| number = ML12107A068
| number = ML12107A068
| issue date = 04/04/2012
| issue date = 04/04/2012
| title = 2012/04/04 NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (Eptb) (TAC No. ME6527)
| title = NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (Eptb)
| author name = Westcott D
| author name = Westcott D
| author affiliation = Progress Energy Co
| author affiliation = Progress Energy Co
| addressee name = Lingam S P
| addressee name = Lingam S
| addressee affiliation = NRC/NRR/DORL/LPLII-2
| addressee affiliation = NRC/NRR/DORL/LPLII-2
| docket = 05000302
| docket = 05000302
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Westcott, Daniel [Daniel.Westcott@pgnmail.com]Sent:Wednesday, April 04, 2012 12:46 PMTo:Lingam, SivaCc:Orenak, Michael
{{#Wiki_filter:NRR-PMDAPEm Resource From:                       Westcott, Daniel [Daniel.Westcott@pgnmail.com]
Sent:                       Wednesday, April 04, 2012 12:46 PM To:                         Lingam, Siva Cc:                         Orenak, Michael


==Subject:==
==Subject:==
RE: Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (EPTB) (TAC No. ME6527)Siva: Our clarifications are provided in red below.
RE: Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (EPTB) (TAC No. ME6527)
Dan From: Lingam, Siva [mailto:Siva.Lingam@nrc.gov] Sent: Friday, March 30, 2012 10:42 AM To: Westcott, Daniel Cc: Orenak, Michael  
Siva:
Our clarifications are provided in red below.
Dan From: Lingam, Siva [mailto:Siva.Lingam@nrc.gov]
Sent: Friday, March 30, 2012 10:42 AM To: Westcott, Daniel Cc: Orenak, Michael


==Subject:==
==Subject:==
RE: Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (EPTB) (TAC No. ME6527) We need the following clarifications, and answers by e-mail are acceptable: 1. What are the valve types for the newly added ADV isolation valves and the replaced main turbine bypass control valves, i.e. MOV, AOV, check valve, gate valve, etc.? The ADVs are Air Operated angle globe control valves (AOVs). The ADV Isolation Valves are Manual Gate Valves installed upstream of the ADVs. The Turbine Bypass Valves are Air Operated, Globe, Control Valves. 2. In your RAI responses dated January 19, 2012 (3F0112-07), the enclosure failed to mention the high pressure injection system (HPI). We like CR-3 to confirm that HPI system was reviewed for IST program changes and describe any changes made. The HPI modification is authorized by Engineering Change 79352. The design changes the position of the throttle valves (MUV-590, MUV-591, MUV-592, MUV-593). Once the position of the valve is verified by flow test, the valve is welded into position. System accessibility, maintenance, repair, and ISI requirements will not be impacted as a result of this EC. We may need additional clarification later regarding the impact of the EPU on the MSIVs that was not described in your submittal.
RE: Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (EPTB) (TAC No. ME6527)
From: Lingam, Siva Sent: Thursday, November 03, 2011 7:38 AM To: 'Westcott, Daniel'  
We need the following clarifications, and answers by e-mail are acceptable:
: 1. What are the valve types for the newly added ADV isolation valves and the replaced main turbine bypass control valves, i.e. MOV, AOV, check valve, gate valve, etc.?
The ADVs are Air Operated angle globe control valves (AOVs). The ADV Isolation Valves are Manual Gate Valves installed upstream of the ADVs.
The Turbine Bypass Valves are Air Operated, Globe, Control Valves.
: 2. In your RAI responses dated January 19, 2012 (3F0112-07), the enclosure failed to mention the high pressure injection system (HPI). We like CR-3 to confirm that HPI system was reviewed for IST program changes and describe any changes made.
The HPI modification is authorized by Engineering Change 79352. The design changes the position of the throttle valves (MUV-590, MUV-591, MUV-592, MUV-593). Once the position of the valve is verified by flow test, the valve is welded into position. System accessibility, maintenance, repair, and ISI requirements will not be impacted as a result of this EC.
We may need additional clarification later regarding the impact of the EPU on the MSIVs that was not described in your submittal.
From: Lingam, Siva Sent: Thursday, November 03, 2011 7:38 AM To: 'Westcott, Daniel'


==Subject:==
==Subject:==
Crystal River, Unit 3 EPU LAR - RAIs from Component Performance & Testing Branch (CPTB) (TAC No. ME6527) 2Please note the following draft RAIs from the Component Performance & Testing Branch (CPTB) for the subject LAR. Official RAIs will follow after issuing acceptance letter.
Crystal River, Unit 3 EPU LAR - RAIs from Component Performance & Testing Branch (CPTB) (TAC No. ME6527) 1


RAI CPTB-1: On page 2.2.4-2, it is stated:   "If not discussed below, no adverse impact was found to the pumps or valves."
Please note the following draft RAIs from the Component Performance & Testing Branch (CPTB) for the subject LAR. Official RAIs will follow after issuing acceptance letter.
RAI CPTB-1:
On page 2.2.4-2, it is stated:
If not discussed below, no adverse impact was found to the pumps or valves.
This statement is very vague and does not describe the adequacy of the evaluation for extended power uprate (EPU) conditions for pumps and valves. Please list and describe each plant system and component that did not experience adverse impacts when reviewed for EPU conditions.
This statement is very vague and does not describe the adequacy of the evaluation for extended power uprate (EPU) conditions for pumps and valves. Please list and describe each plant system and component that did not experience adverse impacts when reviewed for EPU conditions.
RAI CPTB-2: Please identify any modifications to your Appendix J program as a result of the EPU. RAI CPTB-3:
RAI CPTB-2:
Please describe your air-operated valve (AOV) program and any modifications as a result of the EPU. RAI CPTB-4: On page 2.2.4-4, it is stated:  
Please identify any modifications to your Appendix J program as a result of the EPU.
"Calculations reviewing the stroke times for MOVs predict that the stroke times will increase minimally, therefore the impact to stroke time is negligible
RAI CPTB-3:
Please describe your air-operated valve (AOV) program and any modifications as a result of the EPU.
RAI CPTB-4:
On page 2.2.4-4, it is stated:
Calculations reviewing the stroke times for MOVs predict that the stroke times will increase minimally, therefore the impact to stroke time is negligible This statement is unclear. Please better define minimally and negligible in this statement.
RAI CPTB-5:
Please describe the lessons learned programs for MOVs and AOVs.
RAI CPTB-6:
Throughout section 2.2.4, often it is stated at the end of the section that Changes are reflected in the Inservice Testing Program. This statement is very vague. For each instance of a change to the Inservice Testing Program in this section, please provide a more detailed description of the change that will be instituted and how it impacts the IST program RAI CPTB-7:
The weak link component capability and maximum actuator capacities of the MOVs, post-EPU, are provided on Table 2.2.4-2 on page 2.2.4-6. For valves FWV-33 and FWV-36, please identify if analysis was performed to determine their susceptibility to a hot short since the weak link component capabilities are less than the maximum actuator capabilities.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2)
Sequoyah Nuclear Plant Crystal River Nuclear plant (EPU)
Location: O8-D5; Mail Stop: O8-G9a 2


This statement is unclear. Please better define "minimally" and "negligible" in this statement.
Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 3
RAI CPTB-5: Please describe the lessons learned programs for MOVs and AOVs. RAI CPTB-6:
Throughout section 2.2.4, often it is stated at the end of the section that "Changes are reflected in the Inservice Testing Program."  This statement is very vague. For each instance of a change to the Inservice Testing Program in this section, please provide a more detailed description of the change that will be instituted and how it impacts the IST program 


RAI CPTB-7:  The weak link component capability and maximum actuator capacities of the MOVs, post-EPU, are provided on Table 2.2.4-2 on page 2.2.4-6. For valves FWV-33 and FWV-36, please identify if analysis was performed to determine their susceptibility to a "hot short" since the weak link component capabilities are less than the maximum actuator capabilities. Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2) Sequoyah Nuclear Plant Crystal River Nuclear plant (EPU)
Hearing Identifier:     NRR_PMDA Email Number:           328 Mail Envelope Properties     (66C0930ED750B74E80B0F51A1F24D99A1A30AFA056)
Location: O8-D5; Mail Stop: O8-G9a 3Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov Hearing Identifier: NRR_PMDA Email Number: 328   Mail Envelope Properties   (66C0930ED750B74E80B0F51A1F24D99A1A30AFA056)  


==Subject:==
==Subject:==
RE: Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (EPTB) (TAC No. ME6527) Sent Date:   4/4/2012 12:46:23 PM Received Date: 4/4/2012 12:44:24 PM From:   Westcott, Daniel Created By:   Daniel.Westcott@pgnmail.com Recipients:     "Orenak, Michael" <Michael.Orenak@nrc.gov> Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov> Tracking Status: None Post Office:   WN000074.oak.zone1.progress-energy.com   Files     Size     Date & Time MESSAGE   4168     4/4/2012 12:44:24 PM Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:      
RE: Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance &
}}
Testing Branch (EPTB) (TAC No. ME6527)
Sent Date:             4/4/2012 12:46:23 PM Received Date:         4/4/2012 12:44:24 PM From:                   Westcott, Daniel Created By:             Daniel.Westcott@pgnmail.com Recipients:
"Orenak, Michael" <Michael.Orenak@nrc.gov>
Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov>
Tracking Status: None Post Office:           WN000074.oak.zone1.progress-energy.com Files                           Size                     Date & Time MESSAGE                         4168                     4/4/2012 12:44:24 PM Options Priority:                       Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Recipients Received:}}

Latest revision as of 21:24, 5 December 2019

NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (Eptb)
ML12107A068
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/04/2012
From: Westcott D
Progress Energy Co
To: Siva Lingam
Plant Licensing Branch II
References
TAC ME6527
Download: ML12107A068 (4)


Text

NRR-PMDAPEm Resource From: Westcott, Daniel [Daniel.Westcott@pgnmail.com]

Sent: Wednesday, April 04, 2012 12:46 PM To: Lingam, Siva Cc: Orenak, Michael

Subject:

RE: Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (EPTB) (TAC No. ME6527)

Siva:

Our clarifications are provided in red below.

