{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 3, 2013 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801
-1257 September 3, 2013 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D
-C Chattanooga, TN 37402
-2801


==SUBJECT:==
==SUBJECT:==
Line 26: Line 23:
==Dear Mr. Shea:==
==Dear Mr. Shea:==


On August 15, 2013, the NRC completed its mid
On August 15, 2013, the NRC completed its mid-cycle performance review of the Sequoyah Nuclear Plant Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
-cycle performance review of the Sequoyah Nuclear Plant Units 1 and 2.
The NRC determined that the performance at Sequoyah Nuclear Plant Units 1 and 2 during the most recent quarter was within the Degraded Cornerstone Column of the NRCs Reactor Oversight Process (ROP) Action Matrix beginning in the first quarter 2013 because of the two White findings in the Mitigating Systems Cornerstone documented in NRC Inspection Report 05000327, 328/2013011 (ADAMS Accession Number ML13155A560).
The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012 , through June 30, 2013. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
Since the last performance assessment follow-up, Sequoyah Nuclear Plant Units 1 and 2 received one or more greater-than-green Security Cornerstone inputs. The additional input(s) did not change the current assessment of performance because Units 1 and 2 were assessed to be in the Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix beginning in the first quarter 2013.
Because Units 1 and 2 were assessed in the Degraded Cornerstone column of the NRCs Action Matrix, additional regulatory oversight actions will be implemented at your facility.
Therefore, in addition to ROP baseline inspections, the NRC will conduct supplemental inspections in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area for the Security Cornerstone input(s) and Inspection Procedure 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area for the Mitigating Systems Cornerstone inputs. These inspections will be performed when you have notified us of your readiness for the NRC to review the actions taken to address the performance issues.
The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
Routine inspections performed by resident inspectors are not included in the inspection plan.


The NRC determined that the performance at Sequoyah Nuclear Plant Units 1 and 2 during the most recent quarter was within the Degraded Cornerstone Column of the NRC's Reactor Oversight Process (ROP) Action Matrix beginning in the first quarter 2013 because of the two White findings in the Mitigating Systems Cornerstone documented in NRC Inspection Report 05000327, 328/2013011 (ADAMS Accession Number ML13155A560)
J. Shea                                       2 The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
. Since the last performance assessment follow
In addition to the ROP baseline inspections at your facility, we also plan on conducting temporary instructions and infrequently performed inspections which include: IP 92702, Follow up On Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, And Alternative Dispute Resolution Confirmatory Orders; and TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks.
-up, Sequoyah Nuclear Plant Units 1 and 2 receiv ed one or more greater
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-than-green Security Cornerstone inputs.
Please contact Scott Shaeffer at 404-997-4521 with any questions you have regarding this letter.
The additional input(s) did not change the current assessment of performance because Units 1 and 2 were assessed to be in the Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix beginning in the first quarter 2013
Sincerely,
.
                                                    /RA/
Because Units 1 and 2 were assessed in the Degraded Cornerstone column of the NRC's Action Matrix
Victor M. McCree Regional Administrator Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79
, additional regulatory oversight actions will be implemented at your facility.
Therefore, in addition to ROP baseline inspections, the NRC will conduct supplemental inspection s in accordance with Inspection Procedure 95001, "Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area
" for the Security Cornerstone input(s) and Inspection Procedure 95002, "Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area
" for the Mitigating Systems Cornerstone inputs. These inspections will be performed when you have notified us of your readiness for the NRC to review the actions taken to address the performance issues. The enclosed inspection plan lists the inspections scheduled through December 31, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan.
 
J. Shea 2 The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should
 
circumstances warrant any changes.
This inspection plan does not include security related inspections, which will be sent via separate, non
-publicly available correspondence.
In addition to the ROP baseline inspections at your facility, we also plan on conducting temporary instructions and infrequently performed inspections which include:
IP 92702, Follow up On Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, And Alternative Dispute Resolution Confirmatory Orders; and TI 2515/182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks
."  In accordance with 10 CFR 2.390 of the NRC
's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact Scott Shaeffer at 404-997-4521 with any questions you have regarding this letter. Sincerely,
/RA/   Victor M. McCree Regional Administrator Docket No.:
50-327, 50-328 License No.:
DPR-77, DPR-79


==Enclosure:==
==Enclosure:==
Sequoyah Inspection/Activity Plan (09/01/2013 - 12/31/2014) cc: Distribution via Listserv


