LONG ISLAND LIGHTING COMPANY
LONG ISLAND LIGHTING COMPANY
           ,3 w
           ,3 w
SN        -
SN        -
SHOREHAM NUCLEAR POWER STATION P.O. BOX 618, NORTH COUNTRY ROAD e WADING RIVER, N.Y 11792
SHOREHAM NUCLEAR POWER STATION P.O. BOX 618, NORTH COUNTRY ROAD e WADING RIVER, N.Y 11792
,
                   . Direct Dial Numbers
                   . Direct Dial Numbers
                       , October:6,-1989                                                      FM 89-183
                       , October:6,-1989                                                      FM 89-183
                       ~ Director, Office of Resource Management U.S. Nuclear Regulatory Commission.
                       ~ Director, Office of Resource Management U.S. Nuclear Regulatory Commission.
Washington, D.C. 20555'
Washington, D.C. 20555'
                                                                  .
                                                                                                                      '


==Dear Sir:==
==Dear Sir:==


'
In accordance with Technical' Specifications Section 6.9.1.8, enclosed is a. copy of the Shoreham Nuclear Power Station's September Monthly Operating Report which summarizes the operating statistics and shutdown experience of the Plant.
In accordance with Technical' Specifications Section 6.9.1.8, enclosed is a. copy of the Shoreham Nuclear Power Station's September Monthly Operating Report which summarizes the operating statistics and shutdown experience of the Plant.
If you have any questions, please contact us.
If you have any questions, please contact us.
Line 48: Line 43:
                                               ~
                                               ~
                               ' Institute of' Nuclear Power Operations, Records Center American Nuclear Insurers 8910170090 e40930 DR    ADOCK 030      2                                              fg7j
                               ' Institute of' Nuclear Power Operations, Records Center American Nuclear Insurers 8910170090 e40930 DR    ADOCK 030      2                                              fg7j
                                                                                                                ,  ,
                   ~ FC 8935,1                                                                                    1 I
                   ~ FC 8935,1                                                                                    1
                                                          ._
I


(      ..
(      ..
              ,
                      .
       ,sg        : ,
       ,sg        : ,
rE"'
rE"'
   '                                                                                Appendix 12.6
   '                                                                                Appendix 12.6 Page 1 of 1 S110REHAM NUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET No. 50-322 UNIT    1 DATE 10/2/89 COMPLETED B1Roy Jongebloed l-L-                                                                                  TELEPHON!!516-929-8300
        ,
            '
Page 1 of 1 S110REHAM NUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET No. 50-322 UNIT    1 DATE 10/2/89 COMPLETED B1Roy Jongebloed l-L-                                                                                  TELEPHON!!516-929-8300
                 ' MONTH Septaber 1989 DAY AVERAGE DAILY POWER LEVEL              DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                (MWe-Net) 1                0                        17                n-2                0                        18                n 3                0                        19                n 4                0          ,
                 ' MONTH Septaber 1989 DAY AVERAGE DAILY POWER LEVEL              DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                (MWe-Net) 1                0                        17                n-2                0                        18                n 3                0                        19                n 4                0          ,
20                n
20                n 5                0                        21                n 6              0                        22                n
    ,:
                   -7                0                        23                n 8              ~0                        24                n i
      ,
5                0                        21                n 6              0                        22                n
                   -7                0                        23                n
                                            '
..
8              ~0                        24                n i
lE                  9              0                        25                n 10              0                        26                n 1^
lE                  9              0                        25                n 10              0                        26                n 1^
11              0                        27                n l '-                  12            0                        28                n
11              0                        27                n l '-                  12            0                        28                n
Line 80: Line 61:
W      .''    .
W      .''    .
Is- ,.
Is- ,.
App ndix 12.7 Page 1 of 1
App ndix 12.7 Page 1 of 1 SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET.No.50-322 UNIT  1 DATE 10/2/89 COMPLETED BYRoy Joncebloed,
    .
SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET.No.50-322 UNIT  1 DATE 10/2/89 COMPLETED BYRoy Joncebloed,
* TELEPHONE 516-929-8300  :
* TELEPHONE 516-929-8300  :
                                                                                                                                                                                        .
OPERATING STATUS                                                                                                                                                            P
OPERATING STATUS                                                                                                                                                            P
: 1. Reporting Periods o/po                        Gross hours in Reporting Period                                                                  720                  ,
: 1. Reporting Periods o/po                        Gross hours in Reporting Period                                                                  720                  ,
Line 90: Line 68:
Design Electrical Rating (MWe-Net):
Design Electrical Rating (MWe-Net):
: 3. Power Level to which Restricted (if any) (MWe-Net) : .N/A                                                                                                            ;
: 3. Power Level to which Restricted (if any) (MWe-Net) : .N/A                                                                                                            ;
                                                                                                                                                                                        '
: 4. Reasons for Restriction (if any):                                                                        .
: 4. Reasons for Restriction (if any):                                                                        .
This month                                Yr to Date Cumulative    .
This month                                Yr to Date Cumulative    .
                                                                                                                                                                                        !
: 5. . Number of Hours Reac tor was Critical. . . . . . . . . . .                                                            0                          2.7      527.4
: 5. . Number of Hours Reac tor was Critical. . . . . . . . . . .                                                            0                          2.7      527.4
: 6. -Reactor Reserve Shutdown Hours.................                                                                720                            6552      28133.6
: 6. -Reactor Reserve Shutdown Hours.................                                                                720                            6552      28133.6
Line 110: Line 86:
: 19. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):                                                                                            ,
: 19. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):                                                                                            ,
Unit is defueled as of August 9th,1989. No further operation of the unit is anticipated due to the New York State /LIIID Settlement Agreement.
Unit is defueled as of August 9th,1989. No further operation of the unit is anticipated due to the New York State /LIIID Settlement Agreement.
                                                                                                                                                                                        .
             .20. If Shut Down at end of Report Period. Estimated Date of Startup                                                                                          N/A            l
             .20. If Shut Down at end of Report Period. Estimated Date of Startup                                                                                          N/A            l
: 21. Units in Test Status (Prior to Commercial Operation):                                                                                      FORECAST    ACHIEVED
: 21. Units in Test Status (Prior to Commercial Operation):                                                                                      FORECAST    ACHIEVED 5
                                                                                                                                                                                          ,
INITIAL CRITICALITY                                                                                                            2/13/85      2/15/85 INITIAL ELECTRICITY                                                                                                            9/01/86      8/26/86 COMMERCIAL OPERATION                                                                                                              N/A          N/A SPF 51.005.01-6 Rev. 4 SP 51.005.01 Rev. 4 Page 21
5 INITIAL CRITICALITY                                                                                                            2/13/85      2/15/85 INITIAL ELECTRICITY                                                                                                            9/01/86      8/26/86 COMMERCIAL OPERATION                                                                                                              N/A          N/A SPF 51.005.01-6 Rev. 4
                                                                                                                                                                                          !
SP 51.005.01 Rev. 4 Page 21
    ..          .      .    .      - - - - - , . _ - , . -_.                . . _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ - _ _ . - _ - _ _ _ _ _ _ _ _ . . _ _ _


