ML16237A033: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 08/31/2016 | | issue date = 08/31/2016 | ||
| title = Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2016005) | | title = Mid-Cycle Assessment Letter for Callaway Plant (Report 05000483/2016005) | ||
| author name = Taylor N | | author name = Taylor N | ||
| author affiliation = NRC/RGN-IV/DRP/RPB-B | | author affiliation = NRC/RGN-IV/DRP/RPB-B | ||
| addressee name = Diya F | | addressee name = Diya F | ||
Line 9: | Line 9: | ||
| docket = 05000483 | | docket = 05000483 | ||
| license number = NPF-030 | | license number = NPF-030 | ||
| contact person = Taylor N | | contact person = Taylor N | ||
| document report number = IR 2016005 | | document report number = IR 2016005 | ||
| document type = Inspection Plan, Inspection Report, Letter | | document type = Inspection Plan, Inspection Report, Letter | ||
| page count = 6 | | page count = 6 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000483/2016005]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 August 31, 2016 Mr. Fadi Diya, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251 | {{#Wiki_filter:UNITED STATES | ||
Callaway Plant during the most recent quarter was within the Licensee Response Column of the | NUCLEAR REGULATORY COMMISSION | ||
will be sent via separate, non-publicly available correspondence. | REGION IV | ||
1600 E LAMAR BLVD | |||
ARLINGTON, TX 76011-4511 | |||
August 31, 2016 | |||
Mr. Fadi Diya, Senior Vice President | |||
and Chief Nuclear Officer | |||
Union Electric Company | |||
P.O. Box 620 | |||
Fulton, MO 65251 | |||
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT | |||
(REPORT 05000483/2016005) | |||
Dear Mr. Diya: | |||
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle | |||
performance review of Callaway Plant. The NRC reviewed the most recent quarterly | |||
performance indicators (PIs) in addition to inspection results and enforcement actions from | |||
July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your | |||
facility during this period and its plans for future inspections at your facility. | |||
The NRC determined that overall, Callaway Plant operated in a manner that preserved public | |||
health and safety and met all cornerstone objectives. The NRC determined the performance at | |||
Callaway Plant during the most recent quarter was within the Licensee Response Column of the | |||
NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very | |||
low (i.e., Green) safety significance, and all PIs indicated that your performance was within the | |||
nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline | |||
inspections at your facility. | |||
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine | |||
inspections performed by resident inspectors are not included in the inspection plan. The | |||
inspections listed during the second half of the inspection plan are tentative and may be revised | |||
at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the | |||
resolution of any scheduling conflicts and personnel availability issues. The NRC will contact | |||
you as soon as possible to discuss changes to the inspection plan should circumstances | |||
warrant any changes. This inspection plan does not include security related inspections, which | |||
will be sent via separate, non-publicly available correspondence. | |||
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order | |||
Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design- | |||
Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to | |||
Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts | |||
towards compliance with these Orders, and the information gathered will aid staff in | |||
development of the ultimate Safety Evaluation for the site. After the NRC staff receives the | |||
Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff | |||
F. Diya -2- | |||
Letter to Fadi Diya from Nicholas H. Taylor dated August 31, 2016 | will confirm through inspections the full implementation of the orders mentioned above by | ||
