IR 05000346/2014201: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/03/2014
| issue date = 09/03/2014
| title = IR 05000346/2014201, on 08/01/14, Davis-Besse Nuclear Power Station, Unit 1, NRC Inspection Report
| title = IR 05000346/2014201, on 08/01/14, Davis-Besse Nuclear Power Station, Unit 1, NRC Inspection Report
| author name = Johnson R C
| author name = Johnson R
| author affiliation = NRC/NSIR/DSO/DDSO/SPEB
| author affiliation = NRC/NSIR/DSO/DDSO/SPEB
| addressee name = Lieb R
| addressee name = Lieb R
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:ber 3, 2014
[[Issue date::September 3, 2014]]


Mr. Raymond Lieb, Vice President Davis-Besse Nuclear Power Station FirstEnergy Nuclear Operation Company 5501 North State Route 2 Oak harbor, OH 43449
==SUBJECT:==
 
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000346/2014201
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000346/2014201


==Dear Mr. Lieb:==
==Dear Mr. Lieb:==
On August 1, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Davis-Besse Nuclear Power Station. On August 7, 2014, the NRC inspectors discussed the results of this inspection with Mr. Gregory Cramer and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.
On August 1, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Davis-Besse Nuclear Power Station. On August 7, 2014, the NRC inspectors discussed the results of this inspection with Mr. Gregory Cramer and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.


NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. A cross-cutting aspect was assigned to this finding in the area of Human Performance - Training [H.9] because the licensee failed to perform a thorough search during MILE issue.
NRC inspectors documented one finding of very low security significance (Green) in this report.
 
This finding involved a violation of NRC requirements. A cross-cutting aspect was assigned to this finding in the area of Human Performance - Training [H.9] because the licensee failed to perform a thorough search during MILE issue.


If you contest this finding, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-
If you contest this finding, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Davis-Besse Nuclear Power Station.
0001; and the NRC resident inspector at the Davis-Besse Nuclear Power Station.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements," and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if security-related information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if security-related information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)
Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1)
and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.


Sincerely,/RA/ Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No. 05000346 License No. NPF-3 Nonpublic  
Sincerely,
 
/RA/
===Enclosure:===
Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No. 05000346 License No. NPF-3 Nonpublic Enclosure: Inspection Report 05000346/2014201 w/Attachment: Supplemental Information cc w/ enclosure: G. Cramer, Security Manager ML14233A402 OFFICE NSIR/DSO/SPEB NSIR/DSO/SPEB NSIR/DSO/SPEB RIII/DRS/PSB NSIR/DSO/SPEB NAME R. Gibson J. Curry J. Willis R. Skokowski C. Johnson DATE 8/14/14 8/18/14 8/22/14 9/3/14 9/3/14
Inspection Report 05000346/2014201  
 
===w/Attachment:===
Supplemental Information cc w/ enclosure: G. Cramer, Security Manager
}}
}}

Latest revision as of 02:13, 4 November 2019

IR 05000346/2014201, on 08/01/14, Davis-Besse Nuclear Power Station, Unit 1, NRC Inspection Report
ML14233A402
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/03/2014
From: Rachel Johnson
NRC/NSIR/DSO/DDSO/SPEB
To: Lieb R
FirstEnergy Nuclear Operating Co
References
IR 2014201
Download: ML14233A402 (3)


Text

ber 3, 2014

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - NRC SECURITY INSPECTION REPORT 05000346/2014201

Dear Mr. Lieb:

On August 1, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Davis-Besse Nuclear Power Station. On August 7, 2014, the NRC inspectors discussed the results of this inspection with Mr. Gregory Cramer and other members of your staff. Inspectors documented the results of this inspection in the enclosed inspection report.

NRC inspectors documented one finding of very low security significance (Green) in this report.

This finding involved a violation of NRC requirements. A cross-cutting aspect was assigned to this finding in the area of Human Performance - Training [H.9] because the licensee failed to perform a thorough search during MILE issue.

If you contest this finding, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Davis-Besse Nuclear Power Station.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if security-related information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No. 05000346 License No. NPF-3 Nonpublic Enclosure: Inspection Report 05000346/2014201 w/Attachment: Supplemental Information cc w/ enclosure: G. Cramer, Security Manager ML14233A402 OFFICE NSIR/DSO/SPEB NSIR/DSO/SPEB NSIR/DSO/SPEB RIII/DRS/PSB NSIR/DSO/SPEB NAME R. Gibson J. Curry J. Willis R. Skokowski C. Johnson DATE 8/14/14 8/18/14 8/22/14 9/3/14 9/3/14