{{#Wiki_filter:',gC CELE RATED DI QR1BUTI ON DE M ON ST3$TI ON SYSTEM C~r DOCKET N 05000250 05000251  
{{#Wiki_filter:',gC CELE RATED         DI QR1BUTI ON         DE M ON ST3$ TI ON     SYSTEM C~
r REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 8909280127          DOC. DATE: 89/09/21    NOTARIZED: NO          DOCKET N FACIAL:50-250 Turkey      Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME          AUTHOR AFFILIATXON GOLDBERG,J.H.        Florida Power & Light Co.
RECIP.NAME          RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)                R


==SUBJECT:==
==SUBJECT:==
Forwards Aug 1989 progress summary of select sys assessment.
Forwards Aug 1989 progress summary of select sys assessment.                   I DISTRIBUTION CODE: AOOID TITLE:    OR COPIES RECEIVED:LTR Submittal: General Distribution          g ENCL J     SIZE:
DISTRIBUTION CODE: AOOID COPIES RECEIVED:LTR g ENCL J SIZE: TITLE: OR Submittal:
NOTES:
General Distribution NOTES: REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR: 8909280127 DOC.DATE: 89/09/21 NOTARIZED:
RECIPIENT         COPIES          RECIPIENT         COPIES ID CODE/NAME        LTTR ENCL      ID CODE/NAME       LTTR ENCL PD2-2 LA               1      1    PD2-2 PD              1    1              h EDXSON,G               5    5 INTERNAL: NRR/DEST/ADS 7E           1    1    NRR/DEST/ESB 8D        1    1 NRR/DEST/I CS B        1     1     NRR/DEST/MTB 9H        1    1 NRR/DEST/RSB 8E        1    1    NRR/DOEA/TSB 11       1    1 NUDOCS-ABSTRACT        1    1    OC/LFMB               1   0 OGC/HDS2                1     0                            1   1 RES/DSIR/EIB            1     1 EXTERNAL: LPDR                      1     1     NRC PDR NSIC                    1     1 R
NO FACIAL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATXON GOLDBERG,J.H.
S h
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)R I RECIPIENT ID CODE/NAME PD2-2 LA EDXSON,G INTERNAL: NRR/DEST/ADS 7E NRR/DEST/I CS B NRR/DEST/RSB 8E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 5 5 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DEST/ESB 8D NRR/DEST/MTB 9H NRR/DOEA/TSB 11 OC/LFMB NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 h R S h NOIR IO ALL rRIDSr'ECXPIKÃIS PIZASE HELP US IO REDUCE RUTE!COARCT'IHE DOCUMENT CORAL DESK, RXM Pl-37 (EXT.20079)TO XZrXKQQZE%SR MNE HKN DLSX%GBVPXQM TOTAL NUMBER%%%0NlFRR55KMK SF'f ENCL 19 P.O.Box14000, Juno Beach, FL 33408-0420 SFPTEIHgfR 2 1 19SS L-89-339 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
NOIR IO ALL rRIDSr'ECXPIKÃIS PIZASE HELP US IO REDUCE RUTE! COARCT 'IHE DOCUMENT CORAL DESK, TOTAL NUMBER                            SF'f RXM Pl-37 (EXT. 20079) TO XZrXKQQZE %SR MNE HKN DLSX%GBVPXQM
Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Select S stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the August 1989 progress summary of the Select System Assessment.
                  %%%0NlFRR55KMK                     ENCL   19
Should there be any questions regarding this information, please contact us.J.H.Goldberg Executive Vice President JHG/TCG/gp Attachment cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant t 39 ADOCK 050002S0 230127 390921 PDR A R PDC an FPL Group company  
 
P.O. Box14000, Juno Beach, FL 33408-0420 SFPTEIHgfR   2 1 19SS L-89-339 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:
Re:   Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Select       S stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the August 1989 progress summary of the Select System Assessment.
Should there be any questions         regarding this information, please contact us.
J. H. Goldberg Executive Vice President JHG/TCG/gp Attachment cc:   Stewart D. Ebneter, Regional Administrator, Region II,                       USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 39   230127 390921 PDR   ADOCK 050002S0 A                 PDC R
an FPL Group company
 
~,
~,
SELECT SYSTEM REVIEW AUGUST 1989 STATUS ORIGINAL 15 SYSTEMS WALKDOWN AS BUILT RECORDS Breaker List (IS Mod 1265)-Scheduled to be completed January 1991 PAID's (IS Mod 1098)-Scheduled to be completed December 29, 1989 COMPREHENSIVE REVIEW BY SEG Unit 4 Closeout Report (IS Mod 8966)-Completed August 10, 1989.CONFIGURATION MANAGEMENT Unit 4 Drawing Follow Up (IS Mod 8968)-Scheduled completion October 9, 1989 (120 days following end of the recent Unit 4 Refueling Outage)MISCELLANEOUS ITEMS Unit 3 RHR 887 Valve Replacement (IS Mod 519)-Scheduled completion during the next Unit 3 Refueling Outage Unit 4 Outage Related Modifications RHR 887 Valve Replacement (IS Mod 565)-Scheduled completion deferred until the next Unit 4 Refueling Outage EDG Redundant.
SELECT SYSTEM REVIEW AUGUST 1989 STATUS ORIGINAL 15 SYSTEMS WALKDOWN AS   BUILT RECORDS Breaker   List (IS Mod 1265) Scheduled to be completed January 1991 PAID's (IS   Mod 1098) Scheduled   to be completed December 29, 1989 COMPREHENSIVE REVIEW BY SEG Unit 4 Closeout Report (IS   Mod 8966)   Completed August 10, 1989.
Set of Air Start Motors (IS Mod 576)Scheduled completion deferred to coincide with the Emergency Power System Upgrade Project Outage currently scheduled to begin in 1991 SELECT SYSTEM REVIEW AUGUST 1989 STATUS Page two ADDITIONAL SYSTEMS ARMS PRMS NCC WALKDOWNS P&ID's (IS Mod 1042)-Scheduled for completion during next, Unit 3 Refueling Outage P&ID Update Schedule to be determined following walkdowns COMPREHENSIVE REVIEW BY SEG Phase II Review scheduled for completion by October 15, 1989}}
CONFIGURATION MANAGEMENT Unit 4 Drawing Follow Up (IS Mod 8968) Scheduled completion October 9, 1989 (120 days following end of the recent Unit 4 Refueling Outage)
MISCELLANEOUS ITEMS Unit   3 RHR 887   Valve Replacement (IS Mod 519) Scheduled completion during the next Unit 3 Refueling Outage Unit 4 Outage Related   Modifications RHR   887   Valve Replacement (IS Mod 565)       Scheduled completion deferred until the next Unit         4 Refueling Outage EDG   Redundant. Set of Air Start   Motors (IS Mod 576)
Scheduled     completion deferred   to coincide with the Emergency Power System     Upgrade Project Outage currently scheduled to begin in 1991
 
SELECT SYSTEM REVIEW AUGUST 1989 STATUS Page two ADDITIONAL SYSTEMS   ARMS   PRMS NCC WALKDOWNS P & ID's (IS Mod 1042) Scheduled for completion during next, Unit 3 Refueling Outage P & ID Update Schedule to be determined following walkdowns COMPREHENSIVE REVIEW BY SEG Phase II Review   scheduled for completion by October 15, 1989}}

Latest revision as of 09:16, 22 October 2019

Forwards Aug 1989 Progress Summary of Select Sys Assessment. Unit 4 Closeout Rept (is Mod 8966) Completed 890810
ML17347B347
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/21/1989
From: Goldberg J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-339, NUDOCS 8909280127
Download: ML17347B347 (6)


Text

',gC CELE RATED DI QR1BUTI ON DE M ON ST3$ TI ON SYSTEM C~

r REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8909280127 DOC. DATE: 89/09/21 NOTARIZED: NO DOCKET N FACIAL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATXON GOLDBERG,J.H. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) R

SUBJECT:

Forwards Aug 1989 progress summary of select sys assessment. I DISTRIBUTION CODE: AOOID TITLE: OR COPIES RECEIVED:LTR Submittal: General Distribution g ENCL J SIZE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 1 PD2-2 PD 1 1 h EDXSON,G 5 5 INTERNAL: NRR/DEST/ADS 7E 1 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/I CS B 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/RSB 8E 1 1 NRR/DOEA/TSB 11 1 1 NUDOCS-ABSTRACT 1 1 OC/LFMB 1 0 OGC/HDS2 1 0 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LPDR 1 1 NRC PDR NSIC 1 1 R

S h

NOIR IO ALL rRIDSr'ECXPIKÃIS PIZASE HELP US IO REDUCE RUTE! COARCT 'IHE DOCUMENT CORAL DESK, TOTAL NUMBER SF'f RXM Pl-37 (EXT. 20079) TO XZrXKQQZE %SR MNE HKN DLSX%GBVPXQM

%%%0NlFRR55KMK ENCL 19

P.O. Box14000, Juno Beach, FL 33408-0420 SFPTEIHgfR 2 1 19SS L-89-339 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Select S stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the August 1989 progress summary of the Select System Assessment.

Should there be any questions regarding this information, please contact us.

J. H. Goldberg Executive Vice President JHG/TCG/gp Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 39 230127 390921 t PDR ADOCK 050002S0 A PDC R

an FPL Group company

~,

SELECT SYSTEM REVIEW AUGUST 1989 STATUS ORIGINAL 15 SYSTEMS WALKDOWN AS BUILT RECORDS Breaker List (IS Mod 1265) Scheduled to be completed January 1991 PAID's (IS Mod 1098) Scheduled to be completed December 29, 1989 COMPREHENSIVE REVIEW BY SEG Unit 4 Closeout Report (IS Mod 8966) Completed August 10, 1989.

CONFIGURATION MANAGEMENT Unit 4 Drawing Follow Up (IS Mod 8968) Scheduled completion October 9, 1989 (120 days following end of the recent Unit 4 Refueling Outage)

MISCELLANEOUS ITEMS Unit 3 RHR 887 Valve Replacement (IS Mod 519) Scheduled completion during the next Unit 3 Refueling Outage Unit 4 Outage Related Modifications RHR 887 Valve Replacement (IS Mod 565) Scheduled completion deferred until the next Unit 4 Refueling Outage EDG Redundant. Set of Air Start Motors (IS Mod 576)

Scheduled completion deferred to coincide with the Emergency Power System Upgrade Project Outage currently scheduled to begin in 1991

SELECT SYSTEM REVIEW AUGUST 1989 STATUS Page two ADDITIONAL SYSTEMS ARMS PRMS NCC WALKDOWNS P & ID's (IS Mod 1042) Scheduled for completion during next, Unit 3 Refueling Outage P & ID Update Schedule to be determined following walkdowns COMPREHENSIVE REVIEW BY SEG Phase II Review scheduled for completion by October 15, 1989