ML121210654: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML121210654
| number = ML121210654
| issue date = 05/02/2012
| issue date = 05/02/2012
| title = 04/03/2012 Meeting Summary with Nine Mile Point, Unit No. 1 Regarding the Proposed National Fire Protection Association Standard 805 (NFPA-805) License Amendment Request (TAC ME8158)
| title = Meeting Summary with Nine Mile Point, Unit No. 1 Regarding the Proposed National Fire Protection Association Standard 805 (NFPA-805) License Amendment Request
| author name = Guzman R V
| author name = Guzman R
| author affiliation = NRC/NRR/DORL
| author affiliation = NRC/NRR/DORL
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000220, 05000410
| docket = 05000220, 05000410
| license number = DPR-063
| license number = DPR-063
| contact person = Guzman R V, NRR/DORL 415-1030
| contact person = Guzman R, NRR/DORL 415-1030
| case reference number = TAC ME8158
| case reference number = TAC ME8158
| package number = ML121210049
| package number = ML121210049
Line 15: Line 15:
| page count = 14
| page count = 14
| project = TAC:ME8158
| project = TAC:ME8158
| stage = Other
| stage = Meeting
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2,2012 LICENSEE: Nine Mile Point Nuclear Station, LLC FACILITY: Nine Mile Point, Unit No.1  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2,2012 LICENSEE:       Nine Mile Point Nuclear Station, LLC FACILITY:       Nine Mile Point, Unit No.1


==SUBJECT:==
==SUBJECT:==
SUMMARY OF APRIL 3,2012, PRE-APPLICATION MEETING WITH NINE MILE POINT NUCLEAR STATION, LLC REGARDING THE PROPOSED NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (NFPA-805) LICENSE AMENDMENT REQUEST (TAC NO. ME8158) On April 3, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Nine Mile Point Nuclear Station, LLC (NMPNS) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss NMPNS's planned submittal of a license amendment request to transition its fire protection licensing basis to NFPA-805. A member of the public was in attendance by telephone. Public Meeting Feedback forms were not received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a copy of the licensee's slides presented at the meeting (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 121210044). Please direct any inquiries to me at 301-415-1030 or Richard. Guzman@nrc.gov Sincerely, Richard V. Guzman, Senior Project Manager Plant licenSing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410  
 
==SUMMARY==
OF APRIL 3,2012, PRE-APPLICATION MEETING WITH NINE MILE POINT NUCLEAR STATION, LLC REGARDING THE PROPOSED NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (NFPA-805)
LICENSE AMENDMENT REQUEST (TAC NO. ME8158)
On April 3, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Nine Mile Point Nuclear Station, LLC (NMPNS) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss NMPNS's planned submittal of a license amendment request to transition its fire protection licensing basis to NFPA-805.
A member of the public was in attendance by telephone. Public Meeting Feedback forms were not received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a copy of the licensee's slides presented at the meeting (Agencywide Documents Access and Management System (ADAMS) Accession No. ML121210044).
Please direct any inquiries to me at 301-415-1030 or Richard. Guzman@nrc.gov Sincerely, Richard V. Guzman, Senior Project Manager Plant licenSing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410


==Enclosures:==
==Enclosures:==
1. List of Attendees 2. Licensee's Handouts/Slides cc w/encls: Distribution via Listserv LIST OF APRIL 3. 2012. PRE-APPLICATION MEETING CONSTELLATION ENERGY NUCLEAR GROUP NINE MILE POINT NUCLEAR STATION REGARDING THE PROPOSED NATIONAL FIRE PROTECTION STANDARD 805 (NFPA-805) LICENSE AMENDMENT NAME Alex Klein Donnie Harrison Rich Guzman Bhalchandra Vaidya Leslie Fields Jay Robinson Manuel Jimenez Paul Lain Bernard Litkett Charles Moulton Harry Barrett Sampson Lee Stephen Dinsmore Paul Swift S.L. Naron Richard Neild Peter Mazzaferro Dennis Vandeputte Ned Tyler Saeed Savar* Bridget Frymire* Leroy Kreider* Bob Layton* *by telephone FOR NINE MILE POINT, UNIT NO.1 ORGANIZATION NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC NRC CENG CENG CENG CENG CENG CENG CENG New York State Department of Public Service Engineering Planning and Management, Inc. (Pacific Northwest National Laboratory) Enclosure 1 MEETING Enclosure MEETING Enclosure a joint venture of-------.., Nine Mile Point Nuclear Station, Unit NFPA License Amendment Pre-Application Meeting with NRC April 3,
: 1. List of Attendees
* Nine Mile Point Nuclear Station Representatives -Paul Swift NMPNS Manager Engineering Services -Peter Mazzaferro CENG Project Director, NFPA 805 Richard Neild NMPNS Project Manager, I\JFPA 805 Larry Naron NMPNS Supervisor PRA Services -Ned Tyler CENG Licensing Engineer -Dennis Vandeputte NMPNS Licensing Engineer
: 2. Licensee's Handouts/Slides cc w/encls: Distribution via Listserv
* Project Consultants -AREVA -SAIC CENG.
 
