{{#Wiki_filter:UNITED STATES               NUCLEAR REGULATORY COMMISSION                                                         REGION I                                               475 ALLENDALE ROAD                               KING OF PRUSSIA, PA 19406-1415 September 1, 2009 Mr. John T. Carlin Vice President R. E. Ginna Nuclear Power Plant R. E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 1, 2009 Mr. John T. Carlin Vice President R. E. Ginna Nuclear Power Plant R. E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519


==SUBJECT:==
==SUBJECT:==
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - R. E. GINNA NUCLEAR POWER PLANT  
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - R. E.
GINNA NUCLEAR POWER PLANT


==Dear Mr. Carlin:==
==Dear Mr. Carlin:==


On August 12, 2009, the NRC staff completed its performance review of R. E. Ginna Nuclear Power Plant (Ginna). Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
On August 12, 2009, the NRC staff completed its performance review of R. E. Ginna Nuclear Power Plant (Ginna). Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009.
The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter at Ginna was within the Regulatory Response column of the NRC's Action Matrix, based on one finding having low to moderate safety significance (White). This finding involved Ginna's inadequate implementation of a preventive maintenance (PM) program for the turbine-driven auxiliary feedwater (TDAFW) pump governor that led to a failure of the pump to operate properly during a December 2, 2008, surveillance test. After an additional TDAFW pump failure in May 2009, the NRC initiated a Special Inspection Team (SIT) on June 8, 2009, due to the safety significance associated with multiple failures of the TDAFW pump during surveillance tests. While the SIT inspection was ongoing, the TDAFW pump experienced an additional failure. The SIT inspection was conducted in accordance with the guidance of NRC Inspecti on Procedure 93812, "Special Inspection," and a final exit meeting was conducted on August 27, 2009. The SIT inspection report will be issued within 45 days following the final exit meeting for the inspection. The SIT results will be provided to you in separate correspondence and may result in a change to our assessment of the plant's performance and the facility inspection plan.
Plant performance for the most recent quarter at Ginna was within the Regulatory Response column of the NRCs Action Matrix, based on one finding having low to moderate safety significance (White). This finding involved Ginnas inadequate implementation of a preventive maintenance (PM) program for the turbine-driven auxiliary feedwater (TDAFW) pump governor that led to a failure of the pump to operate properly during a December 2, 2008, surveillance test. After an additional TDAFW pump failure in May 2009, the NRC initiated a Special Inspection Team (SIT) on June 8, 2009, due to the safety significance associated with multiple failures of the TDAFW pump during surveillance tests. While the SIT inspection was ongoing, the TDAFW pump experienced an additional failure. The SIT inspection was conducted in accordance with the guidance of NRC Inspection Procedure 93812, Special Inspection, and a final exit meeting was conducted on August 27, 2009. The SIT inspection report will be issued within 45 days following the final exit meeting for the inspection. The SIT results will be provided to you in separate correspondence and may result in a change to our assessment of the plants performance and the facility inspection plan.
Based on our current assessment of performance for Ginna, we plan to conduct, in addition to the reactor oversight process (ROP) baseline inspections at your facility, a supplemental inspection using Inspection Procedure 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area," when your staff notifies us of your readiness for the inspection.  
Based on our current assessment of performance for Ginna, we plan to conduct, in addition to the reactor oversight process (ROP) baseline inspections at your facility, a supplemental inspection using Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area, when your staff notifies us of your readiness for the inspection.


J. Carlin 2 The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2010. In addition to the 95001 supplemental inspection and the baseline inspections, we plan on conducting an independent spent fuel storage installation (ISFSI) inspection and a license renewal follow-up inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
J. Carlin                                     2 The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2010. In addition to the 95001 supplemental inspection and the baseline inspections, we plan on conducting an independent spent fuel storage installation (ISFSI) inspection and a license renewal follow-up inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures as part of our biennial review of the Reactor Oversight Process (ROP). If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel at (610) 337-5233 with any questions you may have regarding this letter or the inspection plan.
As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures as part of our biennial review of the Reactor Oversight Process (ROP). If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel at (610) 337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely,
      /RA/ James W. Clifford, Acting Director Division of Reactor Projects Docket No. 50-244 License No. DPR-18  
                                              /RA/
James W. Clifford, Acting Director Division of Reactor Projects Docket No. 50-244 License No. DPR-18


==Enclosure:==
==Enclosure:==
R. E. Ginna Nuclear Power Plant Inspection/ Activity Plan cc w/ encl.: M. J. Wallace, Vice - President, Constellation Energy B. Barron, President, CEO & Chief Nuclear Officer, Constellation Energy Nuclear Group, LLC P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law C. Fleming, Esquire, Senior Counsel, Nuclear Generation, Constellation Nuclear Energy       Nuclear Group, LLC T. Harding, Director, Licensing, Constellation Energy Nuclear Group, LLC A. Peterson, SLO Designee, New York State Energy Research and Development Authority F. Murray, President & CEO, New York State Energy Research and Development Authority G. Bastedo, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Management T. Judson, Central New York Citizens Awareness Network J. Carlin 2 The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2010. In addition to the 95001 supplemental inspection and the baseline inspections, we plan on conducting an independent spent fuel storage installation (ISFSI) inspection and a license renewal follow-up inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
R. E. Ginna Nuclear Power Plant Inspection/ Activity Plan cc w/ encl.:
In accordance with 10 CFR 2.390 of the NRC
M. J. Wallace, Vice - President, Constellation Energy B. Barron, President, CEO & Chief Nuclear Officer, Constellation Energy Nuclear Group, LLC P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law C. Fleming, Esquire, Senior Counsel, Nuclear Generation, Constellation Nuclear Energy Nuclear Group, LLC T. Harding, Director, Licensing, Constellation Energy Nuclear Group, LLC A. Peterson, SLO Designee, New York State Energy Research and Development Authority F. Murray, President & CEO, New York State Energy Research and Development Authority G. Bastedo, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Management T. Judson, Central New York Citizens Awareness Network
=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
J. Carlin                                                     2 The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2010. In addition to the 95001 supplemental inspection and the baseline inspections, we plan on conducting an independent spent fuel storage installation (ISFSI) inspection and a license renewal follow-up inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures as part of our biennial review of the Reactor Oversight Process (ROP). If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel at (610) 337-5233 with any questions you may have regarding this letter or the inspection plan.
As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures as part of our biennial review of the Reactor Oversight Process (ROP). If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel at (610) 337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely,
      /RA/ James W. Clifford, Acting Director Division of Reactor Projects Docket No. 50-244 License No. DPR-18 Distribution: (via email)
                                                                            /RA/
S. Collins, RA M. Dapas, DRA  D. Lew, DRP J. Clifford, DRP D. Roberts, DRS P. Wilson, DRS DRS Branch Chiefs L. Scholl, DRS D. Silk, DRS D. Screnci, ORA N. Sheehan, ORA R. Barkley, ORA L. Trocine, RI OEDO R. Nelson, NRR D. V. Pickett, PM, NRR B. Vaidya, PM, NRR G. Dentel, DRP N. Perry, DRP J. Hawkins, DRP K. Kolaczyk, DRP L. Casey, DRP M. Rose, DRP D. Bearde, DRP Region I Docket Room ROPreports.Resource@nr c.govRidsNrrDirsIpab@nrc.govSUNSI Review Complete:           nsp*             (Reviewer
James W. Clifford, Acting Director Division of Reactor Projects Docket No. 50-244 License No. DPR-18 Distribution: (via email)
=s Initials) DOCUMENT NAME:   S:\ROP-10 Mid-Cycle Review\Branch 1\Ginna MidCycle Ltr 09.doc ML092440230 After declaring this document AAn Official Agency Record
S. Collins, RA                                 D. Screnci, ORA                              J. Hawkins, DRP M. Dapas, DRA                                  N. Sheehan, ORA                              K. Kolaczyk, DRP D. Lew, DRP                                    R. Barkley, ORA                             L. Casey, DRP J. Clifford, DRP                              L. Trocine, RI OEDO                         M. Rose, DRP D. Roberts, DRS                                R. Nelson, NRR                               D. Bearde, DRP P. Wilson, DRS                                D. V. Pickett, PM, NRR                       Region I Docket Room DRS Branch Chiefs                              B. Vaidya, PM, NRR                           ROPreports.Resource@nr L. Scholl, DRS                                G. Dentel, DRP                               c.gov D. Silk, DRS                                  N. Perry, DRP                               RidsNrrDirsIpab@nrc.gov SUNSI Review Complete:             nsp*       (Reviewer=s Initials)
@ it will/will not be released to the Public. To receive a copy of this document, indicate in the box:
DOCUMENT NAME: S:\ROP-10 Mid-Cycle Review\Branch 1\Ginna MidCycle Ltr 09.doc                         ML092440230 After declaring this document AAn Official Agency Record@ it will/will not be released to the Public.
" C" = Copy without attachment/enclosure   " E" = Copy with attachment/enclosure   " N" = No copy OFFICE R I/DRP   R I/DRP   R I/DRP           N AME  NPerry/nsp*
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE                 RI/DRP                   RI/DRP                         RI/DRP NAME                  NPerry/nsp*               GDentel/gtd*                   JClifford/jwc DATE                   08/21/09                 08/24/09                       09/01/09
G Dentel/gtd*
                *see prior concurrence page                           OFFICIAL RECORD COPY
JClifford/jwc DATE 08/21/09 08/24/09 09/01/09     *see prior concurrence page OFFICIAL RECORD COPY Inspection / Activity Plan Page 1 of 2 09/01/2009 10:18:39 Report 22 07/01/2009
 
