ML19325E261: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:,-s a
{{#Wiki_filter:,-s a
                                .
                       . Goa'a a hwur Comp:ny
                       . Goa'a a hwur Comp:ny
                                                                    ,
                                                                                                                                   )  i
                                                                                                                                   )  i
: j. ,
: j. ,
        '
1        333 P4dictd Aeex
1        333 P4dictd Aeex
             '' C o      Atcnta Gurg 3 30303 C          heerham CD4 fW0 3 f 95 Un brlp A3J'cr4        .
             '' C o      Atcnta Gurg 3 30303 C          heerham CD4 fW0 3 f 95 Un brlp A3J'cr4        .
Line 31: Line 28:
heeptore PD$ N,6 05e1                                                                                        l 1%. w"u"m~r cit <' wnm W. G. Hairston, ill                                                                                          ,
heeptore PD$ N,6 05e1                                                                                        l 1%. w"u"m~r cit <' wnm W. G. Hairston, ill                                                                                          ,
                         $tnor Vice F'rercent                                                                                        {
                         $tnor Vice F'rercent                                                                                        {
Nuclem Ofe' atom
Nuclem Ofe' atom October 26, 1989                    ELV-00997                        l 1542D                            l L                Docket No. 50-424                                                                                              )
                                                                                                                                    <
October 26, 1989                    ELV-00997                        l 1542D                            l
                                                                                                                                    ,
L                Docket No. 50-424                                                                                              )
U. S. Nuclear Regulatory Comission                                                                              :
U. S. Nuclear Regulatory Comission                                                                              :
ATTN: Document Control Desk                                                                                    l Washington, D. C. 20555
ATTN: Document Control Desk                                                                                    l Washington, D. C. 20555 f
  ,
Gentlemen:                                                                                                    .
f Gentlemen:                                                                                                    .
YOGTLE ELECTRIC GENERATING PLANT TECHNICAL SPECIFICATION ' IMPROVEMENT PROGRAM Requirement 3 of the Technical Specification Improvement Program in Section 16.3 of the Final Safety Analysis Report (FSAR) requires that, with one or more of the loose part detection system channel (s) inoperable for more than thirty (30) days, a special report shall be prepared and submitted to the Comission within the next 10 days. This report shall outline the cause of the malfunction and shall describe the actions required to restore the channel (s) to operable status.
YOGTLE ELECTRIC GENERATING PLANT TECHNICAL SPECIFICATION ' IMPROVEMENT PROGRAM Requirement 3 of the Technical Specification Improvement Program in Section 16.3 of the Final Safety Analysis Report (FSAR) requires that, with one or more of the loose part detection system channel (s) inoperable for more than thirty (30) days, a special report shall be prepared and submitted to the Comission within the next 10 days. This report shall outline the cause of the malfunction and shall describe the actions required to restore the channel (s) to operable status.
Enclosed is a special report concerning the failure to perfom a channel calibration of the loose part detection system.
Enclosed is a special report concerning the failure to perfom a channel calibration of the loose part detection system.
Sincerely, g) .),  d / dM W. G. Hairston, Ill l
Sincerely, g) .),  d / dM W. G. Hairston, Ill l
WGH,1!!/PAH/gm Enclosure l
WGH,1!!/PAH/gm Enclosure l
l                    xc: Georgia ~ Power Company Mr. C. K. McCoy
l                    xc: Georgia ~ Power Company Mr. C. K. McCoy Mr. G. Bockhold, Jr.
'
Mr. P. D. Rushton Mr. R. M. Odom WORMS 4
Mr. G. Bockhold, Jr.
Mr. P. D. Rushton Mr. R. M. Odom
.
WORMS 4
U. S. Nuclear' Regulatory Comission Igpbp 1
U. S. Nuclear' Regulatory Comission Igpbp 1
Mr. S. D. Ebneter, Regional Administrator                                                    g nf o
Mr. S. D. Ebneter, Regional Administrator                                                    g nf o
Mr. J. B. Hopkins, Licensing Project Manager, NRR                                              p*kp Mr. J. F. Rogge, Senior Resident Inspector, Yogtle                                g            p
Mr. J. B. Hopkins, Licensing Project Manager, NRR                                              p*kp Mr. J. F. Rogge, Senior Resident Inspector, Yogtle                                g            p S
                                                                                                                      , ,-
Dk        D          [      PNV 24 hi t ,.
S Dk        D          [      PNV 24 hi t ,.
h                        - -
h                        - -


