, LLC, TO DISCUSS DESIGN CHANGES TO THE DECAY HEAT REMOVAL SYSTEM AND EMERGENCY CORE COOLING SYSTEM ACTUATION LOGICS NuScale Power, LLC. (NuScale), representatives made a presentation to the U.S. Nuclear Regulatory Commission (NRC) staff (Agencywide Documents and Management System (ADAMS) (ML19053A517)), and described the ongoing design changes to the actuation logics for the decay heat removal system (DHRS) and emergency core cooling system (ECCS). | |||
NuScale stated that these design changes are necessary to support plant operations, especially, during initial plant startup. NuScale stated that the impact from the logic changes on safety analysis is minimal and some technical specifications will be changed as a result. | |||
NuScale stated that there will be no architecture or fundamental desin changes to the module protection system. | |||
The NRC staff inquired about the Design Certification Application (DCA) Chapters/Sections that would be impacted by the actuation logic changes in the DHRS and ECCS. NuScale stated that some Tier 1 and Tier 2, technical specifications, and some technical reports related to setpoint methodology and advanced sensors would be impacted. | |||
NuScale concluded its presentation by stating that it would submit a schedule to the NRC staff by the end of February 2019, to identify exactly what Chapters/Sections of the DCA would be impacted and that NuScale plans to incorporate the corresponding changes in the Revision 3 to the DCA, which is expected to be submitted in August 2019. | |||
Enclosure 1 | |||
U.S. NUCLEAR REGULATORY COMMISSION | |||
==SUMMARY== | |||
OF THE FEBRUARY 19, 2019, PUBLIC MEETING WITH NUSCALE POWER, LLC, TO DISCUSS DESIGN CHANGES TO THE DECAY HEAT REMOVAL SYSTEM AND EMERGENCY CORE COOLING SYSTEM ACTUATION LOGICS February 19, 2019 MEETING AGENDA Time Topic 1:00 p.m. - 1:10 p.m. Introduction 1:10 p.m. - 2:30 p.m. Discussions related to DHRS/ECCS actuation logic 2:30 p.m. - 2:35 p.m. Public Comments 2:35 p.m. Adjourn Enclosure 2 | |||
U.S. NUCLEAR REGULATORY COMMISSION Formatted: Top: 0.01", Bottom: 0.01" | |||
==SUMMARY== | |||
OF THE FEBRUARY 19, 2019, PUBLIC MEETING WITH NUSCALE POWER, LLC, TO DISCUSS DESIGN CHANGES TO THE DECAY HEAT REMOVAL SYSTEM AND EMERGENCY CORE COOLING ACTUATION LOGICS February 19, 2019 List of Attendees Name Affiliation Joe Ashcraft U.S. Nuclear Regulatory Commission (NRC) | |||
Antonio Barrett NRC Sergio Basturescu NRC Bruce Bavol NRC Tim Drzewiecki NRC Greg Gellatti NRC Craig Harbuck NRC Dawnmathews Kalathiveettil NRC Rebecca Karas NRC Sam Lee NRC Ryan Nolan NRC Jeff Schmidt NRC Alex Siwy NRC Omid Tabatabai NRC Dinesh Taneja NRC Carl Thurson NRC Bob Tjader NRC Boyce Travis NRC Brian Arnholt NuScale Power, LLC. (NuScale) | |||
Ben Bristol NuScale Carrie Fosaaen NuScale Paul Infanger NuScale Ross Snuggerud NuScale Sarah Fields Public Enclosure 3}} |
Latest revision as of 12:19, 2 February 2020
ML19056A289 | |
Person / Time | |
---|---|
Site: | NuScale |
Issue date: | 02/27/2019 |
From: | Tabatabai-Yazdi O NRC/NRO/DLSE/LB1 |
To: | Samson Lee NRC/NRO/DLSE/LB1 |
Tabatabai-Yazdi O/nro/6616 | |
References | |
Download: ML19056A289 (5) | |
Text
February 27, 2019 MEMORANDUM TO: Samuel S. Lee, Chief Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM: Omid Tabatabai, Senior Project Manager /RA/
Licensing Branch 1 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors
SUBJECT:
SUMMARY
OF THE FEBRUARY 19, 2019, PUBLIC MEETING WITH NUSCALE POWER, LLC, TO DISCUSS NUSCALE POWER LLCS DESIGN CHANGES TO THE DECAY HEAT REMOVAL SYSTEM AND EMERGENCY CORE COOLING SYSTEM ACTUATION LOGICS On February 19, 2019, representatives of the U.S. Nuclear Regulatory Commission (NRC) and NuScale Power, LLC (NuScale) held a public meeting to discuss NuScales design changes to the decay heat removal system (DHRS) and the emergency core cooling system (ECCS) actuation logic. captures the summary of the topics discussed during the meeting. The Meeting Agenda and List of Attendees are included in Enclosures 2 and 3, respectively. The notice for this meeting is available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML19014A102. NuScales presentation slides are publicly available in ADAMS (ML19053A517).