Dan From: Lingam, Siva [1]

Sent: Friday, March 30, 2012 10:42 AM To: Westcott, Daniel Cc: Orenak, Michael

Subject:

RE: Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (EPTB) (TAC No. ME6527)

We need the following clarifications, and answers by e-mail are acceptable:

1. What are the valve types for the newly added ADV isolation valves and the replaced main turbine bypass control valves, i.e. MOV, AOV, check valve, gate valve, etc.?

The ADVs are Air Operated angle globe control valves (AOVs). The ADV Isolation Valves are Manual Gate Valves installed upstream of the ADVs.

The Turbine Bypass Valves are Air Operated, Globe, Control Valves.

2. In your RAI responses dated January 19, 2012 (3F0112-07), the enclosure failed to mention the high pressure injection system (HPI). We like CR-3 to confirm that HPI system was reviewed for IST program changes and describe any changes made.

The HPI modification is authorized by Engineering Change 79352. The design changes the position of the throttle valves (MUV-590, MUV-591, MUV-592, MUV-593). Once the position of the valve is verified by flow test, the valve is welded into position. System accessibility, maintenance, repair, and ISI requirements will not be impacted as a result of this EC.

We may need additional clarification later regarding the impact of the EPU on the MSIVs that was not described in your submittal.

From: Lingam, Siva Sent: Thursday, November 03, 2011 7:38 AM To: 'Westcott, Daniel'

Subject:

Crystal River, Unit 3 EPU LAR - RAIs from Component Performance & Testing Branch (CPTB) (TAC No. ME6527) 1

Please note the following draft RAIs from the Component Performance & Testing Branch (CPTB) for the subject LAR. Official RAIs will follow after issuing acceptance letter.

RAI CPTB-1:

On page 2.2.4-2, it is stated:

If not discussed below, no adverse impact was found to the pumps or valves.

This statement is very vague and does not describe the adequacy of the evaluation for extended power uprate (EPU) conditions for pumps and valves. Please list and describe each plant system and component that did not experience adverse impacts when reviewed for EPU conditions.

RAI CPTB-2:

Please identify any modifications to your Appendix J program as a result of the EPU.

RAI CPTB-3:

Please describe your air-operated valve (AOV) program and any modifications as a result of the EPU.

RAI CPTB-4:

On page 2.2.4-4, it is stated:

Calculations reviewing the stroke times for MOVs predict that the stroke times will increase minimally, therefore the impact to stroke time is negligible This statement is unclear. Please better define minimally and negligible in this statement.

RAI CPTB-5:

Please describe the lessons learned programs for MOVs and AOVs.

RAI CPTB-6:

Throughout section 2.2.4, often it is stated at the end of the section that Changes are reflected in the Inservice Testing Program. This statement is very vague. For each instance of a change to the Inservice Testing Program in this section, please provide a more detailed description of the change that will be instituted and how it impacts the IST program RAI CPTB-7:

The weak link component capability and maximum actuator capacities of the MOVs, post-EPU, are provided on Table 2.2.4-2 on page 2.2.4-6. For valves FWV-33 and FWV-36, please identify if analysis was performed to determine their susceptibility to a hot short since the weak link component capabilities are less than the maximum actuator capabilities.

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2)

Sequoyah Nuclear Plant Crystal River Nuclear plant (EPU)

Location: O8-D5; Mail Stop: O8-G9a 2

Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 3

Hearing Identifier: NRR_PMDA Email Number: 328 Mail Envelope Properties (66C0930ED750B74E80B0F51A1F24D99A1A30AFA056)

Subject:

RE: Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance &

Testing Branch (EPTB) (TAC No. ME6527)

Sent Date: 4/4/2012 12:46:23 PM Received Date: 4/4/2012 12:44:24 PM From: Westcott, Daniel Created By: Daniel.Westcott@pgnmail.com Recipients:

"Orenak, Michael" <Michael.Orenak@nrc.gov>

Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov>

Tracking Status: None Post Office: WN000074.oak.zone1.progress-energy.com Files Size Date & Time MESSAGE 4168 4/4/2012 12:44:24 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: