ML19257D044: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 27: Line 27:
If we can provide any additional information, please advise.
If we can provide any additional information, please advise.
Very truly yours,
Very truly yours,
                                                                                         .A
                                                                                         .A R [J. Gary RJG:df cc: NRC Region IV (0 + 1 copy)
                                                                                      -
R [J. Gary RJG:df cc: NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies) c/o Distribution Services Branch, DDC, ADM.
Director, Inspection & Enforcement (15 copies) c/o Distribution Services Branch, DDC, ADM.
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 1841 220
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 1841 220 8001310 M 1 5}}
                                                                              >
8001310 M 1 5}}

Latest revision as of 22:33, 1 February 2020

Clarifies 800114 Ltr Re Violation of Piping Min Wall Thickness,Reported Per 10CFR50.55(e).Attached Rept Intended to Be Classified as Interim.Will Submit Progressive Repts as Welds Are Dispositioned Through Engineering Review
ML19257D044
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/23/1980
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
References
TXX-3092, NUDOCS 8001310272
Download: ML19257D044 (2)


Text

TENAS LTTILITIES GENEltATING CO.Til'ANY 2001 lill) AN TO% 1:34

  • DAll W.TE.\ h 75201 a;cm January 23, 1980

' "J.,  :,2 ;:".ll;' TXX-3092 Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U. S. Nuclear Regulatory Commission Office of Inspection & Enforcement 611 Ryan Plaza Dr. , Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION PIPING MINIMUM WALL FILE NO: 10110

Dear Mr. Seidle:

This supplements and clarifies our letter number TXX-3088, dated January 14, 1980, relative to a violation of piping minimum wall thickness previously reported to your office in accordance with 10 CFR 50.55(e). The report attached to our letter was intended to be classified as an interim report, but we failed to make this clear within the text.

Additionally, we plan to submit progressive reports as welds within affected systems are dispositioned through the currently ongoing engineering review.

The first progressive report is scheduled for submission no later than March 31, 1980. The overall target date for completion of our evaluation and implementation of repairs or replacements, if any, is system turnover.

If we can provide any additional information, please advise.

Very truly yours,

.A R [J. Gary RJG:df cc: NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies) c/o Distribution Services Branch, DDC, ADM.

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 1841 220 8001310 M 1 5