| | issue date = 03/07/2013 | | | issue date = 03/07/2013 |
| | title = Letter and FRN - Withdrawal of an Amendment Request | | | title = Letter and FRN - Withdrawal of an Amendment Request |
| | author name = Lingam S P | | | author name = Lingam S |
| | author affiliation = NRC/NRR/DORL/LPLII-2 | | | author affiliation = NRC/NRR/DORL/LPLII-2 |
| | addressee name = Franke J A | | | addressee name = Franke J |
| | addressee affiliation = Duke Energy Corp, Florida Power Corp | | | addressee affiliation = Duke Energy Corp, Florida Power Corp |
| | docket = 05000302 | | | docket = 05000302 |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 March 7,2013 Mr. Jon A. Franke Vice President Crystal River Nuclear Plant (NA2C) ATTN: Supervisor, Licensing and Regulatory Programs (NA 1 B) 15760 W. Power Line Street Crystal River, FL 34428-6708 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT -WITHDRAWAL OF LICENSE AMENDMENT REQUEST (TAC NO. ME6527) | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 March 7,2013 Mr. Jon A. Franke Vice President Crystal River Nuclear Plant (NA2C) |
| | ATTN: Supervisor, Licensing and Regulatory Programs (NA 1B) 15760 W. Power Line Street Crystal River, FL 34428-6708 |
| | |
| | ==SUBJECT:== |
| | CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - WITHDRAWAL OF LICENSE AMENDMENT REQUEST (TAC NO. ME6527) |
|
| |
|
| ==Dear Mr. Franke:== | | ==Dear Mr. Franke:== |
| By letter dated June 15, 2011, you applied for an amendment to the Crystal River Unit 3 Nuclear Generating Plant (CR-3), Facility Operating License No. DPR-72. The proposed change would have modified the facility operating license and the technical specifications to support operation at an increased core thermal power level. Briefly, the proposed amendment, categorized as an extended power uprate amendment, would have increased the licensed core power level for CR-3 from 2609 megawatts (MWt) to 3014 MWt. Subsequently, by letter dated February 7, 2013, you withdrew the amendment request based on the determination to retire CR-3. The U.S. Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
| |
| Sincerely, \t' Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.
| |
| Notice of cc w/encl: Distribution via
| |
|
| |
|
| NUCLEAR REGULATORY | | By letter dated June 15, 2011, you applied for an amendment to the Crystal River Unit 3 Nuclear Generating Plant (CR-3), Facility Operating License No. DPR-72. The proposed change would have modified the facility operating license and the technical specifications to support operation at an increased core thermal power level. Briefly, the proposed amendment, categorized as an extended power uprate amendment, would have increased the licensed core power level for CR-3 from 2609 megawatts (MWt) to 3014 MWt. Subsequently, by letter dated February 7, 2013, you withdrew the amendment request based on the determination to retire CR-3. |
| [Docket No. 50-302; Crystal River Unit 3 Nuclear Generating Application for Amendment to Facility Operating AGENCY: Nuclear Regulatory Commission, ACTION: License amendment application; withdrawal. | | The U.S. Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication. |
| | Sincerely, |
| | ~ \t' ~VV\.. |
| | Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-302 |
| | |
| | ==Enclosure:== |
| | |
| | Notice of Withdrawal cc w/encl: Distribution via Listserv |
| | |
| | [7590-01-P] |
| | NUCLEAR REGULATORY COMMISSION |
| | [Docket No. 50-302; NRC-2013-XXXX] |
| | Crystal River Unit 3 Nuclear Generating Plant Application for Amendment to Facility Operating License AGENCY: Nuclear Regulatory Commission, ACTION: License amendment application; withdrawal. |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| : The U,S, Nuclear Regulatory Commission (NRC or the Commission) is granting the request of Florida Power Corporation (the licensee), through its owner Duke Energy, to withdraw its June 15, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No, ML 112070659), application for proposed amendment to Facility Operating License No. DPR-72 for the Crystal River Unit 3 Nuclear Generating Plant (CR-3), located in Florida, Citrus County, The proposed amendment would have revised the facility operating license and the technical specifications to support operation at an increased core thermal power level. ADDRESSES: | | : The U,S, Nuclear Regulatory Commission (NRC or the Commission) is granting the request of Florida Power Corporation (the licensee), through its owner Duke Energy, to withdraw its June 15, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No, ML112070659), application for proposed amendment to Facility Operating License No. DPR-72 for the Crystal River Unit 3 Nuclear Generating Plant (CR-3), |
| Please refer to Docket ID NRC-2013-XXXX when contacting the NRC about the availability of information regarding this document You may access information related to this document, which the NRC possesses and is publicly available, using any of the following methods: | | located in Florida, Citrus County, The proposed amendment would have revised the facility operating license and the technical specifications to support operation at an increased core thermal power level. |
| -2 | | ADDRESSES: Please refer to Docket ID NRC-2013-XXXX when contacting the NRC about the availability of information regarding this document You may access information related to this document, which the NRC possesses and is publicly available, using any of the following methods: |
| * Federal rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-XXXX. | | |
| Address questions about NRC dockets to Carol Gallagher; telephone: | | -2 |
| 301-492-3668; e-mail: CaroI.Galiagher@nrc.gov. | | * Federal rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-XXXX. Address questions about NRC dockets to Carol Gallagher; telephone: 301-492-3668; e-mail: CaroI.Galiagher@nrc.gov. |