Sequoyah Inspection/Activity Plan (09/01/201 3 - 12/31/201 4) cc: Distribution via Listserv
_________________________                    SUNSI REVIEW COMPLETE    FORM 665 ATTACHED OFFICE            RII:DRP        RII:DRP      RII:DRP        RII:ORA        RII:ORA SIGNATURE          JDH /RA/      SMS /RA/      RPC /RA/       LDW /RA/       VMM /RA/
NAME              JHamman        SShaeffer    RCroteau        LWert          VMcCree DATE                  08/22/2013    08/26/2013    08/24/2013      08/29/2013      08/29/2013    8/ /2013      8/ /2013 E-MAIL COPY?        YES    NO    YES      NO  YES      NO    YES      NO    YES      NO  YES    NO    YES    NO


_________________________
J. Shea                                   3 Letter to Joseph W. Shea from Victor M. McCree dated September 3, 2013
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:ORA RII:ORA  SIGNATURE JDH /RA/ SMS /RA/ RPC /RA/ LDW /RA/ VMM /RA/  NAME JHamman SShaeffer RCroteau LWert VMcCree  DATE 08/22/2013 08/26/2013 08/24/2013 08/29/2013 08/29/2013 8/    /2013 8/    /2013 E-MAIL COPY?
YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO J. Shea 3 Letter to Joseph W. Shea from Victor M. McCree dated September 3, 2013


==SUBJECT:==
==SUBJECT:==
MID-CYCLE ASSESSMENT LETTER FOR THE SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (NRC INSPECTION REPORTS 05000327/2013006 and 05000328/2013006)
MID-CYCLE ASSESSMENT LETTER FOR THE SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (NRC INSPECTION REPORTS 05000327/2013006 and 05000328/2013006)
DISTRIBUTION
DISTRIBUTION:
: C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC R. Pascarelli, NRR RidsNrrPMSequoyah Resource Institute of Nuclear Power Operations (INPO) ROP Reports
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC R. Pascarelli, NRR RidsNrrPMSequoyah Resource Institute of Nuclear Power Operations (INPO)
ROP Reports
 
Page 1 of 2                                                                                      Sequoyah 09/03/2013      08:09:27                                                              Inspection / Activity Plan Report 22 09/01/2013 - 12/31/2014 Unit          Planned Dates                                                                                                                                          No. of Staff Number          Start        End        Inspection Activity                                                              Title                                            on Site EP            - EMERGENCY PREPAREDNESS INSPECTION                                                                                      1 1, 2        09/30/2013    10/04/2013      IP 7111402              Alert and Notification System Testing 1, 2        09/30/2013    10/04/2013      IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System 1, 2        09/30/2013    10/04/2013      IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2        09/30/2013    10/04/2013      IP 71151                Performance Indicator Verification ISI          - UNIT 1 INSERVICE INSPECTION                                                                                            1 1          10/21/2013    10/25/2013      IP 7111108P            Inservice Inspection Activities - PWR LR            - LICENSE RENEWAL 71002 INSPECTION                                                                                        6 1, 2        10/21/2013    10/25/2013      IP 71002                License Renewal Inspection 1, 2        11/18/2013    11/22/2013      IP 71002                License Renewal Inspection 1, 2        12/02/2013    12/06/2013      IP 71002                License Renewal Inspection OL EXAM      - INITIAL EXAM PREP WEEK                                                                                                  3 1          11/04/2013    11/08/2013          V23417              SEQUOYAH/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES RP            - RAD HAZARD ANALYSIS AND TRANSPORTATION                                                                                  2 1, 2        11/04/2013    11/08/2013      IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1, 2        11/04/2013    11/08/2013      IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2        11/04/2013    11/08/2013      IP 71151                Performance Indicator Verification OL EXAM      - INITIAL EXAM WEEK 1                                                                                                    3 1          12/02/2013    12/06/2013          V23417              SEQUOYAH/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES TI-182        - TI-182 BURIED PIPING/TANK - PHASE 2                                                                                    1 1, 2        12/09/2013    12/11/2013      IP 2515/182            Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping OL EXAM      - INITIAL EXAM WEEK 2                                                                                                    3 1          12/09/2013    12/13/2013          V23417              SEQUOYAH/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES TFPI          - TRIENNIAL FIRE PROTRECTION INSP                                                                                        4 1, 2        01/27/2014    01/31/2014      IP 7111105T            Fire Protection [Triennial]
1, 2        02/10/2014    02/14/2014      IP 7111105T            Fire Protection [Triennial]
RP            - RP OCCUPATIONAL BASELINE                                                                                                2 1, 2        05/12/2014    05/16/2014      IP 71124.02            Occupational ALARA Planning and Controls 1, 2        05/12/2014    05/16/2014      IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1, 2        05/12/2014    05/16/2014      IP 71124.04            Occupational Dose Assessment 1, 2        05/12/2014    05/16/2014      IP 71124.05            Radiation Monitoring Instrumentation 1, 2        05/12/2014    05/16/2014      IP 71151                Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.                                                                                            Enclosure