Docket No.52-048
Enclosures:
As stated CONTACT: Omid Tabatabai, NRO/DLSE 301-415-6616
ML19056A289 *via email NRC-002 OFFICE NRO/DLSE/LB1:PM NRO/DLSE/LB1:LA NRO/DLSE/LB1:PM NAME OTabatabai CSmith* OTabatabai DATE 02/25/2019 02/26/2019 02/27/2019 U.S. NUCLEAR REGULATORY COMMISSION
SUMMARY
OF THE FEBRUARY 19, 2019, PUBLIC MEETING WITH NUSCALE POWER, LLC, TO DISCUSS DESIGN CHANGES TO THE DECAY HEAT REMOVAL SYSTEM AND EMERGENCY CORE COOLING SYSTEM ACTUATION LOGICS NuScale Power, LLC. (NuScale), representatives made a presentation to the U.S. Nuclear Regulatory Commission (NRC) staff (Agencywide Documents and Management System (ADAMS) (ML19053A517)), and described the ongoing design changes to the actuation logics for the decay heat removal system (DHRS) and emergency core cooling system (ECCS).
NuScale stated that these design changes are necessary to support plant operations, especially, during initial plant startup. NuScale stated that the impact from the logic changes on safety analysis is minimal and some technical specifications will be changed as a result.
NuScale stated that there will be no architecture or fundamental desin changes to the module protection system.
The NRC staff inquired about the Design Certification Application (DCA) Chapters/Sections that would be impacted by the actuation logic changes in the DHRS and ECCS. NuScale stated that some Tier 1 and Tier 2, technical specifications, and some technical reports related to setpoint methodology and advanced sensors would be impacted.
NuScale concluded its presentation by stating that it would submit a schedule to the NRC staff by the end of February 2019, to identify exactly what Chapters/Sections of the DCA would be impacted and that NuScale plans to incorporate the corresponding changes in the Revision 3 to the DCA, which is expected to be submitted in August 2019.
Enclosure 1
U.S. NUCLEAR REGULATORY COMMISSION
SUMMARY
OF THE FEBRUARY 19, 2019, PUBLIC MEETING WITH NUSCALE POWER, LLC, TO DISCUSS DESIGN CHANGES TO THE DECAY HEAT REMOVAL SYSTEM AND EMERGENCY CORE COOLING SYSTEM ACTUATION LOGICS February 19, 2019 MEETING AGENDA Time Topic 1:00 p.m. - 1:10 p.m. Introduction 1:10 p.m. - 2:30 p.m. Discussions related to DHRS/ECCS actuation logic 2:30 p.m. - 2:35 p.m. Public Comments 2:35 p.m. Adjourn Enclosure 2
U.S. NUCLEAR REGULATORY COMMISSION Formatted: Top: 0.01", Bottom: 0.01"
SUMMARY
OF THE FEBRUARY 19, 2019, PUBLIC MEETING WITH NUSCALE POWER, LLC, TO DISCUSS DESIGN CHANGES TO THE DECAY HEAT REMOVAL SYSTEM AND EMERGENCY CORE COOLING ACTUATION LOGICS February 19, 2019 List of Attendees Name Affiliation Joe Ashcraft U.S. Nuclear Regulatory Commission (NRC)
Antonio Barrett NRC Sergio Basturescu NRC Bruce Bavol NRC Tim Drzewiecki NRC Greg Gellatti NRC Craig Harbuck NRC Dawnmathews Kalathiveettil NRC Rebecca Karas NRC Sam Lee NRC Ryan Nolan NRC Jeff Schmidt NRC Alex Siwy NRC Omid Tabatabai NRC Dinesh Taneja NRC Carl Thurson NRC Bob Tjader NRC Boyce Travis NRC Brian Arnholt NuScale Power, LLC. (NuScale)
Ben Bristol NuScale Carrie Fosaaen NuScale Paul Infanger NuScale Ross Snuggerud NuScale Sarah Fields Public Enclosure 3