Line 60: Line 47:
_                      ,                ~                                              .-
_                      ,                ~                                              .-
e      go ,
e      go ,
e' .o
e' .o g.
,-
l i
g.
FSAR 16.3, REQUIREMENT 3, SPECI AL REPORT
l
  .                                                                                                  !
i FSAR 16.3, REQUIREMENT 3, SPECI AL REPORT
                                                                                                       ]
                                                                                                       ]
L00SE PART DETECTION $_YSTEM
L00SE PART DETECTION $_YSTEM A. REQUIREMENT FOR REPORT This report is submitted in accordance with Vogtle Electric Generating Plant's Final Safety Analysis Report (FSAR), Section 16.3, Requirement 3.          l This section requires a spects1 report to be submitted to the Comission            :
_
A. REQUIREMENT FOR REPORT This report is submitted in accordance with Vogtle Electric Generating Plant's Final Safety Analysis Report (FSAR), Section 16.3, Requirement 3.          l This section requires a spects1 report to be submitted to the Comission            :
within ten days when one or more of the Loose Part Detection System              j chennels are inoperable for more than 30 days.
within ten days when one or more of the Loose Part Detection System              j chennels are inoperable for more than 30 days.
B. DESCRIPTION OF LOOSE PART DETECTION SYSTEM INOPERABILITY                          I
B. DESCRIPTION OF LOOSE PART DETECTION SYSTEM INOPERABILITY                          I On October 16, 1989, plant perr.onnel discovered that the channel                ;
                                                                                                      !
On October 16, 1989, plant perr.onnel discovered that the channel                ;
calibration for the Loose Part Detection System was not performed as              l specified in the FSAR, Section 16.3, Requirement 3. A Maintenance Work            l Order (MWO) generated under the Preventive Maintenance (PM) Program was          !
calibration for the Loose Part Detection System was not performed as              l specified in the FSAR, Section 16.3, Requirement 3. A Maintenance Work            l Order (MWO) generated under the Preventive Maintenance (PM) Program was          !
initiated on July 27, 1988, to perfom the 18-month channel calibration            i during the first refueling outage for Unit 1. The MWO was erroneously            f voided due to the belief it was not required to be included in the scope of the refueling outage. The FSAR comitment to demonstrate the
initiated on July 27, 1988, to perfom the 18-month channel calibration            i during the first refueling outage for Unit 1. The MWO was erroneously            f voided due to the belief it was not required to be included in the scope of the refueling outage. The FSAR comitment to demonstrate the i
                                                                                                        ,
operability of the Loose Part Detection System was not properly identified        '
i operability of the Loose Part Detection System was not properly identified        '
in the PM progrant which resulted in the MWO not being worked during the outage.
in the PM progrant which resulted in the MWO not being worked during the outage.
For corrective action, the channel calibration for the Loose Part                !
For corrective action, the channel calibration for the Loose Part                !
Line 85: Line 64:
I l
I l
l l
l l
                                                                                                      !
i
i
                                                                                                       ?
                                                                                                       ?
                                                                                             , _ _}}
                                                                                             , _ _}}

Latest revision as of 01:33, 1 February 2020

Special Rept.On 891016,channel Calibr for Loose Part Detection Sys Not Performed as Specified in Fsar.Caused by Belief That Calibr Not Required.Channel Calibr Entered Into Tech Spec Surveillance Tracking Program
ML19325E261
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 10/26/1989
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
1542D, ELV-00997, ELV-997, NUDOCS 8911030144
Download: ML19325E261 (2)


