     .g-OPERATING DATA REPORT                                                                                              ,
  ,
DATE    August 5, 1980 COMPLETED BY      C. W. FAY TELEPHONE    414 277 2811 OPERATING STATUS                                                                            .
     .g-
                                                                                                                                                            .  .
OPERATING DATA REPORT                                                                                              ,
DATE    August 5, 1980
                                                                                      ,
COMPLETED BY      C. W. FAY
                                                                                        ,
TELEPHONE    414 277 2811 OPERATING STATUS                                                                            .
                                                                                                                                    '
: 1. UNIT NAME:                          POINT BEACH NUCLEAR PLANT            UNIT 1    [40TES A    2. REPORTING PERIOD:                                    JULY 1980                  .                                                                .
: 1. UNIT NAME:                          POINT BEACH NUCLEAR PLANT            UNIT 1    [40TES A    2. REPORTING PERIOD:                                    JULY 1980                  .                                                                .
C    3. LICENSED THERMAL POWER (MWT): 1518.                                              .                                                                .
C    3. LICENSED THERMAL POWER (MWT): 1518.                                              .                                                                .
O    4. NAMEPLATE RATING (GROSS MWE):                                      523.8        .                                                                .
O    4. NAMEPLATE RATING (GROSS MWE):                                      523.8        .                                                                .
    $
g
g
: 5. DESIGN ELECTRICkL RATING (NET MWE): 497.
: 5. DESIGN ELECTRICkL RATING (NET MWE): 497.
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 519.
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 519.
                                                                                            .
                                                                                            .
                                                                                                                                                              .
                                                                                                                                                              .
cb  7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495                      ~
cb  7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495                      ~
                                                                                            . . . . . . . . . . . . . . . . . . . . . . . .
8 . IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGil 7) SINCE LAST REPORTe GIVE REASONS:
8 . IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGil 7) SINCE LAST REPORTe GIVE REASONS:
,
M NOT APPLICADLE
M
    $
NOT APPLICADLE
: 9. POWER LEVEL TO WHICH RESTRICTEDe IF ANY (NET MWE):                                    390.0
: 9. POWER LEVEL TO WHICH RESTRICTEDe IF ANY (NET MWE):                                    390.0
: 10. REASONS FOR RESTRICTIONS, (IF ANY): SEXXXKTTA00lNE3EIR$ Power restriction is the result of a self-imposed D                  reduction in core average temperature in an attempt to inhibit corrosion of steam generator tubt.s within the tubesheet crevice.                                                THIS MONTil          YR TO DATE                    CUMULATIVE
: 10. REASONS FOR RESTRICTIONS, (IF ANY): SEXXXKTTA00lNE3EIR$ Power restriction is the result of a self-imposed D                  reduction in core average temperature in an attempt to inhibit corrosion of steam generator tubt.s within the tubesheet crevice.                                                THIS MONTil          YR TO DATE                    CUMULATIVE
Line 64: Line 46:
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEe DATEe AND DURATION OF EACH':
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEe DATEe AND DURATION OF EACH':
Unit scheduled to shut down November 7, 1980, for approximately one month for ref+ ling.
Unit scheduled to shut down November 7, 1980, for approximately one month for ref+ ling.
: 25. IF SHUTDOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUP:                                      A GUST 8, 1980
: 25. IF SHUTDOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUP:                                      A GUST 8, 1980 DATA REPORTED AND FACTORS CALCULATED AS REGbESTED IN NRC LETTER DATED SEPTEMBER 22e 1977
,
DATA REPORTED AND FACTORS CALCULATED AS REGbESTED IN NRC LETTER DATED SEPTEMBER 22e 1977
___    .  - - _ - -                      --


__ _ ____ _________ _ _ ____________ _-_ __-____ ______________                                  _
e g OPERATING DATA REPORT                                                                                .
                                                                                                                                                                                              -
e g
                                                                                                                                                                                    -
-                                                                                                                                                                                .
OPERATING DATA REPORT                                                                                .
DOCKET No. 50-301 DATE      August 5, 1980 s                                                                                                                            COMPLETED BY      C. W. FAY TELEPHONE      414 277 2811 OPERATING STATUS.
DOCKET No. 50-301 DATE      August 5, 1980 s                                                                                                                            COMPLETED BY      C. W. FAY TELEPHONE      414 277 2811 OPERATING STATUS.
                                                                                                                                  * * * * * * * * * * * * * * * * ****
: 1. UNIT NAME:                        POINT BEACH NUCLEAR PLANT    0 nit 2  * [40TES                                                  .
: 1. UNIT NAME:                        POINT BEACH NUCLEAR PLANT    0 nit 2  * [40TES                                                  .
: 2. REPORTING PERIOD:                            JULY 1980                  .                                                          .
: 2. REPORTING PERIOD:                            JULY 1980                  .                                                          .
Line 88: Line 61:
: 9. POWER LEVEL TO WHICH RESTRICTEDe IF ANY (NET MWE): NOT APPLICABLE j                                10. REASONS FOR RESTRICTIONS, (IF ANY):                                    NOT APPLICABLE
: 9. POWER LEVEL TO WHICH RESTRICTEDe IF ANY (NET MWE): NOT APPLICABLE j                                10. REASONS FOR RESTRICTIONS, (IF ANY):                                    NOT APPLICABLE
'                                                                                                                      THiS MONTH            YR TO DATE              CUMULATIVE
'                                                                                                                      THiS MONTH            YR TO DATE              CUMULATIVE
                                                                                                                                                    '
: 11. HOURS iN REPORT NG PERIOD                                      ,                          744                S e 111.              70e128
: 11. HOURS iN REPORT NG PERIOD                                      ,                          744                S e 111.              70e128
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                                    'i44.0            4,010.9                62e907.8
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                                    'i44.0            4,010.9                62e907.8
: 13. REACTOR RESERVE SHUTDOWN HOURS                                                              0.0                  19 2              . 185.3
: 13. REACTOR RESERVE SHUTDOWN HOURS                                                              0.0                  19 2              . 185.3
*
: 14. HOURS GENERATOR.ON LINE                                                                  744.0              3e994 7                61e671.7
: 14. HOURS GENERATOR.ON LINE                                                                  744.0              3e994 7                61e671.7
: 15. UNIT RESERVE SHUTDOWN HOURS                                                        .
: 15. UNIT RESERVE SHUTDOWN HOURS                                                        .
Line 107: Line 78:
NONE t
NONE t
: 25. IF SHUTDOWN AT END OF REPORT PERIODe ESTIMATED DATE OF START P:                                      NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REGOESTED IN NRC LETTER DATED SEPTEM0ER 22e 1977
: 25. IF SHUTDOWN AT END OF REPORT PERIODe ESTIMATED DATE OF START P:                                      NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REGOESTED IN NRC LETTER DATED SEPTEM0ER 22e 1977
,
_- -


                                   ~
                                   ~
  , . .    - _ -    _.  -_l-        .- -.-        _    _.    ...            .      . -. -.            ._
  , . .    - _ -    _.  -_l-        .- -.-        _    _.    ...            .      . -. -.            ._
                                                                                                                  .
DOCKET NO. 50-266 UNIT NAME    Point Beach Unit 1 DATE          August 5,    1980
    '
DOCKET NO. 50-266
* UNIT NAME    Point Beach Unit 1 DATE          August 5,    1980
;                                                                      COMPLETED BY C. W. Fay TELEPHONE    414/277-2811 AVERAGE DAILY UNIT POWER LEVEL i
;                                                                      COMPLETED BY C. W. Fay TELEPHONE    414/277-2811 AVERAGE DAILY UNIT POWER LEVEL i
MONTH          July, 1980 AVERAGE                              AVERAGE                          AVERAGE
MONTH          July, 1980 AVERAGE                              AVERAGE                          AVERAGE
  ,                        DAILY                                  DAILY                            DAILY I
  ,                        DAILY                                  DAILY                            DAILY I
POWER LEVEL                          POWER LEVEL                        POWER LEVEL DAY    MWe NET                  DAY          MWe NET            DAY          MWe NET
POWER LEVEL                          POWER LEVEL                        POWER LEVEL DAY    MWe NET                  DAY          MWe NET            DAY          MWe NET 1        370                    11                371            21              376
* 1        370                    11                371            21              376
]
]
22              371          '*
22              371          '*
l                2        371                    12                371 3        371                    13                358            23              370 4        373                    14                371            24              322
l                2        371                    12                371 3        371                    13                358            23              370 4        373                    14                371            24              322 5        374                    15                375            25              344 6        372                    16                368            26              -6 7        371                  17                372            27              -2 j
:
5        374                    15                375            25              344 6        372                    16                368            26              -6 7        371                  17                372            27              -2 j
.,
8        372                  18                372            28              -2 i
8        372                  18                372            28              -2 i
9        372                  19                373            29              -2        ,
9        372                  19                373            29              -2        ,
10        373                  20                374            30              -2 i
10        373                  20                374            30              -2 i
31              -2
31              -2 AD-28A (1-77)
<
AD-28A (1-77)


__
_                                                ..          . __ .. _ . _    . . .
                                                                                                                                                                                .
   "                                                                                                                                            DOCKET NO. 50-301 UNIT NAME    Point Beach Unit 2 DATE          August 5,  1980 COMPLETED BY C. W. Fay TELEPHONE      414/277-2811 AVERAGE DAILY UNIT POWER LEVEL i                                                                                                                  MONTH        July, 1980 l
   "                                                                                                                                            DOCKET NO. 50-301 UNIT NAME    Point Beach Unit 2 DATE          August 5,  1980 COMPLETED BY C. W. Fay TELEPHONE      414/277-2811 AVERAGE DAILY UNIT POWER LEVEL i                                                                                                                  MONTH        July, 1980 l
AVERAGE                        AVERAGE                            AVERAGE DAILY                          DAILY                            DAILY POWER LEVEL                    POWER LEVEL                        POWER LEVEL
AVERAGE                        AVERAGE                            AVERAGE DAILY                          DAILY                            DAILY POWER LEVEL                    POWER LEVEL                        POWER LEVEL
   ,                                                                                  DAY          MWe NET -            DAY      MWe NET                DAY          MWe NET 1                  458            11            489              21            488 2                  426            12            486              22            486 3                  468            13            486              23            485 4                  483            14            487              24            482 5                  468            15            488              25            486
   ,                                                                                  DAY          MWe NET -            DAY      MWe NET                DAY          MWe NET 1                  458            11            489              21            488 2                  426            12            486              22            486 3                  468            13            486              23            485 4                  483            14            487              24            482 5                  468            15            488              25            486 6                  442            16            488              26            486 7                  486            17            488              27            483 8                  488            18            485              28            487 9                  488            19            492              29            483 10                  488            20            484              30            484 31            483 AD-28A (1-77)
'
6                  442            16            488              26            486 7                  486            17            488              27            483 8                  488            18            485              28            487 9                  488            19            492              29            483 10                  488            20            484              30            484 31            483
:
AD-28A (1-77)
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _


__              -___          _ _ _ _ - - _ _ _ _ .
.                    .
                                                                                                                                                      .
           ,                                                          UNIT SHUTDOWNS AND POWER REDUCTIONS                  DOCKET NO. 50-266            -
           ,                                                          UNIT SHUTDOWNS AND POWER REDUCTIONS                  DOCKET NO. 50-266            -
UNIT NAME Point Beach Unit 1
UNIT NAME Point Beach Unit 1 DATE Aunust 5. 1980 l                                                                        REPORT MONTH      anly. 1990                    COMPLETED BY C. W. Fav TELEPHONE  414/277-2811 c                                  u tn o                              4 e
,
av au "co                        man St                      Pe ao in ce No.      Date      g      4g        g                        jjg      Licensee Event    y      g'g    Cause and Corrective Action b      :s :c    e                          v .c        Report No. ua      so        To Prevent Recurrence Q~      D'e                        e U)                              o 2:                                o i                                                                              0 I
DATE Aunust 5. 1980 l                                                                        REPORT MONTH      anly. 1990                    COMPLETED BY C. W. Fav TELEPHONE  414/277-2811
'
                                        .
.                                                                  ..
c                                  u tn o                              4
                        -
e av au "co                        man St                      Pe ao in ce No.      Date      g      4g        g                        jjg      Licensee Event    y      g'g    Cause and Corrective Action b      :s :c    e                          v .c        Report No. ua      so        To Prevent Recurrence
  -
Q~      D'e                        e U)                              o 2:                                o i                                                                              0 I
4 3      800724  F        1.4        II                          1        N/A          IIF PILTEli  The outage was due to a high i
4 3      800724  F        1.4        II                          1        N/A          IIF PILTEli  The outage was due to a high i
                                                                            '
differential pressure across the circulating water screens caused by a buildup of alewives that
differential pressure across the circulating water screens caused by a buildup of alewives that
;                                                                                                                entered the intake crib.
;                                                                                                                entered the intake crib.
!
4      800726    S  142.6            D                            1      80-009/OlT      CB  llTEXCil  As required by NRC Confirmatory i                                                                                                                Order of 11-30-79, the unit was
4      800726    S  142.6            D                            1      80-009/OlT      CB  llTEXCil  As required by NRC Confirmatory i                                                                                                                Order of 11-30-79, the unit was
:                                                                                                              taken off line for the 90 effective full power day steam generator
:                                                                                                              taken off line for the 90 effective full power day steam generator
Line 171: Line 109:
testing. Both steam generators are
testing. Both steam generators are
;                                                                                                                undergoing a 100% eddy current I                                                                                                              examination through the first j                                                                                                                support plate on the hot leg side, with 3% full length examinations.
;                                                                                                                undergoing a 100% eddy current I                                                                                                              examination through the first j                                                                                                                support plate on the hot leg side, with 3% full length examinations.
i
i 1                                                                                            3 F: Forced                Reason:                                                              Metho'd:
.
1                                                                                            3 F: Forced                Reason:                                                              Metho'd:
* Exhibit G-Instruc-i                  S: Scheduled            A- Equipment Failure (explain)                                      l- Manual            tions for Prepar-B-                      Maintenance or Test                        2- Manual Scram      ation of Data Entry
* Exhibit G-Instruc-i                  S: Scheduled            A- Equipment Failure (explain)                                      l- Manual            tions for Prepar-B-                      Maintenance or Test                        2- Manual Scram      ation of Data Entry
]                                          C-                      Refueling                                  3- Automatic Scram    Sheets for LER File
]                                          C-                      Refueling                                  3- Automatic Scram    Sheets for LER File
Line 181: Line 117:
(01-78)                                11- Other (explain)
(01-78)                                11- Other (explain)


j  : 1 41    1 i
j  : 1 41    1 i (A
                                        *                                    ,
0D 1-                                                    N 2                                                  o 78                                                    .
(A 0D 1-                                                    N 2                                                  o 78                                                    .
8B
8B
   )
   )
Line 193: Line 128:
d                        Q:s ea3c
d                        Q:s ea3c
                                                     ~:gu2 c
                                                     ~:gu2 c
_
                                                                   ~
                                                                   ~
_
                                                                                      .
I I    GFEDCBAR                                      %egoc"
I I    GFEDCBAR                                      %egoc"
   -              - - -      e a                                .                      _
   -              - - -      e a                                .                      _
Line 202: Line 134:
2 vjo
2 vjo
* H                U      _
* H                U      _
h e m e g fiu n                                                          R      N e r ir u u n i:                                    )cge3t U.        p          E      I ranaletp titalem
h e m e g fiu n                                                          R      N e r ir u u n i:                                    )cge3t U.        p          E      I ranaletp titalem 8*C geRou"              P O
                                          .
8*C geRou"              P O
T      _
T      _
(    isotine                                                            R      S eotronan                                                                T      H xnr              rgnt                                    L                    U paaTy                  c                                  i              M      T lltr                  eF                                c              O      D c      iaR              a                          Re                N      O iEvie                  oi                            en ps T      W nrans                  rl                                                H      N
(    isotine                                                            R      S eotronan                                                                T      H xnr              rgnt                                    L                    U paaTy                  c                                  i              M      T lltr                  eF                                c              O      D c      iaR              a                          Re                N      O iEvie                  oi                            en ps T      W nrans                  rl                                                H      N
Line 227: Line 157:
it      c                                                    '
it      c                                                    '
lr        -                                              2 ey
lr        -                                              2 ey
                                                                          ,


  '
                                                                              ,
    . ',
NARRATIVE  
NARRATIVE  


Line 243: Line 169:
Pertinent maintenance being performed during the shut-down are condensate pump seal repairs and charging line isolation valve repairs. The auxiliary feed line orifice flange modification was initiated. No other major safety related maintenance was per-formed during the period.
Pertinent maintenance being performed during the shut-down are condensate pump seal repairs and charging line isolation valve repairs. The auxiliary feed line orifice flange modification was initiated. No other major safety related maintenance was per-formed during the period.
l
l
        '
_ _ _ __.


    -
   .                                                              c.
   .                                                              c.
NARRATIVE  
NARRATIVE  
Line 253: Line 176:
OF OPERATING EXPERIENCE Docket No.                    50-301 Unit Name                    Point Beach Unit 2 Date                          August 5, 1980 Completed By                  C. W. Fay Telephone                    414/277-2811 Unit 2 operated at 495 MWe net throughout the period with 15 load reductions. One load reduction on July 16, 1980, was for crossover steam dump testing. The unit generated its 28 billionth kilowatt hour at 0548 hours on July 8, 1980, with site production surpassing 60 billion kilowatt hours during tne period.
OF OPERATING EXPERIENCE Docket No.                    50-301 Unit Name                    Point Beach Unit 2 Date                          August 5, 1980 Completed By                  C. W. Fay Telephone                    414/277-2811 Unit 2 operated at 495 MWe net throughout the period with 15 load reductions. One load reduction on July 16, 1980, was for crossover steam dump testing. The unit generated its 28 billionth kilowatt hour at 0548 hours on July 8, 1980, with site production surpassing 60 billion kilowatt hours during tne period.
The 2P14A containment spray pump was out of service to repair minor leaks and the varidrive on the "B" charging pump was repaired. No other major safety related maintenance was performed during the period.
The 2P14A containment spray pump was out of service to repair minor leaks and the varidrive on the "B" charging pump was repaired. No other major safety related maintenance was performed during the period.
!
I i
I i
!
l
l
                                                              *
             - . . . - _ _ - .      . _ .}}
             - . . . - _ _ - .      . _ .}}

Revision as of 17:55, 31 January 2020

Monthly Operating Repts for Jul 1980
ML19331B535
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/05/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML19331B533 List:
References
NUDOCS 8008120400
Download: ML19331B535 (8)


Text

- - _ _ _ _ _ -_ -__________ ______ _ _ _ _

.g-OPERATING DATA REPORT ,

DATE August 5, 1980 COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATING STATUS .

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1 [40TES A 2. REPORTING PERIOD: JULY 1980 . .

C 3. LICENSED THERMAL POWER (MWT): 1518. . .

O 4. NAMEPLATE RATING (GROSS MWE): 523.8 . .

g

5. DESIGN ELECTRICkL RATING (NET MWE): 497.
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 519.

cb 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495 ~

8 . IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGil 7) SINCE LAST REPORTe GIVE REASONS:

M NOT APPLICADLE

9. POWER LEVEL TO WHICH RESTRICTEDe IF ANY (NET MWE): 390.0
10. REASONS FOR RESTRICTIONS, (IF ANY): SEXXXKTTA00lNE3EIR$ Power restriction is the result of a self-imposed D reduction in core average temperature in an attempt to inhibit corrosion of steam generator tubt.s within the tubesheet crevice. THIS MONTil YR TO DATE CUMULATIVE
11. Il00RS IN REPORTING PERIOD 744 5,111 85e343
12. NUMBER OF HOURS REACTOR WAS CRITICAL 601.4 4,218.5 70,735.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 19.1 601.3
14. HOVRS GENERATOR ON LINE . 600.0 4,073.3 68,467.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 151.5 753.9
16. GROSS THERMAL ENERGY GENERATED (MWHI 722e969 4e908e025 95e660e820
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 233,820 1,598,000 32,231,750
18. NET ELECTRICAL ENERGY GENERATED (MWH) 220e574 le509e414 30e699e592 i 19. UNIT SERVICE FACTOR 80.6 79.7 80.2
20. UNIT AVAILADILITY FACTOR. 80.6 82.7 81.1
21. UNIT CAPACITY FACTOR (USING MDC NET) 59.9 59.7 73.9
22. UNIT CAPACITY FACTOR (USING DER NET) 59.7 59.4 72.4
23. UNIT FORCED OUTAGE RATE 0.2 01 3.4
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEe DATEe AND DURATION OF EACH':

Unit scheduled to shut down November 7, 1980, for approximately one month for ref+ ling.

25. IF SHUTDOWN AT END OF REPORT PERIODe ESTIMATED DATE OF STARTUP: A GUST 8, 1980 DATA REPORTED AND FACTORS CALCULATED AS REGbESTED IN NRC LETTER DATED SEPTEMBER 22e 1977

e g OPERATING DATA REPORT .

DOCKET No. 50-301 DATE August 5, 1980 s COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATING STATUS.

1. UNIT NAME: POINT BEACH NUCLEAR PLANT 0 nit 2 * [40TES .
2. REPORTING PERIOD: JULY 1980 . .
3. LICENSED THERMAL P0hER (MWT): 1518. . .
4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
5. DESIGN ELECTRICAL RATING (NET MWE): 497. . .

6~. MAXIMUM DEPENDADLE CAPACITY (GROSS MWE): 519. . .

< 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495 . . . . . . . . . . . . . . . . . . . .....

8. IF CHANGES 0CCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORTe GIVE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTEDe IF ANY (NET MWE): NOT APPLICABLE j 10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE

' THiS MONTH YR TO DATE CUMULATIVE

11. HOURS iN REPORT NG PERIOD , 744 S e 111. 70e128
12. NUMBER OF HOURS REACTOR WAS CRITICAL 'i44.0 4,010.9 62e907.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 19 2 . 185.3
14. HOURS GENERATOR.ON LINE 744.0 3e994 7 61e671.7
15. UNIT RESERVE SHUTDOWN HOURS .

0.0 13.5 . 119.9

16. GROSS THERMAL ENERGY GENERATED (MWH) 1,114,363 5,749,170 83,401,706
17. GROSS ELECTRICAL ENERGY GENERATED (MhH) 374e720 le922,570 28e283e910
18. NET ELECT 8ICAL ENERGY GENERATED (MWH) 357,605 1,829,787 . 26,904e914
19. UNIT SERVICE FACTOR 100.0 77.2 87.9
20. UNIT AVAILASILITY FACTOR. 100.0 77.4 88 1
21. UNIT CAPACITY FACTOR (USING MDC NET) 97.1 72.3 78.2
22. UNIT CAPACITY FACTOR (USING DER NET) 96.7 72.0 77.2
23. UNIT FORCED OUTAGE RATE 0.0 8.2 1.9 I
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEe DATEe AND DURATION OF EACH):

NONE t

25. IF SHUTDOWN AT END OF REPORT PERIODe ESTIMATED DATE OF START P: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REGOESTED IN NRC LETTER DATED SEPTEM0ER 22e 1977

~

, . . - _ - _. -_l- .- -.- _ _. ... . . -. -. ._

DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 DATE August 5, 1980

COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL i

MONTH July, 1980 AVERAGE AVERAGE AVERAGE

, DAILY DAILY DAILY I

POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 370 11 371 21 376

]

22 371 '*

l 2 371 12 371 3 371 13 358 23 370 4 373 14 371 24 322 5 374 15 375 25 344 6 372 16 368 26 -6 7 371 17 372 27 -2 j

8 372 18 372 28 -2 i

9 372 19 373 29 -2 ,

10 373 20 374 30 -2 i

31 -2 AD-28A (1-77)

" DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE August 5, 1980 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL i MONTH July, 1980 l

AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL

, DAY MWe NET - DAY MWe NET DAY MWe NET 1 458 11 489 21 488 2 426 12 486 22 486 3 468 13 486 23 485 4 483 14 487 24 482 5 468 15 488 25 486 6 442 16 488 26 486 7 486 17 488 27 483 8 488 18 485 28 487 9 488 19 492 29 483 10 488 20 484 30 484 31 483 AD-28A (1-77)

, UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-266 -

UNIT NAME Point Beach Unit 1 DATE Aunust 5. 1980 l REPORT MONTH anly. 1990 COMPLETED BY C. W. Fav TELEPHONE 414/277-2811 c u tn o 4 e

av au "co man St Pe ao in ce No. Date g 4g g jjg Licensee Event y g'g Cause and Corrective Action b :s :c e v .c Report No. ua so To Prevent Recurrence Q~ D'e e U) o 2: o i 0 I

4 3 800724 F 1.4 II 1 N/A IIF PILTEli The outage was due to a high i

differential pressure across the circulating water screens caused by a buildup of alewives that

entered the intake crib.

4 800726 S 142.6 D 1 80-009/OlT CB llTEXCil As required by NRC Confirmatory i Order of 11-30-79, the unit was

taken off line for the 90 effective full power day steam generator

testing. Both steam generators are

undergoing a 100% eddy current I examination through the first j support plate on the hot leg side, with 3% full length examinations.

i 1 3 F: Forced Reason: Metho'd:

  • Exhibit G-Instruc-i S: Scheduled A- Equipment Failure (explain) l- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry

] C- Refueling 3- Automatic Scram Sheets for LER File

D- Regulatory Restriction 4- Other (explain) (NUREG-0161)

! E- Operator Training & License Exam i 5 F- Administrative Exhibit I- Same

AD-28B G- Operational Error (explain) Source l

(01-78) 11- Other (explain)

j  : 1 41 1 i (A

0D 1- N 2 o 78 .

8B

)

1 D

SF a

: t e

SF co hr ec de ud N (Le~

l e

d Q:s ea3c

~:gu2 c

~

I I GFEDCBAR %egoc"

- - - - e a . _

OOAORRMEs tp dp e e a q o  :

2 vjo

  • H U _

h e m e g fiu n R N e r ir u u n i: )cge3t U. p E I ranaletp titalem 8*C geRou" P O

T _

( isotine R S eotronan T H xnr rgnt L U paaTy c i M T lltr eF c O D c iaR a Re N O iEvie oi en ps T W nrans rl H N

) r it u oe S o nr Tr re r gi ee t A c s E N

( &t t( Nv J D e i e o. ne u x Lo x l P p in p t y O l c l , W a e a E i n i u 1 R

)

n s e )

n )gnV ga' .

9 8 R E

0 E D x U a C m UoEgas4 T I

og'e o O N

S 432lM

- - e t C OAMMh a tuaao Tu .

htnnd os eouu: e rmaaall P

ra C

( t en TO eiS vd EM D xcc e LP UO p r nC EL NC lSa to PE IK acm ir Rr r HT OE TE T

na ee ND N

) m cc E AN ut MO 5 4 ri E.

rv SE ( Sate ee 4 C P 5 ox Nhtix n 1 o 0 uh U e io h cA 4 i -

ri Reoni ec / n 3 cb Etnsb t 2 t 0 ai Gs i i 7 1 t - oft o 7 F B 0ffo n - a e I 1o rG 2 a

- 6rD - 8 c 1 API 1 h S ) Ltrn 1 a Eaes U m R pt n e Ear i Fnru t ,

it c '

lr - 2 ey

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No. 50-266

, Unit Name Point Beach Unit 1 Date August 5, 1980 Completed By C. W. Fay Telephone 414/277-2811 Unit 1 operated at 375 MWe net throughout most of the period with two shutdowns and one load reduction. The load was reduced to 330 MWe net for two hours on July 13, 1980 for turbine stop valve testing.

A leak check of the spent fuel pool detected four very small leaks. The leaks were repaired.

The unit was taken off-line for 1.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> on July 24, 1980, due to a high differential pressure across the circulating water screens caused by a buildup of alewives that entered the intake crib.

The unit was taken off-line at 0123 hours0.00142 days <br />0.0342 hours <br />2.03373e-4 weeks <br />4.68015e-5 months <br /> on July 26, 1980, for the 90 effective full power day steam generator testing and repair outage. An 800 psig secondary-to-primary leak check of both steam generators was performed on July 28, 1980.

In the "A" steam generator, two dripping explosive plugs and two wet end plugs were identified in the hot leg with no leaks detected in the cold leg. In the "B" steam generator, one wet end explosive plug and one dripping tube were identified in the hot leg with no leaks detected in the cold leg. Further investigation including eddy current examination is being conducted.

Pertinent maintenance being performed during the shut-down are condensate pump seal repairs and charging line isolation valve repairs. The auxiliary feed line orifice flange modification was initiated. No other major safety related maintenance was per-formed during the period.

l

. c.

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date August 5, 1980 Completed By C. W. Fay Telephone 414/277-2811 Unit 2 operated at 495 MWe net throughout the period with 15 load reductions. One load reduction on July 16, 1980, was for crossover steam dump testing. The unit generated its 28 billionth kilowatt hour at 0548 hours0.00634 days <br />0.152 hours <br />9.060847e-4 weeks <br />2.08514e-4 months <br /> on July 8, 1980, with site production surpassing 60 billion kilowatt hours during tne period.

The 2P14A containment spray pump was out of service to repair minor leaks and the varidrive on the "B" charging pump was repaired. No other major safety related maintenance was performed during the period.