(7 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML14239A171 | | | number = ML14239A171 |
| | issue date = 09/02/2014 | | | issue date = 09/02/2014 |
| | title = Hope Creek, ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000354/2014006 | | | title = ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000354/2014006 |
| | author name = Dentel G T | | | author name = Dentel G |
| | author affiliation = NRC/RGN-I/DRP/PB3 | | | author affiliation = NRC/RGN-I/DRP/PB3 |
| | addressee name = Joyce T P | | | addressee name = Joyce T |
| | addressee affiliation = PSEG Nuclear, LLC | | | addressee affiliation = PSEG Nuclear, LLC |
| | docket = 05000354 | | | docket = 05000354 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ber 2, 2014 |
| [[Issue date::September 2, 2014]]
| |
|
| |
|
| Mr. Thomas President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038
| | ==SUBJECT:== |
| | MID-CYCLE ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2014006) |
|
| |
|
| SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2014006)
| | ==Dear Mr. Joyce:== |
| | On August 14, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Hope Creek Generating Station (Hope Creek). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2013 through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. |
| | |
| | The NRC determined that overall, Hope Creek was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Hope Creek during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility. |
| | |
| | As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310. |
| | |
| | Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305. |
| | |
| | The enclosed inspection plan lists the inspections scheduled through December 31, 2015. |
| | |
| | Routine inspections performed by resident inspectors are not included in the inspection plan. |
| | |
| | The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. |
| | |
| | A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations. |
| | |
| | In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Document Access and Management System (ADAMS). |
| | |
| | ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| ==Dear Mr. Joyce:==
| | Please contact me at (610) 337-5233 with any questions you have regarding this letter. |
| On August 14, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Hope Creek Generating Station (Hope Creek). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, assessment of your facility during this period and its plans for future inspections at your facility. The NRC determined that overall, Hope Creek was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Hope Creek during the most recent quarter was within the Licensee Response Column of the (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility. As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310. Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305. The enclosed inspection plan lists the inspections scheduled through December 31, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-Instrumentatiowide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations. In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5233 with any questions you have regarding this letter.
| | |
| | Sincerely, |
| | /RA/ |
| | Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-354 License No.: NPF-57 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ |
| | |
| | ML14239A171 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JHawkins/ per email MSD MDraxton/ MSD GDentel/ GTD DATE 08/25/14 08/25/14 08/27/14 |
| | |
