June 2009 Sequoyah Generic Fundamentals Examination Results
ML100390101
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/08/2010
From: Widmann M
NRC/RGN-II/DRS/OLB
To: Picchiotino B
Tennessee Valley Authority
References
Download: ML100390101 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 February 8, 2010 Tennessee Valley Authority ATTN: Mr. Brad Picchiotino Training Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000

SUBJECT:

SEQUOYAH - NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS

Dear Mr. Picchiotino:

On June 10, 2009, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A P in the RESULTS column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while an F indicates that the individual failed the examination.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter without its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

If you have any questions concerning this examination, please contact me at (404) 562-4550.

Sincerely,

/RA/

Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DRP-77, DPR-79

Enclosures:

(See Page 2)

B. Picchiotino 2

Enclosures:

1. Final Answer Key
2. Examination Results Summary
3. Individual Answer Sheets cc w/o encls.:

Tennessee Valley Authority ATTN: Mr. Chris Church Site Vice President Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000 Tennessee Valley Authority ATTN: Mr. Ken Langdon Plant Manager Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, TN 37384-2000

ML X SUNSI REVIEW COMPLETE OFFICE RII:DRS SIGNATURE MTW NAME MWIDMANN DATE 2/8/10 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO