IR 05000219/2012001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/04/2013
| issue date = 03/04/2013
| title = Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2012001)
| title = Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2012001)
| author name = Hunegs G K
| author name = Hunegs G
| author affiliation = NRC/RGN-I/DRP/PB6
| author affiliation = NRC/RGN-I/DRP/PB6
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Nuclear, Exelon Generation Co, LLC
| addressee affiliation = Exelon Nuclear, Exelon Generation Co, LLC
| docket = 05000219
| docket = 05000219
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2013
[[Issue date::March 4, 2013]]


Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear
==SUBJECT:==
 
ANNUAL ASSESSMENT LETTER FOR OYSTER CREEK NUCLEAR GENERATING STATION (REPORT 05000219/2012001)
4300 Winfield Rd.
 
Warrenville, IL 60555
 
SUBJECT: ANNUAL ASSESSMENT LETTER FOR OYSTER CREEK NUCLEAR GENERATING STATION (REPORT 05000219/2012001)


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On February 13, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-
On February 13, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Oyster Creek Nuclear Generating Station. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from January 1, 2012 through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
cycle performance review of Oyster Creek Nuclear Generating Station. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from January 1, 2012 through December 31, 2012. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC determined that overall, Oyster Creek operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Oyster Creek during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.


The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be
The NRC determined that overall, Oyster Creek operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Oyster Creek during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.


revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Temporary Instruction (TI) 182, "Review of the Implementation of the Industry Initiative  
The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Temporary Instruction (TI) 182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.


to Control Degradation of Underground Piping and Tanks." The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
In accordance with 10 CFR 2.390 of the NRC
=s A Rules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at (610)337-5046 with any questions you have regarding this letter.
Please contact me at (610)337-5046 with any questions you have regarding this letter.


Sincerely,/RA/ Gordon K. Hunegs, Chief Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-219 License Nos.: DPR-16  
Sincerely,
 
/RA/
===Enclosure:===
Gordon K. Hunegs, Chief Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-219 License Nos.: DPR-16 Enclosure: Oyster Creek Inspection/Activity Plan cc w/encl: Distribution via ListServ
Oyster Creek Inspection/Activity Plan cc w/encl: Distribution via ListServ  


ML13057A284 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME mmt SBarber/GSB GHunegs/GKH DATE 02/21 /13 02/ 26 /13  
ML13057A284 Non-Sensitive Publicly Available SUNSI Review Sensitive  Non-Publicly Available OFFICE RI/DRP RI/DRP NAME mmt SBarber/GSB GHunegs/GKH DATE 02/21 /13 02/ 26 /13


Page 1 of 1 01/30/2013 08:38:41 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Oyster Creek Inspection / Activity Plan 01/01/2013
Page 1 of 1     Oyster Creek 01/30/2013 08:38:41   Inspection / Activity Plan Report 22 01/01/2013 - 06/30/2014 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site 71124 - 71124.06 RAD EFFLUENT MONT TREATMENT     1 1 01/28/2013 02/01/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7111111B - OYSTER CREEK REQL INSP WITH P/F RESULTS     2 1 05/27/2013 05/31/2013 IP 7111111B Licensed Operator Requalification Program 71124 - OC IP 71124.07 REMP       1 1 06/10/2013 06/14/2013 IP 71124.07 Radiological Environmental Monitoring Program 71124 - IP 71124.01 RAD HAZARD       1 1 07/08/2013 07/12/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 7111121 - CDBI       6 1 09/09/2013 09/13/2013 IP 7111121 Component Design Bases Inspection 1 09/23/2013 09/27/2013 IP 7111121 Component Design Bases Inspection 1 10/07/2013 10/11/2013 IP 7111121 Component Design Bases Inspection EP EX - EP EXERCISE EVALUATION       6 1 10/07/2013 10/11/2013 IP 7111401 Exercise Evaluation TI-182 - DEGRAD UNDERGROUND PIPING - PHASE 2     1 1 10/28/2013 11/01/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 71124 - IP 71124.01 RAD HAZ & HP PI VERIFICATION     1 1 11/04/2013 11/04/2013 IP 71151  Performance Indicator Verification 1 11/04/2013 11/07/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls EX5/19 - OC 2014 EXAM       4 1 04/21/2014 04/25/2014 U01848 FY12-OYSTER CREEK INITIAL OPERATOR LICENSING EXAM 1 05/19/2014 05/23/2014 U01848 FY12-OYSTER CREEK INITIAL OPERATOR LICENSING EXAM 71124.08 - RADWASTE       1 1 02/03/2014 02/07/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation TRI FI - TRIENNIAL FIRE PROTECTION       4 1 03/24/2014 03/28/2014 IP 7111105T Fire Protection [Triennial]
-06/30/2014 71124-71124.06 RAD EFFLUENT MONT TREATMENT 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 01/28/2013 02/01/2013 7111111B-OYSTER CREEK REQL INSP WITH P/F RESULTS 2 1 IP Licensed Operator Requalification Program 7111111B 05/27/2013 05/31/2013 71124-OC IP 71124.07 REMP 1 1 IP Radiological Environmental Monitoring Program 71124.07 06/10/2013 06/14/2013 71124-IP 71124.01 RAD HAZARD 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 07/08/2013 07/12/2013 7111121-CDBI 6 1 IP Component Design Bases Inspection 7111121 09/09/2013 09/13/2013 1 IP Component Design Bases Inspection 7111121 09/23/2013 09/27/2013 1 IP Component Design Bases Inspection 7111121 10/07/2013 10/11/2013 EP EX-EP EXERCISE EVALUATION 6 1 IP Exercise Evaluation 7111401 10/07/2013 10/11/2013 TI-182-DEGRAD UNDERGROUND PIPING - PHASE 2 1 1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 10/28/2013 11/01/2013 71124-IP 71124.01 RAD HAZ & HP PI VERIFICATION 1 1 IP Performance Indicator Verification 71151 11/04/2013 11/04/2013 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/04/2013 11/07/2013 EX5/19-OC 2014 EXAM 4 1 FY12-OYSTER CREEK INITIAL OPERATOR LICENSING EXAM U01848 04/21/2014 04/25/2014 1 FY12-OYSTER CREEK INITIAL OPERATOR LICENSING EXAM U01848 05/19/2014 05/23/2014 71124.08-RADWASTE 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 02/03/2014 02/07/2014 TRI FI-TRIENNIAL FIRE PROTECTION 4 1 IP Fire Protection [Triennial]
1 04/07/2014 04/11/2014 IP 7111105T Fire Protection [Triennial]
7111105T 03/24/2014 03/28/2014 1 IP Fire Protection [Triennial]
71124 - RAD HAZARD & ALARA       1 1 06/02/2014 06/06/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 06/02/2014 06/06/2014 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.
7111105T 04/07/2014 04/11/2014 71124-RAD HAZARD & ALARA 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/02/2014 06/06/2014 1 IP Occupational ALARA Planning and Controls 71124.02 06/02/2014 06/06/2014 This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 22:46, 4 November 2019

Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2012001)
ML13057A284
Person / Time
Site: Oyster Creek
Issue date: 03/04/2013
From: Hunegs G
NRC/RGN-I/DRP/PB6
To: Pacilio M
Exelon Nuclear, Exelon Generation Co
HUNEGS, GK
References
IR-12-001
Download: ML13057A284 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR OYSTER CREEK NUCLEAR GENERATING STATION (REPORT 05000219/2012001)

Dear Mr. Pacilio:

On February 13, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Oyster Creek Nuclear Generating Station. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from January 1, 2012 through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Oyster Creek operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Oyster Creek during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Temporary Instruction (TI) 182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610)337-5046 with any questions you have regarding this letter.

Sincerely,

/RA/

Gordon K. Hunegs, Chief Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-219 License Nos.: DPR-16 Enclosure: Oyster Creek Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML13057A284 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME mmt SBarber/GSB GHunegs/GKH DATE 02/21 /13 02/ 26 /13

Page 1 of 1 Oyster Creek 01/30/2013 08:38:41 Inspection / Activity Plan Report 22 01/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - 71124.06 RAD EFFLUENT MONT TREATMENT 1 1 01/28/2013 02/01/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7111111B - OYSTER CREEK REQL INSP WITH P/F RESULTS 2 1 05/27/2013 05/31/2013 IP 7111111B Licensed Operator Requalification Program 71124 - OC IP 71124.07 REMP 1 1 06/10/2013 06/14/2013 IP 71124.07 Radiological Environmental Monitoring Program 71124 - IP 71124.01 RAD HAZARD 1 1 07/08/2013 07/12/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 7111121 - CDBI 6 1 09/09/2013 09/13/2013 IP 7111121 Component Design Bases Inspection 1 09/23/2013 09/27/2013 IP 7111121 Component Design Bases Inspection 1 10/07/2013 10/11/2013 IP 7111121 Component Design Bases Inspection EP EX - EP EXERCISE EVALUATION 6 1 10/07/2013 10/11/2013 IP 7111401 Exercise Evaluation TI-182 - DEGRAD UNDERGROUND PIPING - PHASE 2 1 1 10/28/2013 11/01/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 71124 - IP 71124.01 RAD HAZ & HP PI VERIFICATION 1 1 11/04/2013 11/04/2013 IP 71151 Performance Indicator Verification 1 11/04/2013 11/07/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls EX5/19 - OC 2014 EXAM 4 1 04/21/2014 04/25/2014 U01848 FY12-OYSTER CREEK INITIAL OPERATOR LICENSING EXAM 1 05/19/2014 05/23/2014 U01848 FY12-OYSTER CREEK INITIAL OPERATOR LICENSING EXAM 71124.08 - RADWASTE 1 1 02/03/2014 02/07/2014 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation TRI FI - TRIENNIAL FIRE PROTECTION 4 1 03/24/2014 03/28/2014 IP 7111105T Fire Protection [Triennial]

1 04/07/2014 04/11/2014 IP 7111105T Fire Protection [Triennial]

71124 - RAD HAZARD & ALARA 1 1 06/02/2014 06/06/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 06/02/2014 06/06/2014 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.