IR 05000272/2014403

From kanterella
Jump to navigation Jump to search
IR 05000354/2014403, 05000272/2014403, and 05000311/2014403; 12/1/2014 to 12/19/2014; Salem Nuclear Generating Station, Units 1 and 2 and Hope Creek Generating Station; Access Control Letter Only
ML15023A210
Person / Time
Site: Salem, Hope Creek  PSEG icon.png
Issue date: 01/22/2015
From: Anthony Dimitriadis
Division of Reactor Safety I
To: Joyce T
Public Service Enterprise Group
References
IR 2014403
Download: ML15023A210 (4)


Text

UNITED STATES anuary 22, 2015

SUBJECT:

HOPE CREEK GENERATING STATION AND SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000354/2014403, 05000272/2014403 AND 05000311/2014403

Dear Mr. Joyce:

On December 5, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Hope Creek Generating Station and Salem Nuclear Generating Station, Units 1 and 2. On December 19, 2014, the NRC inspectors discussed the results of this inspection with Mr. Peter Tocci, Director of Security, and other members of your staff.

Inspectors documented the results of this inspection in the enclosed inspection report.

NRC inspectors documented two findings of very low security significance (Green) in this report.

If you contest the findings, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555 0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001; and the NRC resident inspectors at the Hope Creek Generating Station and Salem Nuclear Generating Station.

Two cross-cutting aspects were assigned to the findings in the area of Human Performance.

Specifically, because PSEG Nuclear failed to implement appropriate error reduction tools (H.12), and failed to create and maintain complete, accurate and, up-to-date documentation (H.7). If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region I; and the NRC resident inspectors at the Hope Creek Generating Station and Salem Nuclear Generating Station.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-354, 50-272, and 50-311 License Nos. NPF-57, DPR-70, and DPR-75 Nonpublic Enclosure:

Inspection Report 05000354/2014403, 05000272/2014403, and 05000311/2014403 w/Attachment: Supplemental Information (OUO-SRI)

cc w/o encl; w/o OUO-SRI: Distribution via ListServ cc w/encl; w/OUO-SRI:

P. Davison, Vice President Hope Creek J. Perry, Vice President, Salem P. Tocci, Director Security P. Baldauf, Director, NJ Radiation Protection Programs F. Fisher-Tyler, Administrator, Office of Radiation Control, DE Division of Public Health ML15023A210 (Cover letter)

ADAMS ACCESSION NUMBER: ML15023A215 (Cover letter w/enclosure)

Cover Letter: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter w/ Enclosure: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS RI/DRP RI/DRS NAME KHussar JBream JCherubini GDentel ADimitriadis DATE 1/13/2015 1/21/2015 1/21/2015 1/21/2015 1/22/2015 Distribution w/o encl; w/o OUO-SRI: (via E-Mail)

D. Dorman, RA (R1ORAMAIL RESOURCE)

D. Lew, DRA (R1ORAMAIL RESOURCE)

H. Nieh, DRP (R1DRPMAIL RESOURCE)

M. Scott, DRP (R1DRPMAIL RESOURCE)

R. Lorson, DRS (R1DRSMAIL RESOURCE)

J. Trapp, DRS (R1DRSMAIL RESOURCE)

G. Dentel, DRP R. Barkley, DRP J. Hawkins, DRP, SRI P. Finney, DRP, SRI S. Haney, DRP, RI A. Ziedonis, DRP, RI M. Draxton, DRP C. Highley, DRP C. Ott, DRP, AA K. MorganButler, RI OEDO RidsNrrPMSalem Resource RidsNrrPMHopeCreek Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource Distribution w/encl; w/OUO-SRI: (via E-Mail)

J. Cherubini, DRS A. Dimitriadis, DRS G. Dentel, DRP J. Hawkins, DRP, SRI P. Finney, DRP, SRI N. Simonian, NSIR E. Wharton, NSIR C. Johnson, NSIR B. Desai, DRS, RII S. Orth, DRS, RIII M. Haire, DRS, RIV