Letter Sequence Withdrawal |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: 3F0112-11, Corrections to the Extended Power Uprate LAR 309 Vendor Affidavit and Technical Report, 3F0113-08, Attachment D: ANP-3195(NP), Revision 0, Response for Crystal River Unit 3, EPU Licensing Amendment Report NRC Reactor Systems Branch Requests for Additional Information (Non-Proprietary) and Attachment E: Location of Reactor Systems RAI Re, 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip, 3F0912-01, ANP-3156 Np, Crystal River 3 EPU Boric Acid Precipitation RAI Responses, Attachment C, 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip, 3F1112-02, 17877-0001-100, Rev. 1, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment, Task 1, Page 174 of 250 Through Page 250 of 250, ML11259A012, ML11300A226, ML11342A195, ML12031A032, ML12053A231, ML12107A068, ML12202A734, ML12205A357, ML12205A358, ML12240A119, ML12255A409, ML12262A385, ML12314A391, ML12314A392, ML12314A393, ML13032A540, ML13170A215
|
MONTHYEARML11167A1072011-05-0606 May 2011 Request for Additional Information Required for the Development of Confirmatory LOCA and non-LOCA Models for the CR-3 Extended Power Uprate Project stage: Request 3F0611-02, Attachments 1, 2 & 3, 4 & 6 Crystal River Unit 3, License Amendment Request 309, Revision 0 Attachment 1, Description of Proposed Change, Background, Justification for the Request, Determination of No Significant Hazards Considerations2011-06-15015 June 2011 Attachments 1, 2 & 3, 4 & 6 Crystal River Unit 3, License Amendment Request 309, Revision 0 Attachment 1, Description of Proposed Change, Background, Justification for the Request, Determination of No Significant Hazards Considerations Project stage: Request 3F0711-07, Clarifications for Trace Confirmatory Model Development for Extended Power Uprate2011-07-0505 July 2011 Clarifications for Trace Confirmatory Model Development for Extended Power Uprate Project stage: Request 3F0811-04, Response to Request for Additional Information to Support NRC Probabilistic Risk Assessment Licensing Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-11011 August 2011 Response to Request for Additional Information to Support NRC Probabilistic Risk Assessment Licensing Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-02, Response to Request for Additional Information to Support NRC Balance of Plant Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-11011 August 2011 Response to Request for Additional Information to Support NRC Balance of Plant Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-01, Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-18018 August 2011 Response to Request for Additional Information to Support NRC Instrumentation and Controls Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0811-03, Response to Request for Additional Information to Support NRC Mechanical and Civil Branch Acceptance Review of the CR-3 Extended Power Uprate LAR2011-08-25025 August 2011 Response to Request for Additional Information to Support NRC Mechanical and Civil Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11259A0122011-09-14014 September 2011 NRR E-mail Capture - Clarification for August 25 Emcb RAI Acceptance Review Letter Project stage: Other ML11286A0922011-10-11011 October 2011 Response to Request for Additional Information to Support NRC Reactor Systems Branch Acceptance Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11300A2262011-10-25025 October 2011 Feedwater Line Break Overpressure Protection Analysis to Support NRC Reactor Systems Branch Acceptance Review of the CR-3 Extended Power Update LAR and LAR Approval Schedule Project stage: Other 3F1011-08, ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip2011-10-25025 October 2011 ANP-3052, Rev. 0, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip Project stage: Other ML11286A0842011-11-21021 November 2011 Acceptance for Review of License Amendment Request for Extended Power Uprate Project stage: Acceptance Review ML11326A2312011-12-0707 December 2011 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI 3F1211-05, Response to Request for Additional Information to Support NRC Health Physics and Human Performance Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-15015 December 2011 Response to Request for Additional Information to Support NRC Health Physics and Human Performance Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12205A3572011-12-15015 December 2011 Attachment a to 3F0712-03, CR-3 LOCA Summary Report - EPU/ROTSG/Mark-B-HTP, Revision 4 Project stage: Other 3F1211-06, Response to Request for Additional Information to Support NRC Vessels and Internals Integrity Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-15015 December 2011 Response to Request for Additional Information to Support NRC Vessels and Internals Integrity Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F1211-10, Response to Request for Additional Information to Support NRC Fire Protection Branch Technical Review of the CR-3 Extended Power Uprate LAR2011-12-21021 December 2011 Response to Request for Additional Information to Support NRC Fire Protection Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12030A2092012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Instrumentation and Control Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-04, Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-0505 January 2012 Response to Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML11342A1952012-01-0606 January 2012 Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non-safeguards Information Project stage: Other ML12024A3002012-01-19019 January 2012 Response to Request for Additional Information to Support NRC Component Performance and Testing Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-06, Response to Request for Additional Information to Support NRC Piping and NDE Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-01-19019 January 2012 Response to Request for Additional Information to Support NRC Piping and NDE Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0112-11, Corrections to the Extended Power Uprate LAR 309 Vendor Affidavit and Technical Report2012-01-31031 January 2012 Corrections to the Extended Power Uprate LAR 309 Vendor Affidavit and Technical Report Project stage: Other ML12003A2172012-02-0808 February 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI 3F0212-01, Complex - Environmental Protection Plan Report 2011 Sea Turtle Rescue and Recovery Summary Report2012-02-0808 February 2012 Complex - Environmental Protection Plan Report 2011 Sea Turtle Rescue and Recovery Summary Report Project stage: Request ML1205505612012-03-0202 March 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12053A2312012-03-0202 March 2012 Request for Withholding Proprietary Information from Public Disclosure Related Extended Power Uprate Technical Report Project stage: Other ML12052A1302012-03-0202 March 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI 3F0312-02, Response to Second Request for Additional Information to Support NRC Instrumentation and Controls Branch (Eicb) Technical Review of the CR-3 Extended Power Uprate LAR2012-03-19019 March 2012 Response to Second Request for Additional Information to Support NRC Instrumentation and Controls Branch (Eicb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0312-01, Response to Request for Additional Information to Support NRC PRA Licensing Branch Technical Review of the CR-3 Extended Power Uprate LAR2012-03-22022 March 2012 Response to Request for Additional Information to Support NRC PRA Licensing Branch Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12031A0322012-03-26026 March 2012 Request for Withholding Proprietary Information from Public Disclosure Related to Extended Power Uprate Technical Report Project stage: Other ML1208300282012-04-0202 April 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI 3F0412-05, Response to Second Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-0404 April 2012 Response to Second Request for Additional Information to Support NRC Health Physics and Human Performance Branch (Ahpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0412-04, Response to Request for Additional Information to Support NRC Mechanical and Civil Engineering Branch (Emcb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-0404 April 2012 Response to Request for Additional Information to Support NRC Mechanical and Civil Engineering Branch (Emcb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12107A0682012-04-0404 April 2012 NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Clarifications for Component Performance & Testing Branch (Eptb) Project stage: Other 3F0412-07, Response to Request for Additional Information to Support NRC Containment and Ventilation Branch (Scvb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-12012 April 2012 Response to Request for Additional Information to Support NRC Containment and Ventilation Branch (Scvb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-06, Response to Request for Additional Information to Support NRC Electrical Systems Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-16016 April 2012 Response to Request for Additional Information to Support NRC Electrical Systems Branch (Eeeb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI 3F0412-09, Response to Request for Additional Information to Support NRC Accident Dose Branch (Aadb) Technical Review of the CR-3 Extended Power Uprate LAR2012-04-26026 April 2012 Response to Request for Additional Information to Support NRC Accident Dose Branch (Aadb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML1208300382012-05-0404 May 2012 Nuclear Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12102A0442012-05-0404 May 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12205A3582012-05-31031 May 2012 Attachment D to 3F0712-03, Technical Report, ANP-3114(NP), Rev. 0, CR-3 EPU - Feedwater Line Break Analysis Sensitivity Studies Project stage: Other ML12314A3912012-05-31031 May 2012 17877-0002-100, CR-3 Inadequate Core Cooling Mitigation System Reliability Assessment 2 Project stage: Other 3F0612-05, Response to Request for Additional Information to Support NRC Nuclear Performance and Code Review Branch (Snpb) Technical Review of the CR-3 Extended Power Uprate LAR2012-06-18018 June 2012 Response to Request for Additional Information to Support NRC Nuclear Performance and Code Review Branch (Snpb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Response to RAI ML12206A3372012-06-29029 June 2012 Response to Second Request for Additional Information to Support NRC Accident Dose Branch (Aadb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 3F0712-03, Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip2012-06-30030 June 2012 Attachment E to 3F0712-03, Technical Report, ANP-3052, Rev. 2, CR-3 EPU Feedwater Line Break Analysis with Failure of First Safety Grade Trip Project stage: Other ML12184A3442012-07-0202 July 2012 NRR E-mail Capture - Crystal River, Unit 3 EPU LAR - Discussion/Clarification of Emcb Draft RAIs Project stage: Draft Other ML12171A3472012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12174A2922012-07-0505 July 2012 Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI ML12194A4172012-07-17017 July 2012 Generating Plant - Request for Additional Information for Extended Power Uprate License Amendment Request Project stage: RAI 3F0712-06, Response to Second Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch (Esgb) Technical Review of the CR-3 Extended Power Uprate LAR2012-07-17017 July 2012 Response to Second Request for Additional Information to Support NRC Steam Generator Tube Integrity and Chemical Engineering Branch (Esgb) Technical Review of the CR-3 Extended Power Uprate LAR Project stage: Request 2012-02-08
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 March 7,2013 Mr. Jon A. Franke Vice President Crystal River Nuclear Plant (NA2C)
ATTN: Supervisor, Licensing and Regulatory Programs (NA 1 B) 15760 W. Power Line Street Crystal River, FL 34428-6708
SUBJECT:
CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - WITHDRAWAL OF LICENSE AMENDMENT REQUEST (TAC NO. ME6527)
Dear Mr. Franke:
By letter dated June 15, 2011, you applied for an amendment to the Crystal River Unit 3 Nuclear Generating Plant (CR-3), Facility Operating License No. DPR-72. The proposed change would have modified the facility operating license and the technical specifications to support operation at an increased core thermal power level. Briefly, the proposed amendment, categorized as an extended power uprate amendment, would have increased the licensed core power level for CR-3 from 2609 megawatts (MWt) to 3014 MWt. Subsequently, by letter dated February 7, 2013, you withdrew the amendment request based on the determination to retire CR-3.
The U.S. Nuclear Regulatory Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely,
~ \\t' ~VV\\..
Siva P. Lingam, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-302
Enclosure:
Notice of Withdrawal cc w/encl: Distribution via Listserv
[7590-01-P]
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-302; NRC-2013-XXXX]
Crystal River Unit 3 Nuclear Generating Plant Application for Amendment to Facility Operating License AGENCY: Nuclear Regulatory Commission, ACTION: License amendment application; withdrawal.
SUMMARY
- The U,S, Nuclear Regulatory Commission (NRC or the Commission) is granting the request of Florida Power Corporation (the licensee), through its owner Duke Energy, to withdraw its June 15, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No, ML112070659), application for proposed amendment to Facility Operating License No. DPR-72 for the Crystal River Unit 3 Nuclear Generating Plant (CR-3),
located in Florida, Citrus County, The proposed amendment would have revised the facility operating license and the technical specifications to support operation at an increased core thermal power level.
ADDRESSES: Please refer to Docket ID NRC-2013-XXXX when contacting the NRC about the availability of information regarding this document You may access information related to this document, which the NRC possesses and is publicly available, using any of the following methods:
- 2 Federal rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-XXXX. Address questions about NRC dockets to Carol Gallagher; telephone: 301-492-3668; e-mail: CaroI.Galiagher@nrc.gov.
NRC's ADAMS: You may access publicly available documents online in the NRC Library at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397 4209, 301-415-4737, or bye-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this notice (if that document is available in ADAMS) is provided the first time that a document is referenced.
NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
FOR FURTHER INFORMATION CONTACT: Siva P. Lingam, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555; telephone: 301-415-1564; e-mail: siva.lingam@nrc.gov.
SUPPLEMENTARY INFORMATION:
The NRC is granting the licensee's request to withdraw its June 15, 2011, application for proposed amendment to the CR-3 Facility Operating License No. DPR-72.
The proposed amendment would have increased the licensed core power level for CR-3 from 2609 megawatts thermal (MWt) to 3014 MWt. The increase in core thermal power would
- 3 have been approximately 15.5 percent over the current licensed core thermal power level and was categorized as an extended power uprate.
The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the Federal Register on January 11, 2012 (77 FR 1743), and a Notice of Consideration of Issuance of draft environmental assessment related to the proposed amendment published in the Federal Register on January 16, 2013 (78 FR 3458). However, by letter dated February 7, 2013 (ADAMS Accession No. ML13043A027), the licensee withdrew the proposed change based on the determination to retire CR-3 due to economic disadvantages to fix the containment delamination that occurred during the steam generators replacement refueling outage. As a result, all the comments received on the above Federal Register notices will not be resolved and the environmental assessment will not be finalized.
For further details with respect to this action, see the application for amendment dated June 15, 2011, and the licensee's letter dated February 7, 2013, which withdrew the application for license amendment.
Dated at Rockville, Maryland, this 7th day of March 2013.
For the Nuclear Regulatory Commission.
(f.~
Siva P. Lingam, Project Manager, Plant Licensing Branch 11-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
PKG M13063A305 LTR ML13063A524 FRN ML13063A527 OFFICE NRR/LPL2-2/PM NRRlLPL2-2/PM NRRlLPL2-2/LA OGC NLO NRR/LPL2-2/BC NRRlLPL2-2/PM NAME SLingam CGratton BClayton LSubin FSaba for JQuichocho SLingam DATE 3/4/13 317113 3/5/13 3/5/13 317113 3/7/13