ML17298C179: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULAT%FORMATION DISTRIBUTIO EM (RIDS)ACCESSION NOR+8505300219 DOC~DATEo 85/05/24 NOTARIZED:
{{#Wiki_filter:REGULAT       %FORMATION DISTRIBUTIO             EM (RIDS)
YES.DOCKET FACILiSTN 50-528 Palo Verde Nuclear Station~Un)t li Arjzana Publi 05000528 STN-50 529 Palo Verde Nuclear Station~Unit 2i Arizona Publi 05000529 STN 50-530 Palo Verde Nuclear Station~Unit 3~Arizona Publi 05000530 AUTH~NAME AUTHOR AFFILIATION VAN BRUNTiE;ED Arizona Public Service Co~RECIP,NAME RECIPIENT AFFILIATION KNI GHTON g G~l'l~Licensing Branch 3  
ACCESSION NOR+8505300219             DOC   DATEo 85/05/24     NOTARIZED: YES           DOCKET
                                          ~
FACILiSTN 50-528 Palo Verde Nuclear Station~ Un)t               li STN-50 529 Palo Verde Nuclear Station~ Unit 2i Arizona Publi Arjzana Publi
                                                                                        .
05000528 05000529 STN 50-530 Palo Verde Nuclear Station~ Unit 3~ Arizona Publi                   05000530 AUTH ~ NAME             AUTHOR AFFILIATION VAN BRUNTiE;ED         Arizona Public Service     Co ~
RECIP,NAME               RECIPIENT AFFILIATION KNIGHTON g G ~ l'l ~       Licensing Branch 3


==SUBJECT:==
==SUBJECT:==
Forwards response to NRC 840522 questions on ponds.DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL TITLE: OR Submittal:
Forwards response to NRC 840522 questions             on plant" spray ponds.
General Distribution NOTES:Standardized plant~OL: 12/31/84 Standardized plant.Standardized plant.plant" spray S I ZE'i 05000528 05000529 05000530 RECIPIENT ID CODE/NAME NRR LB3 BC 01 INTERNAL;ACRS 09 ELD/HDS3 NRR/DL DIR NRR/DL/TSRG NRR/DSI/RAB RGN5 COPIES LTTR ENCL 7 7 6 6 1 0 1 1 1 1 1 1 RECIPIENT ID CODE/NAME ADM/LFMB NRR/DE/MTEB NRR/DL/ORAB ETB REG F ILE 04 COPIES LTTR.ENCL 1 0 1 1 1 0 1 1 1 1 EXTERNAL: EGLG BRUSKEiS NRC PDR 02 1 1 1 1 LPDR NSIC 03 05 1 1 1 1 TOTAL NUMBER OF COPIES REQUIRED'LTTR 27 ENCL 24 III~h I II 14 If Arizona Nuclear Power Project P.o.BOX 52034 4 PHOENIX, ARIZONA 85072-2034 Director of Nuclear Reactor Regulation Mr.George W.Knighton, Chief Licensing Branch No.3 Divisio'n of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555 ANPP-32730-EEVB/WFQ May 24, 1985
DISTRIBUTION CODE: A001D           COPIES RECEIVED:LTR         ENCL       S I ZE'i TITLE:   OR Submittal: General       Distribution NOTES:Standardized         plant ~                                                     05000528 OL: 12/31/84 Standardized plant.                                                             05000529 Standardized plant.                                                             05000530 RECIPIENT             COPIES            RECIPIENT            COPIES ID CODE/NAME          LTTR ENCL      ID CODE/NAME           LTTR. ENCL NRR     LB3 BC   01     7      7 INTERNAL; ACRS                 09     6      6    ADM/LFMB                  1      0 ELD/HDS3                   1      0    NRR/DE/MTEB                1      1 NRR/DL DIR                 1      1    NRR/DL/ORAB                1      0 NRR/DL/TSRG                1                         ETB          1     1 NRR/DSI/RAB                1      1    REG   F ILE       04       1     1 RGN5                      1 EXTERNAL: EGLG BRUSKEiS                1     1     LPDR              03      1     1 NRC     PDR       02     1     1     NSIC             05       1     1 TOTAL NUMBER OF COPIES         REQUIRED'   LTTR   27   ENCL     24
 
III ~ h I
II 14 If
 
Arizona Nuclear Power Project P.o. BOX 52034 4 PHOENIX, ARIZONA 85072-2034 Director of Nuclear Reactor Regulation                                 ANPP-32730-EEVB/WFQ Mr. George W. Knighton, Chief                                         May 24, 1985 Licensing Branch No. 3 Divisio'n of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Units 1, 2, and 3 Docket Nos.STN 50-528(License No.NPF-34)/529/530 Spray Pond Questions File: 85-004-419.06
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528(License No. NPF-34)/529/530 Spray Pond Questions File: 85-004-419.06
 
==Dear Mr. Knighton:==
 
Attached please find a copy of APS responses to NRC questions on the PVNGS spray ponds. These questions were provided in a telephone conversation with the NRC on May 22, 1984.
Very  truly ours, 8    E.
E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/WFQ/slh Attachment cc:  R. P. Zimmerman E. A. Licitra A. C. Gehr 8505300219 850M4 PDR    ADOCK 05000528 P                  PDRI
 
