ML19347C383: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 21: Line 21:
           .. . om                                                          October 10, 1980
           .. . om                                                          October 10, 1980
     "'%,' 7.?' ""J!l '
     "'%,' 7.?' ""J!l '
       .                                                                    TXX-3217
       .                                                                    TXX-3217 Mr. W. C. Seidle, Chie.f Reactor Construction & Engineering i                  Support Branch jj              U. S. Nuclear Regulatory Commission
,
'
Mr. W. C. Seidle, Chie.f Reactor Construction & Engineering i                  Support Branch jj              U. S. Nuclear Regulatory Commission
;
;
Office of InspcLtion & Enforcement a              611 Ryan Plaza Dr., Suite 1000                            Docket Nos. 50-445 Arlington, Texas 76012                                                  50-446
Office of InspcLtion & Enforcement a              611 Ryan Plaza Dr., Suite 1000                            Docket Nos. 50-445 Arlington, Texas 76012                                                  50-446 a
                                                                                                      '
I                                      COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION UPPER INT RNAL        OT M 0 K INSERT 4
a I                                      COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION UPPER INT RNAL        OT M 0 K INSERT 4


==Dear Mr. Seidle:==
==Dear Mr. Seidle:==


'
On September 13, 1980, we verbally informed your Mr. Ray Hall that we q              were evaluating a deficiency with the Roto-lock insert locking tab as a potentially reportable deficiency within the definitions of
On September 13, 1980, we verbally informed your Mr. Ray Hall that we q              were evaluating a deficiency with the Roto-lock insert locking tab as a potentially reportable deficiency within the definitions of
<,              10 CFR 50.55(e).
<,              10 CFR 50.55(e).
-              We have completed our investigation and have concluded that the matter is not reportable under 10 CFR 50.55(e). Records supporting this determination are available for your Inspector's review at the CPSES
-              We have completed our investigation and have concluded that the matter is not reportable under 10 CFR 50.55(e). Records supporting this determination are available for your Inspector's review at the CPSES
   ,            site.
   ,            site.
1 Very truly yours,
1 Very truly yours, l
,
A & Gary R.    .
l A & Gary R.    .
RJG:dk cc: NRC Region IV - (0 + 1 copy)
RJG:dk cc: NRC Region IV - (0 + 1 copy)
  ,                      Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.
  ,                      Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.
;                      U. S. Nuclear Regulatory Commission
;                      U. S. Nuclear Regulatory Commission Washington, D. C. 20555 4      S 801 017a 1
.
Washington, D. C. 20555 4      S
  -
801 017a 1
            .                -.
15 i 0 2 ..
15 i 0 2 ..
                                                       . ..                          .-        -  ..  -}}
                                                       . ..                          .-        -  ..  -}}

Revision as of 02:48, 31 January 2020

Deficiency Rept Re Roto-lock Insert Locking Tab Installed at Facility.Problem Should Not Be Classified as Potentially Reportable Deficiency.Supporting Documentation Available at Plant Site
ML19347C383
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/10/1980
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, TXX-3217, NUDOCS 8010170502
Download: ML19347C383 (1)


Text

.. - _

TENAS UTILITIES GENERATING COMPANY 2001 BRYAN TOWER = DALLAH TEXAS 76201

.. . om October 10, 1980

"'%,' 7.?' ""J!l '

. TXX-3217 Mr. W. C. Seidle, Chie.f Reactor Construction & Engineering i Support Branch jj U. S. Nuclear Regulatory Commission

Office of InspcLtion & Enforcement a 611 Ryan Plaza Dr., Suite 1000 Docket Nos. 50-445 Arlington, Texas 76012 50-446 a

I COMANCHE PEAK STEAM ELECTRIC STATION 1981-83 2300 MW INSTALLATION UPPER INT RNAL OT M 0 K INSERT 4

Dear Mr. Seidle:

On September 13, 1980, we verbally informed your Mr. Ray Hall that we q were evaluating a deficiency with the Roto-lock insert locking tab as a potentially reportable deficiency within the definitions of

<, 10 CFR 50.55(e).

- We have completed our investigation and have concluded that the matter is not reportable under 10 CFR 50.55(e). Records supporting this determination are available for your Inspector's review at the CPSES

, site.

1 Very truly yours, l

A & Gary R. .

RJG:dk cc: NRC Region IV - (0 + 1 copy)

, Director, Inspection & Enforcement - (15 copies) c/o Distribution Services Branch, DDC, ADM.

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 4 S 801 017a 1

15 i 0 2 ..

. .. .- - .. -