Overview of NMP1 Design Features Current Fire Protection Licensing Basis NFPA 805 Transition Project Overview Compliance with NFPA 805 Probabilistic Risk Assessment Development/Results Implementation Overview Summary CENG. I IW!! Wf\lUltl aI_ o=:--"'::erw I Overview of Nine Mile Point Unit 1 Design FeatuSingle unit Boiling Water Reactor, 1850 MWt BWR/2 reactor design with 5 reactor recirculation loops (non-jet pump plant) Mark I Containment Isolation Condensers Ultimate heat sink is Lake Ontario Initial Operating License issued in 1969 Renewed Operating License issued -expires in 2029 CENG. 4 NMPl Current Fire Protection Licensing Fire Protection Program Standard License Condition 10 CFR 50.48(a) and (b) 10 CFR 50, Appendix A, General Design Criterion 3 10 CFR 50, Appendix R (addressed in UFSAR Appendix lOB) Branch Technical Position APCSB 9.5-1 Appendix A (addressed in UFSAR Appendix lOA) Current Exemptions Operator Actions -None required NRC approval CENG. NFPA 805 Transition Project License Amendment Request (LAR) committed submittal date -June 29, 2012 Target submittal date -May 31, 2012 Using the Nuclear Energy Institute (NEI) LAR template Preparation and internal review activities are in progress Web portal established to support NRC review CENG. 6 NFPA 805 Transition Project Fire Protection Program Transition -License Condition being revised -Technical Specifications being revised -Reviewed existing exemptions -Will not be transitioning any exemptions to NFPA 805 design basis -1\10 additional items that require requesting 1\1 RC approval have been identified CENG. Compliance with NFPA NFPA 805 Chapter 3 Compliance -Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0036 -Review documented in B-1 Table (Attachment A of LAR) -Results -One Modification >Removal of H2 Bulk Storage in Turbine Building -Seismic Hose Stations Items that Comply with Prior NRC Approval >Cables that do not meet IEEE 383 flame test (Req. 3.3.5.3) >Fire water provided by Lake Ontario -(Reqs. 3.5.1, 3.5.2) CENG.
LIST OF ATrENDEES APRIL 3. 2012. PRE-APPLICATION MEETING WITH CONSTELLATION ENERGY NUCLEAR GROUP (CENG)
Compliance with NFPA Non-Power Operations -Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ -Results of
NINE MILE POINT NUCLEAR STATION (NMPNS)
REGARDING THE PROPOSED NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (NFPA-805) LICENSE AMENDMENT REQUEST FOR NINE MILE POINT, UNIT NO.1 NAME                               ORGANIZATION Alex Klein                         NRC Donnie Harrison                   NRC Rich Guzman                       NRC Bhalchandra Vaidya                 NRC Leslie Fields                     NRC Jay Robinson                       NRC Manuel Jimenez                     NRC Paul Lain                         NRC Bernard Litkett                   NRC Charles Moulton                   NRC Harry Barrett                     NRC Sampson Lee                       NRC Stephen Dinsmore                   NRC Paul Swift                         CENG S.L. Naron                         CENG Richard Neild                     CENG Peter Mazzaferro                   CENG Dennis Vandeputte                 CENG Ned Tyler                         CENG Saeed Savar*                       CENG Bridget Frymire*                   New York State Department of Public Service Leroy Kreider*                    Engineering Planning and Management, Inc.
Bob Layton*                        (Pacific Northwest National Laboratory)
*by telephone Enclosure 1
 