~ ~ 4I STATE OF ARIZONA            )
                                  )  SSe COUNTY OF MARICOPA)
I,      Edwin E. Van Brunt, Jr., represent that I am Executive Vice President,          Arizona Nuclear Power Project, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that              I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.
Edwin E. Van Brunt,  Jr.
Sworn  to before        me  thie~Adey      I of              1985.
t e r,
Notary  Pub ic My Commi'ssion        Expires:
My Camrrifs"ion Expires April 6, 1987
 
IE
    "
h 4
ty
 
ATTACHMENT Specific  NRR +estions    on the  PVNGS Spray Pond Pitting Problem (DG) heat exchangers      or the essential cooling water heat exchangers since the MIC was  discovered in the spray pond pipingt APS RESPONSE    No. Visual examinations have been performed on the spray pond water side of those heat exchangers in the past 2 years, and only minor repairs were required in those areas where the plasite (epoxy) lining had failed. These failures were due to either improper lining application/
curing, or normal local defects that develop in most coatings/linings used in water service. Such defects will continue to be experienced in the future, and will be repaired as routine maintenance items.          There is no evidence of established bacteria colonies of any species, and no evidence of MIC. Such evidence would have been observed          if it  had been present, even before the spray pond piping    pitting  was documented.
(HX), and what      is their resistance      to chloride induced stress    corrosion cracking  (SCC) and  pittingP APS RESPONSE    All    of the    DG Heat Exchangers use epoxy lined carbon    steel shells  and end caps, Admiralty tubes and 70-30 copper nickel tube sheets.
All of  these materials have excellent resistance      to both chloride pitting and stress corrosion cracking.
cooling water heat exchangers.
 
4 APS RESPONSE    Same as Number 2, except  that the tube sheets are 70-30 copper nickel cladding  on carbon steel.
on these heat exchangersP APS  RESPONSE    The    revised  water  chemistry  program  will  prevent  the establishment of all species of bacteria.        All previous corrosion has been minor and not related to bacteria.
Feedwater Piping (AFW) System since the discovery of the spray pond    pitting.
APS  RESPONSE    On March    22, 1985,  the  PVNGS  inservice  inspection  group supervisor  personnally examined portions of both AFW trains.            He is a certified Level  III  Examiner in Visual Examination. Two stainless steel spool pieces were removed (one in each train) and a total of ten stainless steel welds were examined. No evidence of MIC or other corrosion was observed.


==Dear Mr.Knighton:==
Attached please find a copy of APS responses to NRC questions on the PVNGS spray ponds.These questions were provided in a telephone conversation with the NRC on May 22, 1984.Very truly ours, 8 E.E.E.Van Brunt, Jr.Executive Vice President Project Director EEVB/WFQ/slh Attachment cc: R.P.Zimmerman E.A.Licitra A.C.Gehr 8505300219 850M4 PDR ADOCK 05000528 P PDRI
~~4I STATE OF ARIZONA))SSe COUNTY OF MARICOPA)I, Edwin E.Van Brunt, Jr., represent that I am Executive Vice President, Arizona Nuclear Power Project, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.Edwin E.Van Brunt, Jr.Sworn to before me thie~Adey of I 1985.t e r, My Commi'ssion Expires: My Camrrifs"ion Expires April 6, 1987 Notary Pub ic IE" h 4 ty ATTACHMENT Specific NRR+estions on the PVNGS Spray Pond Pitting Problem (DG)heat exchangers or the essential cooling water heat exchangers since the MIC was discovered in the spray pond pipingt APS RESPONSE-No.Visual examinations have been performed on the spray pond water side of those heat exchangers in the past 2 years, and only minor repairs were required in those areas where the plasite (epoxy)lining had failed.These failures were due to either improper lining application/
curing, or normal local defects that develop in most coatings/linings used in water service.Such defects will continue to be experienced in the future, and will be repaired as routine maintenance items.There is no evidence of established bacteria colonies of any species, and no evidence of MIC.Such evidence would have been observed if it had been present, even before the spray pond piping pitting was documented.(HX), and what is their resistance to chloride induced stress corrosion cracking (SCC)and pittingP APS RESPONSE-All of the DG Heat Exchangers use epoxy lined carbon steel shells and end caps, Admiralty tubes and 70-30 copper nickel tube sheets.All of these materials have excellent resistance to both chloride pitting and stress corrosion cracking.cooling water heat exchangers.
4 APS RESPONSE-Same as Number 2, except that the tube sheets are 70-30 copper nickel cladding on carbon steel.on these heat exchangersP APS RESPONSE-The revised water chemistry program will prevent the establishment of all species of bacteria.All previous corrosion has been minor and not related to bacteria.Feedwater Piping (AFW)System since the discovery of the spray pond pitting.APS RESPONSE-On March 22, 1985, the PVNGS inservice inspection group supervisor personnally examined portions of both AFW trains.He is a certified Level III Examiner in Visual Examination.
Two stainless steel spool pieces were removed (one in each train)and a total of ten stainless steel welds were examined.No evidence of MIC or other corrosion was observed.
w}}
w}}

Revision as of 11:53, 29 October 2019

Forwards Response to NRC 840522 Questions on Plant Spray Ponds
ML17298C179
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/24/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-32730-EEVB, TAC-57419, NUDOCS 8505300219
Download: ML17298C179 (9)


Text

REGULAT %FORMATION DISTRIBUTIO EM (RIDS)

ACCESSION NOR+8505300219 DOC DATEo 85/05/24 NOTARIZED: YES DOCKET

~

FACILiSTN 50-528 Palo Verde Nuclear Station~ Un)t li STN-50 529 Palo Verde Nuclear Station~ Unit 2i Arizona Publi Arjzana Publi

.