| * NRC's ADAMS: You may access publicly available documents online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. | | * NRC's ADAMS: You may access publicly available documents online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397 4209, 301-415-4737, or bye-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this notice (if that document is available in ADAMS) is provided the first time that a document is referenced. |
| To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 4209, 301-415-4737, or bye-mail to pdr.resource@nrc.gov. | | * NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. |
| The ADAMS accession number for each document referenced in this notice (if that document is available in ADAMS) is provided the first time that a document is referenced. | | FOR FURTHER INFORMATION CONTACT: Siva P. Lingam, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555; telephone: 301-415-1564; e-mail: siva.lingam@nrc.gov. |
| * NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: Siva P. Lingam, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555; telephone: | | SUPPLEMENTARY INFORMATION: |
| 301-415-1564; e-mail: siva.lingam@nrc.gov. SUPPLEMENTARY INFORMATION: | | The NRC is granting the licensee's request to withdraw its June 15, 2011, application for proposed amendment to the CR-3 Facility Operating License No. DPR-72. |
| The NRC is granting the licensee's request to withdraw its June 15, 2011, application for proposed amendment to the CR-3 Facility Operating License No. DPR-72. The proposed amendment would have increased the licensed core power level for CR-3 from 2609 megawatts thermal (MWt) to 3014 MWt. The increase in core thermal power would | | The proposed amendment would have increased the licensed core power level for CR-3 from 2609 megawatts thermal (MWt) to 3014 MWt. The increase in core thermal power would |
| -have been approximately 15.5 percent over the current licensed core thermal power level and was categorized as an extended power uprate. The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the Federal Register on January 11, 2012 (77 FR 1743), and a Notice of Consideration of Issuance of draft environmental assessment related to the proposed amendment published in the Federal Register on January 16, 2013 (78 FR 3458). However, by letter dated February 7, 2013 (ADAMS Accession No. ML 13043A027), the licensee withdrew the proposed change based on the determination to retire CR-3 due to economic disadvantages to fix the containment delamination that occurred during the steam generators replacement refueling outage. As a result, all the comments received on the above Federal Register notices will not be resolved and the environmental assessment will not be finalized. | | |
| | - 3 have been approximately 15.5 percent over the current licensed core thermal power level and was categorized as an extended power uprate. |
| | The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the Federal Register on January 11, 2012 (77 FR 1743), and a Notice of Consideration of Issuance of draft environmental assessment related to the proposed amendment published in the Federal Register on January 16, 2013 (78 FR 3458). However, by letter dated February 7, 2013 (ADAMS Accession No. ML13043A027), the licensee withdrew the proposed change based on the determination to retire CR-3 due to economic disadvantages to fix the containment delamination that occurred during the steam generators replacement refueling outage. As a result, all the comments received on the above Federal Register notices will not be resolved and the environmental assessment will not be finalized. |
| For further details with respect to this action, see the application for amendment dated June 15, 2011, and the licensee's letter dated February 7, 2013, which withdrew the application for license amendment. | | For further details with respect to this action, see the application for amendment dated June 15, 2011, and the licensee's letter dated February 7, 2013, which withdrew the application for license amendment. |
| Dated at Rockville, Maryland, this 7th day of March 2013. For the Nuclear Regulatory Commission. | | Dated at Rockville, Maryland, this 7th day of March 2013. |
| Siva P. Lingam, Project Plant Licensing Branch Division of Operating Reactor Office of Nuclear Reactor March 7, 2013 Mr. Jon A Franke Vice President Crystal River Nuclear Plant (NA2C) ATTN: Supervisor, licensing and Regulatory Programs (NA 1 B) 15760 W. Power Line Street Crystal River, FL 34428-6708 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT -WITHDRAWAL OF LICENSE AMENDMENT REQUEST (TAC NO. ME6527) | | For the Nuclear Regulatory Commission. |
| | (f.~ |
| | Siva P. Lingam, Project Manager, Plant Licensing Branch 11-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. |
|
| |
|
| ==Dear Mr. Franke:==
| | PKG M13063A305 LTR ML13063A524 FRN ML13063A527 OFFICE NRR/LPL2-2/PM NRRlLPL2-2/PM NRRlLPL2-2/LA OGC NLO NRR/LPL2-2/BC NRRlLPL2-2/PM LSubin FSaba for NAME SLingam CGratton BClayton JQuichocho SLingam DATE 3/4/13 317113 3/5/13 3/5/13 317113 3/7/13}} |
| By letter dated June 15, 2011, you applied for an amendment to the Crystal River Unit 3 Nuclear Generating Plant (CR-3), Facility Operating License No. DPR-72. The proposed change would have modified the facility operating license and the technical specifications to support operation at an increased core thermal power level. Briefly, the proposed amendment, categorized as an extended power uprate amendment, would have increased the licensed core power level for CR-3 from 2609 megawatts (MWt) to 3014 MWt. Subsequently, by letter dated February 7, 2013, you withdrew the amendment request based on the determination to retire CR-3. The U.S. Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
| |
| Sincerely, IRA! Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.