| | Page 1 of 3 Hope Creek 08/25/2014 08:52:02 Inspection / Activity Plan Report 22 07/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site INSP - RADIATION PROTECTION 1 1 07/21/2014 07/25/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 07/21/2014 07/25/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 07/21/2014 07/25/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 07/21/2014 07/25/2014 IP 71124.04 Occupational Dose Assessment 1 07/21/2014 07/25/2014 IP 71124.05 Radiation Monitoring Instrumentation 7111107T - TRIENNIAL HEAT SINK 1 1 07/28/2014 08/01/2014 IP 7111107T Heat Sink Performance 7111111B - REQUAL INSP WITH P/F RESULTS 2 1 10/06/2014 10/10/2014 IP 7111111B Licensed Operator Requalification Program INSP - RADIATION PROTECTION 1 1 08/11/2014 08/15/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/11/2014 08/15/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 08/11/2014 08/15/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 08/11/2014 08/15/2014 IP 71124.04 Occupational Dose Assessment 1 08/11/2014 08/15/2014 IP 71124.05 Radiation Monitoring Instrumentation 71124 - REMP 1 1 08/25/2014 08/29/2014 IP 71124.07 Radiological Environmental Monitoring Program 2/16EXM - INITIAL OL EXAM 4 1 01/26/2015 01/30/2015 U01904 FY15-HOPE CREEK INITIAL OPERATOR LICENSING EXAM 1 02/23/2015 02/27/2015 U01904 FY15-HOPE CREEK INITIAL OPERATOR LICENSING EXAM 71124 - RADIATION PROTECTION 1 1 12/01/2014 12/05/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 12/01/2014 12/05/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 12/01/2014 12/05/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 12/01/2014 12/05/2014 IP 71124.04 Occupational Dose Assessment 1 12/01/2014 12/05/2014 IP 71124.05 Radiation Monitoring Instrumentation 1 12/01/2014 12/05/2014 IP 71151-OR01 PI&R - PI&R - BIENNIAL 1 1 01/26/2015 01/30/2015 IP 71152B Problem Identification and Resolution 1 02/09/2015 02/13/2015 IP 71152B Problem Identification and Resolution 71124 - RAD CONTROLS 1 1 03/30/2015 04/04/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities. |
|
| |
|
| Sincerely,/RA/ Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-354 License No.: NPF-57
| | This report shows only on-site and announced inspection procedures. |
|
| |
|
| ===Enclosure:===
| | Page 2 of 3 Hope Creek 08/25/2014 08:52:02 Inspection / Activity Plan Report 22 07/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RAD CONTROLS 1 1 03/30/2015 04/04/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 03/30/2015 04/04/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 03/30/2015 04/04/2015 IP 71124.04 Occupational Dose Assessment 1 03/30/2015 04/04/2015 IP 71124.05 Radiation Monitoring Instrumentation 7111108G - INSERVICE INSPECTION 1 1 04/20/2015 04/24/2015 IP 7111108G Inservice Inspection Activities - BWR 71124 - RAD CONTROLS 1 1 04/20/2015 04/24/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/20/2015 04/24/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 04/20/2015 04/24/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/20/2015 04/24/2015 IP 71124.04 Occupational Dose Assessment 1 04/20/2015 04/24/2015 IP 71124.05 Radiation Monitoring Instrumentation 71124 - EFFLUENTS 1 1 05/11/2015 05/15/2015 IP 71124.05 Radiation Monitoring Instrumentation 1 05/11/2015 05/15/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment EP - EP PROGRAM INSPECTION 1 1 06/22/2015 06/26/2015 IP 7111402 Alert and Notification System Testing 1 06/22/2015 06/26/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 06/22/2015 06/26/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 71124 - RAD CONTROLS 1 1 08/10/2015 08/14/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/10/2015 08/14/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 08/10/2015 08/14/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 08/10/2015 08/14/2015 IP 71124.04 Occupational Dose Assessment 1 08/10/2015 08/14/2015 IP 71124.05 Radiation Monitoring Instrumentation CDBI - COMPONENT DESIGN BASIS INSPECTION 6 1 09/21/2015 09/25/2015 IP 7111121 Component Design Bases Inspection 1 10/05/2015 10/09/2015 IP 7111121 Component Design Bases Inspection 1 10/19/2015 10/23/2015 IP 7111121 Component Design Bases Inspection 71124.08 - RADWASTE 1 1 12/07/2015 12/11/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation This report does not include INPO and OUTAGE activities. |
| Inspection Plan cc w/encl: Distribution via ListServ | |
|
| |
|
| ML14239A171 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JHawkins/ per email MSD MDraxton/ MSD GDentel/ GTD DATE 08/25/14 08/25/14 08/27/14 Page 1 of 3 08/25/2014 08:52:02Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteHope CreekInspection / Activity Plan 07/01/2014
| | This report shows only on-site and announced inspection procedures. |
| -12/31/2015 INSP-RADIATION PROTECTION 11 IPRadiological Hazard Assessment and Exposure Controls71124.0107/21/2014 07/25/2014 1 IPOccupational ALARA Planning and Controls71124.0207/21/2014 07/25/2014 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0307/21/2014 07/25/2014 1 IPOccupational Dose Assessment71124.0407/21/2014 07/25/2014 1 IPRadiation Monitoring Instrumentation71124.0507/21/2014 07/25/20147111107T-TRIENNIAL HEAT SINK 11 IPHeat Sink Performance7111107T07/28/2014 08/01/20147111111B-REQUAL INSP WITH P/F RESULTS 21 IPLicensed Operator Requalification Program7111111B10/06/2014 10/10/2014 INSP-RADIATION PROTECTION 11 IPRadiological Hazard Assessment and Exposure Controls71124.0108/11/2014 08/15/2014 1 IPOccupational ALARA Planning and Controls71124.0208/11/2014 08/15/2014 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0308/11/2014 08/15/2014 1 IPOccupational Dose Assessment71124.0408/11/2014 08/15/2014 1 IPRadiation Monitoring Instrumentation71124.0508/11/2014 08/15/201471124-REMP11 IPRadiological Environmental Monitoring Program71124.0708/25/2014 08/29/2014 2/16EXM-INITIAL OL EXAM 41 FY15-HOPE CREEK INITIAL OPERATOR LICENSING EXAM U0190401/26/2015 01/30/2015 1 FY15-HOPE CREEK INITIAL OPERATOR LICENSING EXAM U0190402/23/2015 02/27/201571124-RADIATION PROTECTION 11 IPRadiological Hazard Assessment and Exposure Controls71124.0112/01/2014 12/05/2014 1 IPOccupational ALARA Planning and Controls71124.0212/01/2014 12/05/2014 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0312/01/2014 12/05/2014 1 IPOccupational Dose Assessment71124.0412/01/2014 12/05/2014 1 IPRadiation Monitoring Instrumentation71124.0512/01/2014 12/05/2014 1 IP71151-OR01 12/01/2014 12/05/2014 PI&R-PI&R - BIENNIAL 11 IPProblem Identification and Resolution71152B01/26/2015 01/30/2015 1 IPProblem Identification and Resolution71152B02/09/2015 02/13/201571124-RAD CONTROLS 11 IPRadiological Hazard Assessment and Exposure Controls71124.0103/30/2015 04/04/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
| |
|
| |
|
| Page 2 of 3 08/25/2014 08:52:02Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteHope CreekInspection / Activity Plan 07/01/2014 | | Page 3 of 3 Hope Creek 08/25/2014 08:52:02 Inspection / Activity Plan Report 22 07/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RAD CONTROLS 1 1 12/07/2015 12/11/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 12/07/2015 12/11/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 12/07/2015 12/11/2015 IP 71124.05 Radiation Monitoring Instrumentation 1 12/07/2015 12/11/2015 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities. |
| -12/31/201571124-RAD CONTROLS 11 IPOccupational ALARA Planning and Controls71124.0203/30/2015 04/04/2015 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/30/2015 04/04/2015 1 IPOccupational Dose Assessment71124.0403/30/2015 04/04/2015 1 IPRadiation Monitoring Instrumentation71124.0503/30/2015 04/04/20157111108G-INSERVICE INSPECTION 11 IPInservice Inspection Activities - BWR7111108G04/20/2015 04/24/201571124-RAD CONTROLS 11 IPRadiological Hazard Assessment and Exposure Controls71124.0104/20/2015 04/24/2015 1 IPOccupational ALARA Planning and Controls71124.0204/20/2015 04/24/2015 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0304/20/2015 04/24/2015 1 IPOccupational Dose Assessment71124.0404/20/2015 04/24/2015 1 IPRadiation Monitoring Instrumentation71124.0504/20/2015 04/24/201571124-EFFLUENTS 11 IPRadiation Monitoring Instrumentation71124.0505/11/2015 05/15/2015 1 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0605/11/2015 05/15/2015 EP-EP PROGRAM INSPECTION 11 IPAlert and Notification System Testing711140206/22/2015 06/26/2015 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140306/22/2015 06/26/2015 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140506/22/2015 06/26/201571124-RAD CONTROLS 11 IPRadiological Hazard Assessment and Exposure Controls71124.0108/10/2015 