05000528 05000529 STN 50-530 Palo Verde Nuclear Station~ Unit 3~ Arizona Publi 05000530 AUTH ~ NAME AUTHOR AFFILIATION VAN BRUNTiE;ED Arizona Public Service Co ~

RECIP,NAME RECIPIENT AFFILIATION KNIGHTON g G ~ l'l ~ Licensing Branch 3

SUBJECT:

Forwards response to NRC 840522 questions on plant" spray ponds.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL S I ZE'i TITLE: OR Submittal: General Distribution NOTES:Standardized plant ~ 05000528 OL: 12/31/84 Standardized plant. 05000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR. ENCL NRR LB3 BC 01 7 7 INTERNAL; ACRS 09 6 6 ADM/LFMB 1 0 ELD/HDS3 1 0 NRR/DE/MTEB 1 1 NRR/DL DIR 1 1 NRR/DL/ORAB 1 0 NRR/DL/TSRG 1 ETB 1 1 NRR/DSI/RAB 1 1 REG F ILE 04 1 1 RGN5 1 EXTERNAL: EGLG BRUSKEiS 1 1 LPDR 03 1 1 NRC PDR 02 1 1 NSIC 05 1 1 TOTAL NUMBER OF COPIES REQUIRED' LTTR 27 ENCL 24

III ~ h I

II 14 If

Arizona Nuclear Power Project P.o. BOX 52034 4 PHOENIX, ARIZONA 85072-2034 Director of Nuclear Reactor Regulation ANPP-32730-EEVB/WFQ Mr. George W. Knighton, Chief May 24, 1985 Licensing Branch No. 3 Divisio'n of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528(License No. NPF-34)/529/530 Spray Pond Questions File: 85-004-419.06

Dear Mr. Knighton:

Attached please find a copy of APS responses to NRC questions on the PVNGS spray ponds. These questions were provided in a telephone conversation with the NRC on May 22, 1984.

Very truly ours, 8 E.

E. E. Van Brunt, Jr.

Executive Vice President Project Director EEVB/WFQ/slh Attachment cc: R. P. Zimmerman E. A. Licitra A. C. Gehr 8505300219 850M4 PDR ADOCK 05000528 P PDRI

~ ~ 4I STATE OF ARIZONA )

) SSe COUNTY OF MARICOPA)

I, Edwin E. Van Brunt, Jr., represent that I am Executive Vice President, Arizona Nuclear Power Project, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.

Edwin E. Van Brunt, Jr.

Sworn to before me thie~Adey I of 1985.

t e r,

Notary Pub ic My Commi'ssion Expires:

My Camrrifs"ion Expires April 6, 1987

IE

"

h 4

ty

ATTACHMENT Specific NRR +estions on the PVNGS Spray Pond Pitting Problem (DG) heat exchangers or the essential cooling water heat exchangers since the MIC was discovered in the spray pond pipingt APS RESPONSE No. Visual examinations have been performed on the spray pond water side of those heat exchangers in the past 2 years, and only minor repairs were required in those areas where the plasite (epoxy) lining had failed. These failures were due to either improper lining application/

curing, or normal local defects that develop in most coatings/linings used in water service. Such defects will continue to be experienced in the future, and will be repaired as routine maintenance items. There is no evidence of established bacteria colonies of any species, and no evidence of MIC. Such evidence would have been observed if it had been present, even before the spray pond piping pitting was documented.

(HX), and what is their resistance to chloride induced stress corrosion cracking (SCC) and pittingP APS RESPONSE All of the DG Heat Exchangers use epoxy lined carbon steel shells and end caps, Admiralty tubes and 70-30 copper nickel tube sheets.

All of these materials have excellent resistance to both chloride pitting and stress corrosion cracking.

cooling water heat exchangers.

4 APS RESPONSE Same as Number 2, except that the tube sheets are 70-30 copper nickel cladding on carbon steel.

on these heat exchangersP APS RESPONSE The revised water chemistry program will prevent the establishment of all species of bacteria. All previous corrosion has been minor and not related to bacteria.

Feedwater Piping (AFW) System since the discovery of the spray pond pitting.

APS RESPONSE On March 22, 1985, the PVNGS inservice inspection group supervisor personnally examined portions of both AFW trains. He is a certified Level III Examiner in Visual Examination. Two stainless steel spool pieces were removed (one in each train) and a total of ten stainless steel welds were examined. No evidence of MIC or other corrosion was observed.

w