SequoyahInspection / Activity Plan 09/01/2013
Page 2 of 2                                                                                     Sequoyah 09/03/2013     08:09:27                                                             Inspection / Activity Plan Report 22 09/01/2013 - 12/31/2014 Unit         Planned Dates                                                                                                  No. of Staff Number          Start        End        Inspection Activity                                                            Title      on Site ISI           - UNIT 2 IN-SERVICE INSPECTION                                                   1 2       05/19/2014   05/23/2014     IP 7111108P            Inservice Inspection Activities - PWR SGISI         - UNIT 2 SG IN-SERVICE INSPECTION                                                 1 2       05/26/2014   05/30/2014     IP 7111108P            Inservice Inspection Activities - PWR RP           - RP OCCUPATIONAL BASELINE WEEK2                                                 3 1, 2       06/02/2014   06/06/2014     IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1, 2       06/02/2014   06/06/2014     IP 71124.02            Occupational ALARA Planning and Controls 1, 2       06/02/2014   06/06/2014     IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1, 2       06/02/2014   06/06/2014     IP 71124.04            Occupational Dose Assessment 1, 2       06/02/2014   06/06/2014     IP 71124.05             Radiation Monitoring Instrumentation 1, 2       06/02/2014   06/06/2014     IP 71151                Performance Indicator Verification OL RQ         - REQUAL INSP                                                                     2 1, 2       09/15/2014   09/19/2014     IP 7111111B            Licensed Operator Requalification Program EP           - EP EXERCISE                                                                     1 1, 2       11/17/2014    11/21/2014     IP 7111401              Exercise Evaluation 1, 2       11/17/2014    11/21/2014     IP 71151                Performance Indicator Verification Comments:
-12/31/2014 Unit Number Page 1 of 2 09/03/2013 08:09:27 Report 22 No. of Staff on SitePlanned Dates Start          EndInspection ActivityTitle 1 EP-EMERGENCY PREPAREDNESS INSPECTION 1, 2  09/30/2013 10/04/2013 IP7111402 Alert and Notification System Testing 1, 2  09/30/2013 10/04/2013 IP7111403Emergency Preparedness Organization Staffing and Augmentation System 1, 2  09/30/2013 10/04/2013 IP7111405Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2  09/30/2013 10/04/2013 IP71151Performance Indicator Verification 1 ISI-UNIT 1 INSERVICE INSPECTION 1    10/21/2013 10/25/2013 IP7111108P Inservice Inspection Activities - PWR 6 LR-LICENSE RENEWAL 71002 INSPECTION 1, 2  10/21/2013 10/25/2013 IP 71002License Renewal Inspection 1, 2  11/18/201311/22/2013 IP 71002License Renewal Inspection 1, 2  12/02/2013 12/06/2013 IP 71002License Renewal Inspection 3OL EXAM-INITIAL EXAM PREP WEEK 1    11/04/201311/08/2013 V23417SEQUOYAH/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES 2 RP-RAD HAZARD ANALYSIS AND TRANSPORTATION 1, 2  11/04/201311/08/2013 IP71124.01Radiological Hazard Assessment and Exposure Controls 1, 2  11/04/201311/08/2013 IP71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2  11/04/201311/08/2013 IP71151Performance Indicator Verification 3OL EXAM-INITIAL EXAM WEEK 1 1    12/02/2013 12/06/2013 V23417SEQUOYAH/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES 1TI-182-TI-182 BURIED PIPING/TANK - PHASE 2 1, 2  12/09/201312/11/2013 IP 2515/182Review of the Implementation of the Industry Init iative to Control Degradation of Underground Piping 3OL EXAM-INITIAL EXAM WEEK 2 1    12/09/2013 12/13/2013 V23417SEQUOYAH/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES 4 TFPI-TRIENNIAL FIRE PROTRECTION INSP 1, 2  01/27/2014 01/31/2014 IP7111105TFire Protection [Triennial]
This report does not include INPO and OUTAGE activities.
1, 2  02/10/2014 02/14/2014 IP7111105TFire Protection [Triennial]
This report shows only on-site and announced inspection procedures.                                                   Enclosure}}
2 RP-RP OCCUPATIONAL BASELINE 1, 2  05/12/2014 05/16/2014 IP71124.02Occupational ALARA Planning and Controls 1, 2  05/12/2014 05/16/2014 IP71124.03In-Plant Airborne Radioactivity Control and Mitigation 1, 2  05/12/2014 05/16/2014 IP71124.04Occupational Dose Assessment 1, 2  05/12/2014 05/16/2014 IP71124.05 Radiation Monitoring Instrumentation 1, 2  05/12/2014 05/16/2014 IP71151Performance Indicator Verification This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
SequoyahInspection / Activity Plan 09/01/2013
-12/31/2014 Unit Number Page 2 of 2 09/03/2013 08:09:27 Report 22 No. of Staff on SitePlanned Dates Start           EndInspection ActivityTitle 1 ISI-UNIT 2 IN-SERVICE INSPECTION 2   05/19/2014 05/23/2014 IP7111108P Inservice Inspection Activities - PWR 1 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 2   05/26/2014 05/30/2014 IP7111108P Inservice Inspection Activities - PWR 3 RP-RP OCCUPATIONAL BASELINE WEEK2 1, 2   06/02/2014 06/06/2014 IP71124.01Radiological Hazard Assessment and Exposure Controls 1, 2   06/02/2014 06/06/2014 IP71124.02Occupational ALARA Planning and Controls 1, 2   06/02/2014 06/06/2014 IP71124.03In-Plant Airborne Radioactivity Control and Mitigation 1, 2   06/02/2014 06/06/2014 IP71124.04Occupational Dose Assessment 1, 2   06/02/2014 06/06/2014 IP71124.05 Radiation Monitoring Instrumentation 1, 2   06/02/2014 06/06/2014 IP71151Performance Indicator Verification 2OL RQ-REQUAL INSP 1, 2   09/15/2014 09/19/2014 IP7111111B Licensed Operator Requalification Program 1 EP-EP EXERCISE 1, 2   11/17/201411/21/2014 IP7111401 Exercise Evaluation 1, 2   11/17/201411/21/2014 IP71151Performance Indicator Verification Comments: This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.}}