MEETING SLIDES Enclosure 2
 
MEETING SLIDES Enclosure 2
 
a joint venture of-------..,
O~ion              -1~eDF Nine Mile Point Nuclear Station, Unit 1 NFPA 80S License Amendment Request Pre-Application Meeting with NRC Staff April 3, 2012
 
===Introductions===
* Nine Mile Point Nuclear Station Representatives
        - Paul Swift           NMPNS Manager Engineering Services
        - Peter Mazzaferro       CENG Project Director, NFPA 805 Richard Neild       NMPNS Project Manager, I\JFPA 805 Larry Naron         NMPNS Supervisor PRA Services
        - Ned Tyler             CENG Licensing Engineer
        - Dennis Vandeputte     NMPNS Licensing Engineer
* Project Consultants
        - AREVA
        - SAIC CENG.
 
Agenda
* Overview of NMP1 Design Features
* Current Fire Protection Licensing Basis
* NFPA 805 Transition Project Overview
* Compliance with NFPA 805
* Probabilistic Risk Assessment Development/Results
* Implementation Overview
* Summary CENG.
I IW!! Wf\lUltl a I _
o=:--           "'::erw I Overview of Nine Mile Point Unit 1 (NMP1)
Design Featu res
* Single unit Boiling Water Reactor, 1850 MWt
* BWR/2 reactor design with 5 reactor recirculation loops (non-jet pump plant)
* Mark I Containment
* Isolation Condensers
* Ultimate heat sink is Lake Ontario
* Initial Operating License issued in 1969
* Renewed Operating License issued - expires in 2029 CENG.
4
 
NMPl Current Fire Protection Licensing Basis
* Fire Protection Program Standard License Condition
* 10 CFR 50.48(a) and (b)
* 10 CFR 50, Appendix A, General Design Criterion 3
* 10 CFR 50, Appendix R (addressed in UFSAR Appendix lOB)
* Branch Technical Position APCSB 9.5-1 Appendix A (addressed in UFSAR Appendix lOA)
* Current Exemptions
* Operator Actions - None required NRC approval CENG.
NFPA 805 Transition Project Overview
* License Amendment Request (LAR) committed submittal date - June 29, 2012
* Target submittal date - May 31, 2012
* Using the Nuclear Energy Institute (NEI) LAR template
* Preparation and internal review activities are in progress
* Web portal established to support NRC review CENG.
6
 
NFPA 805 Transition Project Overview
* Fire Protection Program Transition
    - License Condition being revised
    - Technical Specifications being revised
    - Reviewed existing exemptions
        - Will not be transitioning any exemptions to NFPA 805 design basis
    - 1\10 additional items that require requesting 1\1 RC approval have been identified CENG.
Compliance with NFPA 805
* NFPA 805 Chapter 3 Compliance
  - Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0036
  - Review documented in B-1 Table (Attachment A of LAR)
  - Results
        - One Modification
            > Removal of H2 Bulk Storage in Turbine Building
        - Seismic Hose Stations
        - Items that Comply with Prior NRC Approval
            > Cables that do not meet IEEE 383 flame test (Req. 3.3.5.3)
            > Fire water provided by Lake Ontario - (Reqs. 3.5.1, 3.5.2)
CENG.
 
