| issue date = 09/24/2008
| issue date = 09/24/2008
| title = IR 05000445-07-201, IR 05000446-07-201, Comanche Peak Steam Electric Station, Final Significance Determination for Security-Related Greater than Green Finding, NRC Security Baseline Inspection Report
| title = IR 05000445-07-201, IR 05000446-07-201, Comanche Peak Steam Electric Station, Final Significance Determination for Security-Related Greater than Green Finding, NRC Security Baseline Inspection Report
| author name = Westreich B C
| author name = Westreich B
| author affiliation = NRC/NSIR/DSO
| author affiliation = NRC/NSIR/DSO
| addressee name = Blevins M
| addressee name = Blevins M
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ber 17, 2008
[[Issue date::September 17, 2008]]


EA-08-22 Mr. Mike Blevins Chief Nuclear Officer and Executive Vice President Luminant Generation Company, LLC Attn: Regulatory Affairs Department P.O. Box 1002 Glen Rose, TX 76043
==SUBJECT:==
 
FINAL SIGNIFICANCE DETERMINATION FOR A SECURITY-RELATED GREATER THAN GREEN FINDING; NRC SECURITY BASELINE INSPECTION REPORT NOS. 05000445/2007201 AND 05000446/2007201 FOR COMANCHE PEAK STEAM ELECTRIC STATION
SUBJECT: FINAL SIGNIFICANCE DETERMINATION FOR A SECURITY-RELATED GREATER THAN GREEN FINDING; NRC SECURITY BASELINE INSPECTION REPORT NOS. 05000445/2007201 AND 05000446/2007201 FOR COMANCHE PEAK STEAM ELECTRIC STATION


==Dear Mr. Blevins:==
==Dear Mr. Blevins:==
Line 31: Line 29:
During a telephone call on April 28, 2008, Mr. Tim Hope of your staff informed us that Comanche Peak Steam Electric Station contested the characterization of the significance of the finding, and requested the opportunity to discuss these issues in a Regulatory Conference that was conducted on May 19, 2008, in Arlington, Texas, at the Regional Office.
During a telephone call on April 28, 2008, Mr. Tim Hope of your staff informed us that Comanche Peak Steam Electric Station contested the characterization of the significance of the finding, and requested the opportunity to discuss these issues in a Regulatory Conference that was conducted on May 19, 2008, in Arlington, Texas, at the Regional Office.


After considering the information developed during the inspection and additional information provided during the Regulatory Conference, the NRC has concluded that no finding existed. We noted that during the period that the significance of this issue was being discussed, the licensee had taken corrective action to address the concerns. See enclosed Regulatory Conference Summary, which is Safeguards Information for specific details on the issues and the Final Determination.
After considering the information developed during the inspection and additional information provided during the Regulatory Conference, the NRC has concluded that no finding existed.
 
Enclosures Contains Safeguards Information. Upon separation, this page is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosures will not be available for public inspection.
 
Sincerely,/RA/ Barry C. Westreich, Deputy Director Division of Security Oversight Office of Nuclear Security and Incident Response Docket Nos.: 50-445, 50-446 License Nos.: NPF-87, NPF89 Nonpublic Enclosures ( ): 1. Regulatory Conference


cc: Site Vice President - Comanche Peak Steam Electric Station Plant Manager - Comanche Peak Steam Electric Station Director of Oversight and Regulatory Affairs - Comanche Peak Steam Electric Station Chief Operating Officer and Vice President - Comanche Peak Steam Electric Vice President - Luminant Generation Company, LLC Comptroller of Accounts - State Energy Conservation Office, Austin, Texas Deputy Attorney General - Austin, Texas In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosures will not be available for public inspection.
We noted that during the period that the significance of this issue was being discussed, the licensee had taken corrective action to address the concerns. See enclosed Regulatory Conference Summary, which is Safeguards Information for specific details on the issues and the Final Determination.


Sincerely,/RA/ Barry C. Westreich, Deputy Director Division of Security Oversight Office of Nuclear Security and Incident Response Docket Nos.: 50-445, 50-446 License Nos.: NPF-87, NPF89 Nonpublic Enclosures ( ): 1. Regulatory Conference
Enclosures Contains Safeguards Information. Upon separation, this page is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.


cc: Site Vice President - Comanche Peak Steam Electric Station Plant Manager - Comanche Peak Steam Electric Station Director of Oversight and Regulatory Affairs - Comanche Peak Steam Electric Station Chief Operating Officer and Vice President - Comanche Peak Steam Electric Vice President - Luminant Generation Company, LLC Comptroller of Accounts - State Energy Conservation Office, Austin, Texas Deputy Attorney General - Austin, Texas Distribution:
Sincerely,
D. Riffle, NSIR/DSO/DDSO R. Barnes, OE B. Singal, NRR C. Grisby SPEB R/F H. Harrington, OPA D. Detker, OCA M. Shannon, Region IV
/RA/
Barry C. Westreich, Deputy Director Division of Security Oversight Office of Nuclear Security and Incident Response Docket Nos.: 50-445, 50-446 License Nos.: NPF-87, NPF89 Nonpublic Enclosures ( ):
1. Regulatory Conference cc:
Site Vice President - Comanche Peak Steam Electric Station Plant Manager - Comanche Peak Steam Electric Station Director of Oversight and Regulatory Affairs - Comanche Peak Steam Electric Station Chief Operating Officer and Vice President - Comanche Peak Steam Electric Vice President - Luminant Generation Company, LLC Comptroller of Accounts - State Energy Conservation Office, Austin, Texas Deputy Attorney General - Austin, Texas In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.


ACCESSION NO.:
Sincerely,
ML082350298 Log#2021 OFFICE NSIR/DSO/SPEB BC:RIV/DRS/PSBBC:DSO/SPEB DD:NSIR:DSO NAME DCornelius MShannon(Via email) RAlbert BWestreich DATE 08/22/08 09/16 /08 09/17 /08 OFFICIAL RECORD COPY
/RA/
Barry C. Westreich, Deputy Director Division of Security Oversight Office of Nuclear Security and Incident Response Docket Nos.: 50-445, 50-446 License Nos.: NPF-87, NPF89 Nonpublic Enclosures ( ):
1. Regulatory Conference cc:
Site Vice President - Comanche Peak Steam Electric Station Plant Manager - Comanche Peak Steam Electric Station Director of Oversight and Regulatory Affairs - Comanche Peak Steam Electric Station Chief Operating Officer and Vice President - Comanche Peak Steam Electric Vice President - Luminant Generation Company, LLC Comptroller of Accounts - State Energy Conservation Office, Austin, Texas Deputy Attorney General - Austin, Texas Distribution:
D. Riffle, NSIR/DSO/DDSO R. Barnes, OE B. Singal, NRR C. Grisby SPEB R/F H. Harrington, OPA D. Detker, OCA M. Shannon, Region IV ACCESSION NO.: ML082350298   Log#2021 OFFICE NSIR/DSO/SPEB BC:RIV/DRS/PSB BC:DSO/SPEB DD:NSIR:DSO NAME DCornelius MShannon(Via RAlbert BWestreich email)
DATE 08/22/08   09/16 /08 09/17 /08 OFFICIAL RECORD COPY
}}
}}

Latest revision as of 13:42, 14 November 2019

IR 05000445-07-201, IR 05000446-07-201, Comanche Peak Steam Electric Station, Final Significance Determination for Security-Related Greater than Green Finding, NRC Security Baseline Inspection Report
ML082350298
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/24/2008
From: Westreich B
Division of Security Operations
To: Blevins M
Luminant Generation Co
References
EA-08-22 IR-07-201
Download: ML082350298 (3)


Text

ber 17, 2008

SUBJECT:

FINAL SIGNIFICANCE DETERMINATION FOR A SECURITY-RELATED GREATER THAN GREEN FINDING; NRC SECURITY BASELINE INSPECTION REPORT NOS. 05000445/2007201 AND 05000446/2007201 FOR COMANCHE PEAK STEAM ELECTRIC STATION

Dear Mr. Blevins:

The purpose of this letter is to provide you the final results of our significance determination for the potentially Greater than Green finding identified in the subject inspection report. The inspection finding was assessed using the Physical Protection Significance Determination Process and was preliminarily characterized as more than very low security significance. On April 10, 2008, you were presented with a Choice Letter which afforded you the opportunity of participating in a Regulatory Conference to mitigate the finding or provide new information to be considered in reaching the final determination.

During a telephone call on April 28, 2008, Mr. Tim Hope of your staff informed us that Comanche Peak Steam Electric Station contested the characterization of the significance of the finding, and requested the opportunity to discuss these issues in a Regulatory Conference that was conducted on May 19, 2008, in Arlington, Texas, at the Regional Office.

After considering the information developed during the inspection and additional information provided during the Regulatory Conference, the NRC has concluded that no finding existed.

We noted that during the period that the significance of this issue was being discussed, the licensee had taken corrective action to address the concerns. See enclosed Regulatory Conference Summary, which is Safeguards Information for specific details on the issues and the Final Determination.

Enclosures Contains Safeguards Information. Upon separation, this page is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.

Sincerely,

/RA/

Barry C. Westreich, Deputy Director Division of Security Oversight Office of Nuclear Security and Incident Response Docket Nos.: 50-445, 50-446 License Nos.: NPF-87, NPF89 Nonpublic Enclosures ( ):

1. Regulatory Conference cc:

Site Vice President - Comanche Peak Steam Electric Station Plant Manager - Comanche Peak Steam Electric Station Director of Oversight and Regulatory Affairs - Comanche Peak Steam Electric Station Chief Operating Officer and Vice President - Comanche Peak Steam Electric Vice President - Luminant Generation Company, LLC Comptroller of Accounts - State Energy Conservation Office, Austin, Texas Deputy Attorney General - Austin, Texas In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.

Sincerely,

/RA/

Barry C. Westreich, Deputy Director Division of Security Oversight Office of Nuclear Security and Incident Response Docket Nos.: 50-445, 50-446 License Nos.: NPF-87, NPF89 Nonpublic Enclosures ( ):

1. Regulatory Conference cc:

Site Vice President - Comanche Peak Steam Electric Station Plant Manager - Comanche Peak Steam Electric Station Director of Oversight and Regulatory Affairs - Comanche Peak Steam Electric Station Chief Operating Officer and Vice President - Comanche Peak Steam Electric Vice President - Luminant Generation Company, LLC Comptroller of Accounts - State Energy Conservation Office, Austin, Texas Deputy Attorney General - Austin, Texas Distribution:

D. Riffle, NSIR/DSO/DDSO R. Barnes, OE B. Singal, NRR C. Grisby SPEB R/F H. Harrington, OPA D. Detker, OCA M. Shannon, Region IV ACCESSION NO.: ML082350298 Log#2021 OFFICE NSIR/DSO/SPEB BC:RIV/DRS/PSB BC:DSO/SPEB DD:NSIR:DSO NAME DCornelius MShannon(Via RAlbert BWestreich email)

DATE 08/22/08 09/16 /08 09/17 /08 OFFICIAL RECORD COPY