| |
| Notice of cc w/encl: Distribution via DISTRIBUTION:
| |
| PUBLIC Branch Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl2-2 Resource RidsNrrLABClayton Resource RidsNrrPMCrystalRiver Resource RidsOgcRp Resource RidsRgn2MailCenter Resource S. Ungam, NRR D. Mcintyre, OPA ADAMS Accession Nos: PKG M13063A305 L TR ML 13063A524 FRN ML 13063A527 OFFICE NRR/LPL2-2/PM NRRlLPL2-2/PM NRRlLPL2-2/LA OGC NLO NRR/LPL2-2/BC NRRlLPL2-2/PM NAME SLingam CGratton BClayton LSubin FSaba for JQuichocho SLingam DATE 3/4/13 317113 3/5/13 3/5/13 317113 3/7/13 OFFICIAL RECORD COPY}}
| |
Letter Sequence Withdrawal |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: 3F0112-11, Corrections to the Extended Power Uprate LAR 309 Vendor Affidavit and Technical Report, 3F0113-08, Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Re, 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip., 3F0912-01, ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C, 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip, 3F1112-02, 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 250, ML11259A012, ML11300A226, ML11342A195, ML12031A032, ML12053A231, ML12107A068, ML12202A734, ML12205A357, ML12205A358, ML12240A119, ML12255A409, ML12262A385, ML12314A391, ML12314A392, ML12314A393, ML13032A540
|
MONTHYEAR3F0811-04, Response to Request for Additional Information to Support NRC Probabilistic Risk Assessment Licensing Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-11011 August 2011 Response to Request for Additional Information to Support NRC Probabilistic Risk Assessment Licensing Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-02, Response to Request for Additional Information to Support NRC Balance of Plant Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-11011 August 2011 Response to Request for Additional Information to Support NRC Balance of Plant Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-01, Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-18018 August 2011 Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-03, Response to Request for Additional Information to Support NRC Mechanical and Civil Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-25025 August 2011 Response to Request for Additional Information to Support NRC Mechanical and Civil Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11259A0122011-09-14014 September 2011 NRR E-mail Capture - Clarification for August 25 Emcb RAI Acceptance Review Letter Project stage: Other ML11286A0922011-10-11011 October 2011 Response to Request for Additional Information to Support NRC Reactor Systems Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11300A2262011-10-25025 October 2011 Feedwater Line Break Overpressure Protection Analysis to Support NRC Reactor Systems Branch Acceptance Review of the CR-3 Extended Power Update LAR and LAR Approval Schedule Project stage: Other 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip2011-10-25025 October 2011 ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip Project stage: Other ML11326A2312011-12-0707 December 2011 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12205A3572011-12-15015 December 2011 Attachment a to 3F0712-03, CR-3 LOCA Summary Report - EPU/ROTSG/Mark-B-HTP, Revision 4 Project stage: Other 3F1211-05, Response to Request for Additional Information to Support NRC Health Physics and Human Performance Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-15015 December 2011 Response to Request for Additional Information to Support NRC Health Physics and Human Performance Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F1211-06, Response to Request for Additional Information to Support NRC Vessels and Internals Integrity Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-15015 December 2011 Response to Request for Additional Information to Support NRC Vessels and Internals Integrity Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F1211-10, Response to Request for Additional Information to Support NRC Fire Protection Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-21021 December 2011 Response to Request for Additional Information to Support NRC Fire Protection Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-04, Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12030A2092012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Instrumentation and Control Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11342A1952012-01-0606 January 2012 Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-safeguards Information Project stage: Other ML12024A3002012-01-19019 January 2012 Response to Request for Additional Information to Support NRC Component Performance and Testing Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-06, Response to Request for Additional Information to Support NRC Piping and NDE Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-19019 January 2012 Response to Request for Additional Information to Support NRC Piping and NDE Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-11, Corrections to the Extended Power Uprate LAR 309 Vendor Affidavit and Technical Report2012-01-31031 January 2012 Corrections to the Extended Power Uprate LAR #309 Vendor Affidavit and Technical Report Project stage: Other ML12003A2172012-02-0808 February 