ML16190A425: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/05/2016
| issue date = 07/05/2016
| title = June 2016 - Sequoyah NRC Generic Fundamentals Examination Results Cover Letter
| title = June 2016 - Sequoyah NRC Generic Fundamentals Examination Results Cover Letter
| author name = Guthrie E F
| author name = Guthrie E
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Smith K
| addressee name = Smith K
Line 13: Line 13:
| page count = 3
| page count = 3
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 5, 2016 Tennessee Valley Authority ATTN: Mr. Koda Smith Training Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000
==SUBJECT:==
SEQUOYAH - NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS
==Dear Mr. Smith:==
On June 8, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A PASS in the RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while a FAIL indicates that the individual failed the examination.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter without its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
If you have any questions concerning this examination, please contact me at (404) 997-4662.
Sincerely,
                                                /RA by Gerald J. McCoy for/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79
==Enclosures:==
(See Page 2)
K. Smith                                      2
==Enclosures:==
: 1. Final Answer Key
: 2. Examination Results Summary
: 3. Individual Answer Sheets cc w/o encls.:
Tennessee Valley Authority ATTN: Mr. Christopher J. Schwarz Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 Tennessee Valley Authority ATTN: Mr. Preston Pratt Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000
K. Smith                                                  2
==Enclosures:==
: 1. Final Answer Key
: 2. Examination Results Summary
: 3. Individual Answer Sheets cc w/o encls.:
Tennessee Valley Authority ATTN: Mr. Christopher J. Schwarz Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 Tennessee Valley Authority ATTN: Mr. Preston Pratt Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 LETTER W/O ENCLS X PUBLICLY AVAILABLE      NON-PUBLICLY AVAILABLE      SENSITIVE      X NON-SENSITIVE ADAMS: X Yes    ACCESSION NUMBER: ML16190A425                            X SUNSI REVIEW COMPLETE OFFICE            RII:DRS        RII:DRS SIGNATURE          JHK            GJM/FOR NAME              JKIRBY          EGUTHRIE DATE                    6/30/16        7/5 /16 E-MAIL COPY?        YES        NO  YES        NO YES      NO  YES NO  YES      NO  YES    NO}}

Latest revision as of 17:56, 30 October 2019

June 2016 - Sequoyah NRC Generic Fundamentals Examination Results Cover Letter
ML16190A425
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/05/2016
From: Eugene Guthrie
Division of Reactor Safety II
To: Smith K
Tennessee Valley Authority
References
Download: ML16190A425 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 July 5, 2016 Tennessee Valley Authority ATTN: Mr. Koda Smith Training Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000

SUBJECT:

SEQUOYAH - NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS

Dear Mr. Smith:

On June 8, 2016, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A PASS in the RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while a FAIL indicates that the individual failed the examination.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter without its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

If you have any questions concerning this examination, please contact me at (404) 997-4662.

Sincerely,

/RA by Gerald J. McCoy for/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79

Enclosures:

(See Page 2)

K. Smith 2

Enclosures:

1. Final Answer Key
2. Examination Results Summary
3. Individual Answer Sheets cc w/o encls.:

Tennessee Valley Authority ATTN: Mr. Christopher J. Schwarz Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 Tennessee Valley Authority ATTN: Mr. Preston Pratt Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000

K. Smith 2

Enclosures:

1. Final Answer Key
2. Examination Results Summary
3. Individual Answer Sheets cc w/o encls.:

Tennessee Valley Authority ATTN: Mr. Christopher J. Schwarz Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 Tennessee Valley Authority ATTN: Mr. Preston Pratt Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 LETTER W/O ENCLS X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ML16190A425 X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS SIGNATURE JHK GJM/FOR NAME JKIRBY EGUTHRIE DATE 6/30/16 7/5 /16 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO