IR 05000317/2015006: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/02/2016 | | issue date = 03/02/2016 | ||
| title = 2015 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2015006 and 05000318/2015006) | | title = 2015 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2015006 and 05000318/2015006) | ||
| author name = Scott M | | author name = Scott M | ||
| author affiliation = NRC/RGN-I/DRP | | author affiliation = NRC/RGN-I/DRP | ||
| addressee name = Hanson B | | addressee name = Hanson B | ||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | ||
| docket = 05000317, 05000318 | | docket = 05000317, 05000318 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | ||
Mr. Bryan Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 | ==REGION I== | ||
2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 2, 2016 Mr. Bryan Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2015006 AND 05000318/2015006) | |||
==Dear Mr. Hanson:== | |||
On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Calvert Cliffs Nuclear Power Plant (Calvert Cliffs), Units 1 and 2. | |||
The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015, through December 31, 2015. | |||
This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. | |||
The NRC determined that overall, Calvert Cliffs Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Calvert Cliffs Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Calvert Cliffs Unit 2 was in the Regulatory Response Column of the NRCs ROP Action Matrix until the end of first quarter 2015, due to a finding of low to moderate safety significance (White) in the Emergency Preparedness cornerstone as documented in a White Notice of Violation (NOV) and Assessment Follow-Up Letter (ML14297A5471) dated October 27, 2014. Calvert Cliffs Unit 2 transitioned to the Licensee Response Column at the beginning of second quarter 2015 after a supplemental inspection for the White finding was successfully completed, in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, on February 6, 2015, as documented in NRC Supplemental Inspection Report 05000318/2015008 and Assessment Follow-Up Letter (ML15070A127) dated March 10, 2015. Therefore, the NRC plans to conduct ROP baseline inspections at your facility. | |||
Designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. The enclosed inspection plan lists the inspections scheduled through December 31, 2017. | |||
Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Inspection Procedure 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, Inspection Procedure 71003, Post Approval Site Inspection For License Renewal, and Temporary Instruction 2515-191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. | |||
This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. | |||
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range spent fuel pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Calvert Cliffs Units 1 and 2, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans. As noted above, this inspection has been scheduled for Calvert Cliffs Units 1 and 2. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Please contact Anthony Dimitriadis at 610-337-6953 with any questions you have regarding this letter. | |||
Sincerely, | |||
/RA/ | |||
Michael L. Scott, Director Division of Reactor Projects Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 Enclosure: | |||
Calvert Cliffs Inspection/Activity Plan cc w/encl: Distribution via ListServ | Calvert Cliffs Inspection/Activity Plan cc w/encl: Distribution via ListServ | ||
ML16061A169 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME ARosebroo/AAR ADimitriadis/AD MScott/MLS w/edits DATE 2/18/16 2/18/16 2/22/16 | |||
Page 1 of 2 Calvert Cliffs 02/29/2016 07:46:19 Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EXM8/8 - CALVERT CLIFFS INITIAL EXAM 4 1 05/16/2016 05/20/2016 U01923 FY16-CC INITIAL OPERATOR LICENSING EXAM 1 06/13/2016 06/24/2016 U01923 FY16-CC INITIAL OPERATOR LICENSING EXAM ISI - U1 INSERVICE INSPECTION 1 1 02/16/2016 02/19/2016 IP 7111108P Inservice Inspection Activities - PWR 1 02/29/2016 03/04/2016 IP 7111108P Inservice Inspection Activities - PWR BI - RADIOLOGICAL SAFETY - HAZARDS O 1 1, 2 02/22/2016 02/26/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 02/22/2016 02/26/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 02/22/2016 02/26/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation BI - RADIOLOGICAL SAFETY - AIRBORNE 1 1, 2 05/09/2016 05/13/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 71003 - U2 LR COMMITMENT INSPECTION - PHASE 2 1 2 05/16/2016 05/20/2016 IP 71003 Post-Approval Site Inspection for License Renewal ISFSI - ISFSI LOADING CAMPAIGN 4 1, 2 08/15/2016 08/19/2016 IP 60855 Operation Of An ISFSI 1, 2 08/15/2016 08/19/2016 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI - RADIOLOGICAL SAFETY - EXT EXPOSURE 1 1, 2 08/22/2016 08/26/2016 IP 71124.04 Occupational Dose Assessment TRI FI - TRIENNIAL FIRE INSPECTION 4 1, 2 09/12/2016 09/16/2016 IP 7111105X Fire Protection - NFPA 805 (Triennial) | |||
1, 2 09/26/2016 09/30/2016 IP 7111105X Fire Protection - NFPA 805 (Triennial) | |||
EP - EP PROGRAM INSPECTION 1 1, 2 09/12/2016 09/16/2016 IP 7111402 Alert and Notification System Testing 1, 2 09/12/2016 09/16/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 09/12/2016 09/16/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies BI - RADIOLOGICAL SAFETY - ALARA 1 1, 2 10/03/2016 10/07/2016 IP 71124.02 Occupational ALARA Planning and Controls BI - RADIOLOGICAL SAFETY - RAD HAZ & PIV 1 1, 2 12/05/2016 12/09/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 12/05/2016 12/09/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 12/05/2016 12/09/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. Enclosure | |||
Page 2 of 2 Calvert Cliffs 02/29/2016 07:46:19 Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RADIATION SAFETY - INSTRUMENTS 1 1, 2 01/09/2017 01/13/2017 IP 71124.05 Radiation Monitoring Instrumentation 71124 - RADIATION SAFETY - RETS 1 1, 2 02/06/2017 02/10/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7111108P - U2 INSERVICE INSPECTION 1 2 02/21/2017 03/03/2017 IP 7111108P Inservice Inspection Activities - PWR TI-191 - FUKUSHIMA LESSONS-LEARNED 1 1, 2 04/17/2017 04/21/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 71124 - RADIATION SAFETY - RAD HAZ PIV 1 1, 2 02/27/2017 03/03/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 02/27/2017 03/03/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 02/27/2017 03/03/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71124.08 - RADWASTE 1 1, 2 04/10/2017 04/14/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation MODS - PERMANENT PLANT MODIFICATIONS 3 1, 2 04/24/2017 04/28/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 05/08/2017 05/12/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111107T - TRIENNIAL HEAT SINK 1 1, 2 06/12/2017 06/16/2017 IP 7111107T Heat Sink Performance 71152B - PI&R BIENNIAL TEAM INSPECTION 7 1, 2 07/31/2017 08/04/2017 IP 71152B Problem Identification and Resolution 1, 2 08/14/2017 08/18/2017 IP 71152B Problem Identification and Resolution EP - EP EXERCISE EVALUATION 4 1, 2 09/11/2017 09/15/2017 IP 7111401 Exercise Evaluation 1, 2 09/11/2017 09/15/2017 IP 71151 Performance Indicator Verification 7111111B - CC REQUAL INSP WITH P/F RESULTS 2 1, 2 11/13/2017 11/17/2017 IP 7111111B Licensed Operator Requalification Program 71124 - RADIATION SAFETY - REMP 1 1, 2 10/02/2017 10/06/2017 IP 71124.07 Radiological Environmental Monitoring Program This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
}} | }} |
Latest revision as of 22:21, 30 October 2019
ML16061A169 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 03/02/2016 |
From: | Michael Scott Division Reactor Projects I |
To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
Dimitriadis A | |
References | |
IR 2015006 | |
Download: ML16061A169 (6) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 2, 2016 Mr. Bryan Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2015006 AND 05000318/2015006)
Dear Mr. Hanson:
On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Calvert Cliffs Nuclear Power Plant (Calvert Cliffs), Units 1 and 2.
The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015, through December 31, 2015.
This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Calvert Cliffs Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Calvert Cliffs Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Calvert Cliffs Unit 2 was in the Regulatory Response Column of the NRCs ROP Action Matrix until the end of first quarter 2015, due to a finding of low to moderate safety significance (White) in the Emergency Preparedness cornerstone as documented in a White Notice of Violation (NOV) and Assessment Follow-Up Letter (ML14297A5471) dated October 27, 2014. Calvert Cliffs Unit 2 transitioned to the Licensee Response Column at the beginning of second quarter 2015 after a supplemental inspection for the White finding was successfully completed, in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, on February 6, 2015, as documented in NRC Supplemental Inspection Report 05000318/2015008 and Assessment Follow-Up Letter (ML15070A127) dated March 10, 2015. Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
Designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. The enclosed inspection plan lists the inspections scheduled through December 31, 2017.
Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Inspection Procedure 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, Inspection Procedure 71003, Post Approval Site Inspection For License Renewal, and Temporary Instruction 2515-191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range spent fuel pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Calvert Cliffs Units 1 and 2, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans. As noted above, this inspection has been scheduled for Calvert Cliffs Units 1 and 2. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Anthony Dimitriadis at 610-337-6953 with any questions you have regarding this letter.
Sincerely,
/RA/
Michael L. Scott, Director Division of Reactor Projects Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 Enclosure:
Calvert Cliffs Inspection/Activity Plan cc w/encl: Distribution via ListServ
ML16061A169 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME ARosebroo/AAR ADimitriadis/AD MScott/MLS w/edits DATE 2/18/16 2/18/16 2/22/16
Page 1 of 2 Calvert Cliffs 02/29/2016 07:46:19 Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EXM8/8 - CALVERT CLIFFS INITIAL EXAM 4 1 05/16/2016 05/20/2016 U01923 FY16-CC INITIAL OPERATOR LICENSING EXAM 1 06/13/2016 06/24/2016 U01923 FY16-CC INITIAL OPERATOR LICENSING EXAM ISI - U1 INSERVICE INSPECTION 1 1 02/16/2016 02/19/2016 IP 7111108P Inservice Inspection Activities - PWR 1 02/29/2016 03/04/2016 IP 7111108P Inservice Inspection Activities - PWR BI - RADIOLOGICAL SAFETY - HAZARDS O 1 1, 2 02/22/2016 02/26/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 02/22/2016 02/26/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 02/22/2016 02/26/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation BI - RADIOLOGICAL SAFETY - AIRBORNE 1 1, 2 05/09/2016 05/13/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 71003 - U2 LR COMMITMENT INSPECTION - PHASE 2 1 2 05/16/2016 05/20/2016 IP 71003 Post-Approval Site Inspection for License Renewal ISFSI - ISFSI LOADING CAMPAIGN 4 1, 2 08/15/2016 08/19/2016 IP 60855 Operation Of An ISFSI 1, 2 08/15/2016 08/19/2016 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI - RADIOLOGICAL SAFETY - EXT EXPOSURE 1 1, 2 08/22/2016 08/26/2016 IP 71124.04 Occupational Dose Assessment TRI FI - TRIENNIAL FIRE INSPECTION 4 1, 2 09/12/2016 09/16/2016 IP 7111105X Fire Protection - NFPA 805 (Triennial)
1, 2 09/26/2016 09/30/2016 IP 7111105X Fire Protection - NFPA 805 (Triennial)
EP - EP PROGRAM INSPECTION 1 1, 2 09/12/2016 09/16/2016 IP 7111402 Alert and Notification System Testing 1, 2 09/12/2016 09/16/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 09/12/2016 09/16/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies BI - RADIOLOGICAL SAFETY - ALARA 1 1, 2 10/03/2016 10/07/2016 IP 71124.02 Occupational ALARA Planning and Controls BI - RADIOLOGICAL SAFETY - RAD HAZ & PIV 1 1, 2 12/05/2016 12/09/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 12/05/2016 12/09/2016 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 12/05/2016 12/09/2016 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure
Page 2 of 2 Calvert Cliffs 02/29/2016 07:46:19 Inspection / Activity Plan Report 22 01/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RADIATION SAFETY - INSTRUMENTS 1 1, 2 01/09/2017 01/13/2017 IP 71124.05 Radiation Monitoring Instrumentation 71124 - RADIATION SAFETY - RETS 1 1, 2 02/06/2017 02/10/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7111108P - U2 INSERVICE INSPECTION 1 2 02/21/2017 03/03/2017 IP 7111108P Inservice Inspection Activities - PWR TI-191 - FUKUSHIMA LESSONS-LEARNED 1 1, 2 04/17/2017 04/21/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 71124 - RADIATION SAFETY - RAD HAZ PIV 1 1, 2 02/27/2017 03/03/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 02/27/2017 03/03/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1, 2 02/27/2017 03/03/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences 71124.08 - RADWASTE 1 1, 2 04/10/2017 04/14/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation MODS - PERMANENT PLANT MODIFICATIONS 3 1, 2 04/24/2017 04/28/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1, 2 05/08/2017 05/12/2017 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111107T - TRIENNIAL HEAT SINK 1 1, 2 06/12/2017 06/16/2017 IP 7111107T Heat Sink Performance 71152B - PI&R BIENNIAL TEAM INSPECTION 7 1, 2 07/31/2017 08/04/2017 IP 71152B Problem Identification and Resolution 1, 2 08/14/2017 08/18/2017 IP 71152B Problem Identification and Resolution EP - EP EXERCISE EVALUATION 4 1, 2 09/11/2017 09/15/2017 IP 7111401 Exercise Evaluation 1, 2 09/11/2017 09/15/2017 IP 71151 Performance Indicator Verification 7111111B - CC REQUAL INSP WITH P/F RESULTS 2 1, 2 11/13/2017 11/17/2017 IP 7111111B Licensed Operator Requalification Program 71124 - RADIATION SAFETY - REMP 1 1, 2 10/02/2017 10/06/2017 IP 71124.07 Radiological Environmental Monitoring Program This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.