| | number = ML16337A098 | | | number = ML16337A098 |
| | issue date = 12/02/2016 | | | issue date = 12/02/2016 |
| | title = Palisades Nuclear Plant - NRC Temporary Instruction 2515/191, Mitigation Strategies, Spent Fuel Pool Instrumentation and Emergency Preparedness Inspection Report 05000255/2016008 | | | title = NRC Temporary Instruction 2515/191, Mitigation Strategies, Spent Fuel Pool Instrumentation and Emergency Preparedness Inspection Report 05000255/2016008 |
| | author name = Stone A M | | | author name = Stone A |
| | author affiliation = NRC/RGN-III/DRS/SS | | | author affiliation = NRC/RGN-III/DRS/SS |
| | addressee name = Arnone C F | | | addressee name = Arnone C |
| | addressee affiliation = Entergy Nuclear Operations, Inc | | | addressee affiliation = Entergy Nuclear Operations, Inc |
| | docket = 05000255 | | | docket = 05000255 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 2, 2016 | | {{#Wiki_filter:mber 2, 2016 |
|
| |
|
| Mr. Charles Arnone Vice President, Operations Entergy Nuclear Operations, Inc. Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
| | ==SUBJECT:== |
| | PALISADES NUCLEAR PLANTNRC TEMPORARY INSTRUCTION 2515/191, MITIGATION STRATEGIES, SPENT FUEL POOL INSTRUMENTATION AND EMERGENCY PREPAREDNESS INSPECTION REPORT 05000255/2016008 |
|
| |
|
| SUBJECT: PALISADES NUCLEAR PLANT-NRC TEMPORARY INSTRUCTION 2515/191, MITIGATION STRATEGIES, SPENT FUEL POOL INSTRUMENTATION AND EMERGENCY PREPAREDNESS INSPECTION REPORT 05000255/2016008
| | ==Dear Mr. Arnone:== |
| | On November 16, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed Temporary Instruction (TI) 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans inspection at your Palisades Nuclear Plant. The NRC inspection team discussed the results of this inspection with Mr. M. Lee and other members of your staff. The enclosed report represents the results of this inspection. |
|
| |
|
| ==Dear Mr. Arnone:==
| | The inspection examined activities conducted under your license as they relate to the implementation of mitigation strategies and spent fuel pool instrumentation orders (EA-12-049 and EA-12-051) and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, your compliance with the Commissions rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel. |
| On November 16, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed Temporary Instruction (TI) 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans" inspection at your Palisades Nuclear Plant. The NRC inspection team discussed the results of this inspection with Mr. M. Lee and other members of your staff. The enclosed report represents the results of this inspection. The inspection examined activities conducted un der your license as they relate to the implementation of mitigation strategies and spent fuel pool instrumentation orders (EA-12-049 and EA-12-051) and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, your compliance with the Commission's rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel. The NRC inspectors did not identify any findings or violations of more than minor significance. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
| |
| of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records System (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| |
|
| |
|
| Sincerely,/RA/
| | The NRC inspectors did not identify any findings or violations of more than minor significance. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| Ann Marie Stone, Team Leader Technical Support Staff
| |
|
| |
|
| Division of Reactor Projects Docket No. 50-255 License No. DPR-20 | | Sincerely, |
| | /RA/ |
| | Ann Marie Stone, Team Leader Technical Support Staff Division of Reactor Projects Docket No. 50-255 License No. DPR-20 |
|
| |
|
| ===Enclosure:=== | | ===Enclosure:=== |
| Inspection Report 05000255/2016008 cc: Distribution via LISTSERV | | Inspection Report 05000255/2016008 |
|
| |
|
| Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket No: 50-255 License No: DPR-20 Report No: 05000255/2016008 Licensee: Entergy Nuclear Operations, Inc. Facility: Palisades Nuclear Plant Location: Covert, MI Dates: September 26 through November 16, 2016
| | REGION III== |
| | Docket No: 50-255 License No: DPR-20 Report No: 05000255/2016008 Licensee: Entergy Nuclear Operations, Inc. |
|
| |
|
| Inspectors: J. Boettcher, Resident Inspector (Team Lead) B. Bartlett, Project Engineer J. Benjamin, Senior Reactor Inspector S. Sheldon, Project Engineer | | Facility: Palisades Nuclear Plant Location: Covert, MI Dates: September 26 through November 16, 2016 Inspectors: J. Boettcher, Resident Inspector (Team Lead) |
| | B. Bartlett, Project Engineer J. Benjamin, Senior Reactor Inspector S. Sheldon, Project Engineer Approved by: A. Stone, Team Leader Technical Support Staff Division of Reactor Projects Enclosure |
|
| |
|
| Approved by: A. Stone, Team Leader Technical Support Staff Division of Reactor Projects 2
| | =SUMMARY= |
| | Inspection Report 05000255/2016008, 09/26/2016 - 09/30/2016, Palisades Nuclear Plant; |
|
| |
|
| =SUMMARY=
| | Temporary Instruction 2515/191 Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. |
| Inspection Report 05000255/2016008, 09/26/2016 - 09/30/2016, Palisades Nuclear Plant; Temporary Instruction 2515/191 Implementation of Mitigation Strategies and Spent Fuel Pool
| |
|
| |
|
| Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans. This inspection was performed by a resident inspector and three U.S. Nuclear Regulatory Commission (NRC) regional inspectors. No findings of significance or violations of NRC requirements were identified during this inspection. The significance of inspection findings is indicated by their color (i.e., greater than Green, or Green, White, Yellow, Red) and determined using Inspection Manual Chapter 0609, "Significance Determination Process," dated April 29, 2015. Cross-cutting aspects are determined using Inspection Manual Chapter (IMC) 0310, "Aspects Within the Cross-Cutting Areas," dated December 4, 2014. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," dated July 2016.
| | This inspection was performed by a resident inspector and three U.S. Nuclear Regulatory Commission (NRC) regional inspectors. No findings of significance or violations of NRC requirements were identified during this inspection. The significance of inspection findings is indicated by their color (i.e., greater than Green, or Green, White, Yellow, Red) and determined using Inspection Manual Chapter 0609, "Significance Determination Process," dated April 29, 2015. Cross-cutting aspects are determined using Inspection Manual Chapter (IMC) 0310, "Aspects Within the Cross-Cutting Areas," dated December 4, 2014. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," dated July 201 |
|
| |
|
| ===NRC-Identified and Self-Revealing Findings=== | | ===NRC-Identified and Self-Revealing Findings=== |
|
| |
|
| None 3 | | None |
|
| |
|
| =REPORT DETAILS= | | =REPORT DETAILS= |
Line 55: |
Line 58: |
| ==OTHER ACTIVITIES== | | ==OTHER ACTIVITIES== |
| {{a|4OA5}} | | {{a|4OA5}} |
| ==4OA5 Other Activities (Temporary Instruction 2515/191) The objective of Temporary Instruction (TI) 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency== | | ==4OA5 Other Activities (Temporary Instruction 2515/191)== |
| | |
| | The objective of Temporary Instruction (TI) 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, is to verify the licensee has adequately implemented the mitigation strategies as described in the licensees Final Integrated Plan (Agencywide Documents Access Management System (ADAMS) Accession No. ML15351A351), the licensees supplement to the notification of full compliance (ADAMS Accession No. ML16083A285), and the U.S. Nuclear Regulatory Commissions (NRCs) safety evaluation (ADAMS Accession No. |
| | |
| | ML16014A318) and to verify the licensee installed reliable water-level measurement instrumentation in their spent fuel pool (SFP). The purpose of this TI was also to verify the licensee had implemented Emergency Preparedness (EP) enhancements as described in their site-specific submittals and NRC safety assessments, including multi-unit dose assessment capability and enhancements to ensure staffing is sufficient and communications can be maintained during such an event. |
|
| |
|
| Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans," is to verify the licensee has adequately implemented the mitigation strategies as described in the licensee's Final Integrated Plan (Agencywide Documents Access Management System (ADAMS) Accession No. ML15351A351), the licensee's supplement to the notification of full compliance (ADAMS Accession No. ML16083A285), and the U.S. Nuclear Regulatory Commission's (NRC's) safety evaluation (ADAMS Accession No. ML16014A318) and to verify the licensee installed reliable water-level measurement instrumentation in their spent fuel pool (SFP). The purpose of this TI was also to verify the licensee had implemented Emergency Preparedness (EP) enhancements as described in their site-specific submittals and NRC safety assessments, including multi-unit dose assessment capability and enhancements to ensure staffing is sufficient and communications can be maintained during such an event. The inspection also verifies plans for complying with NRC Orders EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML12054A736) and EA-12-051, "Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation" (ADAMS Accession No. ML12054A679) are in place and are being implemented by the licensee. Additionally, the inspection verified implementation of staffing and communications information provided in response to the March 12, 2012, request for information letter and multiunit dose assessment information provided per COMSECY-13-0010, "Schedule and Plans for Tier 2 Order on Emergency Preparedness for Japan Lessons Learned," dated March 27, 2013, (ADAMS Accession No. ML12339A262). The inspectors discussed the plans and strategies with plant staff, reviewed documentation, and where appropriate, performed plant walk downs to verify the strategies could be implemented as stated in the licensee's submittals and the NRC staff prepared safety evaluation. For most strategies, this included verification that the strategy was feasible, procedures and/or guidance had been developed, training had been provided to plant staff, and required equipment had been identified and staged.
| | The inspection also verifies plans for complying with NRC Orders EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (ADAMS Accession No. ML12054A736) and EA-12-051, Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation (ADAMS Accession No. ML12054A679) are in place and are being implemented by the licensee. Additionally, the inspection verified implementation of staffing and communications information provided in response to the March 12, 2012, request for information letter and multiunit dose assessment information provided per COMSECY-13-0010, Schedule and Plans for Tier 2 Order on Emergency Preparedness for Japan Lessons Learned, dated March 27, 2013, (ADAMS Accession No. ML12339A262). |
|
| |
|
| Specific details of the team's inspection activities are described in the following sections. | | The inspectors discussed the plans and strategies with plant staff, reviewed documentation, and where appropriate, performed plant walk downs to verify the strategies could be implemented as stated in the licensees submittals and the NRC staff prepared safety evaluation. For most strategies, this included verification that the strategy was feasible, procedures and/or guidance had been developed, training had been provided to plant staff, and required equipment had been identified and staged. |
| | |
| | Specific details of the teams inspection activities are described in the following sections. |
|
| |
|
| ===.1 Mitigation Strategies for Beyond-Design Basis External Events=== | | ===.1 Mitigation Strategies for Beyond-Design Basis External Events=== |
|
| |
|
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
| The inspectors examined the licensee's established guidelines and implementing procedures for the beyond-design basis mitigation strategies. The inspectors assessed how the licensee coordinated and documented the interface/transition between existing off-normal and emergency operating procedures with the newly developed mitigation strategies. The inspectors selected a number of mitigation strategies and conducted plant walk downs with licensed operators and responsible plant staff to assess: the adequacy and completeness of the procedures; familiarity of operators with the procedure objectives and specific guidance; staging and compatibility of equipment; and the practicality of the operator actions prescribed by the procedures, consistent with the postulated scenarios. The inspectors verified a preventive maintenance program had been established for the Diverse and Flexible Coping Strategies (FLEX) portable equipment and periodic equipment inventories were in place and being conducted. Additionally, the inspectors examined the introductory and planned periodic/refresher training provided to the Operations staff most likely to be tasked with implementation of the FLEX mitigation strategies. The inspectors also reviewed the introductory and planned periodic training provided to the Emergency Response Organization personnel. Documents reviewed are listed in the attachment. b. Assessment Based on samples selected for review, the inspectors verified the licensee satisfactorily implemented appropriate elements of the FLEX strategy as described in the plant specific submittal(s) and the associated safety evaluation and determined the licensee is generally in compliance with NRC Order EA-12-049. The inspectors verified the licensee satisfactorily: | | The inspectors examined the licensees established guidelines and implementing procedures for the beyond-design basis mitigation strategies. The inspectors assessed how the licensee coordinated and documented the interface/transition between existing off-normal and emergency operating procedures with the newly developed mitigation strategies. The inspectors selected a number of mitigation strategies and conducted plant walk downs with licensed operators and responsible plant staff to assess: the adequacy and completeness of the procedures; familiarity of operators with the procedure objectives and specific guidance; staging and compatibility of equipment; and the practicality of the operator actions prescribed by the procedures, consistent with the postulated scenarios. |
| | |
| | The inspectors verified a preventive maintenance program had been established for the Diverse and Flexible Coping Strategies (FLEX) portable equipment and periodic equipment inventories were in place and being conducted. Additionally, the inspectors examined the introductory and planned periodic/refresher training provided to the Operations staff most likely to be tasked with implementation of the FLEX mitigation strategies. The inspectors also reviewed the introductory and planned periodic training provided to the Emergency Response Organization personnel. Documents reviewed are listed in the attachment. |
| | |
| | b. Assessment Based on samples selected for review, the inspectors verified the licensee satisfactorily implemented appropriate elements of the FLEX strategy as described in the plant specific submittal(s) and the associated safety evaluation and determined the licensee is generally in compliance with NRC Order EA-12-049. The inspectors verified the licensee satisfactorily: |
| * developed and issued FLEX Support Guidelines (FSG) to implement the FLEX strategies for postulated external events; | | * developed and issued FLEX Support Guidelines (FSG) to implement the FLEX strategies for postulated external events; |
| * integrated their FSGs into their existing plant procedures such that entry into and departure from the FSGs were clear when using existing plant procedures; | | * integrated their FSGs into their existing plant procedures such that entry into and departure from the FSGs were clear when using existing plant procedures; |
| * protected FLEX equipment from site-specific hazards; | | * protected FLEX equipment from site-specific hazards; |
| * developed and implemented adequate testing and maintenance of FLEX equipment to ensure their availability and capability; | | * developed and implemented adequate testing and maintenance of FLEX equipment to ensure their availability and capability; |
| * trained their staff to assure personnel proficiency in the mitigation of beyond-design basis events; and | | * trained their staff to assure personnel proficiency in the mitigation of beyond-design basis events; and |
| * developed the means to ensure the necessary off-site FLEX equipment would be available from off-site locations. The inspectors verified non-compliances with current licensing requirements, and other issues identified during the inspection were entered into the licensee's corrective action program as appropriate. | | * developed the means to ensure the necessary off-site FLEX equipment would be available from off-site locations. |
| | |
| | The inspectors verified non-compliances with current licensing requirements, and other issues identified during the inspection were entered into the licensee's corrective action program as appropriate. |
|
| |
|
| ====c. Findings==== | | ====c. Findings==== |
Line 78: |
Line 93: |
|
| |
|
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
| The inspectors examined the licensee's newly installed SFP instrumentation. Specifically, the inspectors verified the sensors were installed as described in the plant specific submittals and the associated safety evaluation and that the cabling for the power supplies and the indications for each channel were physically and electrically separated. Additionally, environmental conditions and accessibility of the instruments were evaluated. Documents reviewed are listed in the attachment. | | The inspectors examined the licensees newly installed SFP instrumentation. |
| | |
| | Specifically, the inspectors verified the sensors were installed as described in the plant specific submittals and the associated safety evaluation and that the cabling for the power supplies and the indications for each channel were physically and electrically separated. Additionally, environmental conditions and accessibility of the instruments were evaluated. Documents reviewed are listed in the attachment. |
|
| |
|
| b. Assessment Based on samples selected for review, the inspectors determined the licensee satisfactorily installed and established control of the SFP instrumentation as described in the plant specific submittal(s) and the associated safety evaluation and determined the licensee is generally in compliance with NRC Order EA-12-051. The inspectors verified the licensee satisfactorily: | | b. Assessment Based on samples selected for review, the inspectors determined the licensee satisfactorily installed and established control of the SFP instrumentation as described in the plant specific submittal(s) and the associated safety evaluation and determined the licensee is generally in compliance with NRC Order EA-12-051. The inspectors verified the licensee satisfactorily: |
| * installed the SFP instrumentation sensors, cabling and power supplies to provide physical and electrical separation as described in the plant specific submittal(s)and safety evaluation; | | * installed the SFP instrumentation sensors, cabling and power supplies to provide physical and electrical separation as described in the plant specific submittal(s)and safety evaluation; |
| * installed the SFP instrumentation display in the location, environmental conditions and accessibility as described in the plant specific submittal(s); and | | * installed the SFP instrumentation display in the location, environmental conditions and accessibility as described in the plant specific submittal(s); and |
| * trained their staff to assure personnel proficiency with the maintenance, testing, and use of the SFP instrumentation. The inspectors verified non-compliances with current licensing requirements, and other issues identified during the inspection were entered into the licensee's corrective action program. | | * trained their staff to assure personnel proficiency with the maintenance, testing, and use of the SFP instrumentation. |
| | |
| | The inspectors verified non-compliances with current licensing requirements, and other issues identified during the inspection were entered into the licensee's corrective action program. |
|
| |
|
| ====c. Findings==== | | ====c. Findings==== |
Line 91: |
Line 110: |
|
| |
|
| ====a. Inspection Scope==== | | ====a. Inspection Scope==== |
| Through discussions with plant staff, review of documentation and plant walk downs, the inspectors verified the licensee has implemented required changes to staffing, communications equipment and facilities to support a multi-unit extended loss of alternating current power (ELAP) scenario as described in the licensee's staffing | | Through discussions with plant staff, review of documentation and plant walk downs, the inspectors verified the licensee has implemented required changes to staffing, communications equipment and facilities to support a multi-unit extended loss of alternating current power (ELAP) scenario as described in the licensees staffing assessment and the NRC safety assessment. The inspectors also verified the licensee has implemented multi-unit dose assessment (including releases from SFPs) capability using the licensees site-specific dose assessment software and approach as described in the licensees multi-unit dose assessment submittal. Documents reviewed are listed in the attachment. |
|
| |
|
| assessment and the NRC safety assessment. The inspectors also verified the licensee has implemented multi-unit dose assessment (including releases from SFPs) capability using the licensee's site-specific dose assessment software and approach as described in the licensee's multi-unit dose assessment submittal. Documents reviewed are listed in the attachment. b. Assessment The inspectors reviewed information provided in the licensee's multi-unit dose submittal and in response to the NRC's March 12, 2012, request for information letter and verified that the licensee satisfactorily implemented enhancements pertaining to Near-Term Task Force Recommendation 9.3 response to a large scale natural emergency event that results in an extended loss of all alternating current power to all site units and impedes access to the site. The inspectors verified the following:
| | b. Assessment The inspectors reviewed information provided in the licensees multi-unit dose submittal and in response to the NRCs March 12, 2012, request for information letter and verified that the licensee satisfactorily implemented enhancements pertaining to Near-Term Task Force Recommendation 9.3 response to a large scale natural emergency event that results in an extended loss of all alternating current power to all site units and impedes access to the site. The inspectors verified the following: |
| * the licensee satisfactorily implemented required staffing change(s) to support a multi-unit ELAP scenario; | | * the licensee satisfactorily implemented required staffing change(s) to support a multi-unit ELAP scenario; |
| * EP communications equipment and facilities are sufficient for dealing with a multi-unit ELAP scenario; and | | * EP communications equipment and facilities are sufficient for dealing with a multi-unit ELAP scenario; and |
| * the licensee implemented multi-unit dose assessment capabilities (including releases from SFPs) using the licensee's site-specific dose assessment software and approach. The inspectors verified non-compliances with current licensing requirements, and other issues identified during the inspection were entered into the licensee's corrective action program. | | * the licensee implemented multi-unit dose assessment capabilities (including releases from SFPs) using the licensees site-specific dose assessment software and approach. |
| | |
| | The inspectors verified non-compliances with current licensing requirements, and other issues identified during the inspection were entered into the licensee's corrective action program. |
|
| |
|
| ====c. Findings==== | | ====c. Findings==== |
| No findings were identified. | | No findings were identified. |
| {{a|4OA6}} | | {{a|4OA6}} |
| ==4OA6 Management Meeting Exit Meeting Summary On November 16, 2016, the inspectors presented the inspection results to Mr. M. Lee and other members of the licensee's staff.== | | ==4OA6 Management Meeting== |
| The licensee acknowledged the issues presented. The inspectors confirmed none of the potential report input discussed was considered proprietary. ATTACHMENT: | | |
| | ===Exit Meeting Summary=== |
| | |
| | On November 16, 2016, the inspectors presented the inspection results to Mr. M. Lee and other members of the licensees staff. The licensee acknowledged the issues presented. The inspectors confirmed none of the potential report input discussed was considered proprietary. |
| | |
| | ATTACHMENT: |
|
| |
|
| =SUPPLEMENTAL INFORMATION= | | =SUPPLEMENTAL INFORMATION= |
Line 108: |
Line 134: |
| ==KEY POINTS OF CONTACT== | | ==KEY POINTS OF CONTACT== |
|
| |
|
| Licensee | | Licensee |
| : [[contact::C. Arnone]], Site Vice President | | : [[contact::C. Arnone]], Site Vice President |
| : [[contact::A. Williams]], General Manager Plant Operations | | : [[contact::A. Williams]], General Manager Plant Operations |
| : [[contact::T. Mulford]], Operations Manager | | : [[contact::T. Mulford]], Operations Manager |
| : [[contact::B. Baker]], Operations Manager - Shift | | : [[contact::B. Baker]], Operations Manager - Shift |
| : [[contact::J. Borah]], Engineering Manager, Systems and Components | | : [[contact::J. Borah]], Engineering Manager, Systems and Components |
| : [[contact::T. Davis]], Regulatory Assurance | | : [[contact::T. Davis]], Regulatory Assurance |
| : [[contact::B. Dotson]], Regulatory Assurance | | : [[contact::B. Dotson]], Regulatory Assurance |
| : [[contact::J. Erickson]], Regulatory Assurance | | : [[contact::J. Erickson]], Regulatory Assurance |
| : [[contact::O. Gustafson]], Director of Regulatory and Performance Improvement | | : [[contact::O. Gustafson]], Director of Regulatory and Performance Improvement |
| : [[contact::J. Hardy]], Regulatory Assurance Manager | | : [[contact::J. Hardy]], Regulatory Assurance Manager |
| : [[contact::J. Haumersen]], Site Projects and Maintenance Services Manager | | : [[contact::J. Haumersen]], Site Projects and Maintenance Services Manager |
| : [[contact::G. Heisterman]], Maintenance Manager | | : [[contact::G. Heisterman]], Maintenance Manager |
| : [[contact::M. Lee]], Operations Manager - Support | | : [[contact::M. Lee]], Operations Manager - Support |
| : [[contact::D. Lucy]], Outage Manager | | : [[contact::D. Lucy]], Outage Manager |
| : [[contact::D. Malone]], Emergency Planning Manager | | : [[contact::D. Malone]], Emergency Planning Manager |
| : [[contact::W. Nelson]], Training Manager | | : [[contact::W. Nelson]], Training Manager |
| : [[contact::D. Nestle]], Radiation Protection Manager | | : [[contact::D. Nestle]], Radiation Protection Manager |
| : [[contact::K. O'Connor]], Engineering Manager, Design and Programs | | : [[contact::K. OConnor]], Engineering Manager, Design and Programs |
| : [[contact::C. Plachta]], Nuclear Independent Oversight Manager | | : [[contact::C. Plachta]], Nuclear Independent Oversight Manager |
| : [[contact::P. Russell]], Site Engineering Director | | : [[contact::P. Russell]], Site Engineering Director |
| : [[contact::M. Schultheis]], Performance Improvement Manager | | : [[contact::M. Schultheis]], Performance Improvement Manager |
| : [[contact::M. Soja]], Chemistry Manager | | : [[contact::M. Soja]], Chemistry Manager |
| : [[contact::J. Tharp]], Security Manager | | : [[contact::J. Tharp]], Security Manager |
| : [[contact::U.S. Nuclear Regulatory Commission A. Stone]], Team Leader, Technical Support Staff
| | U.S. Nuclear Regulatory Commission |
| | : [[contact::A. Stone]], Team Leader, Technical Support Staff |
|
| |
|
| ==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== | | ==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== |
|
| |
|
| ===Opened=== | | ===Opened=== |
| None | | |
| | None |
| | |
| ===Closed=== | | ===Closed=== |
| : None
| | |
| | None |
|
| |
|
| ===Discussed=== | | ===Discussed=== |
|
| |
|
| None | | None |
|
| |
|
| ==LIST OF DOCUMENTS REVIEWED== | | ==LIST OF DOCUMENTS REVIEWED== |
| The following is a partial list of documents reviewed during the inspection.
