Other: 3F0111-04, Comments on the Safety Evaluation Report with Open Items Related to the License Renewal and Amendment 18, 3F0412-03, Revised Commitment for the Reactor Vessel Internals Aging Management Program for License Renewal and License Renewal Application Amendment 24, 3F1208-02, Systems Drawings Supporting License Renewal, 3F1209-06, License Renewal Application 10 CFR Part 54.21(b) Annual Update, 3F1211-01, License Renewal Application 10 CFR Part 54.21(b), Annual Update, 3F1212-01, License Renewal Application 10 CFR Part 54.21(b) Annual Update, ML090090233, ML090210171, ML091200415, ML091660559, ML091820465, ML092600889, ML092610309, ML093200023, ML100050166, ML110410597, ML11137A009, ML12213A058
|
MONTHYEAR3F1208-02, Systems Drawings Supporting License Renewal2008-12-16016 December 2008 Systems Drawings Supporting License Renewal Project stage: Other HNP-09-016, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors2009-02-26026 February 2009 Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Project stage: Request ML0900902332009-02-27027 February 2009 Determination of Acceptability and Sufficiency for Docketing, and Opportunity for a Hearing Regarding the Application from Florida Power Corp., for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Other ML0902101712009-02-27027 February 2009 Notice of Opportunity for Hearing Regarding Renewal of Facility Operating License No. DPR-72 for an Additional 20-year Period Florida Power Corporation Corporation Crystal River Unit 3 Nuclear Generating Plant Docket No. 50-302 Project stage: Other ML0903506572009-03-31031 March 2009 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for the Crystal River Unit 3 Nuclear Generating Plant Project stage: Other ML0907808402009-03-31031 March 2009 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for the Crystal River Unit 3 Nuclear Generating Plant (TAC No ME0278) FRN Project stage: Other ML0908501762009-04-20020 April 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 3F0509-01, Response to Request for Additional Information for the Review of the License Renewal Application2009-05-11011 May 2009 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI ML0912004152009-05-22022 May 2009 Proposed Review Schedule Regarding the Application from Florida Power Corporation for Renewal of the Operating License for Crystal River Unit 3 Nuclear Generating Plant Project stage: Other 3F0509-07, License Amendment Request 303, Revision 1, Supplement 1: Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis, Response to Request for Additional Information2009-05-22022 May 2009 License Amendment Request 303, Revision 1, Supplement 1: Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis, Response to Request for Additional Information Project stage: Supplement ML1013204012009-05-31031 May 2009 093-89529, Environmental Support Document South Cooling Tower Laydown Area Citrus County, Florida Project stage: Other ML0904203622009-06-10010 June 2009 Nuclear Generating Plant License Renewal Review Project stage: Other ML0915900062009-07-0202 July 2009 License Amendment, Adoption of Technical Specifications Taskforce (TSTF) Standard Technical Specification Change Traveler TSTF-447, Elimination of Hydrogen Recombiners & Change to Hydrogen & Oxygen Monitors Project stage: Other ML0918204652009-07-0808 July 2009 Plan for the Aging Management Program Regulatory Audit Regarding the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Review Project stage: Other ML0917605122009-07-14014 July 2009 Environmental Site Audit Regarding Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: Other ML0916605592009-07-30030 July 2009 Audit Report Regarding the LRA for the Crystal River, Unit 3 Project stage: Other ML0917400702009-08-0303 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0919700682009-08-10010 August 2009 Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML0920302082009-08-14014 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0920800452009-08-14014 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML0920200122009-08-20020 August 2009 RAI, License Renewal Application Project stage: RAI ML0922507012009-08-20020 August 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML1009805272009-08-28028 August 2009 State of Florida Department of Environmental Protection, Conditions of Certification Project stage: Other ML0923300072009-08-31031 August 2009 RAI for the Review of the Crystal River Unit 3 Nuclear Generating Plant, LRA Project stage: RAI ML0923308312009-08-31031 August 2009 Request for Additional Information Regarding License Renewal Application Project stage: RAI ML0923303432009-08-31031 August 2009 Nuclear Generating Plant, RAI, License Renewal Application Project stage: RAI ML0923309042009-09-0202 September 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI 3F0909-02, Response to Request for Additional Information for the Review of the License Renewal Application2009-09-11011 September 2009 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI 3F0909-03, Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC No. ME0274) and Amendment 22009-09-11011 September 2009 Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC No. ME0274) and Amendment 2 Project stage: Response to RAI ML0921602132009-09-11011 September 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: RAI ML0926008892009-09-11011 September 2009 Areva Np, Inc., 51-9057252-001, Rev. 1, CR3 Reconciliation of 60-Year Fluence Projections Used in Reactor Vessel Beltline Embrittlement Calculations for License Renewal, Enclosure Attachment 3 Project stage: Other 3F0909-04, Response to Requests for Additional Information for the Review of the License Renewal Application and Amendment 32009-09-18018 September 2009 Response to Requests for Additional Information for the Review of the License Renewal Application and Amendment 3 Project stage: Response to RAI ML0923706692009-09-22022 September 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Unit Plant, License Renewal Application Project stage: RAI ML0926103092009-09-29029 September 2009 Scoping and Screening Audit Report Regarding the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application Project stage: Other 3F0909-06, Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC ME0274) and Amendment 42009-09-30030 September 2009 Response to Requests for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application (TAC ME0274) and Amendment 4 Project stage: Response to RAI 3F1009-06, Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC No. ME0274) - Sections B.2.37-1, 3.3.2.2, and XI.S82009-10-0202 October 2009 Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC No. ME0274) - Sections B.2.37-1, 3.3.2.2, and XI.S8 Project stage: Response to RAI ML0926705232009-10-0606 October 2009 Request for Additional Information Regarding the Review of the License Renewal Application for the Crystal River, Units 3 Nuclear Generating Plant Project stage: RAI 3F1009-03, Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives2009-10-0909 October 2009 Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives Project stage: Response to RAI 3F1009-07, Response to Request for Additional Information for the Review of Unit 3 Nuclear Generating Plant License Renewal Application and Amendment 52009-10-13013 October 2009 Response to Request for Additional Information for the Review of Unit 3 Nuclear Generating Plant License Renewal Application and Amendment 5 Project stage: Response to RAI ML0926405542009-10-15015 October 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI 3F1009-08, Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC No. ME0274) - and Amendment 62009-10-22022 October 2009 Response to Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant License Renewal Application (TAC No. ME0274) - and Amendment 6 Project stage: Response to RAI ML0929606602009-10-27027 October 2009 Request for Additional Information for the Review of the Crystal River Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML0929403222009-11-0303 November 2009 Request for Additional Information for the Review of the Crystal River, Unit 3 Nuclear Generating Plant, License Renewal Application Project stage: RAI ML1009805252009-11-0505 November 2009 Plant Operating Manual AI-571, Sea Turtle Rescue and Handling Guidance Project stage: Other ML1009805282009-11-0505 November 2009 License Renewal Revised Environmental Site Audit Needs List, Non-Radiological Waste Radiation Protection, Socioeconomics Terrestrial Ecology Project stage: Other 3F1109-06, License Renewal Environmental Site Audit Needs List, Aquatic Ecology, AR-3 Page 8 Through AR-62009-11-0505 November 2009 License Renewal Environmental Site Audit Needs List, Aquatic Ecology, AR-3 Page 8 Through AR-6 Project stage: Other ML1009805262009-11-0505 November 2009 License Renewal Revised Environmental Site Audit Needs List, Hydrology (Through Additional Reference 6) Project stage: Other ML1009805172009-11-0505 November 2009 License Renewal Revised Environmental Site Audit Needs List Hydrology (Additional Reference 8 Through 16) Project stage: Other ML1009805182009-11-0505 November 2009 Response to Request for Additional Information Regarding the Review of the License Renewal Application - Revised Environmental Site Audit Needs List Project stage: Response to RAI ML1009805242009-11-0505 November 2009 License Renewal Revised Environmental Site Audit Needs List, Aquatic Ecology AQ-3 Project stage: Other 2009-05-31
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 February 28, 2013 Mr. Jon A. Franke Vice President Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428
SUBJECT:
CRYSTAL RIVER NUCLEAR PLANT, UNIT 3 - WITHDRAWAL OF APPLICATION FOR RENEWED OPERATING LICENSE (TAC NOS. ME0274 AND ME0278)
Dear Mr. Franke:
By letter dated December 16, 2008, Florida Power Corporation (FPC or the applicant) submitted a license renewal application (LRA) in accordance with Title 10, Part 54, of the Code of Federal Regulations, "Requirements for Renewal of Operating Licenses for Nuclear Power Plants," to the U.S. Nuclear Regulatory Commission (NRC or the staff) forCrystal River Nuclear Generating Plant, Unit 3 (CR-3). The applicant requested renewal of the CR-3 operating license (facility operating license number DPR-72) for a period of 20 years beyond the current expiration of midnight, December 3,2016.
The staff completed its "Safety Evaluation Report With Open Items Related to the License Renewal of Crystal River Unit 3 Nuclear Generating Plant" (hereinafter known as the SER), in December 2010 (ADAMS Accession No. ML103490568).
By letter dated February 6,2013, you requested to withdraw the application from NRC review based on your determination to retire CR-3.
Consistent with 10 CFR 54.13(a), "[I]nformation provided to the Commission by an applicant for a renewed license... must be complete and accurate in all material respects." The staff notes that the SER contains nine open items and two confirmatory items; these items are incomplete in regards to 10 CFR 54.13(a). The staff acknowledges your request to withdraw the application. NRC staff activities on the review have ceased and the associated Technical Assignment Control numbers will be closed by February 28, 2013.
As noted above, the staff's review to date has identified that your application did not provide technical information in sufficient detail to enable the staff to complete its reviews. Therefore, if you decide to re-submit the application, it must include the information identified in our SER.
J. Franke
- 2 In accordance with our practice, a Federal Register Notice will be posted regarding this matter.
If you have any questions, please contact the safety project manager, John Daily, at (301) 415-3873 or by email at john.daily@nrc.gov.
. Lubinski, irector Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-302 cc: Listserv
February 28, 2013 MEMORANDUM TO:
Cindy K. Bladey. Chief Rules, Announcements, and Directives Branch Division of Administrative Services Office of Administration FROM:
John Daily, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation
SUBJECT:
NOTICE OF WITHDRAWAL FROM DOCKETING OF THE APPLICATION REGARDING RENEWAL OF FACILITY OPERATING LICENSE NUMBER DPR-72 FOR AN ADDITIONAL 20-YEAR PERIOD FOR THE FLORIDA POWER CORPORATION CRYSTAL RIVER NUCLEAR GENERATING PLANT, UNIT 3 (DOCKET NO. 50-302)
Enclosed please find one copy of the supject Federal Register Notice (FRN) for transmittal to the Office of Federal Register for publication.
The Office of Administration, Division of Administrative Services, Rules, Announcements, and Directives Branch (ADM/DAS/RDB) has been given owner's rights to the notice in Agencywide Documents Access and Management System (ADAMS) No. ML13052A655. Publicly available NRC documents referenced in the notice have been finalized in ADAMS and profiled for public release. ADAMS accession numbers for all such documents are provided in the text of the notice.
Copies of this notice and the document(s) being made available to the public have been forwarded to the Office of Information Services (OIS) staff at WEBWORK.Resource@nrc.govfor posting to the NRC public Web site.
Information about this license action has been forwarded to the OIS staff at WEBWORK.Resource@nrc.gov for posting to the NRC public Web site.
Docket No. 50-302 License No. DPR-72
Enclosure:
FRN CONTACT: John Daily, NRR/DLR/RPB1 (301) 415-3873
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-302; NRC-2013-XXXX]
Crystal River Nuclear Generating Plant, Unit 3 Application for Renewal of License to Facility Notice of Withdrawal AGENCY: Nuclear Regulatory Commission, ACTION: License Renewal Application; Withdrawal.
ADDRESSES: Please refer to Docket ID <NRC-201 when contacting the NRC about the availability of information regarding this document. You may access information related to this document, which the NRC possesses and are publicly available, using any of the following methods:
Federal rulemaking Web site: Go to http://www,regulations,gov and search for Docket ID <NRC-2013-XXXX>, Address questions about NRC dockets to Carol Gallagher; telephone: 301-492-3668; e-mail: CaroI.Galiagher@nrc,gov.
NRC's Agencywide Documents Access and Management System (ADAMS):
You may access publicly available documents online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search," For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or bye-mail to pdr,resource@nrc,gov. The ADAMS accession number for each
-2 document referenced in this notice (if that document is available in ADAMS) is provided the first time that a document is referenced.
NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: John Daily, Senior Project Manager, Projects Branch 1, Division of License Renewal, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, PC 20555; telephone: 301-415-3873; e-mail:
John.Daily@nrc.gov.
SUPPLEMENTARY INFORMATION:
The U.S. Nuclear Regulatory Commission (NRC or the Commission) grants the Florida Power Corporation request to withdraw its application for the renewal of operating license DPR-72, which authorizes Florida Power Corporaton (FPC) to operate the Crystal River Nuclear Generating Plant, Unit 3 (CR3), at 2609 megawatts thermal. FPC stated its decision to withdraw the application is based upon a determination to retire CR3. CR3 is located near Crystal River, FL; the current operating license for CR3 expires on December 3, 2016.
FPC submitted the license renewal application (LRA) by letter dated December 16, 2008, pursuant to Title 10, Part 54, of the Code of Federal Regulations (10 CFR Part 54), to renew operating license DPR-72 for CR3 (ADAMS Accession No. ML090080053). The Commission had previously noticed the acceptance of the application in the Federal Register on March 9, 2009 (74 FR 10099). FPC requested withdrawal of the application by letter dated
//~/.
- 3 February 6, 2013, based on its determination to retire CR3 (ADAMS Accession No. ML13043A028).
The NRC staff completed its "Safety Evaluation Report With Open Items Related to the License Renewal of Crystal River Unit 3 Nuclear Generating Plant" (hereinafter known as the SER) in December 2010 (ADAMS Accession No. ML103490568). Consistent with 10 CFR 54.13(a), "[I]nformation provided to the Commission by an applicant for a renewed license... must be complete and accurate in all material respects." The staff noted that the SER contains nine open items and two confirmatory items; these items are incomplete in regards to 10 CFR 54.13(a). Since the staff's review to date has identified that FPC's application did not provide technical information in sufficient detail to enable the staff to complete its reviews, if FPC decides to re-submit the application, it must include this technical information in sufficient detail to allow the staff to continue its evaluations.
The staff also issued a Notice of Issuance for the draft supplemental environmental impact statement (DSEIS) related to the proposed license renewal, which was published in the Federal Register on June 3, 2011 (76 FR 32237). However, since the licensee has withdrawn its application, all comments received on the DSEIS and all of the above Federal Register Notices need not be and will not be resolved.
For further details with respect to this action, see the LRA dated December 16, 2008, and the licensee's letter of withdrawal dated February 6,2013.
Dated at Rockville, Maryland, this 28 th day of FebruaJ 2013.
For the NUctefu. Regulatory Commission.
, ski, Director, Di Ision of Li se Renewal, Office of Nuclear Reactor Regulation.
J. Franke
- 2 In accordance with our practice, a Federal Register Notice will be posted regarding this matter.
If you have any questions, please contact the safety project manager, John Daily, at (301) 415-3873 or by email at john.daily@nrc.gov.
Sincerely, IRA!
John W. Lubinski, Director Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-302 cc: Listserv ADAMS Accession Nos. ML13052A667 (Package)
ML13052A606 (Incoming)
ML13052A655 (FRN)
ML13052A658 (Memo)
- concurred via email DLRI DLRlRPB1/BC DLRI OFFICE DLR/LA RPB1/PM RPB2/BC OGC NLO*
DLR/RPB 1/PM NAME IKing JDaily DMorey DWrona LSubin I ~IDaily DATE 2122/13 2/26/13 2/28/13 2/28/13 2/28/13 2/28/13 OFFICIAL RECORD COpy
Letter to J. Franke from J. Lubinski, dated February 28, 2013
SUBJECT:
CRYSTAL RIVER NUCLEAR PLANT, UNIT 3 - WITHDRAWAL OF APPLICATION FOR RENEWED OPERATING LICENSE (TAC NOS. ME0274 AND ME0278)
DISTRIBUTION:
HARD COPY:
DLR R/F E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRapb Resource RidsNrrDlrRerb Resource RidsOgcMailCenter Resource
..IDaily EKeegan FSaba, DORL AJones,OGC DMclntyre, OPA LLake, RII RReyes, RII TMorrisey, RII