March 2, 2016
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2015006 AND 05000318/2015006)
Dear Mr. Hanson:
On February 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Calvert Cliffs Nuclear Power Plant (Calvert Cliffs), Units 1 and 2.
The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015, through December 31, 2015.
This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Calvert Cliffs Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Calvert Cliffs Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Calvert Cliffs Unit 2 was in the Regulatory Response Column of the NRCs ROP Action Matrix until the end of first quarter 2015, due to a finding of low to moderate safety significance (White) in the Emergency Preparedness cornerstone as documented in a White Notice of Violation (NOV) and Assessment Follow-Up Letter (ML14297A5471) dated October 27, 2014. Calvert Cliffs Unit 2 transitioned to the Licensee Response Column at the beginning of second quarter 2015 after a supplemental inspection for the White finding was successfully completed, in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, on February 6, 2015, as documented in NRC Supplemental Inspection Report 05000318/2015008 and Assessment Follow-Up Letter (ML15070A127) dated March 10, 2015. Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
1 Designation in parentheses refers to an Agencywide Documents Access and Management System (ADAMS) Accession Number. Documents referenced in this letter are publicly available using the Accession Number in ADAMS. The enclosed inspection plan lists the inspections scheduled through December 31, 2017.
Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to baseline inspections, the NRC will perform Inspection Procedure 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, Inspection Procedure 71003, Post Approval Site Inspection For License Renewal, and Temporary Instruction 2515-191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range spent fuel pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for Calvert Cliffs Units 1 and 2, and the information gathered will aid staff in development of the Final Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above by performing Temporary Instruction 2515-191, Inspection of the Implementation of Mitigating Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communications/Staffing/Multi-Unit Dose Assessment Plans. As noted above, this inspection has been scheduled for Calvert Cliffs Units 1 and 2. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Anthony Dimitriadis at 610-337-6953 with any questions you have regarding this letter.
Sincerely,
/RA/
Michael L. Scott, Director Division of Reactor Projects
Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69
Enclosure:
Calvert Cliffs Inspection/Activity Plan
cc w/encl:
Distribution via ListServ
SUNSI Review
Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP
NAME ARosebroo/AAR ADimitriadis/AD MScott/MLS w/edits
DATE 2/18/16 2/18/16 2/22/16
Page 1 of 2 02/29/2016 07:46:19 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Calvert Cliffs Inspection / Activity Plan 01/01/2016 - 12/31/2017 EXM8/8
- CALVERT CLIFFS INITIAL EXAM
1 FY16-CC INITIAL OPERATOR LICENSING EXAM U01923 05/16/2016 05/20/2016
FY16-CC INITIAL OPERATOR LICENSING EXAM U01923 06/13/2016 06/24/2016 ISI
- U1 INSERVICE INSPECTION
1 IP Inservice Inspection Activities - PWR 7111108P 02/16/2016 02/19/2016
IP Inservice Inspection Activities - PWR 7111108P 02/29/2016 03/04/2016 BI
- RADIOLOGICAL SAFETY - HAZARDS O
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/22/2016 02/26/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 02/22/2016 02/26/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/22/2016 02/26/2016 BI
- RADIOLOGICAL SAFETY - AIRBORNE
1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/09/2016 05/13/2016 71003
- U2 LR COMMITMENT INSPECTION - PHASE 2
2 IP Post-Approval Site Inspection for License Renewal 71003 05/16/2016 05/20/2016 ISFSI
- ISFSI LOADING CAMPAIGN
1, 2 IP Operation Of An ISFSI 60855 08/15/2016 08/19/2016 1, 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 08/15/2016 08/19/2016 BI
- RADIOLOGICAL SAFETY - EXT EXPOSURE
1, 2 IP Occupational Dose Assessment 71124.04 08/22/2016 08/26/2016 TRI FI
- TRIENNIAL FIRE INSPECTION
1, 2 IP Fire Protection - NFPA 805 (Triennial)
7111105X 09/12/2016 09/16/2016 1, 2 IP Fire Protection - NFPA 805 (Triennial)
7111105X 09/26/2016 09/30/2016 EP
- EP PROGRAM INSPECTION
1, 2 IP Alert and Notification System Testing 7111402 09/12/2016 09/16/2016 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 09/12/2016 09/16/2016 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 09/12/2016 09/16/2016 BI
- RADIOLOGICAL SAFETY - ALARA
1, 2 IP Occupational ALARA Planning and Controls 71124.02 10/03/2016 10/07/2016 BI
- RADIOLOGICAL SAFETY - RAD HAZ & PIV
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/05/2016 12/09/2016 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 12/05/2016 12/09/2016 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 12/05/2016 12/09/2016 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 2 02/29/2016 07:46:19 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Calvert Cliffs Inspection / Activity Plan 01/01/2016 - 12/31/2017 71124
- RADIATION SAFETY - INSTRUMENTS
1, 2 IP Radiation Monitoring Instrumentation 71124.05 01/09/2017 01/13/2017 71124
- RADIATION SAFETY - RETS
1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 02/06/2017 02/10/2017 7111108P
- U2 INSERVICE INSPECTION
2 IP Inservice Inspection Activities - PWR 7111108P 02/21/2017 03/03/2017 TI-191
- FUKUSHIMA LESSONS-LEARNED
1, 2 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/191 04/17/2017 04/21/2017 71124
- RADIATION SAFETY - RAD HAZ PIV
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/27/2017 03/03/2017 1, 2 IP Occupational Exposure Control Effectiveness 71151-OR01 02/27/2017 03/03/2017 1, 2 IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 02/27/2017 03/03/2017 71124.08
- RADWASTE
1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/10/2017 04/14/2017 MODS
- PERMANENT PLANT MODIFICATIONS
1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 04/24/2017 04/28/2017 1, 2 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 7111117T 05/08/2017 05/12/2017 7111107T
- TRIENNIAL HEAT SINK
1, 2 IP Heat Sink Performance 7111107T 06/12/2017 06/16/2017 71152B
- PI&R BIENNIAL TEAM INSPECTION
1, 2 IP Problem Identification and Resolution 71152B 07/31/2017 08/04/2017 1, 2 IP Problem Identification and Resolution 71152B 08/14/2017 08/18/2017 EP
- EP EXERCISE EVALUATION
1, 2 IP Exercise Evaluation 7111401 09/11/2017 09/15/2017 1, 2 IP Performance Indicator Verification 71151 09/11/2017 09/15/2017 7111111B
- CC REQUAL INSP WITH P/F RESULTS
1, 2 IP Licensed Operator Requalification Program 7111111B 11/13/2017 11/17/2017 71124
- RADIATION SAFETY - REMP
1, 2 IP Radiological Environmental Monitoring Program 71124.07 10/02/2017 10/06/2017 This report does not include INPO and OUTAGE activities.