Compliance with NFPA 805
* Non-Power Operations
  - Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0040
  - Results of Review
* All success paths identified
* All success paths identified
* Complete component list by Key Safety Function (KSF)
* Complete component list by Key Safety Function (KSF)
* High Risk Evolutions
* High Risk Evolutions
* Pinch Points identified
* Pinch Points identified
* Recommendations to manage Fire Risk CENG. o=---Compliance with NFPA 805 Radioactive Release -Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 09-0056 -Plant evaluated on a Fire Zone basis -Credit engineering controls for gaseous and liquid effluents -Revise Pre-Fire Plans and Training material to clarify monitoring and control requirements CENG. 10 9 Compliance with NFPA Nuclear Safety Capability Assessment -Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 08-0054 -Fire Area Review -CT Circuit -Automatic System Initiation -Breaker Coordination -Multiple Spurious Operations -* Safe and Stable is defined to be Cold Shutdown
* Recommendations to manage Fire Risk CENG.
I!ptiv<<lttY&(j~
o=---~I                          9 Compliance with NFPA 805
* Radioactive Release
  - Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 09-0056
  - Plant evaluated on a Fire Zone basis
  - Credit engineering controls for gaseous and liquid effluents
  - Revise Pre-Fire Plans and Training material to clarify monitoring and control requirements CENG.
10
 
Compliance with NFPA 805
* Nuclear Safety Capability Assessment
  - Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 08-0054
  - Fire Area Review
    - CT Circuit
    - Automatic System Initiation
    - Breaker Coordination
    - Multiple Spurious Operations review
  - Results:
* Safe and Stable is defined to be Cold Shutdown
* 24 Total Fire Areas
* 24 Total Fire Areas
* No Fire Areas to be transitioned deterministically
* No Fire Areas to be transitioned deterministically
* All 24 Fire Areas to be transitioned using RI-PB method CENG,. 11 Compliance with NFPA Recovery Actions -Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ -Primary Control
* All 24 Fire Areas to be transitioned using RI-PB method CENG,.
* 2 Remote Shutdown -16 Unique Recovery 12 Compliance with NFPA Monitoring Program -Following FAQ 10-0059, Revision 5 guidance -NSEL and FPRA Components -Include any new functions in existing Maintenance Rule Program -NPO Components, Rad Release Systems, FP Programmatic -Include in normal System and Program Health Monitoring -FP Systems and Features -Low Safety Significant -Normal System/Program Health Monitoring -High Safety Significant -NFPA 805 Specific Monitoring Program that mirrors Maintenance Rule Program and uses same software CENG. 13 PRA Fire PRA built on a high quality Internal Events model -Internal Events model peer reviewed to RG 1.2001 Revision 1 Fire PRA peer reviewed by BWROG in October 2011 -IlStrong FPRA model with sound technical approachesll -"The best we/ve seen and likely the best in the industryll -4 "Bestll practices -All F&Os subsequently addressed -No unreviewed methods used CENG.
11 Compliance with NFPA 805
* 14 PRA
* Recovery Actions
* Overall Plant Risk -Total CDF = 2.06E-S/yr and LERF = 2.84E-6/yr -llCDF =8.73E-6 and llLERF =9.00E-7
  - Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0030
* The results of the RI-PB evaluation meet the requirements of NFPA 805 and RG 1.174 CENG,. 15 Implementation Modifications Planned (15) -No Major Modifications
  - Primary Control Station
* 2 Remote Shutdown Panels
  - 16 Unique Recovery Actions 12
 
Compliance with NFPA 805
* Monitoring Program
  - Following FAQ 10-0059, Revision 5 guidance
  - NSEL and FPRA Components
      - Include any new functions in existing Maintenance Rule Program
  - NPO Components, Rad Release Systems, FP Programmatic
      - Include in normal System and Program Health Monitoring
  - FP Systems and Features
      - Low Safety Significant - Normal System/Program Health Monitoring
      - High Safety Significant - NFPA 805 Specific Monitoring Program that mirrors Maintenance Rule Program and uses same software CENG.
13 PRA Development/Results
* Fire PRA built on a high quality Internal Events model
  - Internal Events model peer reviewed to RG 1.2001 Revision 1
* Fire PRA peer reviewed by BWROG in October 2011
  - IlStrong FPRA model with sound technical approachesl l
  - "The best we/ve seen and likely the best in the industryll ll
  - 4 "Best practices
  - All F&Os subsequently addressed
  - No unreviewed methods used CENG.
* 14
 