-12/31/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Ginna 93812-TDAFW SIT 4 1     IP Special Inspection 93812 06/05/2009 08/28/2009 71121-OCC RAD SAFETY 1 1     IP A ccess Control to Radiologically Significant Areas 7112101 07/06/2009 07/10/2009 1    IP A LARA Planning and Controls 7112102 07/06/2009 07/10/2009 1    IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 07/06/2009 07/10/2009 1    IP Performance Indicator Verification 71151 07/06/2009 07/10/2009 7111108P-INSERVICE INSPECTION 2 1     IP Inservice Inspection Activities - PWR 7111108P 09/14/2009 09/25/2009 TI-172-TI 2515/172 DISSIMILAR METAL WELDS 1 1     IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 09/14/2009 09/25/2009 71121-OCC RAD SAFETY 1 1    IP A ccess Control to Radiologically Significant Areas 7112101 09/21/2009 09/25/2009 1    IP A LARA Planning and Controls 7112102 09/21/2009 09/25/2009 1    IP Radiation Monitoring Instrumentation and Protective Equipment 7112103 09/21/2009 09/25/2009 1    IP Performance Indicator Verification 71151 09/21/2009 09/25/2009 TRI FIRE-TRIENNIAL FIRE PROTECTION INSPECTION 3 1     IP Fire Protection [Triennial]
Page 1 of 2                                                                                   Ginna 09/01/2009     10:18:39                                                         Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit         Planned Dates                                                                                                 No. of Staff Number        Start     End     Inspection Activity                                                             Title       on Site 93812         - TDAFW SIT                                                                         4 1         06/05/2009   08/28/2009   IP 93812                Special Inspection 71121         - OCC RAD SAFETY                                                                     1 1         07/06/2009  07/10/2009  IP 7112101              Access Control to Radiologically Significant Areas 1          07/06/2009   07/10/2009   IP 7112102              ALARA Planning and Controls 1          07/06/2009   07/10/2009   IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment 1          07/06/2009   07/10/2009   IP 71151                Performance Indicator Verification 7111108P     - INSERVICE INSPECTION                                                               2 1         09/14/2009   09/25/2009   IP 7111108P            Inservice Inspection Activities - PWR TI-172       - TI 2515/172 DISSIMILAR METAL WELDS                                                 1 1         09/14/2009  09/25/2009  IP 2515/172            Reactor Coolant System Dissimiliar Metal Butt Welds 71121        - OCC RAD SAFETY                                                                    1 1          09/21/2009   09/25/2009   IP 7112101              Access Control to Radiologically Significant Areas 1          09/21/2009   09/25/2009   IP 7112102              ALARA Planning and Controls 1          09/21/2009   09/25/2009   IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment 1          09/21/2009   09/25/2009   IP 71151                Performance Indicator Verification TRI FIRE     - TRIENNIAL FIRE PROTECTION INSPECTION                                               3 1         11/02/2009   11/06/2009   IP 7111105T            Fire Protection [Triennial]
7111105T 11/02/2009 11/06/2009 1    IP Fire Protection [Triennial]
1          11/16/2009   11/20/2009   IP 7111105T            Fire Protection [Triennial]
7111105T 11/16/2009 11/20/2009 71003-LR FOLLOW-UP 1 1     IP Post-Approval Site Inspection for License Renewal 71003 11/02/2009 11/06/2009 CRANE-NEW CRANE INSTALLATION INSPECTION 1 1     IP On-Site Fabrication Of Components And Construction On An ISFSI 60853 11/16/2009 11/20/2009 71121-OCC RADIATION SAFETY 1 1     IP A ccess Control to Radiologically Significant Areas 7112101 01/11/2010 01/15/2010 1     IP A LARA - Required 7112102-7112102R 01/11/2010 01/15/2010 EP PROG-EP PROGRAM INSPECTION 1 1     IP A lert and Notification System Testing 7111402 02/08/2010 02/12/2010 1    IP Emergency Response Organization Augmentation Testing 7111403 02/08/2010 02/12/2010 1    IP Emergency Action Level and Emergency Plan Changes 7111404 02/08/2010 02/12/2010 1    IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 02/08/2010 02/12/2010 1    IP Drill/Exercise Performance 71151-EP01 02/08/2010 02/12/2010 1    IP ERO Drill Participation 71151-EP02 02/08/2010 02/12/2010 1    IP A lert & Notification System 71151-EP03 02/08/2010 02/12/2010 This report does not include INPO and OUTAGE activities.
71003         - LR FOLLOW-UP                                                                       1 1         11/02/2009   11/06/2009   IP 71003                Post-Approval Site Inspection for License Renewal CRANE         - NEW CRANE INSTALLATION INSPECTION                                                 1 1         11/16/2009  11/20/2009  IP 60853                On-Site Fabrication Of Components And Construction On An ISFSI 71121         - OCC RADIATION SAFETY                                                               1 1         01/11/2010   01/15/2010   IP 7112101              Access Control to Radiologically Significant Areas 1         01/11/2010   01/15/2010   IP 7112102-7112102R ALARA - Required EP PROG       - EP PROGRAM INSPECTION                                                             1 1         02/08/2010  02/12/2010  IP 7111402              Alert and Notification System Testing 1          02/08/2010   02/12/2010   IP 7111403              Emergency Response Organization Augmentation Testing 1          02/08/2010   02/12/2010   IP 7111404              Emergency Action Level and Emergency Plan Changes 1          02/08/2010   02/12/2010   IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1          02/08/2010   02/12/2010   IP 71151-EP01          Drill/Exercise Performance 1          02/08/2010   02/12/2010   IP 71151-EP02          ERO Drill Participation 1          02/08/2010   02/12/2010   IP 71151-EP03          Alert & Notification System This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 09/01/2009 10:18:39 Report 22 07/01/2009
 
-12/31/2010 Unit Number Planned Dates Start           End Inspection Activity Title No. of Staff on Site Ginna 6/21EXAM-OPERATOR LICENSING INITIAL EXAMS 5 1     FY10 - GINNA INITIAL OPERATOR LICENSING EXAM U01766 05/24/2010 05/28/2010 1    FY10 - GINNA INITIAL OPERATOR LICENSING EXAM U01766 06/21/2010 07/02/2010 71122.02-RAD MATERIAL PROCESSING AND TRANSPORT 1 1     IP Radioactive Material Processing and Transportation 7112202 04/05/2010 04/09/2010 ISFSI-ISFSI DRY RUN AND INITIAL LOADING 1 1     IP Preoperational Testing Of An ISFSI 60854 04/05/2010 04/16/2010 ISFSI-ISFSI DRY RUN DEMO 1 1     IP Preoperational Testing Of An ISFSI 60854 04/12/2010 04/16/2010 1     IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 60854.1 04/12/2010 04/16/2010 71152B-PI&R 4 1     IP Identification and Resolution of Problems 71152B 05/24/2010 05/28/2010 1    IP Identification and Resolution of Problems 71152B 06/07/2010 06/11/2010 2515/173-INDUSTRY GROUND WATER INITIATIVE 1 1     IP Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 2515/173 06/21/2010 06/25/2010 71122.03-PUB RAD SAFETY - REMP 1 1     IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 7112203 06/21/2010 06/25/2010 71121-OCC RAD SAFETY - ACCESS/ALARA 1 1     IP A ccess Control to Radiologically Significant Areas 7112101 09/27/2010 10/01/2010 1    IP A LARA - Required 7112102-7112102R 09/27/2010 10/01/2010 1    IP Performance Indicator Verification 71151 09/27/2010 10/01/2010 CDBI-COMPONENT DESIGN BASES INSPECTION 9 1     IP Component Design Bases Inspection 7111121 10/11/2010 10/15/2010 1    IP Component Design Bases Inspection 7111121 10/25/2010 11/05/2010 This report does not include INPO and OUTAGE activities.
Page 2 of 2                                                                                 Ginna 09/01/2009     10:18:39                                                         Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit         Planned Dates                                                                                                                                   No. of Staff Number        Start     End     Inspection Activity                                                           Title                                         on Site 6/21EXAM     - OPERATOR LICENSING INITIAL EXAMS                                                                                     5 1         05/24/2010   05/28/2010     U01766              FY10 - GINNA INITIAL OPERATOR LICENSING EXAM 1          06/21/2010   07/02/2010     U01766              FY10 - GINNA INITIAL OPERATOR LICENSING EXAM 71122.02     - RAD MATERIAL PROCESSING AND TRANSPORT                                                                               1 1         04/05/2010   04/09/2010   IP 7112202              Radioactive Material Processing and Transportation ISFSI         - ISFSI DRY RUN AND INITIAL LOADING                                                                                   1 1         04/05/2010   04/16/2010   IP 60854                Preoperational Testing Of An ISFSI ISFSI         - ISFSI DRY RUN DEMO                                                                                                   1 1         04/12/2010  04/16/2010  IP 60854                Preoperational Testing Of An ISFSI 1          04/12/2010   04/16/2010   IP 60854.1             Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 71152B       - PI&R                                                                                                                 4 1         05/24/2010   05/28/2010   IP 71152B              Identification and Resolution of Problems 1          06/07/2010   06/11/2010   IP 71152B              Identification and Resolution of Problems 2515/173     - INDUSTRY GROUND WATER INITIATIVE                                                                                     1 1         06/21/2010  06/25/2010  IP 2515/173            Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 71122.03     - PUB RAD SAFETY - REMP                                                                                               1 1         06/21/2010  06/25/2010  IP 7112203              Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 71121         - OCC RAD SAFETY - ACCESS/ALARA                                                                                       1 1         09/27/2010  10/01/2010  IP 7112101              Access Control to Radiologically Significant Areas 1          09/27/2010   10/01/2010   IP 7112102-7112102R ALARA - Required 1          09/27/2010   10/01/2010   IP 71151                Performance Indicator Verification CDBI         - COMPONENT DESIGN BASES INSPECTION                                                                                   9 1         10/11/2010   10/15/2010   IP 7111121              Component Design Bases Inspection 1          10/25/2010   11/05/2010   IP 7111121              Component Design Bases Inspection This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 03:43, 14 November 2019

Mid-Cycle Performance Review and Inspection Plan - R.E. Ginna Nuclear Power Plant, Dated 09/01/09
ML092440230
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/01/2009
From: Clifford J
Division Reactor Projects I
To: John Carlin
Ginna
Clifford J
References
Download: ML092440230 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 1, 2009 Mr. John T. Carlin Vice President R. E. Ginna Nuclear Power Plant R. E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - R. E.

GINNA NUCLEAR POWER PLANT

Dear Mr. Carlin:

On August 12, 2009, the NRC staff completed its performance review of R. E. Ginna Nuclear Power Plant (Ginna). Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2008, through June 30, 2009.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Ginna was within the Regulatory Response column of the NRCs Action Matrix, based on one finding having low to moderate safety significance (White). This finding involved Ginnas inadequate implementation of a preventive maintenance (PM) program for the turbine-driven auxiliary feedwater (TDAFW) pump governor that led to a failure of the pump to operate properly during a December 2, 2008, surveillance test. After an additional TDAFW pump failure in May 2009, the NRC initiated a Special Inspection Team (SIT) on June 8, 2009, due to the safety significance associated with multiple failures of the TDAFW pump during surveillance tests. While the SIT inspection was ongoing, the TDAFW pump experienced an additional failure. The SIT inspection was conducted in accordance with the guidance of NRC Inspection Procedure 93812, Special Inspection, and a final exit meeting was conducted on August 27, 2009. The SIT inspection report will be issued within 45 days following the final exit meeting for the inspection. The SIT results will be provided to you in separate correspondence and may result in a change to our assessment of the plants performance and the facility inspection plan.

Based on our current assessment of performance for Ginna, we plan to conduct, in addition to the reactor oversight process (ROP) baseline inspections at your facility, a supplemental inspection using Inspection Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area, when your staff notifies us of your readiness for the inspection.

J. Carlin 2 The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2010. In addition to the 95001 supplemental inspection and the baseline inspections, we plan on conducting an independent spent fuel storage installation (ISFSI) inspection and a license renewal follow-up inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures as part of our biennial review of the Reactor Oversight Process (ROP). If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel at (610) 337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

James W. Clifford, Acting Director Division of Reactor Projects Docket No. 50-244 License No. DPR-18

Enclosure:

R. E. Ginna Nuclear Power Plant Inspection/ Activity Plan cc w/ encl.:

M. J. Wallace, Vice - President, Constellation Energy B. Barron, President, CEO & Chief Nuclear Officer, Constellation Energy Nuclear Group, LLC P. Eddy, Electric Division, NYS Department of Public Service C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law C. Fleming, Esquire, Senior Counsel, Nuclear Generation, Constellation Nuclear Energy Nuclear Group, LLC T. Harding, Director, Licensing, Constellation Energy Nuclear Group, LLC A. Peterson, SLO Designee, New York State Energy Research and Development Authority F. Murray, President & CEO, New York State Energy Research and Development Authority G. Bastedo, Director, Wayne County Emergency Management Office M. Meisenzahl, Administrator, Monroe County, Office of Emergency Management T. Judson, Central New York Citizens Awareness Network

J. Carlin 2 The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2010. In addition to the 95001 supplemental inspection and the baseline inspections, we plan on conducting an independent spent fuel storage installation (ISFSI) inspection and a license renewal follow-up inspection. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures as part of our biennial review of the Reactor Oversight Process (ROP). If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Glenn Dentel at (610) 337-5233 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

James W. Clifford, Acting Director Division of Reactor Projects Docket No. 50-244 License No. DPR-18 Distribution: (via email)

S. Collins, RA D. Screnci, ORA J. Hawkins, DRP M. Dapas, DRA N. Sheehan, ORA K. Kolaczyk, DRP D. Lew, DRP R. Barkley, ORA L. Casey, DRP J. Clifford, DRP L. Trocine, RI OEDO M. Rose, DRP D. Roberts, DRS R. Nelson, NRR D. Bearde, DRP P. Wilson, DRS D. V. Pickett, PM, NRR Region I Docket Room DRS Branch Chiefs B. Vaidya, PM, NRR ROPreports.Resource@nr L. Scholl, DRS G. Dentel, DRP c.gov D. Silk, DRS N. Perry, DRP RidsNrrDirsIpab@nrc.gov SUNSI Review Complete: nsp* (Reviewer=s Initials)

DOCUMENT NAME: S:\ROP-10 Mid-Cycle Review\Branch 1\Ginna MidCycle Ltr 09.doc ML092440230 After declaring this document AAn Official Agency Record@ it will/will not be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME NPerry/nsp* GDentel/gtd* JClifford/jwc DATE 08/21/09 08/24/09 09/01/09

  • see prior concurrence page OFFICIAL RECORD COPY

Page 1 of 2 Ginna 09/01/2009 10:18:39 Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 93812 - TDAFW SIT 4 1 06/05/2009 08/28/2009 IP 93812 Special Inspection 71121 - OCC RAD SAFETY 1 1 07/06/2009 07/10/2009 IP 7112101 Access Control to Radiologically Significant Areas 1 07/06/2009 07/10/2009 IP 7112102 ALARA Planning and Controls 1 07/06/2009 07/10/2009 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 1 07/06/2009 07/10/2009 IP 71151 Performance Indicator Verification 7111108P - INSERVICE INSPECTION 2 1 09/14/2009 09/25/2009 IP 7111108P Inservice Inspection Activities - PWR TI-172 - TI 2515/172 DISSIMILAR METAL WELDS 1 1 09/14/2009 09/25/2009 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 71121 - OCC RAD SAFETY 1 1 09/21/2009 09/25/2009 IP 7112101 Access Control to Radiologically Significant Areas 1 09/21/2009 09/25/2009 IP 7112102 ALARA Planning and Controls 1 09/21/2009 09/25/2009 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 1 09/21/2009 09/25/2009 IP 71151 Performance Indicator Verification TRI FIRE - TRIENNIAL FIRE PROTECTION INSPECTION 3 1 11/02/2009 11/06/2009 IP 7111105T Fire Protection [Triennial]

1 11/16/2009 11/20/2009 IP 7111105T Fire Protection [Triennial]

71003 - LR FOLLOW-UP 1 1 11/02/2009 11/06/2009 IP 71003 Post-Approval Site Inspection for License Renewal CRANE - NEW CRANE INSTALLATION INSPECTION 1 1 11/16/2009 11/20/2009 IP 60853 On-Site Fabrication Of Components And Construction On An ISFSI 71121 - OCC RADIATION SAFETY 1 1 01/11/2010 01/15/2010 IP 7112101 Access Control to Radiologically Significant Areas 1 01/11/2010 01/15/2010 IP 7112102-7112102R ALARA - Required EP PROG - EP PROGRAM INSPECTION 1 1 02/08/2010 02/12/2010 IP 7111402 Alert and Notification System Testing 1 02/08/2010 02/12/2010 IP 7111403 Emergency Response Organization Augmentation Testing 1 02/08/2010 02/12/2010 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 02/08/2010 02/12/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 02/08/2010 02/12/2010 IP 71151-EP01 Drill/Exercise Performance 1 02/08/2010 02/12/2010 IP 71151-EP02 ERO Drill Participation 1 02/08/2010 02/12/2010 IP 71151-EP03 Alert & Notification System This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Ginna 09/01/2009 10:18:39 Inspection / Activity Plan Report 22 07/01/2009 - 12/31/2010 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 6/21EXAM - OPERATOR LICENSING INITIAL EXAMS 5 1 05/24/2010 05/28/2010 U01766 FY10 - GINNA INITIAL OPERATOR LICENSING EXAM 1 06/21/2010 07/02/2010 U01766 FY10 - GINNA INITIAL OPERATOR LICENSING EXAM 71122.02 - RAD MATERIAL PROCESSING AND TRANSPORT 1 1 04/05/2010 04/09/2010 IP 7112202 Radioactive Material Processing and Transportation ISFSI - ISFSI DRY RUN AND INITIAL LOADING 1 1 04/05/2010 04/16/2010 IP 60854 Preoperational Testing Of An ISFSI ISFSI - ISFSI DRY RUN DEMO 1 1 04/12/2010 04/16/2010 IP 60854 Preoperational Testing Of An ISFSI 1 04/12/2010 04/16/2010 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 71152B - PI&R 4 1 05/24/2010 05/28/2010 IP 71152B Identification and Resolution of Problems 1 06/07/2010 06/11/2010 IP 71152B Identification and Resolution of Problems 2515/173 - INDUSTRY GROUND WATER INITIATIVE 1 1 06/21/2010 06/25/2010 IP 2515/173 Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 71122.03 - PUB RAD SAFETY - REMP 1 1 06/21/2010 06/25/2010 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 71121 - OCC RAD SAFETY - ACCESS/ALARA 1 1 09/27/2010 10/01/2010 IP 7112101 Access Control to Radiologically Significant Areas 1 09/27/2010 10/01/2010 IP 7112102-7112102R ALARA - Required 1 09/27/2010 10/01/2010 IP 71151 Performance Indicator Verification CDBI - COMPONENT DESIGN BASES INSPECTION 9 1 10/11/2010 10/15/2010 IP 7111121 Component Design Bases Inspection 1 10/25/2010 11/05/2010 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.