| |
| : Inclusion on this list does not imply the NRC inspector reviewed the documents in their entirety, but rather that selected sections or portions of the documents were evaluated as part of the overall inspection effort.
| |
| : Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
| |
| ===Condition Reports===
| |
| : Initiated as a Result of the Inspection -
| |
| : CR-HQN-2016-01215, It Was Discovered that Two Copies of the Palisades FLEX FIP Exist, September 27, 2016 -
| |
| : CR-PLP-2016-04603, It Was Discovered that the Labels on Both the FLEX Diesel Generators are Incorrect, September 28, 2016 -
| |
| : CR-PLP-2016-04610, Walkdown Discovered that the Labels on the FLEX Diesel Generators are Incorrect, September 28, 2016 -
| |
| : CR-PLP-2016-04638, Flooding Level in A Flex Building Question, September 29, 2016
| |
| -
| |
| : CR-PLP-2016-04641, A Later Version of Staffing Assessment, Revision 2, was Discovered, September 29, 2016 -
| |
| : CR-PLP-2016-04643, NRC Identified, Incorrect Value to Fill Tank T-81, September 29, 2016 -
| |
| : CR-PLP-2016-04650, No Specific Operator Guidance for Flex Hose Minimum Bend Radius, September 29, 2016
| |
| ===Condition Reports===
| |
| : Reviewed -
| |
| : CR-HQN-2015-00345, Potential Concern with the Instrumentation for Spent Fuel Pool Level Monitoring, April 9, 2015 -
| |
| : CR-HQN-2016-00164, Fukushima Project:
| |
| : Uninterruptable Power Supply Rated Battery Life, February 9, 2016 -
| |
| : CR-PLP-2015-02436, Cables do not Appear to Connect to the Generator, June 11, 2015
| |
| -
| |
| : CR-PLP-2015-02482, Tracking of NRC FLEX/SFPI Audit Follow-up Items, June 16, 2015 -
| |
| : CR-PLP-2015-05627, Broken Weld on "A" FLEX Generator, November 11, 2015 -
| |
| : CR-PLP-2015-05750, Breaker 11 was Found in Trip Free Condition, November 19, 2015
| |
| -
| |
| : CR-PLP-2016-00127,
| |
| : LI-2141 Spent Fuel Level Indicator Blank Screen, January 7, 2016
| |
| -
| |
| : CR-PLP-2016-01079, Uninterruptable Power Supply Battery Life Error, March 2, 2016
| |
| -
| |
| : CR-PLP-2016-01224, The Rating of the Generators in the FIP are Wrong, March 10, 2016 -
| |
| : CR-PLP-2016-01364, K-2 FLEX Diesel Generator Fuel Oil Level Low, March 19, 2016 -
| |
| : CR-PLP-2016-01655,
| |
| : LI-2141 Spent Fuel Level Indicator Blank Screen, April 5, 2016
| |
| -
| |
| : CR-PLP-2016-01740, Trend with
| |
| : LI-2141 Spent Fuel Level Indicator Blank Screen, April 12, 2016 -
| |
| : CR-PLP-2016-01902,
| |
| : LI-2141 Spent Fuel Level Indicator Time Incorrect, April 21, 2016
| |
| -
| |
| : CR-PLP-2016-02248, K-1 FLEX Diesel Generator Trailer Wiring Harness is Damaged, May 14, 2016 -
| |
| : CR-PLP-2016-02451, Satellite Phone Cords Failed, May 26, 2016
| |
| -
| |
| : CR-PLP-2016-02985,
| |
| : LI-2141 Spent Fuel Level Indicator Blank Screen, June 29, 2016
| |
| -
| |
| : CR-PLP-2016-03992,
| |
| : LI-2141 Spent Fuel Level Indicator Time Incorrect, August 25, 2016
| |
| -
| |
| : CR-PLP-2016-04564, NSRCs Declared Degraded but Operational due to the Inability of Two or More 4160VAC Portable Generators to Perform Load Sharing, September 26, 2016
| |
| ===Calculations===
| |
| -
| |
| : EA-GOTHIC-AFW-01, Auxiliary Feedwater Pump Room Heat Up Analysis, Revision 0 -
| |
| : EA-EC46465-08, Freezing of Coolant Sources for FLEX Event, Revision 0
| |
| -
| |
| : EA-EC46465-14, T-2 Inventory Makeup Capability of AFW with T-81 Gravity Feed, Revision 0 -
| |
| : EA-EC46467-04, Sliding and Rocking Evaluation of FLEX Storage Building-A Equipment, Revision 1
| |
| ===Drawings===
| |
| - B213781, 2500 kVA Transformer Outline Drawing for Graybar, Revision 0 - E-1 Sh. A, Single Line Meter and Relay Diagram, Revision 12 - E-44 Sh. 156, Lighting Panel Schedule Panel L-76, Revision 7 - E-44 Sh. 105, Lighting Panel Schedule Panel L-258, Revision 6 Miscellaneous Documents - Enercon Report, Flex Portable Hose Failure Extent of Condition Review - Letter of Agreement Between Entergy Nuclear Operations, Inc., as Agent for Entergy Nuclear Palisades, LLC, Owner of Palisades Nuclear Power Plant and Andrews University Airpark
| |
| : Airport Authority, September 15, 2014 - Letter to the NRC from Anthony J. Vitale, Response to NRC Request for Information Pursuant to 10
| |
| : CFR 50.54(f) Regarding Recommendation 9.3, Emergency Preparedness - Staffing, Requested Information Items 1, 2, and 6 - Phase 2 Staffing Assessment, May 19, 2015 - Letter to the NRC from Anthony J. Vitale, Notification of Full Compliance with NRC Order
| |
| : EA-12-049, "Order Modifying Licenses with Regar
| |
| d to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," December 16, 2015 - Letter to the NRC from Anthony J. Vitale, Notification of Full Compliance with NRC Order
| |
| : EA-12-049, "Order Modifying Licenses with Regar
| |
| d to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," December 16, 2015 - Letter to Vice President, Operations at Entergy Nuclear Operations, Inc. from Mandy Halter, NRC/NRR, Palisades Nuclear Plant - Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders
| |
| : EA-12-049
| |
| and
| |
| : EA-12-051 (CAC Nos. MF0768 and MF0769), August 22, 2016 -
| |
| : LO-HWNLO-2015-0001, Phase 2 Communicati ons Assessment Fukushima Project, April 19, 2016 - M0204-0161, MOHR Vendor Manual SFPI Level Indication, Revision 0
| |
| -
| |
| : Memorandum of Understanding Between West Michigan Airport Authority and Entergy Nuclear Operations, Inc., as Agent for Entergy Nuclear Palisades, LLC, Owner of Palisades Nuclear Power Plant, September 15, 2014 - MSP/EMHSD Response Procedure #22 b, Emer gency Operation Center Extended Loss AC Power Response Plan, August 2015 - Mutual Assistance Agreement Between DTE Energy Electric Company, Entergy Nuclear Palisades, LLC and Indiana Michigan Power -
| |
| : PLP-RPT-13-00050, Turbine Driven Auxiliary Feedwater (TDAFW) Upgrade Evaluation for FLEX, Revision 0 -
| |
| : PLP-RPT-14-00030, Report of Geotechnical Exploration FLEX Equipment Storage Building, Revision 0 -
| |
| : PLP-RPT-15-00049, Palisades Final Integrated Plan for FLEX Implementation, Revision 0
| |
| -
| |
| : PLP-RPT-15-00049, Palisades Final Integrated Plan for FLEX Implementation, Revision 1 - Palisades Nuclear Plant FLEX Validation, September 28, 2015
| |
| - Palisades Nuclear Plant IPEEE, Revision 1 - Palisades Nuclear Plant
| |
| : NEI 12-01 / Phase 2 Staffing Assessment, Revision 1
| |
| - Palisades Nuclear Plant
| |
| : NEI 12-01 / Phase 2 Staffing Assessment, Revision 2 - SAFER Response Plan for Palisades Nuclear Plant, Revision 1 - Snapshot Assessment: Pre-NRC Fukushima Lessons Learned, Une 21, 2016
| |
| -
| |
| : WCAP-17601-P, Reactor Coolant System Response to the Extended Loss of AC Power Event for Westinghouse, Combustion Engineering, and Babcock & Wilcox NSSS Designs, Revision 0 Modifications -
| |
| : EC 46465, FLEX Basis (Base/Parent EC), Revision 0 -
| |
| : EC 46466, Spent Fuel Pool Instrumentation, Revision 0
| |
| -
| |
| : EC 46467, Storage Buildings, Revision 0 -
| |
| : EC 47490, EP Communications, Revision 0 -
| |
| : EC 63992, Capacity of Turbine Building Uninterruptable Power Supply, Revision 0 -
| |
| : EC 66731, FLEX Hose Bend Radius Evaluation, Revision 0
| |
| ===Procedures===
| |
| -
| |
| : AOP-26, Loss of Spent Fuel Pool Cooling, Revision 3 -
| |
| : AOP-30,
| |
| : Loss of Shutdown Cooling, Revision 2
| |
| -
| |
| : AOP-38, Acts of Nature, Revision 6
| |
| -
| |
| : ARP-7, Auxiliary Systems Scheme
| |
| : EK-11 (C-13), Revision 96 -
| |
| : EI-6.0, Palisades Nuclear Plant Emergency Impl ementing Procedure Rapid Dose Calculation, Revision 16 -
| |
| : EI-6.9, Palisades Nuclear Plant Emergency Implementing Procedure Automated Dose Assessment Program, Revision 8 -
| |
| : EN-OP-201, Diverse and Flexible Coping Strategies (FLEX) Fleet Program Document, Revision 2 -
| |
| : EN-OP-201-05, Palisades FLEX Program Document, Revision 1 -
| |
| : EN-OP-202, Diverse and Flexible Coping Strategies (FLEX) Program Document Bases, Revision 0 -
| |
| : EN-OU-103, Long Range Outage Planning, Revision 3
| |
| -
| |
| : EN-WM-105, Planning, Revision 16
| |
| -
| |
| : EN-WM-109, Scheduling, Revision 10 -
| |
| : EOP-1.0, Standard Post-Trip Actions, Revision 18 -
| |
| : EOP-2.0, Reactor Trip Recovery, Revision 14
| |
| -
| |
| : EOP-3.0, Station Blackout Recovery, Revision 17
| |
| - EOP 8.0, Loss of Offsite PWR - Forced Circulation Recovery, Revision 19
| |
| - EOP 9.0,
| |
| : PC-2 PCS Press Control PORVS
| |
| : PC-2 Tree D, Revision 19
| |
| -
| |
| : FIG-1, FLEX Generator Staging and Operation, Revision 1 -
| |
| : FIG-2, FLEX Pump Staging and Operations, Revision 0 -
| |
| : FIG-3, Alternate SFP Makeup and Cooling, Revision 0
| |
| -
| |
| : FIG-4, Low Pressure Feedwater, Revision 0
| |
| -
| |
| : FIG-5, FLEX T-77 Boration Blending, Revision 0
| |
| -
| |
| : FIG-7, FLEX PCS Injection, Revision 0 -
| |
| : FIG-8, Alternate Ventilation, Revision 0 -
| |
| : FIG-9, Backup ADV Nitrogen Station 9 Operation, Revision 0
| |
| -
| |
| : FIG-10, Fuel Oil Transfer, Revision 0
| |
| -
| |
| : FIG-11, Service Water - NSRC (Phase 3), Revision 0
| |
| -
| |
| : FIG-12, 4160 VAC Generator - NSRC (Phase 3), Revision 2 -
| |
| : FSG-1, Long Term Inventory Control, Revision 0
| |
| -
| |
| : FSG-4, ELAP DC Bus Load Shed and Management, Revision 0 -
| |
| : FSG-5, Initial Assessment and FLEX Equipment Staging, Revision 0 -
| |
| : FSG-5, Initial Assessment and FLEX Equipment Staging - Attachment 4, Ops Flowchart, Revision 0 -
| |
| : FSG-7, Loss of Vital Instrument or Control Power, Revision 1
| |
| -
| |
| : FSG-8, Alternate PCS Boration, Revision 0
| |
| -
| |
| : FSG-11, Alternate SFP Makeup and Cooling, Revision 0 -
| |
| : FSG-13, Transition from Flex Equipment, Revision 0 -
| |
| : FSG-14, Shutdown PCS Makeup, Revision 0
| |
| -
| |
| : FSG-15, Shutdown ELAP, Revision 0
| |
| -
| |
| : FSG-100, Beyond Design Bases External Event (BDBEE) with an Extended Loss of Offsite and Onsite Power (ELAP) Emergency Response, Revision 0 -
| |
| : FSG-101, BDBEE / EP Communications, Revision 1 -
| |
| : SOP-2A, Chemical and Volume Control System, Revision 86
| |
| -
| |
| : SOP-14, Service Water System, Revision 65
| |
| - Spent Fuel Pool Level Instrumentation (SFPI) Boric Acid Mitigation, January 14, 2014 - Spent Fuel Pool Level Instrumentation (SFPI) Channel Functional Check, January 14, 2014
| |
| : Training Documents -
| |
| : PLLP-NLO Training, FLEX Loader, Revision 0 -
| |
| : PLLP-OPS-FLEXOVER, FLEX Process & Equipment, Training Cycle 15B -
| |
| : PLLP-OPS-15D-01, Palisades Operations Cycle 15D Kickoff
| |
| -
| |
| : PLLP-OPS-FLEXGAP, FLEX Process & Equipment, Cycle 15E GAP Training
| |
| ===Work Orders===
| |
| -
| |
| : 00374145 04, FUK,
| |
| : EC-47345,
| |
| : BUS 19 Voltage & Phase Rotation Checks, October 4, 2015 -
| |
| : 00374147 04, FUK,
| |
| : EC-47345,
| |
| : BUS 20 Voltage & Phase Rotation Checks, September 29, 2015 -
| |
| : 00378594 16, FUK, (FLEX
| |
| : EC-46465) Verification of FLEX Pumps/Equip, August 26, 2015
| |
| -
| |
| : 00378594 17, FUK, (FLEX
| |
| : EC-46465) Verification of PH 2 Generator/Equip, August 27, 2015
| |
| -
| |
| : 00424932 01, FLEX Standby Periodic Maintenance (PM) - 6 Month Inspection -
| |
| : FEL-FLEX1B, April 19, 2016 -
| |
| : 00424934 01, FLEX Standby PM - 6 Month Functional - K-4-FLEX Generator, March 19, 2016 -
| |
| : 00424939 01, FLEX Standby PM - 6 Month Inspection - Tow Vehicle A, April 19, 2016
| |
| -
| |
| : 00424941 01, FLEX Standby PM - 6 Month Functional - C-910 Air Comp, April 19, 2016
| |
| -
| |
| : 52676484 01, FLEX Standby PM - 1 Yr Operational Test - P-1002 Pump (FSB B), April 19, 2016 -
| |
| : 52676487 01, FLEX Standby PM - 1 Yr Operational Test - K-1-FLEX Generator, April 19, 2016 -
| |
| : 52676489 01, FLEX Standby PM - 1 Yr Operational Test - K-2-FLEX Generator, April 19, 2016 -
| |
| : 52709100 01, Emergency Communications Test, Monthly, August 31, 2016
| |
| ==LIST OF ACRONYMS==
| |
| : [[USED]] [[]]
| |
| : [[ADAMS]] [[Agencywide Documents Access Management System]]
| |
| : [[CFR]] [[Code of Federal Regulations]]
| |
| : [[ELAP]] [[Extended Loss of]]
| |
| : [[AC]] [[Power]]
| |
| : [[EP]] [[Emergency Preparedness]]
| |
| : [[FLEX]] [[Diverse and Flexible Coping Strategies]]
| |
| : [[FSG]] [[]]
| |
| : [[FLEX]] [[Support Guidelines]]
| |
| : [[IMC]] [[Inspection Manual Chapter]]
| |
| : [[NRC]] [[U.S. Nuclear Regulatory Commission]]
| |
| : [[PARS]] [[Publicly Available Records System]]
| |
| : [[PM]] [[Periodic Maintenance]]
| |
| SFP Spent Fuel Pool TI Temporary Instruction
| |
| C. Arnone -2- In accordance with Title 10 of the Code of Federal Regulations
| |
| (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
| |
| of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public
| |
| inspection in the
| |
| : [[NRC]] [['s Public Document Room or from the Publicly Available Records System (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).]]
