ML080920844: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML080920844
| number = ML080920844
| issue date = 04/01/2008
| issue date = 04/01/2008
| title = 04/17/2008 Notice of Public Meeting to Discuss Nrc'S Assessment of the Safety Performance of Millstone Power Station for Calendar Year 2007 with the Nuclear Energy Advisory Council (Neac)
| title = Notice of Public Meeting to Discuss Nrc'S Assessment of the Safety Performance of Millstone Power Station for Calendar Year 2007 with the Nuclear Energy Advisory Council (Neac)
| author name = Powell R
| author name = Powell R
| author affiliation = NRC/RGN-I
| author affiliation = NRC/RGN-I
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:April 1, 2008 MN No. 08-016 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING Licensee: Dominion Nuclear Connecticut, Inc.  
{{#Wiki_filter:April 1, 2008 MN No. 08-016 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING Licensee:       Dominion Nuclear Connecticut, Inc.
Facility:      Millstone Power Station Docket No.      50-336 and 50-423 Date and Time:  April 17, 2008 at 6:00 p.m.
Location:      Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385


Facility:  Millstone Power Station Docket No. 50-336 and 50-423 Date and Time: April 17, 2008 at 6:00 p.m.
==Purpose:==
Location:  Waterford Town Hall 15 Rope Ferry Road    Waterford, CT 06385 Purpose:  To discuss NRC's assessment of the safety performance of the Millstone Power Station for calendar year 2007 with the Nuclear Energy Advisory Council (NEAC).
To discuss NRCs assessment of the safety performance of the Millstone Power Station for calendar year 2007 with the Nuclear Energy Advisory Council (NEAC).
Attendees:
Attendees:
NRC: R. Powell, Chief, Projects Branch 5, Region I S. Shaffer, Senior Resident Inspector   J. Benjamin, Resident Inspector   J. Krafty, Resident Inspector NEAC : W. Sheehan, Chairman P. Rathbun     E. Woollacott     P. Blasioli   M. DeBold     G. Dixon M. Holloway     R. Klancko     J. Markowicz     K. Ryan   J. Sherrard     E. Wilds
NRC:   R. Powell, Chief, Projects Branch 5, Region I S. Shaffer, Senior Resident Inspector J. Benjamin, Resident Inspector J. Krafty, Resident Inspector NEAC : W. Sheehan, Chairman P. Rathbun E. Woollacott P. Blasioli M. DeBold G. Dixon M. Holloway R. Klancko J. Markowicz K. Ryan J. Sherrard E. Wilds


2Public Participation*: This is a Category 1 Meeting. The public is invited to observe the meeting. After the business portion, but before the meeting adjourns, the public will have an opportunity to communicate with the NRC regarding Dominion's performance at Millstone and the role of the agency in ensuring safe plant operations.
2 Public Participation*: This is a Category 1 Meeting. The public is invited to observe the meeting. After the business portion, but before the meeting adjourns, the public will have an opportunity to communicate with the NRC regarding Dominions performance at Millstone and the role of the agency in ensuring safe plant operations.
The NRC's Annual Assessment Letter for Millstone Power Station can be located in ADAMS with Accession Number ML080630630. The slides for the meeting can be located in ADAMS with Accession Number ML080880083. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.
The NRCs Annual Assessment Letter for Millstone Power Station can be located in ADAMS with Accession Number ML080630630. The slides for the meeting can be located in ADAMS with Accession Number ML080880083. ADAMS is accessible from the NRC Web Site at:
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. Meeting Contact: Raymond J. Powell, Chief, Projects Branch 5   (610) 337-6967 E-mail: rjp@nrc.gov
http://www.nrc.gov/reading-rm/adams.html.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Meeting
 
==Contact:==
Raymond J. Powell, Chief, Projects Branch 5 (610) 337-6967 E-mail: rjp@nrc.gov
* Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 10, 2008, via telephone to the NRC meeting contact.
* Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 10, 2008, via telephone to the NRC meeting contact.
Approved by: _RA by A. Burritt Acting for/
Approved by: _RA by A. Burritt Acting for/__
__ Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects cc w/ encl
Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects cc w/ encl:
: J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support W. Bartron, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Jr., Ph.D, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control C. Meek-Gallagher, Commissioner, Suffolk County, Department of Environment and Energy V. Minei, P.E., Director, Suffolk County Health Department, Division of Environmental Quality R. Shadis, New England Coalition Staff 3cc w/ encl
J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support W. Bartron, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Jr., Ph.D, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control C. Meek-Gallagher, Commissioner, Suffolk County, Department of Environment and Energy V. Minei, P.E., Director, Suffolk County Health Department, Division of Environmental Quality R. Shadis, New England Coalition Staff
: S. Comley, We The People D. Katz, Citizens Awareness Network (CAN) R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq. R. Rubinstein, Waterford Library 4 Agenda NRC & NEAC Meeting Concerning Millstone Power Station Performance Millstone Power Station April 17, 2008 6:00 - 8:00 pm Introduction
 
.......................................................................................................NRC (3 minutes) Review of Reactor Oversight Process................................................................NRC (5 minutes)
3 cc w/ encl:
S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)
R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq.
R. Rubinstein, Waterford Library
 
4 Agenda NRC & NEAC Meeting Concerning Millstone Power Station Performance Millstone Power Station April 17, 2008 6:00 - 8:00 pm Introduction .......................................................................................................NRC (3 minutes)
Review of Reactor Oversight Process ................................................................NRC (5 minutes)
National Summary of Plant Performance............................................................NRC (7 minutes)
National Summary of Plant Performance............................................................NRC (7 minutes)
Discussion of Millstone Station Performance....................................................NRC (15 minutes)
Discussion of Millstone Station Performance ....................................................NRC (15 minutes)
NEAC's Response and Questions..................................................................NEAC (20 minutes)  
NEACs Response and Questions ..................................................................NEAC (20 minutes)
Closing Remarks ................................................................................................NRC (5 minutes)
Short Break ................................................................................................................ (5 minutes)
NRC to address public questions.......NRC/Members of the Public (as needed)


Closing Remarks
4 Agenda NRC & NEAC Meeting Concerning Millstone Power Station Performance Millstone Power Station April 17, 2008 6:00 - 8:00 pm Introduction .......................................................................................................NRC (3 minutes)
................................................................................................NRC (5 minutes)
Review of Reactor Oversight Process ................................................................NRC (5 minutes)
Short Break................................................................................................................(5 minutes)  NRC to address public questions--------.......NRC/Members of the Public (as needed) 4 Agenda NRC & NEAC Meeting Concerning Millstone Power Station Performance Millstone Power Station April 17, 2008 6:00 - 8:00 pm Introduction
National Summary of Plant Performance............................................................NRC (7 minutes)
.......................................................................................................NRC (3 minutes) Review of Reactor Oversight Process................................................................NRC (5 minutes)
Discussion of Millstone Station Performance ....................................................NRC (15 minutes)
National Summary of Plant Performance............................................................NRC (7 minutes)  
NEACs Response and Questions ..................................................................NEAC (20 minutes)
 
Closing Remarks ................................................................................................NRC (5 minutes)
Discussion of Millstone Station Performance....................................................NRC (15 minutes)
Short Break ................................................................................................................ (5 minutes)
NEAC's Response and Questions..................................................................NEAC (20 minutes)
NRC to address public questions.......NRC/Members of the Public (as needed)
Closing Remarks
................................................................................................NRC (5 minutes)
Short Break................................................................................................................(5 minutes) NRC to address public questions--------.......NRC/Members of the Public (as needed)
Distribution :
Distribution :
See next page  
See next page DOCUMENT NAME: T:\DRP\BRANCH5\Annual Assessment Meeting Notices\ROP 8 Annual Assessment\Pilgrim ROP 8 Annual Assessment Meeting Notice.doc SUNSI Review Complete:                      ALB            (Reviewers Initials)
After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy                                      ML080920844 OFFICE      RI/DRP                                RI/DRP NAME        NSieller/NSS                          RPowell/ALB FOR/
DATE        04/01/08                              04/01/08 OFFICIAL RECORD COPY


DOCUMENT NAME: T:\DRP\BRANCH5\Annual Assessment Meeting Notices\ROP 8 Annual Assessment\Pilgrim ROP 8 Annual Assessment Meeting Notice.doc SUNSI Review Complete:        ALB        (Reviewer's Initials)  After declaring this document "An Official Agency Record" it will be released to the Public. To receive a copy of this document, indicate in the box: 
5 Distribution:
" C" = Copy without attachment/enclosure   
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER RESOURCES)
" E" = Copy with attachment/enclosure  " N" = No copy            ML080920844                                                    OFFICE RI/DRP  RI/DRP    NAME NSieller/NSS RPowell/ALB FOR/  DATE 04/01/08 04/01/08 OFFICIAL RECORD COPY 5Distribution:
Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER RESOURCES)
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER RESOURCES) Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER RESOURCES) Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD) Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP) Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM) Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM) Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI) Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)
Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)
S. Collins, RA M. Dapas, DRA S. Williams, RI OEDO (Acting) J. Lubinski, NRR J. Hughey NRR, PM J. Lamb, NRR, PM S. Shaffer, SRI J. Benjamin, RI J. Krafty, RI R. Powell, DRP B. Norris, DRP N. Sieller, DRP M. Gamberoni, DRS D. Roberts, DRS D. Screnci, PAO J. Lubinski, NRR N. Sheehan, PAO N. McNamara, SLO M. McLaughlin, SLO Regional Administrator Secretary, RI DRP Division Secretary, RI Deputy Regional Administrator Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Docket Room (w/concurrences) Region I Receptionist PMNS}}
Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)
Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)
Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)
Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)
Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)
S. Collins, RA M. Dapas, DRA S. Williams, RI OEDO (Acting)
J. Lubinski, NRR J. Hughey NRR, PM J. Lamb, NRR, PM S. Shaffer, SRI J. Benjamin, RI J. Krafty, RI R. Powell, DRP B. Norris, DRP N. Sieller, DRP M. Gamberoni, DRS D. Roberts, DRS D. Screnci, PAO J. Lubinski, NRR N. Sheehan, PAO N. McNamara, SLO M. McLaughlin, SLO Regional Administrator Secretary, RI DRP Division Secretary, RI Deputy Regional Administrator Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Docket Room (w/concurrences)
Region I Receptionist PMNS}}

Latest revision as of 08:35, 7 December 2019

Notice of Public Meeting to Discuss Nrc'S Assessment of the Safety Performance of Millstone Power Station for Calendar Year 2007 with the Nuclear Energy Advisory Council (Neac)
ML080920844
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 04/01/2008
From: Racquel Powell
NRC Region 1
To:
Powell R, RI/DRP/610-337-6967
References
MN 08-016
Download: ML080920844 (6)


Text

April 1, 2008 MN No.08-016 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING Licensee: Dominion Nuclear Connecticut, Inc.

Facility: Millstone Power Station Docket No. 50-336 and 50-423 Date and Time: April 17, 2008 at 6:00 p.m.

Location: Waterford Town Hall 15 Rope Ferry Road Waterford, CT 06385

Purpose:

To discuss NRCs assessment of the safety performance of the Millstone Power Station for calendar year 2007 with the Nuclear Energy Advisory Council (NEAC).

Attendees:

NRC: R. Powell, Chief, Projects Branch 5, Region I S. Shaffer, Senior Resident Inspector J. Benjamin, Resident Inspector J. Krafty, Resident Inspector NEAC : W. Sheehan, Chairman P. Rathbun E. Woollacott P. Blasioli M. DeBold G. Dixon M. Holloway R. Klancko J. Markowicz K. Ryan J. Sherrard E. Wilds

2 Public Participation*: This is a Category 1 Meeting. The public is invited to observe the meeting. After the business portion, but before the meeting adjourns, the public will have an opportunity to communicate with the NRC regarding Dominions performance at Millstone and the role of the agency in ensuring safe plant operations.

The NRCs Annual Assessment Letter for Millstone Power Station can be located in ADAMS with Accession Number ML080630630. The slides for the meeting can be located in ADAMS with Accession Number ML080880083. ADAMS is accessible from the NRC Web Site at:

http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Millstone Power Station can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Meeting

Contact:

Raymond J. Powell, Chief, Projects Branch 5 (610) 337-6967 E-mail: rjp@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by April 10, 2008, via telephone to the NRC meeting contact.

Approved by: _RA by A. Burritt Acting for/__

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects cc w/ encl:

J. A. Price, Site Vice President, Millstone Station C. L. Funderburk, Director, Nuclear Licensing and Operations Support W. Bartron, Supervisor, Station Licensing J. Spence, Manager Nuclear Training L. M. Cuoco, Senior Counsel C. Brinkman, Manager, Washington Nuclear Operations J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company First Selectmen, Town of Waterford B. Sheehan, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC E. Wilds, Jr., Ph.D, Director, State of Connecticut SLO Designee J. Buckingham, Department of Public Utility Control C. Meek-Gallagher, Commissioner, Suffolk County, Department of Environment and Energy V. Minei, P.E., Director, Suffolk County Health Department, Division of Environmental Quality R. Shadis, New England Coalition Staff

3 cc w/ encl:

S. Comley, We The People D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN P. Eddy, Electric Division, Department of Public Service, State of New York P. Tonko, President and CEO, New York State Energy Research and Development Authority J. Spath, SLO Designee, New York State Energy Research and Development Authority N. Burton, Esq.

R. Rubinstein, Waterford Library

4 Agenda NRC & NEAC Meeting Concerning Millstone Power Station Performance Millstone Power Station April 17, 2008 6:00 - 8:00 pm Introduction .......................................................................................................NRC (3 minutes)

Review of Reactor Oversight Process ................................................................NRC (5 minutes)

National Summary of Plant Performance............................................................NRC (7 minutes)

Discussion of Millstone Station Performance ....................................................NRC (15 minutes)

NEACs Response and Questions ..................................................................NEAC (20 minutes)

Closing Remarks ................................................................................................NRC (5 minutes)

Short Break ................................................................................................................ (5 minutes)

NRC to address public questions.......NRC/Members of the Public (as needed)

4 Agenda NRC & NEAC Meeting Concerning Millstone Power Station Performance Millstone Power Station April 17, 2008 6:00 - 8:00 pm Introduction .......................................................................................................NRC (3 minutes)

Review of Reactor Oversight Process ................................................................NRC (5 minutes)

National Summary of Plant Performance............................................................NRC (7 minutes)

Discussion of Millstone Station Performance ....................................................NRC (15 minutes)

NEACs Response and Questions ..................................................................NEAC (20 minutes)

Closing Remarks ................................................................................................NRC (5 minutes)

Short Break ................................................................................................................ (5 minutes)

NRC to address public questions.......NRC/Members of the Public (as needed)

Distribution :

See next page DOCUMENT NAME: T:\DRP\BRANCH5\Annual Assessment Meeting Notices\ROP 8 Annual Assessment\Pilgrim ROP 8 Annual Assessment Meeting Notice.doc SUNSI Review Complete: ALB (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy ML080920844 OFFICE RI/DRP RI/DRP NAME NSieller/NSS RPowell/ALB FOR/

DATE 04/01/08 04/01/08 OFFICIAL RECORD COPY

5 Distribution:

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER RESOURCES)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER RESOURCES)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA M. Dapas, DRA S. Williams, RI OEDO (Acting)

J. Lubinski, NRR J. Hughey NRR, PM J. Lamb, NRR, PM S. Shaffer, SRI J. Benjamin, RI J. Krafty, RI R. Powell, DRP B. Norris, DRP N. Sieller, DRP M. Gamberoni, DRS D. Roberts, DRS D. Screnci, PAO J. Lubinski, NRR N. Sheehan, PAO N. McNamara, SLO M. McLaughlin, SLO Regional Administrator Secretary, RI DRP Division Secretary, RI Deputy Regional Administrator Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Docket Room (w/concurrences)

Region I Receptionist PMNS