PRA Development/Results
* Overall Plant Risk
  - Total CDF = 2.06E-S/yr and LERF = 2.84E-6/yr
  - llCDF = 8.73E-6 and llLERF       =9.00E-7
* The results of the RI-PB evaluation meet the requirements of NFPA 805 and RG 1.174 CENG,.
15 Implementation Overview
* Modifications Planned (15)
  - No Major Modifications
* Minor Circuit mods
* Minor Circuit mods
* Minor mechanical mods
* Minor mechanical mods
* Cable re-routes
* Cable re-routes
* New Damper installation
* New Damper installation
* Provide a portable generator for battery charging Process/Procedure Changes -Training -Operator Response for Recovery Actions -Fire Brigade Response -Design Change Process CENG. 16 Complete LAR to be submitted on or before June 29, 2012
* Provide a portable generator for battery charging
* Process/Procedure Changes
  - Training
  - Operator Response for Recovery Actions
  - Fire Brigade Response
  - Design Change Process CENG.
16
 
Summary
* Complete LAR to be submitted on or before June 29, 2012
* Nothing unique or unusual
* Nothing unique or unusual
* No alternative Fire PRA methods
* No alternative Fire PRA methods
* Transition Schedule -Implement procedure/process changes 6 months after SER -Completion of modifications 1St Refueling Outage after SER CENG.
* Transition Schedule
* 17 May 2,2012 Nine Mile Point Nuclear Station, LLC Nine Mile Point, Unit No.1 SUMMARY OF APRIL 3,2012, PRE-APPLICATION MEETING WITH NINE MILE POINT NUCLEAR STATION, LLC REGARDING THE PROPOSED NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (NFPA-805) LICENSE AMENDMENT REQUEST (TAC NO. ME8158) On April 3, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Nine Mile Point Nuclear Station, LLC (NMPNS) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss NMPNS's planned submittal of a license amendment request to transition its fire protection licensing basis to NFPA-805. A member of the public was in attendance by telephone. Public Meeting Feedback forms were not received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a copy of the licensee's slides presented at the meeting (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 121210044). Please direct any inquiries to me at 301-415-1030 or Richard.Guzman@nrc.gov Sincerely, Ira! Richard V. Guzman, Senior Project Manager Plant licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410  
  - Implement procedure/process changes 6 months after SER
  - Completion of modifications 1St Refueling Outage after SER CENG.
* 17
 
May 2,2012 LICENSEE:        Nine Mile Point Nuclear Station, LLC FACILITY:        Nine Mile Point, Unit No.1
 
==SUBJECT:==
 
==SUMMARY==
OF APRIL 3,2012, PRE-APPLICATION MEETING WITH NINE MILE POINT NUCLEAR STATION, LLC REGARDING THE PROPOSED NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (NFPA-805)
LICENSE AMENDMENT REQUEST (TAC NO. ME8158)
On April 3, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Nine Mile Point Nuclear Station, LLC (NMPNS) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss NMPNS's planned submittal of a license amendment request to transition its fire protection licensing basis to NFPA-805.
A member of the public was in attendance by telephone. Public Meeting Feedback forms were not received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a copy of the licensee's slides presented at the meeting (Agencywide Documents Access and Management System (ADAMS) Accession No. ML121210044).
Please direct any inquiries to me at 301-415-1030 or Richard.Guzman@nrc.gov Sincerely, Ira!
Richard V. Guzman, Senior Project Manager Plant licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410


==Enclosures:==
==Enclosures:==
1. List of Attendees 2, Licensee's Handouts/Slides cc w/encls: Distribution via Listserv DISTRIBUTION: PUBLIC LPL1-1 Branch Reading RidsAcrsAcnw_MailCTR Resource RGuzman, NRR RidsNrrDorlLpl1-1 Resource RidsNrrLASLittie Resource RidsOgcRp Resource RidsRgn1 MailCenter Resource RidsNrrPmNineMilePoint GDentel, RI RidsNrrDraAfpb Resource RidsNrrDraApla Resource LFields, NRR JRobinson, NRR MJimenez, NRR PLain, NRR BLitkett, NRR CMoulton, NRR HNarrett, NRR SLee, NRR SDinsmore, NRR ADAMS Accession No. PKG ML 121210049, Meeting Notice MLM f Summary ML121210654, Pubr andoutS ML121210044 *Concurrence via e-mal ee IC H IloFFICE DORLlLPL 1-1/PM ., ,""-RGuzman DATE 5/1/12 DORLlLPL 1-1/LA* SLittie 5/1/12 DORLlLPL 1-1/BC GWilson 5/2/12 DORLlLPL 1-1/PM RGuzman 5/2/12 OFFICIAL RECORD COpy
: 1. List of Attendees 2, Licensee's Handouts/Slides cc w/encls: Distribution via Listserv DISTRIBUTION:
}}
PUBLIC                   LPL 1-1 Branch Reading           RidsAcrsAcnw_MailCTR Resource RGuzman, NRR             RidsNrrDorlLpl1-1 Resource       RidsNrrLASLittie Resource RidsOgcRp Resource       RidsRgn1 MailCenter Resource     RidsNrrPmNineMilePoint GDentel, RI             RidsNrrDraAfpb Resource         RidsNrrDraApla Resource LFields, NRR             JRobinson, NRR                   MJimenez, NRR PLain, NRR               BLitkett, NRR                   CMoulton, NRR HNarrett, NRR           SLee, NRR                       SDinsmore, NRR ADAMS Accession No. PKG ML121210049, Meeting Notice ML120720054, Meef Ing Summary ML121210654, P u brIC Han d ou t S ML121210044 *Concurrence via e-mal'I IloFFICE     DORLlLPL 1-1/PM          DORLlLPL 1-1/LA*      DORLlLPL 1-1/BC          DORLlLPL 1-1/PM
  ., ,""-   RGuzman                  SLittie              GWilson                  RGuzman DATE       5/1/12                   5/1/12               5/2/12                   5/2/12 OFFICIAL RECORD COpy}}

Latest revision as of 22:10, 5 December 2019

Meeting Summary with Nine Mile Point, Unit No. 1 Regarding the Proposed National Fire Protection Association Standard 805 (NFPA-805) License Amendment Request
ML121210654
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 05/02/2012
From: Richard Guzman
Division of Operating Reactor Licensing
To:
Office of Nuclear Reactor Regulation
Guzman R, NRR/DORL 415-1030
Shared Package
ML121210049 List:
References
TAC ME8158
Download: ML121210654 (14)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2,2012 LICENSEE: Nine Mile Point Nuclear Station, LLC FACILITY: Nine Mile Point, Unit No.1

SUBJECT:

SUMMARY

OF APRIL 3,2012, PRE-APPLICATION MEETING WITH NINE MILE POINT NUCLEAR STATION, LLC REGARDING THE PROPOSED NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (NFPA-805)

LICENSE AMENDMENT REQUEST (TAC NO. ME8158)

On April 3, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Nine Mile Point Nuclear Station, LLC (NMPNS) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss NMPNS's planned submittal of a license amendment request to transition its fire protection licensing basis to NFPA-805.

A member of the public was in attendance by telephone. Public Meeting Feedback forms were not received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a copy of the licensee's slides presented at the meeting (Agencywide Documents Access and Management System (ADAMS) Accession No. ML121210044).

Please direct any inquiries to me at 301-415-1030 or Richard. Guzman@nrc.gov Sincerely, Richard V. Guzman, Senior Project Manager Plant licenSing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410

Enclosures:

1. List of Attendees
2. Licensee's Handouts/Slides cc w/encls: Distribution via Listserv

LIST OF ATrENDEES APRIL 3. 2012. PRE-APPLICATION MEETING WITH CONSTELLATION ENERGY NUCLEAR GROUP (CENG)

NINE MILE POINT NUCLEAR STATION (NMPNS)

REGARDING THE PROPOSED NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (NFPA-805) LICENSE AMENDMENT REQUEST FOR NINE MILE POINT, UNIT NO.1 NAME ORGANIZATION Alex Klein NRC Donnie Harrison NRC Rich Guzman NRC Bhalchandra Vaidya NRC Leslie Fields NRC Jay Robinson NRC Manuel Jimenez NRC Paul Lain NRC Bernard Litkett NRC Charles Moulton NRC Harry Barrett NRC Sampson Lee NRC Stephen Dinsmore NRC Paul Swift CENG S.L. Naron CENG Richard Neild CENG Peter Mazzaferro CENG Dennis Vandeputte CENG Ned Tyler CENG Saeed Savar* CENG Bridget Frymire* New York State Department of Public Service Leroy Kreider* Engineering Planning and Management, Inc.

Bob Layton* (Pacific Northwest National Laboratory)

  • by telephone Enclosure 1

MEETING SLIDES Enclosure 2

MEETING SLIDES Enclosure 2

a joint venture of-------..,

O~ion -1~eDF Nine Mile Point Nuclear Station, Unit 1 NFPA 80S License Amendment Request Pre-Application Meeting with NRC Staff April 3, 2012

Introductions

  • Nine Mile Point Nuclear Station Representatives

- Paul Swift NMPNS Manager Engineering Services

- Peter Mazzaferro CENG Project Director, NFPA 805 Richard Neild NMPNS Project Manager, I\JFPA 805 Larry Naron NMPNS Supervisor PRA Services

- Ned Tyler CENG Licensing Engineer

- Dennis Vandeputte NMPNS Licensing Engineer

  • Project Consultants

- AREVA

- SAIC CENG.

Agenda

  • Overview of NMP1 Design Features
  • Current Fire Protection Licensing Basis
  • Implementation Overview

I IW!! Wf\lUltl a I _

o=:-- "'::erw I Overview of Nine Mile Point Unit 1 (NMP1)

Design Featu res

  • Single unit Boiling Water Reactor, 1850 MWt
  • BWR/2 reactor design with 5 reactor recirculation loops (non-jet pump plant)
  • Mark I Containment
  • Isolation Condensers
  • Initial Operating License issued in 1969
  • Renewed Operating License issued - expires in 2029 CENG.

4

NMPl Current Fire Protection Licensing Basis

  • Branch Technical Position APCSB 9.5-1 Appendix A (addressed in UFSAR Appendix lOA)
  • Current Exemptions
  • Operator Actions - None required NRC approval CENG.

NFPA 805 Transition Project Overview

  • License Amendment Request (LAR) committed submittal date - June 29, 2012
  • Target submittal date - May 31, 2012
  • Using the Nuclear Energy Institute (NEI) LAR template
  • Preparation and internal review activities are in progress
  • Web portal established to support NRC review CENG.

6

NFPA 805 Transition Project Overview

- License Condition being revised

- Technical Specifications being revised

- Reviewed existing exemptions

- Will not be transitioning any exemptions to NFPA 805 design basis

- 1\10 additional items that require requesting 1\1 RC approval have been identified CENG.

Compliance with NFPA 805

- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0036

- Review documented in B-1 Table (Attachment A of LAR)

- Results

- One Modification

> Removal of H2 Bulk Storage in Turbine Building

- Seismic Hose Stations

- Items that Comply with Prior NRC Approval

> Cables that do not meet IEEE 383 flame test (Req. 3.3.5.3)

> Fire water provided by Lake Ontario - (Reqs. 3.5.1, 3.5.2)

CENG.

Compliance with NFPA 805

  • Non-Power Operations

- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0040

- Results of Review

  • All success paths identified
  • Complete component list by Key Safety Function (KSF)
  • High Risk Evolutions
  • Pinch Points identified
  • Recommendations to manage Fire Risk CENG.

I!ptiv<<lttY&(j~

o=---~I 9 Compliance with NFPA 805

  • Radioactive Release

- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 09-0056

- Plant evaluated on a Fire Zone basis

- Credit engineering controls for gaseous and liquid effluents

- Revise Pre-Fire Plans and Training material to clarify monitoring and control requirements CENG.

10

Compliance with NFPA 805

  • Nuclear Safety Capability Assessment

- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 08-0054

- Fire Area Review

- CT Circuit

- Automatic System Initiation

- Breaker Coordination

- Multiple Spurious Operations review

- Results:

  • Safe and Stable is defined to be Cold Shutdown
  • 24 Total Fire Areas
  • No Fire Areas to be transitioned deterministically
  • All 24 Fire Areas to be transitioned using RI-PB method CENG,.

11 Compliance with NFPA 805

  • Recovery Actions

- Review performed using NEI 04-02, Revision 2 guidance as supplemented by FAQ 07-0030

- Primary Control Station

- 16 Unique Recovery Actions 12

Compliance with NFPA 805

  • Monitoring Program

- Following FAQ 10-0059, Revision 5 guidance

- NSEL and FPRA Components

- Include any new functions in existing Maintenance Rule Program

- NPO Components, Rad Release Systems, FP Programmatic

- Include in normal System and Program Health Monitoring

- FP Systems and Features

- Low Safety Significant - Normal System/Program Health Monitoring

- High Safety Significant - NFPA 805 Specific Monitoring Program that mirrors Maintenance Rule Program and uses same software CENG.

13 PRA Development/Results

  • Fire PRA built on a high quality Internal Events model

- Internal Events model peer reviewed to RG 1.2001 Revision 1

  • Fire PRA peer reviewed by BWROG in October 2011

- IlStrong FPRA model with sound technical approachesl l

- "The best we/ve seen and likely the best in the industryll ll

- 4 "Best practices

- All F&Os subsequently addressed

- No unreviewed methods used CENG.

  • 14

PRA Development/Results

  • Overall Plant Risk

- Total CDF = 2.06E-S/yr and LERF = 2.84E-6/yr

- llCDF = 8.73E-6 and llLERF =9.00E-7

15 Implementation Overview

  • Modifications Planned (15)

- No Major Modifications

  • Minor Circuit mods
  • Minor mechanical mods
  • Cable re-routes
  • Provide a portable generator for battery charging
  • Process/Procedure Changes

- Training

- Operator Response for Recovery Actions

- Fire Brigade Response

- Design Change Process CENG.

16

Summary

  • Complete LAR to be submitted on or before June 29, 2012
  • Nothing unique or unusual
  • No alternative Fire PRA methods
  • Transition Schedule

- Implement procedure/process changes 6 months after SER

- Completion of modifications 1St Refueling Outage after SER CENG.

  • 17

May 2,2012 LICENSEE: Nine Mile Point Nuclear Station, LLC FACILITY: Nine Mile Point, Unit No.1

SUBJECT:

SUMMARY

OF APRIL 3,2012, PRE-APPLICATION MEETING WITH NINE MILE POINT NUCLEAR STATION, LLC REGARDING THE PROPOSED NATIONAL FIRE PROTECTION ASSOCIATION STANDARD 805 (NFPA-805)

LICENSE AMENDMENT REQUEST (TAC NO. ME8158)

On April 3, 2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of the Nine Mile Point Nuclear Station, LLC (NMPNS) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss NMPNS's planned submittal of a license amendment request to transition its fire protection licensing basis to NFPA-805.

A member of the public was in attendance by telephone. Public Meeting Feedback forms were not received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a copy of the licensee's slides presented at the meeting (Agencywide Documents Access and Management System (ADAMS) Accession No. ML121210044).

Please direct any inquiries to me at 301-415-1030 or Richard.Guzman@nrc.gov Sincerely, Ira!

Richard V. Guzman, Senior Project Manager Plant licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-410

Enclosures:

1. List of Attendees 2, Licensee's Handouts/Slides cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL 1-1 Branch Reading RidsAcrsAcnw_MailCTR Resource RGuzman, NRR RidsNrrDorlLpl1-1 Resource RidsNrrLASLittie Resource RidsOgcRp Resource RidsRgn1 MailCenter Resource RidsNrrPmNineMilePoint GDentel, RI RidsNrrDraAfpb Resource RidsNrrDraApla Resource LFields, NRR JRobinson, NRR MJimenez, NRR PLain, NRR BLitkett, NRR CMoulton, NRR HNarrett, NRR SLee, NRR SDinsmore, NRR ADAMS Accession No. PKG ML121210049, Meeting Notice ML120720054, Meef Ing Summary ML121210654, P u brIC Han d ou t S ML121210044 *Concurrence via e-mal'I IloFFICE DORLlLPL 1-1/PM DORLlLPL 1-1/LA* DORLlLPL 1-1/BC DORLlLPL 1-1/PM

., ,""- RGuzman SLittie GWilson RGuzman DATE 5/1/12 5/1/12 5/2/12 5/2/12 OFFICIAL RECORD COpy