| |
| : [[ADAMS]] [[is accessible from the]]
| |
| NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| |
| Sincerely,
| |
| /RA/
| |
| Ann Marie Stone, Team Leader
| |
| Technical Support Staff
| |
|
| |
|
| Division of Reactor Projects
| |
| Docket No. 50-255 License No. DPR-20
| |
| Enclosure: Inspection Report 05000255/2016008 cc: Distribution via
| |
| : [[LISTSE]] [[RV]]
| |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 IR 05000255/20240112024-07-15015 July 2024 Nuclear Plant - Restart Inspection Report 05000255/2024011 IR 05000255/20240012024-05-10010 May 2024 NRC Inspection Report No. 05000255/2024001 IR 05000255/20244012024-04-0909 April 2024 – Decommissioning Security Inspection Report 05000255/2024401 IR 05000255/20240102024-03-20020 March 2024 Plant Reference Simulator Inspection Report 05000255/2024010 IR 05000255/20230042024-02-20020 February 2024 NRC Inspection Report 05000255/2023004(DRSS) Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 IR 05000255/20220022022-08-0303 August 2022 Integrated Inspection Report 05000255/2022002 IR 05000255/20220012022-05-13013 May 2022 Integrated Inspection Report 05000255/2022001 IR 05000255/20220102022-04-0101 April 2022 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000255/2022010 IR 05000255/20210062022-03-0202 March 2022 Annual Assessment Letter for Palisades Nuclear Plant, Unit 1, (Report 05000255/2021006) IR 05000255/20210102022-02-24024 February 2022 Triennial Fire Protection Inspection Report 05000255/2021010 IR 05000255/20210042022-02-0808 February 2022 Integrated Inspection Report 05000255/2021004 and Exercise of Enforcement Discretion IR 05000255/20214042021-11-15015 November 2021 NRC Independent Spent Fuel Storage Installation Security Inspection Report 05000255/2021404 and 07200007/2021401 IR 05000255/20210032021-11-0303 November 2021 Integrated Inspection Report 05000255/2021003 IR 05000255/20214032021-10-21021 October 2021 Material Control and Accounting Program Inspection Report 05000255/2021403 IR 05000255/20214022021-10-0606 October 2021 Security Baseline Inspection Report 05000255/2021402 IR 05000255/20210052021-09-0101 September 2021 Updated Inspection Plan for Palisades Nuclear Plant (Report 05000255/2021005) IR 05000255/20210022021-08-10010 August 2021 Integrated Inspection Report 05000255/2021002 ML21197A0322021-07-21021 July 2021 Review of the Fall 2020 Steam Generator Tube Inspection Report IR 05000255/20210012021-05-12012 May 2021 Integrated Inspection Report 05000255/2021001 IR 05000255/20214012021-04-14014 April 2021 Security Baseline Inspection Report 05000255/2021401 IR 05000255/20200062021-03-0404 March 2021 Annual Assessment Letter for Palisades Nuclear Plant (Report 05000255/2020006) IR 05000255/20200042021-02-11011 February 2021 Integrated Inspection Report 05000255/2020004 IR 05000255/20204012021-01-0606 January 2021 Security Baseline Inspection Report 05000255/2020401 ML20342A1812020-12-10010 December 2020 Security Inspection Report Cover Letter 05000255/2020420 IR 05000255/20204202020-12-10010 December 2020 Security Inspection Report 05000255/2020420 IR 05000255/20204022020-11-30030 November 2020 Cyber Security Inspection Report 05000255/2020402 IR 05000255/20205012020-11-20020 November 2020 Emergency Preparedness Inspection Report 05000255/2020501 IR 05000255/20200032020-11-13013 November 2020 Integrated Inspection Report 05000255/2020003 IR 05000255/20200052020-09-0101 September 2020 Updated Inspection Plan for Palisades Nuclear Plant (Report 05000255/2020005) IR 05000255/20200102020-08-24024 August 2020 Biennial Problem Identification and Resolution Inspection Report 05000255/2020010 IR 05000255/20203012020-08-13013 August 2020 NRC Initial License Examination Report 05000255/2020301 IR 05000255/20200022020-08-11011 August 2020 Integrated Inspection Report 05000255/2020002 and Exercise of Enforcement Discretion IR 05000255/20010082020-05-12012 May 2020 Final ASP Analysis - Palisades (IR 050002552001008) IR 05000255/20200012020-05-12012 May 2020 Integrated Inspection Report 05000255/2020001 IR 05000255/20200112020-04-21021 April 2020 Design Basis Assurance Inspection (Teams) Inspection Report 05000255/2020011 IR 05000254/20204012020-03-23023 March 2020 Security Baseline Inspection Report 05000254/2020401 and 05000265/2020401 IR 05000255/20190062020-03-0303 March 2020 Annual Assessment Letter Palisades Nuclear Plant (Report 05000255/2019006) IR 05000255/20190042020-01-28028 January 2020 Integrated Inspection Report 05000255/2019004 and 07200007/2019001 ML19357A2752019-12-23023 December 2019 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000255/2020011 IR 05000255/20190112019-11-27027 November 2019 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000255/2019011 IR 05000255/20194112019-11-25025 November 2019 Security Baseline Inspection Report 05000255/2019411 and Independent Spent Fuel Storage Security Inspection Report 07200007/2019401 (Cover Letter Only) (DRS-M.Ziolkowski) IR 05000255/20190032019-11-14014 November 2019 Integrated Inspection Report 05000255/2019003 IR 05000255/20190102019-10-29029 October 2019 Reissue - Palisades Nuclear Plant - Design Basis Assurance Inspection (Programs) Inspection Report 05000255/2019010 ML19294A2872019-10-21021 October 2019 Design Basis Assurance Inspection (Programs) Inspection Report 05000255/2019010 2024-09-06
[Table view] Category:Letter
MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations ML24206A0572024-07-25025 July 2024 PRM-50-125 - Letter to Alan Blind; Docketing of Petition for Rulemaking and Sufficiency Review Status (10 CFR Part 50) PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000255/20240112024-07-15015 July 2024 Nuclear Plant - Restart Inspection Report 05000255/2024011 PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24183A1382024-07-0202 July 2024 Tribal Letter - Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24137A0142024-07-0202 July 2024 OEDO-24-00011 - 2.206 Petition for Misuse of Palisades Decommissioning Trust Fund (EPID L-2023-CRS-0008) - Letter ML24183A1492024-07-0101 July 2024 Tribal Letter - Pokagon Band of Potawatomi Indians ML24156A0222024-07-0101 July 2024 Initiation of Scoping Process to Prepare an Environmental Assessment for the Environmental Review of Holtec Decommissioning International, Llc’S Licensing and Regulatory Requests for Reauthorization of Power Operations at Palisades EPID L-2 ML24183A1552024-07-0101 July 2024 Tribal Letter - Red Lake Band of Chippewa Indians ML24183A1542024-07-0101 July 2024 Tribal Letter Red Cliff Band of Lake Superior Chippewa Indians ML24172A0032024-07-0101 July 2024 Letter to L. Powers, Mackinac Bands of Chippewa and Ottawa Indians Re Initiation of Scoping Process for Environ Review Holtec Decommissioning Intl, LLC Request for Reauthorization of Power Ops-Palisades ML24183A1332024-07-0101 July 2024 Tribal Letter-Forest County Potawatomi Community ML24183A1582024-07-0101 July 2024 Tribal Letter Sault Ste. Marie Tribe of Chippewa Indians ML24183A1302024-07-0101 July 2024 Tribal Letter-Chippewa Cree Indians of the Rocky Boys Reservation ML24183A1282024-07-0101 July 2024 Tribal letter-Bay Mills Indian Community ML24183A1532024-07-0101 July 2024 Tribal Letter Quechan Tribe of the Fort Yuma Indian Reservation ML24183A1572024-07-0101 July 2024 Tribal Letter - Saint Croix Chippewa Indians of Wisconsin ML24183A1462024-07-0101 July 2024 Tribal letter-Mille Lacs Band of Ojibwe ML24183A1422024-07-0101 July 2024 Tribal Letter-Little Traverse Bay Bands of Odawa Indians ML24183A1312024-07-0101 July 2024 Tribal Letter-Citizen Potawatomi Nation ML24163A0552024-07-0101 July 2024 Rebecca Held Knoche NOAA-Palisades-NOI to Conduct Scoping Process and Prepare an EA - EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24163A2392024-07-0101 July 2024 Sara Thompson, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24155A0102024-07-0101 July 2024 Quentin L. Messer Jr., Michigan Econ-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003 Docket No.50-0255P ML24155A0032024-07-0101 July 2024 Kathy Kowal, Us EPA Region 5-Palisades-NOI to Cibdyct Scoping Process and Prepare an EA EPID L-2024-LNE-0003 ML24163A0832024-07-0101 July 2024 Ltr to R Schumaker SHPO Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1342024-07-0101 July 2024 Tribal Letter-Grand Portage Band of Lake Superior Chippewa ML24183A1392024-07-0101 July 2024 Tribal Letter-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24183A1272024-07-0101 July 2024 Tribal Letter-Bad River Band of the Lake Superior Tribe of Chippewa ML24183A1412024-07-0101 July 2024 Tribal Letter-Little River Band of Ottawa Indians ML24163A1922024-07-0101 July 2024 Jeremy Rubio, Dept of Env, Great Lakes and Energy, Kalamazoo District-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No.50-0255 ML24183A1322024-07-0101 July 2024 Tribal Letter-Fond Du Lac Band of Lake Superior Chippewa ML24183A1592024-07-0101 July 2024 Tribal letter-Sokaogon Chippewa Community ML24163A0822024-07-0101 July 2024 Ltr to J Loichinger Achp Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1252024-07-0101 July 2024 Letter to G. Gould, Swan Creek Black River Confederated Ojibwa-Init of Scoping Process for the Env Rev of Holtec Decommissioning Intl, LLC Request for Reauth of Power Ops at Palisades ML24183A1352024-07-0101 July 2024 Tribal Letter-Hannahville Indian Community ML24183A1442024-07-0101 July 2024 Tribal Letter - Menominee Indian Tribe of Wisconsin ML24183A1502024-07-0101 July 2024 Tribal Letter - Prarie Band Potawatomi Nation ML24183A1452024-07-0101 July 2024 Tribal Letter - Miami Tribe of Oklahoma 2024-09-06
[Table view] |
Text
mber 2, 2016
SUBJECT:
PALISADES NUCLEAR PLANTNRC TEMPORARY INSTRUCTION 2515/191, MITIGATION STRATEGIES, SPENT FUEL POOL INSTRUMENTATION AND EMERGENCY PREPAREDNESS INSPECTION REPORT 05000255/2016008
Dear Mr. Arnone:
On November 16, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed Temporary Instruction (TI) 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans inspection at your Palisades Nuclear Plant. The NRC inspection team discussed the results of this inspection with Mr. M. Lee and other members of your staff. The enclosed report represents the results of this inspection.
The inspection examined activities conducted under your license as they relate to the implementation of mitigation strategies and spent fuel pool instrumentation orders (EA-12-049 and EA-12-051) and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, your compliance with the Commissions rules and regulations, and with the conditions of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel.
The NRC inspectors did not identify any findings or violations of more than minor significance. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Ann Marie Stone, Team Leader Technical Support Staff Division of Reactor Projects Docket No. 50-255 License No. DPR-20
Enclosure:
Inspection Report 05000255/2016008
REGION III==
Docket No: 50-255 License No: DPR-20 Report No: 05000255/2016008 Licensee: Entergy Nuclear Operations, Inc.
Facility: Palisades Nuclear Plant Location: Covert, MI Dates: September 26 through November 16, 2016 Inspectors: J. Boettcher, Resident Inspector (Team Lead)
B. Bartlett, Project Engineer J. Benjamin, Senior Reactor Inspector S. Sheldon, Project Engineer Approved by: A. Stone, Team Leader Technical Support Staff Division of Reactor Projects Enclosure
SUMMARY
Inspection Report 05000255/2016008, 09/26/2016 - 09/30/2016, Palisades Nuclear Plant;
Temporary Instruction 2515/191 Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.
This inspection was performed by a resident inspector and three U.S. Nuclear Regulatory Commission (NRC) regional inspectors. No findings of significance or violations of NRC requirements were identified during this inspection. The significance of inspection findings is indicated by their color (i.e., greater than Green, or Green, White, Yellow, Red) and determined using Inspection Manual Chapter 0609, "Significance Determination Process," dated April 29, 2015. Cross-cutting aspects are determined using Inspection Manual Chapter (IMC) 0310, "Aspects Within the Cross-Cutting Areas," dated December 4, 2014. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," dated July 201
NRC-Identified and Self-Revealing Findings
None
REPORT DETAILS
OTHER ACTIVITIES
The objective of Temporary Instruction (TI) 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans, is to verify the licensee has adequately implemented the mitigation strategies as described in the licensees Final Integrated Plan (Agencywide Documents Access Management System (ADAMS) Accession No. ML15351A351), the licensees supplement to the notification of full compliance (ADAMS Accession No. ML16083A285), and the U.S. Nuclear Regulatory Commissions (NRCs) safety evaluation (ADAMS Accession No.
ML16014A318) and to verify the licensee installed reliable water-level measurement instrumentation in their spent fuel pool (SFP). The purpose of this TI was also to verify the licensee had implemented Emergency Preparedness (EP) enhancements as described in their site-specific submittals and NRC safety assessments, including multi-unit dose assessment capability and enhancements to ensure staffing is sufficient and communications can be maintained during such an event.
The inspection also verifies plans for complying with NRC Orders EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (ADAMS Accession No. ML12054A736) and EA-12-051, Order Modifying Licenses With Regard to Reliable Spent Fuel Pool Instrumentation (ADAMS Accession No. ML12054A679) are in place and are being implemented by the licensee. Additionally, the inspection verified implementation of staffing and communications information provided in response to the March 12, 2012, request for information letter and multiunit dose assessment information provided per COMSECY-13-0010, Schedule and Plans for Tier 2 Order on Emergency Preparedness for Japan Lessons Learned, dated March 27, 2013, (ADAMS Accession No. ML12339A262).
The inspectors discussed the plans and strategies with plant staff, reviewed documentation, and where appropriate, performed plant walk downs to verify the strategies could be implemented as stated in the licensees submittals and the NRC staff prepared safety evaluation. For most strategies, this included verification that the strategy was feasible, procedures and/or guidance had been developed, training had been provided to plant staff, and required equipment had been identified and staged.
Specific details of the teams inspection activities are described in the following sections.
.1 Mitigation Strategies for Beyond-Design Basis External Events
a. Inspection Scope
The inspectors examined the licensees established guidelines and implementing procedures for the beyond-design basis mitigation strategies. The inspectors assessed how the licensee coordinated and documented the interface/transition between existing off-normal and emergency operating procedures with the newly developed mitigation strategies. The inspectors selected a number of mitigation strategies and conducted plant walk downs with licensed operators and responsible plant staff to assess: the adequacy and completeness of the procedures; familiarity of operators with the procedure objectives and specific guidance; staging and compatibility of equipment; and the practicality of the operator actions prescribed by the procedures, consistent with the postulated scenarios.
The inspectors verified a preventive maintenance program had been established for the Diverse and Flexible Coping Strategies (FLEX) portable equipment and periodic equipment inventories were in place and being conducted. Additionally, the inspectors examined the introductory and planned periodic/refresher training provided to the Operations staff most likely to be tasked with implementation of the FLEX mitigation strategies. The inspectors also reviewed the introductory and planned periodic training provided to the Emergency Response Organization personnel. Documents reviewed are listed in the attachment.
b. Assessment Based on samples selected for review, the inspectors verified the licensee satisfactorily implemented appropriate elements of the FLEX strategy as described in the plant specific submittal(s) and the associated safety evaluation and determined the licensee is generally in compliance with NRC Order EA-12-049. The inspectors verified the licensee satisfactorily:
- developed and issued FLEX Support Guidelines (FSG) to implement the FLEX strategies for postulated external events;
- integrated their FSGs into their existing plant procedures such that entry into and departure from the FSGs were clear when using existing plant procedures;
- protected FLEX equipment from site-specific hazards;
- developed and implemented adequate testing and maintenance of FLEX equipment to ensure their availability and capability;
- trained their staff to assure personnel proficiency in the mitigation of beyond-design basis events; and
- developed the means to ensure the necessary off-site FLEX equipment would be available from off-site locations.
The inspectors verified non-compliances with current licensing requirements, and other issues identified during the inspection were entered into the licensee's corrective action program as appropriate.
c. Findings
No findings were identified.
.2 Spent Fuel Pool Instrumentation
a. Inspection Scope
The inspectors examined the licensees newly installed SFP instrumentation.
Specifically, the inspectors verified the sensors were installed as described in the plant specific submittals and the associated safety evaluation and that the cabling for the power supplies and the indications for each channel were physically and electrically separated. Additionally, environmental conditions and accessibility of the instruments were evaluated. Documents reviewed are listed in the attachment.
b. Assessment Based on samples selected for review, the inspectors determined the licensee satisfactorily installed and established control of the SFP instrumentation as described in the plant specific submittal(s) and the associated safety evaluation and determined the licensee is generally in compliance with NRC Order EA-12-051. The inspectors verified the licensee satisfactorily:
- installed the SFP instrumentation sensors, cabling and power supplies to provide physical and electrical separation as described in the plant specific submittal(s)and safety evaluation;
- installed the SFP instrumentation display in the location, environmental conditions and accessibility as described in the plant specific submittal(s); and
- trained their staff to assure personnel proficiency with the maintenance, testing, and use of the SFP instrumentation.
The inspectors verified non-compliances with current licensing requirements, and other issues identified during the inspection were entered into the licensee's corrective action program.
c. Findings
No findings were identified.
.3 Staffing and Communication Request for Information
a. Inspection Scope
Through discussions with plant staff, review of documentation and plant walk downs, the inspectors verified the licensee has implemented required changes to staffing, communications equipment and facilities to support a multi-unit extended loss of alternating current power (ELAP) scenario as described in the licensees staffing assessment and the NRC safety assessment. The inspectors also verified the licensee has implemented multi-unit dose assessment (including releases from SFPs) capability using the licensees site-specific dose assessment software and approach as described in the licensees multi-unit dose assessment submittal. Documents reviewed are listed in the attachment.
b. Assessment The inspectors reviewed information provided in the licensees multi-unit dose submittal and in response to the NRCs March 12, 2012, request for information letter and verified that the licensee satisfactorily implemented enhancements pertaining to Near-Term Task Force Recommendation 9.3 response to a large scale natural emergency event that results in an extended loss of all alternating current power to all site units and impedes access to the site. The inspectors verified the following:
- the licensee satisfactorily implemented required staffing change(s) to support a multi-unit ELAP scenario;
- EP communications equipment and facilities are sufficient for dealing with a multi-unit ELAP scenario; and
- the licensee implemented multi-unit dose assessment capabilities (including releases from SFPs) using the licensees site-specific dose assessment software and approach.
The inspectors verified non-compliances with current licensing requirements, and other issues identified during the inspection were entered into the licensee's corrective action program.
c. Findings
No findings were identified.
4OA6 Management Meeting
Exit Meeting Summary
On November 16, 2016, the inspectors presented the inspection results to Mr. M. Lee and other members of the licensees staff. The licensee acknowledged the issues presented. The inspectors confirmed none of the potential report input discussed was considered proprietary.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- C. Arnone, Site Vice President
- A. Williams, General Manager Plant Operations
- T. Mulford, Operations Manager
- B. Baker, Operations Manager - Shift
- J. Borah, Engineering Manager, Systems and Components
- T. Davis, Regulatory Assurance
- B. Dotson, Regulatory Assurance
- J. Erickson, Regulatory Assurance
- O. Gustafson, Director of Regulatory and Performance Improvement
- J. Hardy, Regulatory Assurance Manager
- J. Haumersen, Site Projects and Maintenance Services Manager
- G. Heisterman, Maintenance Manager
- M. Lee, Operations Manager - Support
- D. Lucy, Outage Manager
- D. Malone, Emergency Planning Manager
- W. Nelson, Training Manager
- D. Nestle, Radiation Protection Manager
- K. OConnor, Engineering Manager, Design and Programs
- C. Plachta, Nuclear Independent Oversight Manager
- P. Russell, Site Engineering Director
- M. Schultheis, Performance Improvement Manager
- M. Soja, Chemistry Manager
- J. Tharp, Security Manager
U.S. Nuclear Regulatory Commission
- A. Stone, Team Leader, Technical Support Staff
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened
None
Closed
None
Discussed
None
LIST OF DOCUMENTS REVIEWED