* d 1026790120 sencs INoWdA October 26, 1979 Mr. James G. Keppler, Director U.S. Nuclear Regulatory Commission            Docket Nos.: STN 50-546 Region III                                                  STN 50-547 799 Roosevelt Road                            Construction Permit Nos.:
        .
1026790120
_
sencs INoWdA October 26, 1979 Mr. James G. Keppler, Director U.S. Nuclear Regulatory Commission            Docket Nos.: STN 50-546 Region III                                                  STN 50-547 799 Roosevelt Road                            Construction Permit Nos.:
Glen Ellyn, Illinois 60'137                                CPPR-170 CPPR-171 MARBLE HILL NUCLEAR GENERATING STATION UNITS 1 & 2
Glen Ellyn, Illinois 60'137                                CPPR-170 CPPR-171 MARBLE HILL NUCLEAR GENERATING STATION UNITS 1 & 2


Line 33: Line 29:
3
3


                    .
.
  *
        ,
Mr. James G. Keppler                      October 26, 1979 PUSUC semnca INoW4A This letter is intended to fulfill the requirements of an interim report as defined in 10CFR50.55 (e) (3) . A final report will be filed upon completion of the corrective actions.
Mr. James G. Keppler                      October 26, 1979 PUSUC semnca INoW4A This letter is intended to fulfill the requirements of an interim report as defined in 10CFR50.55 (e) (3) . A final report will be filed upon completion of the corrective actions.
Sincerely, S. W. Shields PAB:ka cca Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555                                        -
Sincerely, S. W. Shields PAB:ka cca Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555                                        -
E. R. Schweibinz, P.E.
E. R. Schweibinz, P.E.
1249 109
1249 109 e
                                        '
                                            .
* e
                                       $}}
                                       $}}

Latest revision as of 00:02, 2 February 2020

Ro:On 790919,Cherne Contracting Corp Installed Approx 600 safety-related Component Supports W/O Procedural Control for Installation.Work in Accordance W/Sargent & Lundy Design Drawings.Investigation Continues as to Significance
ML19254E748
Person / Time
Site: Marble Hill
Issue date: 10/26/1979
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 7911020286
Download: ML19254E748 (2)


Text

.

  • d 1026790120 sencs INoWdA October 26, 1979 Mr. James G. Keppler, Director U.S. Nuclear Regulatory Commission Docket Nos.: STN 50-546 Region III STN 50-547 799 Roosevelt Road Construction Permit Nos.:

Glen Ellyn, Illinois 60'137 CPPR-170 CPPR-171 MARBLE HILL NUCLEAR GENERATING STATION UNITS 1 & 2

Dear Mr. Keppler:

On September 19, 1979, Mr. J. U. Bott of Public Service Company of Indiana, Inc. (PSI) telephoned your office to notify you of a potentially reportable incident as required by 10CFR50.55(e). On October 23rd, 1979, Mr. Bott telephoned your offices and Mr. C. Williams granted an extension until today to submit this interim report. To date, Cherne Contracting Corporation (CCC) has installed approximately 600 safety-related component supports without procedural control for such installation. The work performed thus far has been in accordance with CCC's welding process sheet for NP welds and approved Sargent & Lundy h; anger design drawings.

PSI was unable to determine that this incident was not significant and therefore elected to report it as potentially significant under 10CFR50.55 (e) .

Due to the fact that PSI is currently in the process of reorganizing its QA and construction staff for Marble Hill, we are unable to make a final report at this time. The investigation as to whether or not this actually constitutes a reportable incident, and as to what corrective measures are necessary is continuing, 1249 108 %a \

, 7911020 c);'I[2

)

3

Mr. James G. Keppler October 26, 1979 PUSUC semnca INoW4A This letter is intended to fulfill the requirements of an interim report as defined in 10CFR50.55 (e) (3) . A final report will be filed upon completion of the corrective actions.

Sincerely, S. W. Shields PAB:ka cca Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 -

E. R. Schweibinz, P.E.