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12052A1302012-03-0202 March 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12053A2312012-03-0202 March 2012 Request for Withholding Proprietary Information from Public Disclosure Related Extended Power Uprate Technical Report Project stage: Other 3F0312-02, Response to Second Request for Additional Information to Support NRC Instrumentation and Controls Branch (Eicb) Technical Review of the CR-3 Extended Power Uprate LAR2012-03-19019 March 2012 Response to Second Request for Additional Information to Support NRC Instrumentation and Controls Branch (Eicb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0312-01, Response to Request for Additional Information to Support NRC PRA Licensing Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-03-22022 March 2012 Response to Request for Additional Information to Support NRC PRA Licensing Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12031A0322012-03-26026 March 2012 Request for Withholding Proprietary Information from Public Disclosure Related to Extended Power Uprate Technical Report Project stage: Other ML12107A0682012-04-0404 April 2012 NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (Eptb) Project stage: Other 3F0412-05, Response to Second Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-0404 April 2012 Response to Second Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0412-04, Response to Request for Additional Information to Support NRC Mechanical and Civil Engineering Branch (Emcb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-0404 April 2012 Response to Request for Additional Information to Support NRC Mechanical and Civil Engineering Branch (Emcb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-07, Response to Request for Additional Information to Support NRC Containment and Ventilation Branch (Scvb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-12012 April 2012 Response to Request for Additional Information to Support NRC Containment and Ventilation Branch (Scvb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-06, Response to Request for Additional Information to Support NRC Electrical Systems Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-16016 April 2012 Response to Request for Additional Information to Support NRC Electrical Systems Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-09, Response to Request for Additional Information to Support NRC Accident Dose Branch (Aadb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-26026 April 2012 Response to Request for Additional Information to Support NRC Accident Dose Branch (Aadb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12102A0442012-05-0404 May 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12314A3912012-05-31031 May 2012 17877-0002-100, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment 2 Project stage: Other ML12205A3582012-05-31031 May 2012 Attachment D to 3F0712-03, Technical Report, ANP-3114(NP), Rev. 0, CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies. Project stage: Other 3F0612-05, Response to Request for Additional Information to Support NRC Nuclear Performance and Code Review Branch (Snpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-06-18018 June 2012 Response to Request for Additional Information to Support NRC Nuclear Performance and Code Review Branch (Snpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip.2012-06-30030 June 2012 Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip. Project stage: Other ML12184A3442012-07-0202 July 2012 NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Discussion/Clarification of Emcb Draft RAIs Project stage: Draft Other ML12174A2922012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12171A3472012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12205A3562012-07-17017 July 2012 Supplement to the Extended Power Uprate License Amendment Request #309 Project stage: Supplement 3F0712-06, Response to Second Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch (Esgb) Technical Review of the CR-3 Extended Power Uprate LAR2012-07-17017 July 2012 Response to Second Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch (Esgb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request ML12194A4172012-07-17017 July 2012 Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI 3F0712-07, Response to Third Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-07-31031 July 2012 Response to Third Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0712-08, Response to Second Request for Additional Information to Support NRC PRA Licensing Branch (Apla) Technical Review of the CR-3 Extended Power Uprate LAR2012-07-31031 July 2012 Response to Second Request for Additional Information to Support NRC PRA Licensing Branch (Apla) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request ML12125A1622012-08-0101 August 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12202A7342012-08-0101 August 2012 Request for Withholding Proprietary Information from Public Disclosure Related to Extended Power Uprate Technical Report Project stage: Other ML12202A0602012-08-0202 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12213A3032012-08-0303 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request (Srxb) Project stage: RAI ML12219A1912012-08-16016 August 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI 3F0812-02, Response to Second Request for Additional Information to Support NRC Electrical Engineering Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR2012-08-21021 August 2012 Response to Second Request for Additional Information to Support NRC Electrical Engineering Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 2012-03-26
[Table View] |
|
---|
Category:Letter
MONTHYEARML23342A0942024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23354A0632023-12-22022 December 2023 Cover Letter - Crystal River License Termination Plan Request for Additional Information ML23345A1882023-12-0606 December 2023 Fws to NRC Crystal River Species List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML23320A2592023-11-17017 November 2023 STC-23 077 Notification of the Crystal River Unit 3 Generating Plant License Termination Plan Public Meeting and Federal Register Notice ML23313A1322023-11-15015 November 2023 Request for Additional Information for the Environmental Assessment of the License Termination Plan for Crystal River Unit 3 Nuclear Generating Plant ML23310A0712023-11-0707 November 2023 Audit Plan Cover Letter - Crystal River Unit 3 Nuclear Generating Plant LTP ML23187A1112023-07-25025 July 2023 Acceptance of Requested Licensing Action License Request to Add License Condition to Include License Termination Plan Requirements ML23107A2722023-06-13013 June 2023 Letter Transmitting NRC Survey Results for East Settling Pond ML23160A2962023-06-0909 June 2023 Response to Crystal River, Unit 3 Supplemental Information Needed for Acceptance on the Application for a License Amendment Regarding Approval of the License Termination Plan ML23107A2732023-06-0707 June 2023 Orise Independent Survey Report Dcn 5366-SR-01-0 IR 05000302/20220032023-05-25025 May 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2022003 ML23103A1902023-04-19019 April 2023 Request for Supplemental Information Cover Letter ML23058A2532023-03-22022 March 2023 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River, Unit 3 - NRC Inspection Report No. 05000302/2022003 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22265A0192022-09-26026 September 2022 Nuclear Generating Plant - U.S. Nuclear Regulatory Commission'S Analysis of ADP CR3, Llc'S Decommissioning Funding Status Report (License No. DPR-72, Docket Nos. 50-302 and 72-1035) IR 05000302/20220022022-08-0909 August 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022002 IR 05000302/20220012022-05-0303 May 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report 05000302/2022001 ML22116A1752022-04-27027 April 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3- Independent Spent Fuel Storage Installation Security Inspection Report 07201035/2022401 ML22105A3992022-04-18018 April 2022 Nuclear Generating Plant - Change in NRC Project Manager ML22011A1362022-01-31031 January 2022 Independent Spent Fuel Storage Installation Security Inspection Plan IR 05000302/20210042022-01-24024 January 2022 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report No. 05000302/2021004 ML22024A2142022-01-24024 January 2022 Nuclear Generating Plant - NMFS NRC Letter - Crystal River Energy Complex Biological Opinion Status (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21351A0052021-12-20020 December 2021 NRC Analysis of ADP CR3, LLC Decommissioning Funding Status Report for the Crystal River Unit 3 Nuclear Generating Plant (License No. DPR-72, Docket Nos. 50-302 and 72-1035) ML21322A2702021-11-24024 November 2021 Nuclear Generating Plant - Issuance of Amendment No. 260 Approving the Independent Spent Fuel Storage Installation Only Security Plan, Rev 3 IR 05000302/20210032021-11-0909 November 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021003 and 07201035/2021001 ML21288A4292021-10-18018 October 2021 Letter - Crystal River Unit 3 Nuclear Generating Plant - Correction to Safety Evaluation Related to the Issuance of Amendment No. 259 Approving the Independent Spent Fuel Storage Installation Only Emergency Plan ML21238A0952021-10-13013 October 2021 Issuance of Amendment No. 259 Approving the ISFSI-Only Emergency Plan, Revision Draft a IR 05000302/20210012021-08-12012 August 2021 Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3 - NRC Inspection Report Nos. 05000302/2021001 and 05000302/2021002 ML21182A1032021-07-0606 July 2021 Request for Additional Information (RAI) Related to the ISFSI-Only Emergency Plan ML21159A0422021-06-28028 June 2021 VY and CR Indirect License Transfer Package ML21060B4142021-04-12012 April 2021 U.S. Nuclear Regulatory Commission Analysis of Duke Energy Florida, Llc'S Initial Decommissioning Funding Plan for the Crystal River Independent Spent Fuel Storage Installation ML21028A5912021-03-0202 March 2021 Letter to Reid Forwarding Exemption from 10 CFR Part 20, Appendix G, Section Iii.E ML21055A7832021-02-25025 February 2021 Letter to Reid, Change in NRC Staff Project Management for Crystal River Unit 3 Nuclear Generating Plant ML21012A3142021-01-13013 January 2021 Independent Spent Fuel Storage Installation Security Inspection Plan IR 05000302/20200012020-11-19019 November 2020 NRC Inspection Report No. 05000302/2020001, Accelerated Decommissioning Partners (ADP) CR3, LLC, Crystal River Unit 3, Crystal River, Florida