Revision as of 15:00, 4 November 2019

Mid Cycle Assessment Letter
ML13246A195
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/03/2013
From: Mccree V
Region 2 Administrator
To: James Shea
Tennessee Valley Authority
References
IR-13-006
Download: ML13246A195 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 3, 2013 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR THE SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (NRC INSPECTION REPORTS 05000327/2013006 and 05000328/2013006)

Dear Mr. Shea:

On August 15, 2013, the NRC completed its mid-cycle performance review of the Sequoyah Nuclear Plant Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that the performance at Sequoyah Nuclear Plant Units 1 and 2 during the most recent quarter was within the Degraded Cornerstone Column of the NRCs Reactor Oversight Process (ROP) Action Matrix beginning in the first quarter 2013 because of the two White findings in the Mitigating Systems Cornerstone documented in NRC Inspection Report 05000327, 328/2013011 (ADAMS Accession Number ML13155A560).

Since the last performance assessment follow-up, Sequoyah Nuclear Plant Units 1 and 2 received one or more greater-than-green Security Cornerstone inputs. The additional input(s) did not change the current assessment of performance because Units 1 and 2 were assessed to be in the Degraded Cornerstone Column of the Reactor Oversight Process Action Matrix beginning in the first quarter 2013.

Because Units 1 and 2 were assessed in the Degraded Cornerstone column of the NRCs Action Matrix, additional regulatory oversight actions will be implemented at your facility.

Therefore, in addition to ROP baseline inspections, the NRC will conduct supplemental inspections in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area for the Security Cornerstone input(s) and Inspection Procedure 95002, Supplemental Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area for the Mitigating Systems Cornerstone inputs. These inspections will be performed when you have notified us of your readiness for the NRC to review the actions taken to address the performance issues.

The enclosed inspection plan lists the inspections scheduled through December 31, 2014.

Routine inspections performed by resident inspectors are not included in the inspection plan.