Text

,-s a

. Goa'a a hwur Comp:ny

) i

j. ,

1 333 P4dictd Aeex

C o Atcnta Gurg 3 30303 C heerham CD4 fW0 3 f 95 Un brlp A3J'cr4 .

l J'

40 trweren Cemet rr.nay I

fut Ottce Box t?p5 I

Dirt.ein(fiam. Alat.ama SL?DI l l'

heeptore PD$ N,6 05e1 l 1%. w"u"m~r cit <' wnm W. G. Hairston, ill ,

$tnor Vice F'rercent {

Nuclem Ofe' atom October 26, 1989 ELV-00997 l 1542D l L Docket No. 50-424 )

U. S. Nuclear Regulatory Comission  :

ATTN: Document Control Desk l Washington, D. C. 20555 f

Gentlemen: .

YOGTLE ELECTRIC GENERATING PLANT TECHNICAL SPECIFICATION ' IMPROVEMENT PROGRAM Requirement 3 of the Technical Specification Improvement Program in Section 16.3 of the Final Safety Analysis Report (FSAR) requires that, with one or more of the loose part detection system channel (s) inoperable for more than thirty (30) days, a special report shall be prepared and submitted to the Comission within the next 10 days. This report shall outline the cause of the malfunction and shall describe the actions required to restore the channel (s) to operable status.

Enclosed is a special report concerning the failure to perfom a channel calibration of the loose part detection system.

Sincerely, g) .), d / dM W. G. Hairston, Ill l

WGH,1!!/PAH/gm Enclosure l

l xc: Georgia ~ Power Company Mr. C. K. McCoy Mr. G. Bockhold, Jr.

Mr. P. D. Rushton Mr. R. M. Odom WORMS 4

U. S. Nuclear' Regulatory Comission Igpbp 1

Mr. S. D. Ebneter, Regional Administrator g nf o

Mr. J. B. Hopkins, Licensing Project Manager, NRR p*kp Mr. J. F. Rogge, Senior Resident Inspector, Yogtle g p S

Dk D [ PNV 24 hi t ,.

h - -

g- ~ -

_ , ~ .-

e go ,

e' .o g.

l i

FSAR 16.3, REQUIREMENT 3, SPECI AL REPORT

]

L00SE PART DETECTION $_YSTEM A. REQUIREMENT FOR REPORT This report is submitted in accordance with Vogtle Electric Generating Plant's Final Safety Analysis Report (FSAR), Section 16.3, Requirement 3. l This section requires a spects1 report to be submitted to the Comission  :

within ten days when one or more of the Loose Part Detection System j chennels are inoperable for more than 30 days.

B. DESCRIPTION OF LOOSE PART DETECTION SYSTEM INOPERABILITY I On October 16, 1989, plant perr.onnel discovered that the channel  ;

calibration for the Loose Part Detection System was not performed as l specified in the FSAR, Section 16.3, Requirement 3. A Maintenance Work l Order (MWO) generated under the Preventive Maintenance (PM) Program was  !

initiated on July 27, 1988, to perfom the 18-month channel calibration i during the first refueling outage for Unit 1. The MWO was erroneously f voided due to the belief it was not required to be included in the scope of the refueling outage. The FSAR comitment to demonstrate the i

operability of the Loose Part Detection System was not properly identified '

in the PM progrant which resulted in the MWO not being worked during the outage.

For corrective action, the channel calibration for the Loose Part  !

Detection System has been entered into the Technical Specification l Surveillance Tracking Program. Since this surveillance can only be l perfomed in Mode 5, the operability of the Loose Part Detection System (

will be demonstrated during the next refueling outage for Unit 1. l Additionally, it should be noted a channel check has been performed at  !

least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and an analog channel operational test has been performed at least once per 31 days in accordance with FSAR Section 16.3.  ;