ML20269A2922020-10-0707 October 2020 NRC Form 311 QA Program Approval Revision 10 Related to Crystal River 3 ML20101G5822020-04-10010 April 2020 CR-3 License Transfer SE Corrected Cover Letter ML20069A0232020-04-0101 April 2020 Order Approving Transfer of Licensed Authority from Duke Energy Florida, LLC, to ADP CR3, LLC, and Draft Conforming Administrative License Amendment ML20050D0142020-02-19019 February 2020 NRC Independent Spent Fuel Storage Installation Inspection Report No. 07201035/2020001, Duke Energy Florida, LLC, Crystal River Unit 3, Crystal River, Florida ML20050F7702020-02-14014 February 2020 30-Day Notice of Payment from the City of Tallahassee Trust Fund Non-Qualified Nuclear Decommissioning Trust Fund for Crystal River Unit 3 ML20015A5672020-01-15015 January 2020 Independent Spent Fuel Storage Installation Security Inspection Plan ML20009D0432020-01-10010 January 2020 Letter to Hobbs, Crystal River Unit 3 Nuclear Generating Plant - Corrected Safety Evaluation for Approval of Partial Site Release for Facility Operating License No. DPR-72 ML19339G5092020-01-0202 January 2020 Letter to Hobbs, Crystal River Unit 3 Nuclear Generating Plant - Approval of Partial Site Release for Facility Operating License No. DPR-72 ML19343A8252019-12-0606 December 2019 Letter from Erika Bailey, Oak Ridge Institute for Science and Education, to John Hickman, NRC, Forwarding Independent Confirmatory Survey Summary and Results for the 3,854-Acre Area Partial Site Release at the Crystal River Energy Complex IR 05000302/20190022019-11-20020 November 2019 NRC Inspection Report No. 05000302/2019002 and Independent Spent Fuel Storage Installation Inspection Report No. 07201035/2019002, Duke Energy Florida, LLC, Crystal River Unit 3, Crystal River, Florida ML19317D0932019-10-25025 October 2019 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0127, Rev. 0, Emd Fuel Injectors - Seized Plunger and Bushing ML19261A0702019-09-19019 September 2019 VEGP U3 Proficiency Watches Prior to Fuel Load ML19177A0802019-06-26026 June 2019 Nuclear Generating Plant (CR-3) - Notification of Revised Post-Shutdown Decommissioning Activities Report (Revised PSDAR) ML19170A1942019-06-14014 June 2019 Application for Order Consenting to Direct Transfer of Control of Licenses and Approving Conforming License Amendment ML19129A1402019-05-15015 May 2019 Letter to Hobbs, Correction to Amendment No. 257 Approving Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Revision 1 2024-01-09
[Table view] Category:Federal Register Notice
MONTHYEARML21159A0522021-06-29029 June 2021 VY and CR Indirect License Transfer Order FRN ML21064A1392021-03-29029 March 2021 Nuclear Generating Plant (License DPR-72, Docket Nos. 50-302 and 72-1035) - Notice of Consideration, Request for Indirect License Transfer ML19248C1412019-10-0808 October 2019 FRN Notice of Consideration, Crystal River License Transfer Request ML19140A4562019-05-28028 May 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 06/04/2019 ML18173A1792018-08-0707 August 2018 OEDO-17-00070 - Notice of Issuance of Director'S Decision, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Japan C NRC-2018-0140, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/20182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML18180A2182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML16355A2612016-12-21021 December 2016 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations; Publication Date: January 3, 2017 NRC-2016-0273, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations; Publication Date: January 3, 20172016-12-21021 December 2016 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations; Publication Date: January 3, 2017 ML16273A4502016-11-30030 November 2016 Exemption from Record Keeping Requirements NRC-2016-0253, Exemption from Record Keeping Requirements2016-11-30030 November 2016 Exemption from Record Keeping Requirements ML16173A0242016-09-0101 September 2016 Order Approving Transfer of License, Crystal River, Unit 3 NRC-2016-0161, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 20162016-08-0303 August 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 ML16215A2272016-08-0303 August 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 ML16084A8912016-03-31031 March 2016 Replacement FRN - Exemption from 10 CFR 50.54(w) (1) for Crystal River, Unit 3 - Federal Register Notice ML16020A4632016-03-16016 March 2016 Exemption from 10 CFR 50.54(w)(1) for Crystal River, Unit 3 - Federal Register notice ML15356A5992015-12-29029 December 2015 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 5, 2016 ML15238B4952015-12-23023 December 2015 FRN Consideration NRC-2011-0024, Crystal River FRN Consideration2015-12-23023 December 2015 Crystal River FRN Consideration ML15121A5982015-05-29029 May 2015 Nuclear Generating Plant - FRN Order Approving Transfer of Licenses and Conforming Amendment ML15146A2912015-05-29029 May 2015 Nuclear Generating Plant - Order Approving Transfer of License and Conforming Amendment ML15121A5702015-05-29029 May 2015 Letter, Safety Evaluation for Order Approving Transfer of Licenses and Conforming Amendments ML14183B3382015-04-27027 April 2015 LTR Exemption from Requirements of 10 CFR 140.11(a)(4), to Allow Reduction in Offsite Primary Liability Insurance and Withdrawal from Participation in Secondary Retrospective Premium Pool for Deferred Premium Charges NRC-2015-0115, FRN, Exemption from Requirements of 10 CFR 140.11(a)(4), to Allow Reduction in Offsite Primary Liability Insurance and Withdrawal from Participation in Secondary Retrospective Premium Pool for Deferred Premium Charges2015-04-27027 April 2015 FRN, Exemption from Requirements of 10 CFR 140.11(a)(4), to Allow Reduction in Offsite Primary Liability Insurance and Withdrawal from Participation in Secondary Retrospective Premium Pool for Deferred Premium Charges ML14183B4772015-04-27027 April 2015 FRN, Exemption from Requirements of 10 CFR 140.11(a)(4), to Allow Reduction in Offsite Primary Liability Insurance and Withdrawal from Participation in Secondary Retrospective Premium Pool for Deferred Premium Charges ML15111A4552015-04-22022 April 2015 Nuclear Generating Plant - Letter and Notice of Consideration of Approval of Application for Proposed Merger of Facility Operating License and Conforming Amendment, and Opportunity for a Hearing ML15111A3802015-04-22022 April 2015 Nuclear Generating Plant - Notice of Consideration of Approval of Application for Proposed Merger of Facility Operating License and Conforming Amendment, and Opportunity for a Hearing NRC-2015-0042, Nuclear Generating Plant - FRN for Exemptions on Emergency Plan and Emergency Action Level Scheme.2015-03-30030 March 2015 Nuclear Generating Plant - FRN for Exemptions on Emergency Plan and Emergency Action Level Scheme. ML15058A9062015-03-30030 March 2015 Letter, Exemptions from Certain Emergency Planning Requirements and Related Safety Evaluation ML15040A0902015-03-30030 March 2015 Nuclear Generating Plant - FRN for Exemptions on Emergency Plan and Emergency Action Level Scheme. ML15013A1812015-02-23023 February 2015 Letter with Environmental Assessment and Finding of No Significant Impact Related to Request for Exemptions from Certain Emergency Planning Requirements ML15013A1732015-02-23023 February 2015 Environmental Assessment and Finding of No Significant Impact Exemptions from Certain Emergency Planning Requirements ML14247A5452015-01-26026 January 2015 Letter, Exemption from the Requirements of 10 CFR Sections 50.75 Related to Use of the Decommissioning Trust Fund for Irradiated Fuel Management and Site Restoration NRC-2015-0010, Crystal River Unit - FRN, Exemption from the Requirements of 10 CFR Sections 50.82 and 50.75 Related to Use of the Decommissioning Trust Fund for Irradiated Fuel Management and Site Restoration2015-01-26026 January 2015 Crystal River Unit - FRN, Exemption from the Requirements of 10 CFR Sections 50.82 and 50.75 Related to Use of the Decommissioning Trust Fund for Irradiated Fuel Management and Site Restoration ML14247A5582015-01-26026 January 2015 Unit - FRN, Exemption from the Requirements of 10 CFR Sections 50.82 and 50.75 Related to Use of the Decommissioning Trust Fund for Irradiated Fuel Management and Site Restoration ML14246A2132015-01-15015 January 2015 FRN, Finding of No Significant Impact and Associated Environmental Assessment Related to Use of the Decommissioning Trust Fund for Irradiated Fuel Management and Site Restoration ML14246A1982015-01-14014 January 2015 Letter, Finding of No Significant Impact and Associated Environmental Assessment Related to Use of the Decommissioning Trust Fund for Irradiated Fuel Management and Site Restoration NRC-2014-0266, Nuclear Generating Plant - FRN, Exemption from Requirements of 10 CFR 73.55(p)(1)(i) and (Ii) Related to Suspension of Security Measures in an Emergency or During Severe Weather2014-12-0909 December 2014 Nuclear Generating Plant - FRN, Exemption from Requirements of 10 CFR 73.55(p)(1)(i) and (Ii) Related to Suspension of Security Measures in an Emergency or During Severe Weather ML14176B0862014-12-0909 December 2014 Nuclear Generating Plant - FRN, Exemption from Requirements of 10 CFR 73.55(p)(1)(i) and (II) Related to Suspension of Security Measures in an Emergency or During Severe Weather ML14205A3142014-07-28028 July 2014 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations- Published July 22, 2014 ML14097A2202014-05-0606 May 2014 G20090690/EDATS:OEDO-2009-0758/Notice of Issuance of Director'S Decision, 2.206 - Enforcement Action Against the Progress Energy Company, Crystal River Nuclear Plant NRC-2010-0096, G20090690/EDATS:OEDO-2009-0758/Notice of Issuance of Director'S Decision, 2.206 - Enforcement Action Against the Progress Energy Company, Crystal River Nuclear Plant2014-05-0606 May 2014 G20090690/EDATS:OEDO-2009-0758/Notice of Issuance of Director'S Decision, 2.206 - Enforcement Action Against the Progress Energy Company, Crystal River Nuclear Plant ML14099A2172014-04-28028 April 2014 FRN on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing SUNSI and Order Imposing Procedures for Access to SUNSI ML13339A6642013-12-22022 December 2013 Nuclear Generating Plant - Federal Register Notice for Post Shutdown Activity Report ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit NRC-2011-0301, Federal Register Notice - Withdrawal of an Amendment Request2013-03-0707 March 2013 Federal Register Notice - Withdrawal of an Amendment Request ML13063A5272013-03-0707 March 2013 Federal Register Notice - Withdrawal of an Amendment Request ML13063A5242013-03-0707 March 2013 Letter and FRN - Withdrawal of an Amendment Request ML13052A6062013-02-28028 February 2013 Withdrawal of Application for Renewed Operating License ML12314A0652013-01-0808 January 2013 Nuclear Generating Plant - Letter - Draft Environmental Assessment and Draft Finding of No Significant Impact Related to the Proposed Extended Power Uprate 2021-06-29
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 March 7,2013 Mr. Jon A. Franke Vice President Crystal River Nuclear Plant (NA2C)
ATTN: Supervisor, Licensing and Regulatory Programs (NA 1B) 15760 W. Power Line Street Crystal River, FL 34428-6708
SUBJECT:
CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - WITHDRAWAL OF LICENSE AMENDMENT REQUEST (TAC NO. ME6527)
Dear Mr. Franke:
By letter dated June 15, 2011, you applied for an amendment to the Crystal River Unit 3 Nuclear Generating Plant (CR-3), Facility Operating License No. DPR-72. The proposed change would have modified the facility operating license and the technical specifications to support operation at an increased core thermal power level. Briefly, the proposed amendment, categorized as an extended power uprate amendment, would have increased the licensed core power level for CR-3 from 2609 megawatts (MWt) to 3014 MWt. Subsequently, by letter dated February 7, 2013, you withdrew the amendment request based on the determination to retire CR-3.
The U.S. Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely,
~ \t' ~VV\..
Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-302
Enclosure:
Notice of Withdrawal cc w/encl: Distribution via Listserv
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-302; NRC-2013-XXXX]
Crystal River Unit 3 Nuclear Generating Plant Application for Amendment to Facility Operating License AGENCY: Nuclear Regulatory Commission, ACTION: License amendment application; withdrawal.
SUMMARY
- The U,S, Nuclear Regulatory Commission (NRC or the Commission) is granting the request of Florida Power Corporation (the licensee), through its owner Duke Energy, to withdraw its June 15, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No, ML112070659), application for proposed amendment to Facility Operating License No. DPR-72 for the Crystal River Unit 3 Nuclear Generating Plant (CR-3),
located in Florida, Citrus County, The proposed amendment would have revised the facility operating license and the technical specifications to support operation at an increased core thermal power level.
ADDRESSES: Please refer to Docket ID NRC-2013-XXXX when contacting the NRC about the availability of information regarding this document You may access information related to this document, which the NRC possesses and is publicly available, using any of the following methods:
-2
- Federal rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-XXXX. Address questions about NRC dockets to Carol Gallagher; telephone: 301-492-3668; e-mail: CaroI.Galiagher@nrc.gov.
- NRC's ADAMS: You may access publicly available documents online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397 4209, 301-415-4737, or bye-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this notice (if that document is available in ADAMS) is provided the first time that a document is referenced.
- NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Siva P. Lingam, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555; telephone: 301-415-1564; e-mail: siva.lingam@nrc.gov.
SUPPLEMENTARY INFORMATION:
The NRC is granting the licensee's request to withdraw its June 15, 2011, application for proposed amendment to the CR-3 Facility Operating License No. DPR-72.
The proposed amendment would have increased the licensed core power level for CR-3 from 2609 megawatts thermal (MWt) to 3014 MWt. The increase in core thermal power would
- 3 have been approximately 15.5 percent over the current licensed core thermal power level and was categorized as an extended power uprate.
The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the Federal Register on January 11, 2012 (77 FR 1743), and a Notice of Consideration of Issuance of draft environmental assessment related to the proposed amendment published in the Federal Register on January 16, 2013 (78 FR 3458). However, by letter dated February 7, 2013 (ADAMS Accession No. ML13043A027), the licensee withdrew the proposed change based on the determination to retire CR-3 due to economic disadvantages to fix the containment delamination that occurred during the steam generators replacement refueling outage. As a result, all the comments received on the above Federal Register notices will not be resolved and the environmental assessment will not be finalized.
For further details with respect to this action, see the application for amendment dated June 15, 2011, and the licensee's letter dated February 7, 2013, which withdrew the application for license amendment.
Dated at Rockville, Maryland, this 7th day of March 2013.
For the Nuclear Regulatory Commission.
(f.~
Siva P. Lingam, Project Manager, Plant Licensing Branch 11-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
PKG M13063A305 LTR ML13063A524 FRN ML13063A527 OFFICE NRR/LPL2-2/PM NRRlLPL2-2/PM NRRlLPL2-2/LA OGC NLO NRR/LPL2-2/BC NRRlLPL2-2/PM LSubin FSaba for NAME SLingam CGratton BClayton JQuichocho SLingam DATE 3/4/13 317113 3/5/13 3/5/13 317113 3/7/13