_.  ,    ,
                                                                                                  -        . - _
                                                                                                                      ,
                                                                                                                           -.;-n,        _,
                                                                                                                           -.;-n,        _,
                                                                        .
Appendix 12.4*
Appendix 12.4*
Pame 1 of I SHOREHAM NUCLEAR POWER STATION
Pame 1 of I SHOREHAM NUCLEAR POWER STATION UNIT SHUTDOWNS AND POWER REDUCTIONS:                                                    -
'
* DOCKET Wo. - 50_-323 UNIT        1 DATR 10/2/89 3
UNIT SHUTDOWNS AND POWER REDUCTIONS:                                                    -
COMPLETED BY Roy Jonoebloed -
* DOCKET Wo. - 50_-323 UNIT        1 DATR 10/2/89
                                                                                                                      .
3 COMPLETED BY Roy Jonoebloed -
TELEPHONE 516-929-8300 i
TELEPHONE 516-929-8300 i
REPORT MONTH Seoterber 1989.
REPORT MONTH Seoterber 1989.
,
T METHOD OF TYPE                                    SHUTTING DOWN F: FORCED      DURATION                      THE REACTOR OR CORRECTIVE ACTIONS / COMMENTS NO. DATE      S: SCHEDULED        (HOlfRS)  REASON (1)        REDUCING POWER (2) 3    370606              S          744      Post 5%      Controlled Shutdown                        None.
T METHOD OF TYPE                                    SHUTTING DOWN F: FORCED      DURATION                      THE REACTOR OR CORRECTIVE ACTIONS / COMMENTS
                                                                                                                                                    --
NO. DATE      S: SCHEDULED        (HOlfRS)  REASON (1)        REDUCING POWER (2) 3    370606              S          744      Post 5%      Controlled Shutdown                        None.
i-                                                        Operations                                                -
i-                                                        Operations                                                -
'
Shutdown i.
Shutdown i.
i 4
i 4
4 4
4 4
.
!
'
                                                                                                                        .
i         
i         


==SUMMARY==
==SUMMARY==
:
SPF 51.005.01-7 Rev. 4 1-SP 51.005.01 Rev. 4-Page 22 P      .
SPF 51.005.01-7 Rev. 4 1-
    -
SP 51.005.01 Rev. 4-
        "
Page 22
  .      .
P      .
O                              ",
O                              ",
*                                                                                                                                    *'
s .                        -
s .                        -
                                            ,.
                                              ,
                                                                                                        "
                          '
_s}}
_s}}

Latest revision as of 23:38, 31 January 2020

Monthly Operating Rept for Sept 1989 for Shoreham Nuclear Power Station Unit 1.W/891006 Ltr
ML19327A713
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 09/30/1989
From: Jongebloed R, Scalice J
LONG ISLAND LIGHTING CO.
To:
NRC
References
PM-89-183, NUDOCS 8910170090
Download: ML19327A713 (4)


Text

.

ff'

( 'y. ,_ i.

a

  • 9 i

[s 3 t~

LONG ISLAND LIGHTING COMPANY

,3 w

SN -

SHOREHAM NUCLEAR POWER STATION P.O. BOX 618, NORTH COUNTRY ROAD e WADING RIVER, N.Y 11792

. Direct Dial Numbers

, October:6,-1989 FM 89-183

~ Director, Office of Resource Management U.S. Nuclear Regulatory Commission.

Washington, D.C. 20555'

Dear Sir:

In accordance with Technical' Specifications Section 6.9.1.8, enclosed is a. copy of the Shoreham Nuclear Power Station's September Monthly Operating Report which summarizes the operating statistics and shutdown experience of the Plant.

If you have any questions, please contact us.

.Very-Truly Yours,.

-t

' 7 M

J v. Scalice-

,. ant Manaser

~WK:jp Enclosure cc: William T. Russell, Regional Administrator Frank Crescenzo, Senior Resident Inspector

~

' Institute of' Nuclear Power Operations, Records Center American Nuclear Insurers 8910170090 e40930 DR ADOCK 030 2 fg7j

~ FC 8935,1 1 I

( ..

,sg  : ,

rE"'

' Appendix 12.6 Page 1 of 1 S110REHAM NUCLEAR POWER STATION AVERAGE DAILY UNIT POWER LEVEL DOCKET No. 50-322 UNIT 1 DATE 10/2/89 COMPLETED B1Roy Jongebloed l-L- TELEPHON!!516-929-8300

' MONTH Septaber 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 n-2 0 18 n 3 0 19 n 4 0 ,

20 n 5 0 21 n 6 0 22 n

-7 0 23 n 8 ~0 24 n i

lE 9 0 25 n 10 0 26 n 1^

11 0 27 n l '- 12 0 28 n

'13 0 29 n 14 0 30 n 15 0 31 n 16 0 l

SPF 51.005.01-5 Rev 4 i

SP 51.005.01 Rev. 4 4 Page 20

f'.

W . .

Is- ,.

App ndix 12.7 Page 1 of 1 SHOREHAM NUCLEAR POWER STATION OPERATING DATA REPORT DOCKET.No.50-322 UNIT 1 DATE 10/2/89 COMPLETED BYRoy Joncebloed,

  • TELEPHONE 516-929-8300  :

OPERATING STATUS P

1. Reporting Periods o/po Gross hours in Reporting Period 720 ,
2. Currently Authorized Power Level,(MWt): 2436 Max. Depend. Capacity (MWe-Net): jgyL_

Design Electrical Rating (MWe-Net):

3. Power Level to which Restricted (if any) (MWe-Net) : .N/A  ;
4. Reasons for Restriction (if any): .

This month Yr to Date Cumulative .

5. . Number of Hours Reac tor was Critical. . . . . . . . . . . 0 2.7 527.4
6. -Reactor Reserve Shutdown Hours................. 720 6552 28133.6

-7. Hours Generator on Line........................ 0 0 32.8 '

8. Unit Reserve Shutdown Hours.................... 0 0 0
9. Gross Thermal Energy Generated (MWH)........... 0 0 23056 i
10. Gross Electrical Energy Generated (MWH) . . . . . . . . 0 0 SRO I
11. Net Electrical Energy Generated (MWH).......... 0 0 315
12. Reaator Service Factor......................... N/A N/A N/A
13. Reactor' Availability Factor.................... N/A N/A N/A 14.' Unit Service Factor............................ N/A N/A N/A
15. Unit Availability Factor....................... N/A N/A N/A -
16. Unit Cape:ity Factor (Using MDC)........... ... N/A N/A N/A
17. Unit Capacity Factor (Using Design MWe) . . . . . . . . N/A N/A N/A
18. Unit Forced Outage Rate........................ .

N/A N/A N/A ,

19. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each): ,

Unit is defueled as of August 9th,1989. No further operation of the unit is anticipated due to the New York State /LIIID Settlement Agreement.

.20. If Shut Down at end of Report Period. Estimated Date of Startup N/A l

21. Units in Test Status (Prior to Commercial Operation): FORECAST ACHIEVED 5

INITIAL CRITICALITY 2/13/85 2/15/85 INITIAL ELECTRICITY 9/01/86 8/26/86 COMMERCIAL OPERATION N/A N/A SPF 51.005.01-6 Rev. 4 SP 51.005.01 Rev. 4 Page 21

-.;-n, _,

Appendix 12.4*

Pame 1 of I SHOREHAM NUCLEAR POWER STATION UNIT SHUTDOWNS AND POWER REDUCTIONS: -

  • DOCKET Wo. - 50_-323 UNIT 1 DATR 10/2/89 3

COMPLETED BY Roy Jonoebloed -

TELEPHONE 516-929-8300 i

REPORT MONTH Seoterber 1989.

T METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE ACTIONS / COMMENTS NO. DATE S: SCHEDULED (HOlfRS) REASON (1) REDUCING POWER (2) 3 370606 S 744 Post 5% Controlled Shutdown None.

i- Operations -

Shutdown i.

i 4

4 4

i

SUMMARY

SPF 51.005.01-7 Rev. 4 1-SP 51.005.01 Rev. 4-Page 22 P .

O ",

s . -

_s