08/14/2015 1 IPOccupational ALARA Planning and Controls71124.0208/10/2015 08/14/2015 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0308/10/2015 08/14/2015 1 IPOccupational Dose Assessment71124.0408/10/2015 08/14/2015 1 IPRadiation Monitoring Instrumentation71124.0508/10/2015 08/14/2015 CDBI-COMPONENT DESIGN BASIS INSPECTION 61 IPComponent Design Bases Inspection711112109/21/2015 09/25/2015 1 IPComponent Design Bases Inspection711112110/05/2015 10/09/2015 1 IPComponent Design Bases Inspection711112110/19/2015 10/23/201571124.08-RADWASTE11 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0812/07/201512/11/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | |
|
| |
|
| Page 3 of 3 08/25/2014 08:52:02Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteHope CreekInspection / Activity Plan 07/01/2014
| | This report shows only on-site and announced inspection procedures. |
| -12/31/201571124-RAD CONTROLS 11 IPRadiological Hazard Assessment and Exposure Controls71124.0112/07/201512/11/2015 1 IPOccupational ALARA Planning and Controls71124.0212/07/201512/11/2015 1 IPRadiation Monitoring Instrumentation71124.0512/07/201512/11/2015 1 IPPerformance Indicator Verification7115112/07/201512/11/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
| |
| }} | | }} |
|
---|
Category:Inspection Plan
MONTHYEARML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 IR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) ML23118A1032023-04-28028 April 2023 PI&R Inspection Document Request IR 05000354/20220062023-03-0101 March 2023 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006) IR 05000354/20220052022-08-31031 August 2022 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2022005) ML22103A0662022-04-13013 April 2022 Information Request to Support Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000354/2022012 IR 05000354/20210062022-03-0202 March 2022 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2021006) ML21300A0222021-10-27027 October 2021 Notification of Conduct of a Fire Protection Team Inspection IR 05000354/20210052021-09-0101 September 2021 Updated Inspection Plan for the Hope Creek Nuclear Generating Station (Report 05000354/2021005) IR 05000354/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000354/2020005) IR 05000354/20190062020-03-0303 March 2020 Annual Assessment Letter for Hope Creek Generating Station, Unit 1 (Report 05000354/2019006) IR 05000354/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 05000354/2019005) ML19136A1852019-05-15015 May 2019 Byron Station, Clinton Power Station, Dresden Nuclear Power Station, LaSalle County Station, and Quad Cities Nuclear Power Station-Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency IR 05000354/20180062019-03-0404 March 2019 Annual Assessment Letter for Hope Creek Generating Station, Unit 1 (Report 05000354/2018006) ML18340A2492018-12-0303 December 2018 Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information IR 05000354/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000354/2018005) IR 05000354/20170062018-02-28028 February 2018 Annual Assessment Letter for Hope Creek Generating Station Unit 1 (Reports 05000354/2017006, 05000354/2017402, and 05000354/2017501) IR 05000354/20170052017-08-28028 August 2017 Updated Inspection Plan for Hope Creek Generating Station, Unit 1(Report 05000354/2017005) IR 05000354/20160062017-03-0101 March 2017 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2016006) IR 05000354/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Hope Creek Generating Station Report (05000354/2016005) IR 05000354/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2015006) IR 05000354/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Hope Creek Generating Station (Report 05000354/2015005) IR 05000354/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2014001) IR 05000354/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000354/2014006 IR 05000354/20130012014-03-0404 March 2014 ROP-14 2013 Hope Creek Generating Station Annual Assessment Letter, Report 05000354-13-001, and Inspection Plan IR 05000354/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000354-13-006 IR 05000354/20120012013-03-0404 March 2013 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354-12-001) ML12334A0052012-11-28028 November 2012 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML12248A0422012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Hope Creek Generating Station, Unit 1 IR 05000354/20110012012-03-0505 March 2012 Annual Assessment Letter for Hope Creek Generating Station Unit 1 (Report 05000354/2011001) ML1124113152011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Hope Creek Generating Station IR 05000354/20100012011-03-0404 March 2011 Annual Assessment Letter for Hope Creek Generating Station, EOC-11 (05000354-10-001) ML1024403372010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Hope Creek Generating Station ML1006208502010-03-0303 March 2010 2009 EOC Hope Creek Annual Assessment Letter and Report 22 IR 05000354/20090012009-03-0404 March 2009 Annual Assessment Letter - Hope Creek Nuclear Generating Station (05000354-09-001) ML0824607952008-09-0202 September 2008 2008 Mid-Cycle Performance Review and Inspection Plan - Hope Creek Generating Station IR 05000354/20080012008-03-0303 March 2008 2007 Annual Assessment Letter - Hope Creek (05000354/2008001) ML0724309452007-08-31031 August 2007 Mid-Cycle Review and Inspection Plan IR 05000354/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Hope Creek Generating Station (Report 05000354-07-001) IR 05000354/20060012006-03-0202 March 2006 Annual Assessment Letter - Hope Creek Nuclear Generating Station (Report 05000354/2006001) ML0424402332004-08-30030 August 2004 Hope Creek ROP5 Mid-Cycle Performance Review and Inspection Plan LR-N04-0036, Correction PSEG Letter LR-N04-0036, Risk-Informed Inservice Inspection Submittal2004-03-11011 March 2004 Correction PSEG Letter LR-N04-0036, Risk-Informed Inservice Inspection Submittal ML0406308562004-03-0303 March 2004 2003-04 Annual Assessment Letter - Hope Creek ML0323904242003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Hope Creek Generating Station ML0306207722003-03-0303 March 2003 2003 Annual Assessment Letter - Hope Creek Nuclear Generating Station ML0223501752002-08-23023 August 2002 2002 Hope Creek Mid-Cycle Performance Review and Inspection Plan IR 05000354/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Hope Creek Nuclear Plant (Report 50-354/02-001) 2024-09-11
[Table view] Category:Letter
MONTHYEARIR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 ML24295A3742024-10-23023 October 2024 Project Manager Assignment ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums 05000354/LER-2023-003-01, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges 05000354/LER-2023-003, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-02-12012 February 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23307A1532023-12-15015 December 2023 NRC Investigation Report No. 1-2023-001 2024-09-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ber 2, 2014
SUBJECT:
MID-CYCLE ASSESSMENT LETTER FOR HOPE CREEK GENERATING STATION (REPORT 05000354/2014006)
Dear Mr. Joyce:
On August 14, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Hope Creek Generating Station (Hope Creek). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2013 through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Hope Creek was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Hope Creek during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators demonstrated that your performance was within the nominal, expected range (i.e, green). Therefore, the NRC plans to conduct Reactor Oversight Process baseline inspections at your facility.
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.
Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.
The enclosed inspection plan lists the inspections scheduled through December 31, 2015.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff.
A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Document Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5233 with any questions you have regarding this letter.
Sincerely,
/RA/
Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-354 License No.: NPF-57 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ
ML14239A171 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JHawkins/ per email MSD MDraxton/ MSD GDentel/ GTD DATE 08/25/14 08/25/14 08/27/14
Page 1 of 3 Hope Creek 08/25/2014 08:52:02 Inspection / Activity Plan Report 22 07/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site INSP - RADIATION PROTECTION 1 1 07/21/2014 07/25/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 07/21/2014 07/25/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 07/21/2014 07/25/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 07/21/2014 07/25/2014 IP 71124.04 Occupational Dose Assessment 1 07/21/2014 07/25/2014 IP 71124.05 Radiation Monitoring Instrumentation 7111107T - TRIENNIAL HEAT SINK 1 1 07/28/2014 08/01/2014 IP 7111107T Heat Sink Performance 7111111B - REQUAL INSP WITH P/F RESULTS 2 1 10/06/2014 10/10/2014 IP 7111111B Licensed Operator Requalification Program INSP - RADIATION PROTECTION 1 1 08/11/2014 08/15/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/11/2014 08/15/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 08/11/2014 08/15/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 08/11/2014 08/15/2014 IP 71124.04 Occupational Dose Assessment 1 08/11/2014 08/15/2014 IP 71124.05 Radiation Monitoring Instrumentation 71124 - REMP 1 1 08/25/2014 08/29/2014 IP 71124.07 Radiological Environmental Monitoring Program 2/16EXM - INITIAL OL EXAM 4 1 01/26/2015 01/30/2015 U01904 FY15-HOPE CREEK INITIAL OPERATOR LICENSING EXAM 1 02/23/2015 02/27/2015 U01904 FY15-HOPE CREEK INITIAL OPERATOR LICENSING EXAM 71124 - RADIATION PROTECTION 1 1 12/01/2014 12/05/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 12/01/2014 12/05/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 12/01/2014 12/05/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 12/01/2014 12/05/2014 IP 71124.04 Occupational Dose Assessment 1 12/01/2014 12/05/2014 IP 71124.05 Radiation Monitoring Instrumentation 1 12/01/2014 12/05/2014 IP 71151-OR01 PI&R - PI&R - BIENNIAL 1 1 01/26/2015 01/30/2015 IP 71152B Problem Identification and Resolution 1 02/09/2015 02/13/2015 IP 71152B Problem Identification and Resolution 71124 - RAD CONTROLS 1 1 03/30/2015 04/04/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 3 Hope Creek 08/25/2014 08:52:02 Inspection / Activity Plan Report 22 07/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RAD CONTROLS 1 1 03/30/2015 04/04/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 03/30/2015 04/04/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 03/30/2015 04/04/2015 IP 71124.04 Occupational Dose Assessment 1 03/30/2015 04/04/2015 IP 71124.05 Radiation Monitoring Instrumentation 7111108G - INSERVICE INSPECTION 1 1 04/20/2015 04/24/2015 IP 7111108G Inservice Inspection Activities - BWR 71124 - RAD CONTROLS 1 1 04/20/2015 04/24/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/20/2015 04/24/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 04/20/2015 04/24/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/20/2015 04/24/2015 IP 71124.04 Occupational Dose Assessment 1 04/20/2015 04/24/2015 IP 71124.05 Radiation Monitoring Instrumentation 71124 - EFFLUENTS 1 1 05/11/2015 05/15/2015 IP 71124.05 Radiation Monitoring Instrumentation 1 05/11/2015 05/15/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment EP - EP PROGRAM INSPECTION 1 1 06/22/2015 06/26/2015 IP 7111402 Alert and Notification System Testing 1 06/22/2015 06/26/2015 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 06/22/2015 06/26/2015 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 71124 - RAD CONTROLS 1 1 08/10/2015 08/14/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/10/2015 08/14/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 08/10/2015 08/14/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 08/10/2015 08/14/2015 IP 71124.04 Occupational Dose Assessment 1 08/10/2015 08/14/2015 IP 71124.05 Radiation Monitoring Instrumentation CDBI - COMPONENT DESIGN BASIS INSPECTION 6 1 09/21/2015 09/25/2015 IP 7111121 Component Design Bases Inspection 1 10/05/2015 10/09/2015 IP 7111121 Component Design Bases Inspection 1 10/19/2015 10/23/2015 IP 7111121 Component Design Bases Inspection 71124.08 - RADWASTE 1 1 12/07/2015 12/11/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 3 of 3 Hope Creek 08/25/2014 08:52:02 Inspection / Activity Plan Report 22 07/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RAD CONTROLS 1 1 12/07/2015 12/11/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 12/07/2015 12/11/2015 IP 71124.02 Occupational ALARA Planning and Controls 1 12/07/2015 12/11/2015 IP 71124.05 Radiation Monitoring Instrumentation 1 12/07/2015 12/11/2015 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.