IR 05000336/2014502: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(6 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
| author name = Dimitriadis A | | author name = Dimitriadis A | ||
| author affiliation = NRC/RGN-I/DRS/PSB1 | | author affiliation = NRC/RGN-I/DRS/PSB1 | ||
| addressee name = Heacock D | | addressee name = Heacock D | ||
| addressee affiliation = Dominion Resources, Inc | | addressee affiliation = Dominion Resources, Inc | ||
| docket = 05000336, 05000423 | | docket = 05000336, 05000423 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:ber 22, 2014 | ||
==SUBJECT:== | |||
MILLSTONE POWER STATION, UNITS 2 AND 3 - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NOS. | |||
SUBJECT: MILLSTONE POWER STATION, UNITS 2 AND 3 - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NOS. | |||
05000336/2014502 AND 05000423/2014502 | 05000336/2014502 AND 05000423/2014502 | ||
Line 29: | Line 28: | ||
On September 12, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the September 9, 2014, evaluated emergency preparedness exercise at your Millstone Power Station, Units 2 and 3 (Millstone). The enclosed inspection report documents the inspection results, which were discussed on September 12, 2014, with Mr. S. Scace, Site Vice President, and other members of your staff. | On September 12, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the September 9, 2014, evaluated emergency preparedness exercise at your Millstone Power Station, Units 2 and 3 (Millstone). The enclosed inspection report documents the inspection results, which were discussed on September 12, 2014, with Mr. S. Scace, Site Vice President, and other members of your staff. | ||
The inspection examined activities conducted under your licenses as they relate to safety and compliance with the | The inspection examined activities conducted under your licenses as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | ||
The NRC inspectors did not identify any findings or violations of more than minor significance. | The NRC inspectors did not identify any findings or violations of more than minor significance. | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) | ||
component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49 | |||
ML14295A280 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME SBarr RMcKinley ADimitriadis DATE 10/21/14 10/20/14 10/22/14 | |||
===Enclosure:=== | ===Enclosure:=== | ||
NRC Inspection Report Nos. 05000336/2014502 and 05000423/2014502 | NRC Inspection Report Nos. 05000336/2014502 and 05000423/2014502 w/Attachment: Supplementary Information | ||
== | REGION I== | ||
Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49 Report No.: 05000336/2014502 and 05000423/2014502 Licensee: Dominion Nuclear Connecticut, Inc. (Dominion) | |||
Facility: Millstone Power Station, Units 2 and 3 Location: P.O. Box 128 Waterford, CT 06385 Dates: September 8-12, 2014 Inspectors: S. Barr, Senior Emergency Preparedness Inspector, Division of Reactor Safety (DRS), Region I (Lead) | |||
B. Fuller, Senior Operations Inspector, DRS, Region I N. Day, Project Engineer, Division of Reactor Projects, Region I J. Ambrosini, Senior Resident Inspector, Millstone B. Haagensen, Resident Inspector, Millstone L. McKown, Resident Inspector, Millstone S. LaVie, Senior Emergency Preparedness Specialist, NSIR Approved By: Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety i Enclosure | |||
=SUMMARY OF FINDINGS= | |||
IR 05000336/2014502, 05000423/2014502; 09/08/2014 - 09/12/2014; Millstone Power Station | |||
Units 2 and 3 (Millstone); Exercise Evaluation - Hostile Action (HA) Event; Exercise Evaluation- Scenario Review; Performance Indicator Verification. | |||
This report covers an announced inspection conducted by four Region I-based inspectors, one senior EP specialist from the Office of Nuclear Security and Incident Response, and three resident inspectors. No findings were identified during the inspection. The | This report covers an announced inspection conducted by four Region I-based inspectors, one senior EP specialist from the Office of Nuclear Security and Incident Response, and three resident inspectors. No findings were identified during the inspection. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 5, dated February 2014. | ||
===Cornerstone: Emergency Preparedness=== | ===Cornerstone: Emergency Preparedness=== | ||
No findings were identified. | No findings were identified. | ||
ii | |||
=REPORT DETAILS= | =REPORT DETAILS= | ||
Line 95: | Line 66: | ||
==REACTOR SAFETY== | ==REACTOR SAFETY== | ||
===Cornerstone: | ===Cornerstone: Emergency Preparedness (EP)=== | ||
Emergency Preparedness (EP) | |||
1EP7 Exercise Evaluation - Hostile Action Event (71114.07 - 1 Sample) | 1EP7 Exercise Evaluation - Hostile Action Event (71114.07 - 1 Sample) | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix E, Section IV.F.2.j, requires in part that nuclear power reactor licensees, in each eight | Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix E, Section IV.F.2.j, requires in part that nuclear power reactor licensees, in each eight calendar year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA) directed at the plant site. Dominion designed the September 9, 2014, Millstone EP exercise to satisfy that requirement, and the U.S. Nuclear Regulatory Commission (NRC) inspected the Millstone HA event exercise to assess Dominions ability to effectively implement the Millstone Emergency Plan during a HA event. This overall exercise inspection activity represented the completion of one sample on a biennial cycle. | ||
calendar year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA) directed at the plant site. Dominion designed the September 9, 2014, Millstone EP exercise to satisfy that requirement, and the U.S. Nuclear Regulatory | |||
Commission (NRC) inspected the Millstone HA event exercise to assess | |||
The exercise evaluation consisted of the following review and assessment: | The exercise evaluation consisted of the following review and assessment: | ||
The adequacy of the Dominion Millstone | The adequacy of the Dominion Millstone EROs performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b) (4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment; onsite protective actions, and public protective action recommendations, respectively. | ||
The overall adequacy of | The overall adequacy of Dominions emergency response facilities with regard to Emergency Plan commitments. The facilities assessed were: the Control Room Simulator; the Alternative Facility (AF); the Central Alarm Station (CAS); the onsite Incident Command Post (ICP); the local law enforcement Unified Command Post (UCP); and the Alternative Emergency Operations Facility (AEOF). | ||
A review of other performance areas, such as the Dominion Millstone | A review of other performance areas, such as the Dominion Millstone EROs: | ||
recognition of abnormal plant conditions; command and control, including interactions with site security staff; intra- and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the Millstone Emergency Plan and their implementing procedures. | |||
A review of past performance issues from the last NRC Millstone exercise inspection report and recent Dominion Millstone EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the September 9, 2014, exercise and to ensure compliance with 10 CFR 50.47(b)(14). | A review of past performance issues from the last NRC Millstone exercise inspection report and recent Dominion Millstone EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the September 9, 2014, exercise and to ensure compliance with 10 CFR 50.47(b)(14). | ||
The | The licensees post-exercise critiques, to evaluate Dominions self-assessment of its Millstone ERO performance during the September 9, 2014, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g. | ||
The inspectors reviewed the documents listed in the attachment to this report. | The inspectors reviewed the documents listed in the attachment to this report. | ||
Line 122: | Line 89: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
1EP8 Exercise Evaluation - Scenario Review (71114.08 - 1 Sample) | 1EP8 Exercise Evaluation - Scenario Review (71114.08 - 1 Sample) | ||
Line 141: | Line 107: | ||
: (1) Drill and Exercise Performance (DEP) (EP01); | : (1) Drill and Exercise Performance (DEP) (EP01); | ||
: (2) ERO Drill Participation (EP02); and | : (2) ERO Drill Participation (EP02); and | ||
: (3) Alert and Notification System (ANS) Reliability (EP03). The last NRC EP PI inspection at Millstone was conducted in the fourth calendar quarter of 2013, so the inspectors reviewed supporting documentation from EP drills and tests from the fourth calendar quarter of 2013 through the second calendar quarter of 2014, to verify | : (3) Alert and Notification System (ANS) Reliability (EP03). The last NRC EP PI inspection at Millstone was conducted in the fourth calendar quarter of 2013, so the inspectors reviewed supporting documentation from EP drills and tests from the fourth calendar quarter of 2013 through the second calendar quarter of 2014, to verify the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, Regulatory Assessment Performance Indicator Guidelines, Revision 7. | ||
the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, | |||
Revision 7. | |||
This inspection activity represented the completion of three samples. | This inspection activity represented the completion of three samples. | ||
Line 150: | Line 113: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|4OA6}} | |||
{{a|4OA6}} | |||
==4OA6 Meetings, including Exit== | ==4OA6 Meetings, including Exit== | ||
On September 12, 2014, the inspectors presented the results of this inspection to | On September 12, 2014, the inspectors presented the results of this inspection to Mr. S. Scace, Site Vice President, and other members of the Dominion staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report. | ||
ATTACHMENT | ATTACHMENT | ||
=SUPPLEMENTAL INFORMATION= | =SUPPLEMENTAL INFORMATION= | ||
Line 163: | Line 125: | ||
===Licensee Personnel=== | ===Licensee Personnel=== | ||
: [[contact::S. Scace]], Site Vice President | : [[contact::S. Scace]], Site Vice President | ||
: [[contact::D. Smith]], Emergency Preparedness Manager | : [[contact::D. Smith]], Emergency Preparedness Manager | ||
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== | ==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== | ||
None. | None. | ||
==LIST OF DOCUMENTS REVIEWED== | ==LIST OF DOCUMENTS REVIEWED== | ||
}} | }} |
Latest revision as of 07:54, 20 December 2019
ML14295A280 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 10/22/2014 |
From: | Anthony Dimitriadis Plant Support Branch 1 |
To: | Heacock D Dominion Resources |
References | |
IR 2014502 | |
Download: ML14295A280 (11) | |
Text
ber 22, 2014
SUBJECT:
MILLSTONE POWER STATION, UNITS 2 AND 3 - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NOS.
05000336/2014502 AND 05000423/2014502
Dear Mr. Heacock:
On September 12, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the September 9, 2014, evaluated emergency preparedness exercise at your Millstone Power Station, Units 2 and 3 (Millstone). The enclosed inspection report documents the inspection results, which were discussed on September 12, 2014, with Mr. S. Scace, Site Vice President, and other members of your staff.
The inspection examined activities conducted under your licenses as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The NRC inspectors did not identify any findings or violations of more than minor significance.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of the NRCs document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49
ML14295A280 SUNSI Review Non-Sensitive Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME SBarr RMcKinley ADimitriadis DATE 10/21/14 10/20/14 10/22/14
Enclosure:
NRC Inspection Report Nos. 05000336/2014502 and 05000423/2014502 w/Attachment: Supplementary Information
REGION I==
Docket Nos.: 50-336, 50-423 License Nos.: DPR-65, NPF-49 Report No.: 05000336/2014502 and 05000423/2014502 Licensee: Dominion Nuclear Connecticut, Inc. (Dominion)
Facility: Millstone Power Station, Units 2 and 3 Location: P.O. Box 128 Waterford, CT 06385 Dates: September 8-12, 2014 Inspectors: S. Barr, Senior Emergency Preparedness Inspector, Division of Reactor Safety (DRS), Region I (Lead)
B. Fuller, Senior Operations Inspector, DRS, Region I N. Day, Project Engineer, Division of Reactor Projects, Region I J. Ambrosini, Senior Resident Inspector, Millstone B. Haagensen, Resident Inspector, Millstone L. McKown, Resident Inspector, Millstone S. LaVie, Senior Emergency Preparedness Specialist, NSIR Approved By: Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety i Enclosure
SUMMARY OF FINDINGS
IR 05000336/2014502, 05000423/2014502; 09/08/2014 - 09/12/2014; Millstone Power Station
Units 2 and 3 (Millstone); Exercise Evaluation - Hostile Action (HA) Event; Exercise Evaluation- Scenario Review; Performance Indicator Verification.
This report covers an announced inspection conducted by four Region I-based inspectors, one senior EP specialist from the Office of Nuclear Security and Incident Response, and three resident inspectors. No findings were identified during the inspection. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 5, dated February 2014.
Cornerstone: Emergency Preparedness
No findings were identified.
ii
REPORT DETAILS
REACTOR SAFETY
Cornerstone: Emergency Preparedness (EP)
1EP7 Exercise Evaluation - Hostile Action Event (71114.07 - 1 Sample)
a. Inspection Scope
Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix E,Section IV.F.2.j, requires in part that nuclear power reactor licensees, in each eight calendar year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA) directed at the plant site. Dominion designed the September 9, 2014, Millstone EP exercise to satisfy that requirement, and the U.S. Nuclear Regulatory Commission (NRC) inspected the Millstone HA event exercise to assess Dominions ability to effectively implement the Millstone Emergency Plan during a HA event. This overall exercise inspection activity represented the completion of one sample on a biennial cycle.
The exercise evaluation consisted of the following review and assessment:
The adequacy of the Dominion Millstone EROs performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b) (4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment; onsite protective actions, and public protective action recommendations, respectively.
The overall adequacy of Dominions emergency response facilities with regard to Emergency Plan commitments. The facilities assessed were: the Control Room Simulator; the Alternative Facility (AF); the Central Alarm Station (CAS); the onsite Incident Command Post (ICP); the local law enforcement Unified Command Post (UCP); and the Alternative Emergency Operations Facility (AEOF).
A review of other performance areas, such as the Dominion Millstone EROs:
recognition of abnormal plant conditions; command and control, including interactions with site security staff; intra- and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the Millstone Emergency Plan and their implementing procedures.
A review of past performance issues from the last NRC Millstone exercise inspection report and recent Dominion Millstone EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the September 9, 2014, exercise and to ensure compliance with 10 CFR 50.47(b)(14).
The licensees post-exercise critiques, to evaluate Dominions self-assessment of its Millstone ERO performance during the September 9, 2014, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g.
The inspectors reviewed the documents listed in the attachment to this report.
b. Findings
No findings were identified.
1EP8 Exercise Evaluation - Scenario Review (71114.08 - 1 Sample)
a. Inspection Scope
Prior to the September 9, 2014, EP exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Dominion had submitted to the NRC, to determine if the exercise would test major elements of the Millstone Emergency Plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle.
The inspectors reviewed the documents listed in the attachment to this report.
b. Findings
No findings were identified.
OTHER ACTIVITIES (OA)
4OA1 Performance Indicator Verification (71151 - 3 Samples)
a. Inspection Scope
The inspectors reviewed data for the Millstone EP Performance Indicators (PI), which are:
- (1) Drill and Exercise Performance (DEP) (EP01);
- (2) ERO Drill Participation (EP02); and
- (3) Alert and Notification System (ANS) Reliability (EP03). The last NRC EP PI inspection at Millstone was conducted in the fourth calendar quarter of 2013, so the inspectors reviewed supporting documentation from EP drills and tests from the fourth calendar quarter of 2013 through the second calendar quarter of 2014, to verify the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, Regulatory Assessment Performance Indicator Guidelines, Revision 7.
This inspection activity represented the completion of three samples.
b. Findings
No findings were identified.
4OA6 Meetings, including Exit
On September 12, 2014, the inspectors presented the results of this inspection to Mr. S. Scace, Site Vice President, and other members of the Dominion staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.
ATTACHMENT
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- S. Scace, Site Vice President
- D. Smith, Emergency Preparedness Manager
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None.