J. Shea 2 The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to the ROP baseline inspections at your facility, we also plan on conducting temporary instructions and infrequently performed inspections which include: IP 92702, Follow up On Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, And Alternative Dispute Resolution Confirmatory Orders; and TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Scott Shaeffer at 404-997-4521 with any questions you have regarding this letter.

Sincerely,

/RA/

Victor M. McCree Regional Administrator Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79

Enclosure:

Sequoyah Inspection/Activity Plan (09/01/2013 - 12/31/2014) cc: Distribution via Listserv

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP RII:ORA RII:ORA SIGNATURE JDH /RA/ SMS /RA/ RPC /RA/ LDW /RA/ VMM /RA/

NAME JHamman SShaeffer RCroteau LWert VMcCree DATE 08/22/2013 08/26/2013 08/24/2013 08/29/2013 08/29/2013 8/ /2013 8/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

J. Shea 3 Letter to Joseph W. Shea from Victor M. McCree dated September 3, 2013

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR THE SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (NRC INSPECTION REPORTS 05000327/2013006 and 05000328/2013006)

DISTRIBUTION:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC R. Pascarelli, NRR RidsNrrPMSequoyah Resource Institute of Nuclear Power Operations (INPO)

ROP Reports

Page 1 of 2 Sequoyah 09/03/2013 08:09:27 Inspection / Activity Plan Report 22 09/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 09/30/2013 10/04/2013 IP 7111402 Alert and Notification System Testing 1, 2 09/30/2013 10/04/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 09/30/2013 10/04/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 09/30/2013 10/04/2013 IP 71151 Performance Indicator Verification ISI - UNIT 1 INSERVICE INSPECTION 1 1 10/21/2013 10/25/2013 IP 7111108P Inservice Inspection Activities - PWR LR - LICENSE RENEWAL 71002 INSPECTION 6 1, 2 10/21/2013 10/25/2013 IP 71002 License Renewal Inspection 1, 2 11/18/2013 11/22/2013 IP 71002 License Renewal Inspection 1, 2 12/02/2013 12/06/2013 IP 71002 License Renewal Inspection OL EXAM - INITIAL EXAM PREP WEEK 3 1 11/04/2013 11/08/2013 V23417 SEQUOYAH/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES RP - RAD HAZARD ANALYSIS AND TRANSPORTATION 2 1, 2 11/04/2013 11/08/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 11/04/2013 11/08/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1, 2 11/04/2013 11/08/2013 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM WEEK 1 3 1 12/02/2013 12/06/2013 V23417 SEQUOYAH/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES TI-182 - TI-182 BURIED PIPING/TANK - PHASE 2 1 1, 2 12/09/2013 12/11/2013 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping OL EXAM - INITIAL EXAM WEEK 2 3 1 12/09/2013 12/13/2013 V23417 SEQUOYAH/DECEMBER 2013 INITIAL EXAM AT POWER FACILITIES TFPI - TRIENNIAL FIRE PROTRECTION INSP 4 1, 2 01/27/2014 01/31/2014 IP 7111105T Fire Protection [Triennial]

1, 2 02/10/2014 02/14/2014 IP 7111105T Fire Protection [Triennial]

RP - RP OCCUPATIONAL BASELINE 2 1, 2 05/12/2014 05/16/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 05/12/2014 05/16/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 05/12/2014 05/16/2014 IP 71124.04 Occupational Dose Assessment 1, 2 05/12/2014 05/16/2014 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 05/12/2014 05/16/2014 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Sequoyah 09/03/2013 08:09:27 Inspection / Activity Plan Report 22 09/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ISI - UNIT 2 IN-SERVICE INSPECTION 1 2 05/19/2014 05/23/2014 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 2 SG IN-SERVICE INSPECTION 1 2 05/26/2014 05/30/2014 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL BASELINE WEEK2 3 1, 2 06/02/2014 06/06/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 06/02/2014 06/06/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 06/02/2014 06/06/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 06/02/2014 06/06/2014 IP 71124.04 Occupational Dose Assessment 1, 2 06/02/2014 06/06/2014 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 06/02/2014 06/06/2014 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSP 2 1, 2 09/15/2014 09/19/2014 IP 7111111B Licensed Operator Requalification Program EP - EP EXERCISE 1 1, 2 11/17/2014 11/21/2014 IP 7111401 Exercise Evaluation 1, 2 11/17/2014 11/21/2014 IP 71151 Performance Indicator Verification Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure