Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO
MONTHYEARML20043H9921990-06-22022 June 1990 Special Rept 1-90-04:on 900523,valid Diesel Generator 1B Tripped.Caused by Replaced Jacket Water Temp Switches.Onsite Calibr Procedure Revised to Provide Technique Consistent W/ Actual Operating Conditions ML20043B6001990-05-24024 May 1990 Special Rept:On 900415,loose Part Detection Sys Inoperable for More than 30 Days.Caused by Either Sensors IXE-0750 & IXE-0751 Attached to Reactor Head or pre-amplifier Located 6 Ft Away.Sensors Will Be Inspected After Next Mode 5 Entry ML20042F3781990-05-0404 May 1990 Special Rept 1-90-03: on 900415,steam Line Radiation Monitor Removed from Svc When Personnel Unable to Enter Parameters on Digital Process Module.New Circuit Board Installed on 900430 & Monitor Returned to Svc by 900501 ML20012C3371990-03-12012 March 1990 Special Rept 2-90-02-01:on 900124 & 25,Diesel Generators 2A & 2B Failed,Respectively.Caused by Air Leak from Right Bank Air Start Blocking Valve Solenoids.Air Start Distributor Filters Replaced ML20011F5621990-02-19019 February 1990 Special Rept 2-90-02:on 900124 & 25,when Start Button Depressed,Diesel Generator 2A Rolled Slowly for Approx Two Turns But Did Not Start.On 900201,when Diesel Paralleled to Grid,Low Excitation Alarm Received.Bridge Circuit Repaired ML20006B9891990-01-29029 January 1990 Special Rept 1-90-01:on 900103,when Diesel Generator 1B Started for Monthly Surveillance,Low Turbocharger Oil Pressure Annunicator Alarmed.Caused by Small Leak on Low Oil Pressure Switch.Switch Replaced & Surveillance Completed ML20006B9141990-01-29029 January 1990 Special Rept 2-90-01:on 891206-900110,containment Radiation Level high-range Monitors Inoperable.Caused by Bad Preamplifier Circuit Board Which Caused Spurious Alarms. Preamplifier Circuit Board Replaced ML19332D9051989-11-29029 November 1989 Special Rept 50-424/1989-003:on 891030,31 & 1107,tendon Grease Deficiencies Noted During Combined Tendon Surveillances.No Corrosion or Cracks Found.Tensile Test Results for Strand Samples Expected by End of Dec 1989 ML19325E2611989-10-26026 October 1989 Special Rept.On 891016,channel Calibr for Loose Part Detection Sys Not Performed as Specified in Fsar.Caused by Belief That Calibr Not Required.Channel Calibr Entered Into Tech Spec Surveillance Tracking Program 1990-06-22
[Table view] Category:LER)
MONTHYEARML20043H9921990-06-22022 June 1990 Special Rept 1-90-04:on 900523,valid Diesel Generator 1B Tripped.Caused by Replaced Jacket Water Temp Switches.Onsite Calibr Procedure Revised to Provide Technique Consistent W/ Actual Operating Conditions ML20043B6001990-05-24024 May 1990 Special Rept:On 900415,loose Part Detection Sys Inoperable for More than 30 Days.Caused by Either Sensors IXE-0750 & IXE-0751 Attached to Reactor Head or pre-amplifier Located 6 Ft Away.Sensors Will Be Inspected After Next Mode 5 Entry ML20042F3781990-05-0404 May 1990 Special Rept 1-90-03: on 900415,steam Line Radiation Monitor Removed from Svc When Personnel Unable to Enter Parameters on Digital Process Module.New Circuit Board Installed on 900430 & Monitor Returned to Svc by 900501 ML20012C3371990-03-12012 March 1990 Special Rept 2-90-02-01:on 900124 & 25,Diesel Generators 2A & 2B Failed,Respectively.Caused by Air Leak from Right Bank Air Start Blocking Valve Solenoids.Air Start Distributor Filters Replaced ML20011F5621990-02-19019 February 1990 Special Rept 2-90-02:on 900124 & 25,when Start Button Depressed,Diesel Generator 2A Rolled Slowly for Approx Two Turns But Did Not Start.On 900201,when Diesel Paralleled to Grid,Low Excitation Alarm Received.Bridge Circuit Repaired ML20006B9891990-01-29029 January 1990 Special Rept 1-90-01:on 900103,when Diesel Generator 1B Started for Monthly Surveillance,Low Turbocharger Oil Pressure Annunicator Alarmed.Caused by Small Leak on Low Oil Pressure Switch.Switch Replaced & Surveillance Completed ML20006B9141990-01-29029 January 1990 Special Rept 2-90-01:on 891206-900110,containment Radiation Level high-range Monitors Inoperable.Caused by Bad Preamplifier Circuit Board Which Caused Spurious Alarms. Preamplifier Circuit Board Replaced ML19332D9051989-11-29029 November 1989 Special Rept 50-424/1989-003:on 891030,31 & 1107,tendon Grease Deficiencies Noted During Combined Tendon Surveillances.No Corrosion or Cracks Found.Tensile Test Results for Strand Samples Expected by End of Dec 1989 ML19325E2611989-10-26026 October 1989 Special Rept.On 891016,channel Calibr for Loose Part Detection Sys Not Performed as Specified in Fsar.Caused by Belief That Calibr Not Required.Channel Calibr Entered Into Tech Spec Surveillance Tracking Program 1990-06-22
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K4591999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20217K8041999-09-30030 September 1999 Rev 1 to Vegp,Unit 2 Cycle 7 Colr ML20217K7741999-09-30030 September 1999 Rev 1 to Vegp,Unit 1 Cycle 9 Colr ML20216E5061999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Vegp,Units 1 & 2. with ML20210P9841999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H1211999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20196F9711999-05-31031 May 1999 Owner Rept for ISI for Vogtle Electric Generating Plant, Unit 1 Eighth Maint/Refueling Outage ML20195G1731999-05-31031 May 1999 Monthly Operating Repts for May 1999 for VEGP Units 1 & 2. with ML20206N2141999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20206A6561999-04-21021 April 1999 Safety Evaluation Authorizing Licensee Re Rev 9 to First 10-year ISI Interval Program Plan & Associated Requests for Relief (RR) 65 from ASME Boiler & Pressure Vessel Code ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206C2291999-03-31031 March 1999 Revised Monthly Operating Repts for Mar 1999 for Vogtle Electric Generating Plant,Units 1 & 2 ML20205Q8081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Vegp,Units 1 & 2. with ML20205A9581999-03-31031 March 1999 Rev 0 to VEGP Unit 1 Cycle 9 Colr ML20207K6051999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20209H3951999-02-15015 February 1999 Rev 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20209H4091999-02-15015 February 1999 Rev 1 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 ML20202H9851999-01-29029 January 1999 Safety Evaluation Accepting Rev 8 to First 10-year Interval Inservice Insp Program & Associated Requests for Relief for Vogtle Electric Generating Plant,Unit 1 ML20199F8041999-01-13013 January 1999 Corrected Pages to VEGP-2 ISI Summary Rept for Spring 1998 Maint/Refueling Outage ML20199E7561998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20198S1781998-12-31031 December 1998 SER Re Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Southern Nuclear Operating Co,Inc Units 1 & 2 ML20196E5221998-12-0101 December 1998 Rev 8 to ISI-P-014, ISI Program for VEGP-2 ML20198B8571998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Vogtle Electric Generating Plant,Units 1 & 2.With ML20195H2131998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Vogtle Electric Generating Station,Units 1 & 2.With ML20154L5681998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Vegp,Units 1 & 2 ML20151W3681998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Vogtle Electric Generating Plant Units 1 & 2.With ML20154L5721998-08-31031 August 1998 Corrected Page from MOR for Aug 1998 for Vegp,Unit 2 ML20237D2051998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Vogtle Electric Generating Plant Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236P6991998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20236Q3051998-06-30030 June 1998 Owner'S Rept for ISI for Sixth Maint/Refueling Outage of Vogtle Electric Generating Plant,Unit 2 ML20249A3911998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Vogtle Electric Generating Plant ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20249A3931998-04-30030 April 1998 Revised MOR for Apr 1998 for Vogtle Electric Generating Plant Unit 1 ML20247F3841998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20154Q9721998-04-20020 April 1998 10CFR50.59(B) Rept of Facility Changes,Tests & Experiments for Vogtle Electric Generating Plant,Units 1 & 2 ML20217H7181998-04-0101 April 1998 Corrected Page 5 to 980324 SER Re Relief Requests Associated W/Second 10-year Interval Insp program.RR-21 in Error in That Component,Suction Damper Inadvertently Omitted. Corrected Page 7 of Technical Ltr Rept Also Encl ML20216D6141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20217Q1301998-03-31031 March 1998 Rev 0 to Vepc Unit 2 Cycle 7,COLR ML20217B8831998-03-24024 March 1998 SER Accepting Relief Request RR-5,RR-19,RR-20,RR-21,RR-23 & RR-24 for Second 10-yr Interval ISI Program Plan ML20216E2421998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203H9551998-02-23023 February 1998 SER Denying Quality Assurance Program Description Change for Vogtle Electric Generating Plant,Units 1 & 2 ML20203E4831998-02-11011 February 1998 Rev 1 to Vogtle Electric Generating Plant,Units 1 & 2 Second Ten-Yr Interval Pump Inservice Test Program ML20198T1211998-01-31031 January 1998 Owners Rept for Inservice Inspection for Seventh Maintenance/Refueling Outage ML20202G5441998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Vogtle Electric Generating Plant,Units 1 & 2 ML20199E5431998-01-31031 January 1998 Rev 3 to WCAP-14720, Vogtle Units 1 & 2 Spent Fuel Rack Criticality Analysis W/Credit for Soluble Boron ML20198L6471997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Vogtle Electric Generating Plant,Units 1 & 2 ML20203C2811997-12-0909 December 1997 Safety Evaluation Authorizing Request for Relief of Second 10 Yr Interval Inservice Insp Program ML20202B7881997-12-0101 December 1997 Rev 8 to ISI-P-006, ISI Program for Gpc Vogtle Electric Generating Plant Unit 1 ML20203H0601997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Vegp,Units 1 & 2 1999-09-30
[Table view] |
Text
"'#!