Deputy Regional Administrator (Scott.Morris@nrc.gov) | performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies | ||
and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness | |||
Communication/Staffing/Multi-Unit Dose Assessment Plans. | |||
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the | |||
Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the | |||
NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning | |||
in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue | |||
to conduct quarterly assessment meetings and communicate changes in the assessment of | |||
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, | |||
Operating Reactor Assessment Program. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs | |||
Rules of Practice, a copy of this letter will be available electronically for public inspection in the | |||
NRC Public Document Room or from the Publicly Available Records (PARS) component of | |||
NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is | |||
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public | |||
Electronic Reading Room). | |||
Please contact me at 817-200-1141 with any questions you have regarding this letter. | |||
Sincerely, | |||
/RA/ | |||
Nicholas H. Taylor, Chief | |||
Projects Branch B | |||
Division of Reactor Projects | |||
Docket No. 50-483 | |||
License No. NPF-30 | |||
Enclosure: | |||
Callaway Plant Inspection/Activity Plan | |||
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information CWY | |||
Page 1 of 2 Callaway | |||
08/30/2016 09:32:44 Inspection / Activity Plan | |||
Report 22 | |||
07/01/2016 - 06/30/2018 | |||
Unit Planned Dates No. of Staff | |||
Number Start End Inspection Activity Title on Site | |||
BASELINE - PLANT MODS 1 | |||
1 01/01/2016 12/31/2016 IP 7111101-Imminent Adverse Weather (Site/Imminent) | |||
EB1-07T - CWY HEAT SINK PERFORMANCE 1 | |||
1 09/26/2016 09/30/2016 IP 7111107T Heat Sink Performance | |||
RS 24 - RADIATION SAFETY 3 | |||
1 11/07/2016 11/11/2016 IP 71124.02 Occupational ALARA Planning and Controls | |||
1 11/07/2016 11/11/2016 IP 71124.04 Occupational Dose Assessment | |||
EP-1 - EP PERFORMANCE INDICATORS 1 | |||
1 11/14/2016 11/18/2016 IP 71151-EP01 Drill/Exercise Performance | |||
1 11/14/2016 11/18/2016 IP 71151-EP02 ERO Readiness | |||
1 11/14/2016 11/18/2016 IP 71151-EP03 Alert & Notification System Reliability | |||
EP-2 - BIENNIAL EP PROGRAM INSPECTION 1 | |||
1 11/14/2016 11/18/2016 IP 7111402 Alert and Notification System Testing | |||
1 11/14/2016 11/18/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System | |||
1 11/14/2016 11/18/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes | |||
1 11/14/2016 11/18/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies | |||
ISFSI - ROUTINE INSPECTION (ONE WEEK IN MONTH) 1 | |||
1 02/01/2017 02/28/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants | |||
EXAM - INIT EXAM 4 | |||
1 08/14/2017 08/18/2017 X02591 INITIAL EXAM CALLAWAY (09/2017) | |||
1 09/11/2017 09/15/2017 X02591 INITIAL EXAM CALLAWAY (09/2017) | |||
RS 5678 - RS TEAM 5 | |||
1 02/27/2017 03/03/2017 IP 71124.05 Radiation Monitoring Instrumentation | |||
1 02/27/2017 03/03/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment | |||
1 02/27/2017 03/03/2017 IP 71124.07 Radiological Environmental Monitoring Program | |||
1 02/27/2017 03/03/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation | |||
EP-2 - BIENNIAL EP EXERCISE INSPECTION 4 | |||
1 04/24/2017 04/28/2017 IP 7111401 Exercise Evaluation | |||
1 04/24/2017 04/28/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes | |||
EP-3 - EP PERFORMANCE INDICATOR VERIFICATION 1 | |||
1 04/24/2017 04/28/2017 IP 71151-EP01 Drill/Exercise Performance | |||
1 04/24/2017 04/28/2017 IP 71151-EP02 ERO Readiness | |||
1 04/24/2017 04/28/2017 IP 71151-EP03 Alert & Notification System Reliability | |||
This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. Enclosure | |||
Official Use Only - Sensitive Internal Information/Security-Related Information | |||
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information CWY | |||
Page 2 of 2 Callaway | |||
08/30/2016 09:32:44 Inspection / Activity Plan | |||
Report 22 | |||
07/01/2016 - 06/30/2018 | |||
Unit Planned Dates No. of Staff | |||
Number Start End Inspection Activity Title on Site | |||
BRQ - BIENNIAL REQUAL INSPECTION 3 | |||
1 06/12/2017 06/16/2017 IP 7111111B Licensed Operator Requalification Program | |||
EB1-21M - CWY COMPONENT DESIGN BASES INSPECTION 6 | |||
1 07/31/2017 09/01/2017 IP 7111121M Component Design Bases Inspection (Teams) | |||
RS 12 PI - RADIATION SAFETY 3 | |||
1 10/16/2017 10/20/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls | |||
1 10/16/2017 10/20/2017 IP 71124.02 Occupational ALARA Planning and Controls | |||
1 10/16/2017 10/20/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness | |||
1 10/16/2017 10/20/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences | |||
71111.08 - INSERVICE INSPECTION RFO22 1 | |||
1 10/16/2017 10/27/2017 IP 7111108P Inservice Inspection Activities - PWR | |||
EP-1 - EP PROGRAM INSPECTION 1 | |||
1 04/23/2018 04/27/2018 IP 7111402 Alert and Notification System Testing | |||
1 04/23/2018 04/27/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System | |||
1 04/23/2018 04/27/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes | |||
1 04/23/2018 04/27/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies | |||
1 04/23/2018 04/27/2018 IP 71151-EP01 Drill/Exercise Performance | |||
1 04/23/2018 04/27/2018 IP 71151-EP02 ERO Readiness | |||
1 04/23/2018 04/27/2018 IP 71151-EP03 Alert & Notification System Reliability | |||
This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. Enclosure | |||
Official Use Only - Sensitive Internal Information/Security-Related Information | |||
ML16237A033 | |||
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: | |||
By: Yes No Non-Publicly Available Sensitive NRC-002 | |||
OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B | |||
NAME DProulx AVegel TWPruett NTaylor | |||
SIGNATURE /RA/ /RA Jeff Clark for/ /RA/ /RA/ | |||
DATE 8/22/16 8/22/16 8/23/16 8/23/16 | |||
Letter to Fadi Diya from Nicholas H. Taylor dated August 31, 2016 | |||
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT | |||
(REPORT 05000483/2016005) | |||
DISTRIBUTION: | |||
Regional Administrator (Kriss.Kennedy@nrc.gov) | |||
Deputy Regional Administrator (Scott.Morris@nrc.gov) | |||
DRP Director (Troy.Pruett@nrc.gov) | |||
DRP Deputy Director (Ryan.Lantz@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (Thomas.Hartman@nrc.gov) | |||
Resident Inspector (Michael.Langelier@nrc.gov) | |||
Branch Chief, DRP/B (Nick.Taylor@nrc.gov) | |||
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) | |||
Project Engineer, DRP/B (Steven.Janicki@nrc.gov) | |||
Administrative Assistant (Dawn.Yancey@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Project Manager (John.Klos@nrc.gov) | |||
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | |||
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) | |||
RIV RSLO (Bill.Maier@nrc.gov) | |||
Director, DIRS, NRR (Chris.Miller@nrc.gov) | |||
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov) | |||
Director, DORL, NRR (Anne.Boland@nrc.gov) | |||
Deputy Director, DORL, NRR (George.Wilson@nrc.gov) | |||
Director, NSIR (Brian.Holian@nrc.gov) | |||
Director, DPR, NSIR (Marissa.Bailey@nrc.gov) | |||
DRP Branch Chiefs (R4DRPBC@nrc.gov) | |||
DRS Branch Chiefs (R4DRSBC@nrc.gov) | |||
ROPreports.Resource@nrc.gov | |||
ROPassessment.Resource@nrc.gov | |||
}} | }} |
Latest revision as of 15:50, 30 October 2019
ML16237A033 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 08/31/2016 |
From: | Nick Taylor NRC/RGN-IV/DRP/RPB-B |
To: | Diya F Union Electric Co |
Taylor N | |
References | |
IR 2016005 | |
Download: ML16237A033 (6) | |
See also: IR 05000483/2016005
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E LAMAR BLVD
ARLINGTON, TX 76011-4511
August 31, 2016
Mr. Fadi Diya, Senior Vice President
and Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, MO 65251
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT
(REPORT 05000483/2016005)
Dear Mr. Diya:
On August 9, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle
performance review of Callaway Plant. The NRC reviewed the most recent quarterly
performance indicators (PIs) in addition to inspection results and enforcement actions from
July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your
facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Callaway Plant operated in a manner that preserved public
health and safety and met all cornerstone objectives. The NRC determined the performance at
Callaway Plant during the most recent quarter was within the Licensee Response Column of the
NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very
low (i.e., Green) safety significance, and all PIs indicated that your performance was within the
nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline
inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine
inspections performed by resident inspectors are not included in the inspection plan. The
inspections listed during the second half of the inspection plan are tentative and may be revised
at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the
resolution of any scheduling conflicts and personnel availability issues. The NRC will contact
you as soon as possible to discuss changes to the inspection plan should circumstances
warrant any changes. This inspection plan does not include security related inspections, which
will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order
Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-
Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to
Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts
towards compliance with these Orders, and the information gathered will aid staff in
development of the ultimate Safety Evaluation for the site. After the NRC staff receives the
Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff
F. Diya -2-
will confirm through inspections the full implementation of the orders mentioned above by
performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies
and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness
Communication/Staffing/Multi-Unit Dose Assessment Plans.
In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the
Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the
NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning
in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue
to conduct quarterly assessment meetings and communicate changes in the assessment of
licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,
Operating Reactor Assessment Program.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
Rules of Practice, a copy of this letter will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records (PARS) component of
NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Please contact me at 817-200-1141 with any questions you have regarding this letter.
Sincerely,
/RA/
Nicholas H. Taylor, Chief
Projects Branch B
Division of Reactor Projects
Docket No. 50-483
License No. NPF-30
Enclosure:
Callaway Plant Inspection/Activity Plan
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information CWY
Page 1 of 2 Callaway
08/30/2016 09:32:44 Inspection / Activity Plan
Report 22
07/01/2016 - 06/30/2018
Unit Planned Dates No. of Staff
Number Start End Inspection Activity Title on Site
BASELINE - PLANT MODS 1
1 01/01/2016 12/31/2016 IP 7111101-Imminent Adverse Weather (Site/Imminent)
EB1-07T - CWY HEAT SINK PERFORMANCE 1
1 09/26/2016 09/30/2016 IP 7111107T Heat Sink Performance
RS 24 - RADIATION SAFETY 3
1 11/07/2016 11/11/2016 IP 71124.02 Occupational ALARA Planning and Controls
1 11/07/2016 11/11/2016 IP 71124.04 Occupational Dose Assessment
EP-1 - EP PERFORMANCE INDICATORS 1
1 11/14/2016 11/18/2016 IP 71151-EP01 Drill/Exercise Performance
1 11/14/2016 11/18/2016 IP 71151-EP02 ERO Readiness
1 11/14/2016 11/18/2016 IP 71151-EP03 Alert & Notification System Reliability
EP-2 - BIENNIAL EP PROGRAM INSPECTION 1
1 11/14/2016 11/18/2016 IP 7111402 Alert and Notification System Testing
1 11/14/2016 11/18/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System
1 11/14/2016 11/18/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes
1 11/14/2016 11/18/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies
ISFSI - ROUTINE INSPECTION (ONE WEEK IN MONTH) 1
1 02/01/2017 02/28/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
EXAM - INIT EXAM 4
1 08/14/2017 08/18/2017 X02591 INITIAL EXAM CALLAWAY (09/2017)
1 09/11/2017 09/15/2017 X02591 INITIAL EXAM CALLAWAY (09/2017)
RS 5678 - RS TEAM 5
1 02/27/2017 03/03/2017 IP 71124.05 Radiation Monitoring Instrumentation
1 02/27/2017 03/03/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment
1 02/27/2017 03/03/2017 IP 71124.07 Radiological Environmental Monitoring Program
1 02/27/2017 03/03/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation
EP-2 - BIENNIAL EP EXERCISE INSPECTION 4
1 04/24/2017 04/28/2017 IP 7111401 Exercise Evaluation
1 04/24/2017 04/28/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes
EP-3 - EP PERFORMANCE INDICATOR VERIFICATION 1
1 04/24/2017 04/28/2017 IP 71151-EP01 Drill/Exercise Performance
1 04/24/2017 04/28/2017 IP 71151-EP02 ERO Readiness
1 04/24/2017 04/28/2017 IP 71151-EP03 Alert & Notification System Reliability
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure
Official Use Only - Sensitive Internal Information/Security-Related Information
Attachment 2 - Proposed Inspection Plan Official Use Only - Sensitive Internal Information/Security-Related Information CWY
Page 2 of 2 Callaway
08/30/2016 09:32:44 Inspection / Activity Plan
Report 22
07/01/2016 - 06/30/2018
Unit Planned Dates No. of Staff
Number Start End Inspection Activity Title on Site
BRQ - BIENNIAL REQUAL INSPECTION 3
1 06/12/2017 06/16/2017 IP 7111111B Licensed Operator Requalification Program
EB1-21M - CWY COMPONENT DESIGN BASES INSPECTION 6
1 07/31/2017 09/01/2017 IP 7111121M Component Design Bases Inspection (Teams)
1 10/16/2017 10/20/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls
1 10/16/2017 10/20/2017 IP 71124.02 Occupational ALARA Planning and Controls
1 10/16/2017 10/20/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness
1 10/16/2017 10/20/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences
71111.08 - INSERVICE INSPECTION RFO22 1
1 10/16/2017 10/27/2017 IP 7111108P Inservice Inspection Activities - PWR
EP-1 - EP PROGRAM INSPECTION 1
1 04/23/2018 04/27/2018 IP 7111402 Alert and Notification System Testing
1 04/23/2018 04/27/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System
1 04/23/2018 04/27/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes
1 04/23/2018 04/27/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies
1 04/23/2018 04/27/2018 IP 71151-EP01 Drill/Exercise Performance
1 04/23/2018 04/27/2018 IP 71151-EP02 ERO Readiness
1 04/23/2018 04/27/2018 IP 71151-EP03 Alert & Notification System Reliability
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures. Enclosure
Official Use Only - Sensitive Internal Information/Security-Related Information
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: Yes No Non-Publicly Available Sensitive NRC-002
OFFICE: RIV SPE:DRP/B D: DRS D: DRP C: DRP/B
NAME DProulx AVegel TWPruett NTaylor
SIGNATURE /RA/ /RA Jeff Clark for/ /RA/ /RA/
DATE 8/22/16 8/22/16 8/23/16 8/23/16
Letter to Fadi Diya from Nicholas H. Taylor dated August 31, 2016
SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR CALLAWAY PLANT
(REPORT 05000483/2016005)
DISTRIBUTION:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hartman@nrc.gov)
Resident Inspector (Michael.Langelier@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Administrative Assistant (Dawn.Yancey@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (John.Klos@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
Director, DIRS, NRR (Chris.Miller@nrc.gov)
Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)
Director, DORL, NRR (Anne.Boland@nrc.gov)
Deputy Director, DORL, NRR (George.Wilson@nrc.gov)
Director, NSIR (Brian.Holian@nrc.gov)
Director, DPR, NSIR (Marissa.Bailey@nrc.gov)
DRP Branch Chiefs (R4DRPBC@nrc.gov)
DRS Branch Chiefs (R4DRSBC@nrc.gov)
ROPreports.Resource@nrc.gov
ROPassessment.Resource@nrc.gov