- 3 \
- Georg a Power company - :if
- 333 Pedmont Avenuo #
Nfanta. Georgia 30308 ~i
.*,~ Telephone 404 526 3195 l i. . j --
l Maltog Address L; - 40 invemess center Parkway i Post Off.ce Box 1295 Dirmingham; Nubama 35201 .
Telephone 205 868 5581 ,
January 29, 1990. . ,.c, ,,, ., ,, g n.c ,,,,,
W. G. Hairston,111 l Sernor Vcc ProSdent ,
Nuclear operaans .
L ELV-01276 .. ,
.0217 1 1
Docket No. 50-425
.U. S. Nuclear. Regulatory Commission '
ATTN: Document Control Desk Washington, D. C.. 20555 ,
Gentlemen:
V0GTLE ELECTRIC: GENERATING PLANT' SPECIAL REPORT' CONTAINMENT RADIATION. LEVEL HIGH .
RANGE MONITORS IN0PERABLE
/
In accordance with the Vogtle Ele Generating' Plant Technical >
Specifications,-Section 3.3.3.6, t .a Power Company hereby submits the enclosed Special Report concernir' Containment . Radiation Level High: Range Monitors.
. Sincerely, et) ' b
! W..G. Hairston, III J l
WGH,III/NJS/gm 3 1
Enclosure:
Special Report 2-90-01 1
l xc: Georaia Power Company L Mr. C. K. McCoy L Mr. G. Bockhold,_Jr.
l' Mr. R. M. Odom a L Mr. P. D.-Rushton- !
NORMS
.c
-U. S. Nuclear Reaulatory Commissio'n .
Mr. S. D. Ebneter, Regional Administrator !
Mr. D.'B. Matthews, Director, Project. Directorate 11-3 Mr. R. F. Aiello, Senior Resident Inspector,.~Vogtle I4 9002060088 900129 ? 9 PDR ADOCK 05000425 S PDC g .- 'J'
/ 6 b . '
l
w '
y ll f
ENCLOSURE j x
V0GTLE ELECTRIC GENERATING' PLANT - UNIT 2. j
. TECHNICAL SPECIFICATION SPECIAL REPORT 2-90-01 l CONTAINMENT RADIATION LEVEL HIGH RANGE MONITORS INOPERABLE j A; REQUIREMENT FOR REPORT P
In accordance with Technical Specification 3.3.3.6, " Accident' Monitoring
- Instrumentation," and Item 14 of. Technical- Specification Table 3.3-8, at least-r one Containment Radiation Level- (High Range) channel is required'to be operable in Modes 1, 2, and 3. If this requirement is not met,' thenlable 3.3-8 ;
indicates that the action requirements. contained in Action Statement 33 apply." !
These eetion requirements are as follows: 9
'"With .the . number of OPERABLE channels less than the Minimum Channels OPERABLE requirement, initiate' the alternate method of monitoring the.
parameter within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 'and either, restore the inoperable channel (s) .to
. q OPERABLE status' within 7 days or prepare and submit a Special Report to the s Commission, pursutnt to Specification 6.8.2, within 14 days that provides.
actions-_taken, cause of the inoperabi.lity, and the plans and schedule for. t restoring the channels to OPERABLE status. The provisions of Specification. ,
3.0.4 are not applicable." !
Recent problems have been experienced with containment high range radiation ,
monitors 2RE-0005 and 2RE-0006 resulting in entry of the above action requirements on several occasions (see attached Table 1). During each of these 1 occasions, the containment low range radiation-monitors 2RE-0002 and 2RE-0003 ;
were operable and the alternate method of monitoring the containment high range radiation level was initiated when required. On the last entry of these action requirements (on 1/10/90), it was decided to notLrestore 2RE-0006 to OPERABLE o status until a vendor representative could be consulted to diagnose the cause'of the recurring problem. Since radiation monitor 2RE-0005 has been inope'rable since 12/6/89 (Table 1), this action resulted in both containment high range radiation monitoring channels being inoperable in excess of 7' days and therefore a Special Report is required per the above action statement.
B. .CAUSE OF IN0PERABILITY b The cause for 2RE-0005 being removed from service was a' ground fault condition-
-i i which was traced to the AC low power supply cable for this monitor. The location of the ground required a design change to allow splicing ~ of the cable-within a cable tray. Initiation of the design change package and procurement of a qualified splicing kit has resulted in this problem taking. additional time to 'r resolve. Also, a replacement preamplifier circuit board for. this monitor must be obtained since the circuit board for 2RE-0005 was installed in the 2RE-0006-monitor in order to correct the problem that 2RE-0006 was experiencing.
l i
,1 . + '>
-?
-1 ENCLOSURE (CONT'D) .
TECHNICAL SPECIFICATION SPECIAL REPORT 2-90-01 .
j CONTAINMENT RADIATION LEVEL HIGH RANGE MONITORS INOPERABLE I
The cause-for 2RE-0006 being removed from service was determined to be a bad' preamplifier circuit board which caused spurious: alarms. This' determination was ;
made by' the vendor representative who 'was consulted to . help. troubleshoot-the -i cause of the recurring problem involving spurious: alarms.
C. CORRECTIVE ACTION PLAN Radiation monitor 2RE-0006 was returned to OPERABLE status on 1/19/90.following l replacement of the preamplifier circuit board with a board removed from - ;.
2RE-0005. No further corrective action is expected to be: required,for this-monitor. ,
' Radiation monitor 2RE-0005 is expected to be returned to service by 2/15/90.-
Completion'of this action is dependent upon receipt of qualified . splice' kits for correcting the ground problem and -obtaining a replacement preamplifier circuit- ,
board. !
i u
1 l
1 s
- i i
r
.':l q
.,. y ]
d n
ENCLOSURE (CONT'D) i
.SPECIAL REPORT-2-90-01 TABLE 1
SUMMARY
OF PROBLEMS INVOLVING 2RE-0005 AND 2RE-0006 DAlf DESCRIPTION ACTION ~TAKEN:
-12/6/89 Ground on 120VAC Panel' Ground problem discovered in ,
2AY2A traced to circuit . AC.' low power supply cable to-for 2RE-0005.- 2RE-0005 2RX-0005.
deenergized to allow
. troubleshooting / repair Design change initiated to '
of ground.. allow splice of cable. - q 12/17/89- 2RE-0006 deenergized .. ' Analog-to-Digital Circuit i after failing off-scale Board replacedLin Data Processing - ';
high. . Module (DPM).
Analog Channel Operational Test .. ,
(ACOT) and Channel Check completed satisfactorily.
Returned to service on 12/18/89. .
12/22/89 2RE-0006 deenergized Signal cable and high voltage for troubleshooting connections at preamplifier assembly after experiencing cleaned, and. cables reconnected, spurious " Low Fail" and "High" alarms.
Channel monitored for approximate 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> period with-no recurrence of spurious alarms =. <
- i Returned to service on 12/23/89.
4 12/23/89 2RE-0006 declared Alternate method of_monit'oring inoperable after Containment High Range Radiation experiencing further Level initiated per~ Procedure.43017-C.
spurious " Low Fail" 2 and "High" alarms. Front' Panel Input /0utput Board E replaced in'DPM.
l Channel monitored for approximate 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period with no recurrence of-l spurious alarms.
l ACOT and Channel Check completed ;
! satisfactorily.
Returned to service on 12/27/89. -$
l' L
,p,; :-
ENCLOSURE (CONT'D)-
SPECIAL REPORT 2-90-01 TABLE 1-
SUMMARY
OF PROBLEMS' INVOLVING 2RE-0005 AND 2RE-0006 j i
.QalE DESCRIPTION ACTION TAKEN ,
1/1/90- 2RE-0006 declared. Alternate method' of monitoring; [
inoperable after. Containment High Range Radiation ;
again experiencing Level initiated. -l spurious " Low Fail" -- i al arms. Signal cable' and high voltage i connections at preamplifier assembly ,
cleaned and cables reconnected. - !
Channel monitored for approximate 24- -i hour- period with no recurrence of i spurious' alarms.
Channel check completed satisfactorily,- :
Returned to service on_1/4/90; ;
4 1/10/90 2RE-0006 declared Alternate method of monitoring inoperable after Containment-High Range Radiati.on' experiencing spurious Level initiated.
"High" and " Trouble" q al arms. - . Vendor-(Westinghouse) Representative-consulted.
Preamplifier- Board removed from 2RE-0005 and installed':in 2RE-0006. .
l Returned to service on 1/19/90.
)